SCHEDULE 10 LAND OF WHICH ONLY TEMPORARY POSSESSION MAY BE TAKEN

Articles 25 and 26 (1) Plot number of land shown on Land Plan | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development | (4) Element of Work in respect of which land is not required to be reinstated 1-05 | Temporary use for access | Work No. 1 and Work No. 2 1-07, 1-09, 1-15, 1-21, 1-23, 1-24, 1-25, 1-27 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 1-07 – removal of pylon foundations only to a depth of 1.5m 1-09 – planting 1-21 – removal of pylon foundations only to a depth of 1.5m 1-15 – planting 2-03 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 2-11, 2-24, 2-35, 2-36, 2-38, 2-39, 2-42, 2-44 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 2-24 – planting 2-38 – planting 2-42 – planting 2-44 – planting 3-03, 3-07, 3-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 3-08 – planting 3-01, 3-02 | Temporary use for access | Work No. 1 and Work No. 2 3-11, 3-12, 3-51, 3-52, 3-53, 3-55, 3-57, 3-58, 3-60, 3-62, 3-63, 3-64, 3-67, 3-68, 3-69, 3-70, 3-71, 3-73, 3-74, 3-78, 3-80, 3-81, 3-82, 3-83, 3-87, 3-88, 3-96, 3-99, 3-106, 3-108, 3-109, 3-110, 3-111, 3-112, 3-113, 3-115 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No 1 and Work No. 2 | 3-11 – planting 3-12 – planting 3-51 – planting 3-53 – planting 3-55 – planting 3-57 – planting 3-62 – planting 3-63 – planting 3-64 – planting 3-68 – planting 3-73 – planting 3-74 – planting 3-82 – planting 3-83 – planting 4-01, 4-02 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 4-03, 4-04, 4-05 | Temporary use for access | Work No. 8 4-06 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 4-07 | Temporary use for access | Work No. 8 4-08, 4-09, 4-10, 4-11, 4-13 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 4-09 – removal of pylon foundations only to a depth of 1.5m 4-16 | Temporary use for access | Work No. 8 4-17, 4-18 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 4-24 | Temporary use for access | Work No. 8 4-25, 4-26, 4-27, 4-28 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 4-25 – removal of pylon foundations only to a depth of 1.5m 4-27 – removal of pylon foundations only to a depth of 1.5m 4-29 | Temporary use for access | Work No. 8 4-30, 4-31, 4-33, 4-34, 4-36, 4-37, 4-39, 4-40 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 4-31 – removal of pylon foundations only to a depth of 1.5m 4-40 – removal of pylon foundations only to a depth of 1.5m 5-01, 5-02 | Temporary use for access | Work No. 8 5-03, 5-04, 5-05, 5-06, 5-07 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 5-06 – removal of pylon foundations only to a depth of 1.5m 5-08, 5-09, 5-10, 5-11 | Temporary use for access | Work No. 8 5-12, 5-14, 5-15, 5-16, 5-19 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 5-15 – removal of pylon foundations only to a depth of 1.5m 5-20 | Temporary use for access | Work No. 8 6-06, 6-10, 6-21, 6-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 6-06 – planting 6-10 – planting 6-21 – planting 6-22, 6-23 | Temporary use for access | Work No. 1 and Work No. 2 6-25, | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 6-25 – planting 6-29, 6-30, 6-31, 6-32, 6-33, 6-35 | Temporary use for access | Work No. 1 and Work No. 2 6-41, 6-43 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 6-41 – planting 6-43 – planting 6-45, 6-46, 6-47, 6-50 | Temporary use for access | Work No. 1 and Work No. 2 7-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-01 – removal of pylon foundations only to a depth of 1.5m 7-02, 7-03, 7-04, 7-05, 7-06, 7-07, 7-08 | Temporary use for access | Work No. 8 7-09 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-09 – removal of pylon foundations only to a depth of 1.5m 7-10, 7-11 | Temporary use for access | Work No. 8 7-12, 7-13 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 7-14 | Temporary use for access | Work No. 8 7-15 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-15 – removal of pylon foundations only to a depth of 1.5m 7-16, 7-17 | Temporary use for access | Work No. 8 7-19, 7-20, 7-21, 7-22, 7-23, 7-24, 7-25, 7-27, 7-28, 7-29, 7-30, 7-31, 7-32, 7-33, 7-34, 7-35, 7-37, 7-38, 7-39, 7-40, 7-41, 7-43, 7-44, 7-45, 7-46, 7-47, 7-49, 7-50, | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-50 – removal of pylon foundations only to a depth of 1.5m 8-03, 8-04, 8-05 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 8-03 – planting 8-06, 8-07, 8-08, 8-09, 8-10, 8-11 | Temporary use for access | Work No. 8 8-12, 8-14, 8-15, 8-16, 8-18, 8-19, 8-23, 8-25, 8-29, 8-33, 8-34, 8-38, 8-39, 8-53, 8-55, 8-57, 8-58, 8-59, 8-60, 8-61, 8-62, 8-66, 8-73, 8-74, 8-88, 8-96, 8-100, 8-104, 8-113, 8-114, 8-118, 8-119, 8-120, 8-126, 8-128 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 and Work No. 8 | 8-12 – removal of pylon foundations only to a depth of 1.5m 8-15 – planting 8-53 – planting 8-57 – removal of pylon foundations only to a depth of 1.5m 8-66 – planting 8-74 – planting 8-100 – planting 8-118 – planting 9-09 | Temporary use for access | Work No. 2 and Work No. 8 9-11, 9-14 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 9-12, 9-15, 9-19, 9-21, 9-23, 9-27, 9-28 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 10-17 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 10-17 – planting 10-21 | Temporary use for access | Work No. 2 and Work No. 8 10-30 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 10-30 – planting 11-02 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 11-02 – planting 12-04, 12-10, 12-22 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 12-10 – planting 12-23, 12-25, 12-27, 12-50, 12-51 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 12-23 – removal of pylon foundations only to a depth of 1.5m 12-51 – removal of pylon foundations only to a depth of 1.5m 12-52, 12-54, 12-55 | Temporary use for access | Work No. 3 and Work No. 8 13-01 | Temporary use for access | Work No. 8 13-05 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 13-05 – removal of pylon foundations only to a depth of 1.5m 13-14 | Temporary use for access | Work No. 8 13-15 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 13-16, 13-17 | Temporary use for access | Work No. 3 and Work No. 8 13-18 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 13-18 – removal of pylon foundations only to a depth of 1.5m 13-19, 13-20, 13-24, 13-25, 13-26, 13-27, 13-28 | Temporary use for access | Work No. 3 and Work No. 8 13-29, 13-30 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 13-30 – removal of pylon foundations only to a depth of 1.5m 13-31, 13-32, 13-33 | Temporary use for access | Work No. 3 and Work No. 8 14-06, 14-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 14-06 – planting 14-17, 14-18, 14-20, 14-21, 14-22, 14-24, 14-27, 14-28, 14-30, 14-31, 14-32, 14-33, 14-34 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 14-24 – planting 14-31 – removal of pylon foundations only to a depth of 1.5m 14-35, 14-37 | Temporary use for access | Work No. 3 and Work No. 8 14-38, 14-39 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No.8 | 14-38 – removal of pylon foundations only to a depth of 1.5m 14-40, 14-41, 14-42, 14-43, 14-44, 14-45, | Temporary use for access | Work No. 3 and Work No. 8 15-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 15-10, 15-15, 15-17, 15-18 | Temporary use for access | Work No. 8 15-19 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 15-20, 15-22, 15-23 | Temporary use for access | Work No. 3 and Work No. 8 15-24 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 15-25 | Temporary use for access | Work No. 3 and Work No. 8 15-26 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-26 – removal of pylon foundations only to a depth of 1.5m 15-27 | Temporary use for access | Work No. 3 and Work No. 8 15-28 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-28 – removal of pylon foundations only to a depth of 1.5m 15-29 | Temporary use for access | Work No. 3 and Work No. 8 15-31, 15-32 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-31 – removal of pylon foundations only to a depth of 1.5m 15-33, 15-46, 15-47, 15-48, 15-49, 15-50, 15-51, 15-52, 15-53 | Temporary use for access | Work No. 3 and Work No. 8 15-54, 15-55 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-55 – removal of pylon foundations only to a depth of 1.5m 15-56, 15-57, 15-58, 15-63 | Temporary use for access | Work No. 3 and Work No. 8 15-66, 15-69, 15-85, 15-86 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3, Work No. 4 and Work No. 8 | 15-85 – planting 15-97, 15-99, 15-104, 15-110, 15-112, 15-114, | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 15-97 – planting 16-03, 16-10, 16-14, 16-20, 16-22, 16-35 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 16-51, 16-54 | Temporary use for access | Work No. 4 and Work No. 8 16-58 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 16-58 – removal of pylon foundations only to a depth of 1.5m 16-65 | Temporary use for access | Work No. 4 and Work 8 16-67, 16-69, 16-72, 16-73, 16-74, 16-84, 16-88 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 17-01 | Temporary use for access | Work No. 4 and Work No. 8 17-13, 17-29, 17-30, 17-34, 17-35, 17-37, 17-42, 17-67, 17-68, 17-69 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 17-34 – planting 17-35 – planting 17-37 – planting 17-42 – removal of pylon foundations only to a depth of 1.5m 17-68 – removal of pylon foundations only to a depth of 1.5m 17-70 | Temporary use for access | Work No. 4 and Work No. 8 17-104, 17-108, 17-109 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 17-109 – removal of pylon foundations only to a depth of 1.5m 17-109 – planting 19-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 19-08 – removal of pylon foundations only to a depth of 1.5m 19-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | 19-16 – removal of pylon foundations only to a depth of 1.5m 19-24, 19-25, 19-26 | Temporary use for access | Work No. 5 and Work No. 8 19-29, 19-30, 19-31, 19-32, 19-34, 19-36 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 20-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 20-06, 20-07 | Temporary use for access | Work No. 5 and Work No. 8 20-10 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 20-13, 20-14, 20-15, 20-16 | Temporary use for access | Work No. 5 and Work No. 8 20-46, 20-47, 20-48 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 20-53 | Temporary use for access | Work No. 5 and Work No. 8 20-57, 20-58 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | 20-58 – removal of pylon foundations only to a depth of 1.5m 21-01, 21-03, 21-04, 21-05, 21-06, 21-07, 21-09, 21-10, 21-11, 21-12, 21-13, 21-14 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | 21-04 – removal of pylon foundations only to a depth of 1.5m 21-09 – removal of pylon foundations only to a depth of 1.5m 21-15, 21-16, 21-17, 21-18, 21-19 | Temporary use for access | Work No. 8 21-20, 21-21 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 21-21 – removal of pylon foundations only to a depth of 1.5m 21-22 | Temporary use for access | Work No. 8 21-23 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 21-24 | Temporary use for access | Work No. 8 21-25 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 21-25 – removal of pylon foundations only to a depth of 1.5m 21-26, 21-27, 21-28, 21-29, 21-30, 21-31, 21-32 | Temporary use for access | Work No. 7 and Work No. 8 21-33, 21-34, 21-35 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 21-36 | Temporary use for access | Work No. 7 and Work No. 8 21-37, 21-38 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 | 21-38 – removal of pylon foundations only to a depth of 1.5m 21-39, 21-40 | Temporary use for access | Work No. 7 and Work No. 8 21-41, 21-42, 21-44, 21-47, 21-49, 21-50, 21-51, 21-52, 21-55, 21-56, 21-57, 21-58, 21-59, 21-61 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 21-62, 21-63, 21-64, 21-65 | Temporary use for access | Work No. 7 and Work No. 8 21-66, 21-67, 21-68, 21-69, 21-70, 21-71 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 | 21-68 – removal of pylon foundations only to a depth of 1.5m 21-71 – removal of pylon foundations only to a depth of 1.5m 21-72 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 21-73 | Temporary use for access | Work No. 10 22-01 | Temporary use for access | Work No. 10 22-02 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 22-03, 22-04, 22-05, 22-06, 22-07, 22-08, 22-09, 22-10, 22-11, 22-12 | Temporary use for access | Work No 10 22-13 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 22-14, 22-15, 22-16, 22-17, 22-18, 22-19 | Temporary use for access | Work No. 10 22-20 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 22-21 | Temporary use for access | Work No. 10 22-22, 23-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 23-02, 23-03 | Temporary use for access | Work No. 10 23-04 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 9 and Work No. 10 and Work No. 11 23-06, 23-07, 23-08, 23-09, 23-10 | Temporary use for access | Work No. 10 23-11, 23-16, 23-15, 23-18, 23-21, 23-22, 23-25 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 9, Work No. 10 and Work No. 11 23-26, 23-27 | Temporary use for access | Work No. 9, Work No. 10 and Work No. 11 23-33, 23-37, 23-45, 23-47, 23-49, 23-55 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 9 and Work No. 10 and Work No. 11 23-50, 23-51, 23-53, 23-54, 23-56 | Temporary use for access | Work No. 9 and Work No. 10 and Work No. 11 23-57 | Temporary use for access | Work No. 9 and Work No. 10 and Work No. 11 23-58, 23-59, 23-60 | Temporary use for access | Work No. 9 and Work No. 10 and Work No. 11 24-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No 10 24-02, 24-03, 24-04 | Temporary use for access | Work No 10 24-05, 24-06, 24-07 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No 10 24-08 | Temporary use for access | Work No. 10 24-09 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 24-10, 24-11, 24-12, 24-13, 24-14, 24-15 | Temporary use for access | Work No. 10 24-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 24-17 | Temporary use for access | Work No. 10 24-18 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 24-19, 24-20 | Temporary use for access | Work No. 10 24-21 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 24-22, 24-23 | Temporary use for access | Work No. 10 24-24 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 24-25, 24-26, 24-27, 24-28 | Temporary use for access | Work No. 10 25-02, 25-03, 25-04, 25-05, 25-06, 25-07, 25-09, 25-10, 25-11, 25-12 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 25-13 | Temporary use for access | Work No. 11 26-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 26-02, 26-03 | Temporary use for access | Work No. 11 26-04 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 26-05, 26-06, 26-07 | Temporary use for access | Work No. 11 26-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 26-09 | Temporary use for access | Work No. 11 26-10 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 26-11, 26-12, 26-13, 26-14, 26-15 | Temporary use for access | Work No. 11 26-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 27-09, 27-30, 27-31, 27-33, 27-36, 27-38, 27-46, 27-47, 27-48, 27-56 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 7 27-49, 27-52 | Temporary use for access | Work No. 5 and Work No. 7 28-01, 28-02, 28-18, 28-19, 28-22, 28-23, 28-24, 28-25, 28-27, 28-28, 28-29, 28-33, 28-37, 28-44, 28-58 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5, Work No. 6 and Work No. 7

Your change, as a redline

SCHEDULE 10 LAND OF WHICH ONLY TEMPORARY POSSESSION MAY BE TAKEN

Articles 25 and 26 (1) Plot number of land shown on Land Plan | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development | (4) Element of Work in respect of which land is not required to be reinstated 1-05 | Temporary use for access | Work No. 1 and Work No. 2 1-07, 1-09, 1-15, 1-21, 1-23, 1-24, 1-25, 1-27 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 1-07 – removal of pylon foundations only to a depth of 1.5m 1-09 – planting 1-21 – removal of pylon foundations only to a depth of 1.5m 1-15 – planting 2-03 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 2-11, 2-24, 2-35, 2-36, 2-38, 2-39, 2-42, 2-44 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 2-24 – planting 2-38 – planting 2-42 – planting 2-44 – planting 3-03, 3-07, 3-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 3-08 – planting 3-01, 3-02 | Temporary use for access | Work No. 1 and Work No. 2 3-11, 3-12, 3-51, 3-52, 3-53, 3-55, 3-57, 3-58, 3-60, 3-62, 3-63, 3-64, 3-67, 3-68, 3-69, 3-70, 3-71, 3-73, 3-74, 3-78, 3-80, 3-81, 3-82, 3-83, 3-87, 3-88, 3-96, 3-99, 3-106, 3-108, 3-109, 3-110, 3-111, 3-112, 3-113, 3-115 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No 1 and Work No. 2 | 3-11 – planting 3-12 – planting 3-51 – planting 3-53 – planting 3-55 – planting 3-57 – planting 3-62 – planting 3-63 – planting 3-64 – planting 3-68 – planting 3-73 – planting 3-74 – planting 3-82 – planting 3-83 – planting 4-01, 4-02 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 4-03, 4-04, 4-05 | Temporary use for access | Work No. 8 4-06 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 4-07 | Temporary use for access | Work No. 8 4-08, 4-09, 4-10, 4-11, 4-13 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 4-09 – removal of pylon foundations only to a depth of 1.5m 4-16 | Temporary use for access | Work No. 8 4-17, 4-18 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 4-24 | Temporary use for access | Work No. 8 4-25, 4-26, 4-27, 4-28 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 4-25 – removal of pylon foundations only to a depth of 1.5m 4-27 – removal of pylon foundations only to a depth of 1.5m 4-29 | Temporary use for access | Work No. 8 4-30, 4-31, 4-33, 4-34, 4-36, 4-37, 4-39, 4-40 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 4-31 – removal of pylon foundations only to a depth of 1.5m 4-40 – removal of pylon foundations only to a depth of 1.5m 5-01, 5-02 | Temporary use for access | Work No. 8 5-03, 5-04, 5-05, 5-06, 5-07 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 5-06 – removal of pylon foundations only to a depth of 1.5m 5-08, 5-09, 5-10, 5-11 | Temporary use for access | Work No. 8 5-12, 5-14, 5-15, 5-16, 5-19 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 5-15 – removal of pylon foundations only to a depth of 1.5m 5-20 | Temporary use for access | Work No. 8 6-06, 6-10, 6-21, 6-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 6-06 – planting 6-10 – planting 6-21 – planting 6-22, 6-23 | Temporary use for access | Work No. 1 and Work No. 2 6-25, | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 6-25 – planting 6-29, 6-30, 6-31, 6-32, 6-33, 6-35 | Temporary use for access | Work No. 1 and Work No. 2 6-41, 6-43 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 | 6-41 – planting 6-43 – planting 6-45, 6-46, 6-47, 6-50 | Temporary use for access | Work No. 1 and Work No. 2 7-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-01 – removal of pylon foundations only to a depth of 1.5m 7-02, 7-03, 7-04, 7-05, 7-06, 7-07, 7-08 | Temporary use for access | Work No. 8 7-09 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-09 – removal of pylon foundations only to a depth of 1.5m 7-10, 7-11 | Temporary use for access | Work No. 8 7-12, 7-13 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 7-14 | Temporary use for access | Work No. 8 7-15 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-15 – removal of pylon foundations only to a depth of 1.5m 7-16, 7-17 | Temporary use for access | Work No. 8 7-19, 7-20, 7-21, 7-22, 7-23, 7-24, 7-25, 7-27, 7-28, 7-29, 7-30, 7-31, 7-32, 7-33, 7-34, 7-35, 7-37, 7-38, 7-39, 7-40, 7-41, 7-43, 7-44, 7-45, 7-46, 7-47, 7-49, 7-50, | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 7-50 – removal of pylon foundations only to a depth of 1.5m 8-03, 8-04, 8-05 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 8-03 – planting 8-06, 8-07, 8-08, 8-09, 8-10, 8-11 | Temporary use for access | Work No. 8 8-12, 8-14, 8-15, 8-16, 8-18, 8-19, 8-23, 8-25, 8-29, 8-33, 8-34, 8-38, 8-39, 8-53, 8-55, 8-57, 8-58, 8-59, 8-60, 8-61, 8-62, 8-66, 8-73, 8-74, 8-88, 8-96, 8-100, 8-104, 8-113, 8-114, 8-118, 8-119, 8-120, 8-126, 8-128 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 1 and Work No. 2 and Work No. 8 | 8-12 – removal of pylon foundations only to a depth of 1.5m 8-15 – planting 8-53 – planting 8-57 – removal of pylon foundations only to a depth of 1.5m 8-66 – planting 8-74 – planting 8-100 – planting 8-118 – planting 9-09 | Temporary use for access | Work No. 2 and Work No. 8 9-11, 9-14 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 9-12, 9-15, 9-19, 9-21, 9-23, 9-27, 9-28 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 10-17 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 10-17 – planting 10-21 | Temporary use for access | Work No. 2 and Work No. 8 10-30 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 10-30 – planting 11-02 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 11-02 – planting 12-04, 12-10, 12-22 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 2 and Work No. 8 | 12-10 – planting 12-23, 12-25, 12-27, 12-50, 12-51 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 12-23 – removal of pylon foundations only to a depth of 1.5m 12-51 – removal of pylon foundations only to a depth of 1.5m 12-52, 12-54, 12-55 | Temporary use for access | Work No. 3 and Work No. 8 13-01 | Temporary use for access | Work No. 8 13-05 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 13-05 – removal of pylon foundations only to a depth of 1.5m 13-14 | Temporary use for access | Work No. 8 13-15 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 13-16, 13-17 | Temporary use for access | Work No. 3 and Work No. 8 13-18 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 13-18 – removal of pylon foundations only to a depth of 1.5m 13-19, 13-20, 13-24, 13-25, 13-26, 13-27, 13-28 | Temporary use for access | Work No. 3 and Work No. 8 13-29, 13-30 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 13-30 – removal of pylon foundations only to a depth of 1.5m 13-31, 13-32, 13-33 | Temporary use for access | Work No. 3 and Work No. 8 14-06, 14-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 14-06 – planting 14-17, 14-18, 14-20, 14-21, 14-22, 14-24, 14-27, 14-28, 14-30, 14-31, 14-32, 14-33, 14-34 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 14-24 – planting 14-31 – removal of pylon foundations only to a depth of 1.5m 14-35, 14-37 | Temporary use for access | Work No. 3 and Work No. 8 14-38, 14-39 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No.8 | 14-38 – removal of pylon foundations only to a depth of 1.5m 14-40, 14-41, 14-42, 14-43, 14-44, 14-45, | Temporary use for access | Work No. 3 and Work No. 8 15-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 15-10, 15-15, 15-17, 15-18 | Temporary use for access | Work No. 8 15-19 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 15-20, 15-22, 15-23 | Temporary use for access | Work No. 3 and Work No. 8 15-24 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 15-25 | Temporary use for access | Work No. 3 and Work No. 8 15-26 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-26 – removal of pylon foundations only to a depth of 1.5m 15-27 | Temporary use for access | Work No. 3 and Work No. 8 15-28 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-28 – removal of pylon foundations only to a depth of 1.5m 15-29 | Temporary use for access | Work No. 3 and Work No. 8 15-31, 15-32 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-31 – removal of pylon foundations only to a depth of 1.5m 15-33, 15-46, 15-47, 15-48, 15-49, 15-50, 15-51, 15-52, 15-53 | Temporary use for access | Work No. 3 and Work No. 8 15-54, 15-55 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3 and Work No. 8 | 15-55 – removal of pylon foundations only to a depth of 1.5m 15-56, 15-57, 15-58, 15-63 | Temporary use for access | Work No. 3 and Work No. 8 15-66, 15-69, 15-85, 15-86 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 3, Work No. 4 and Work No. 8 | 15-85 – planting 15-97, 15-99, 15-104, 15-110, 15-112, 15-114, | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 15-97 – planting 16-03, 16-10, 16-14, 16-20, 16-22, 16-35 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 16-51, 16-54 | Temporary use for access | Work No. 4 and Work No. 8 16-58 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 16-58 – removal of pylon foundations only to a depth of 1.5m 16-65 | Temporary use for access | Work No. 4 and Work 8 16-67, 16-69, 16-72, 16-73, 16-74, 16-84, 16-88 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 17-01 | Temporary use for access | Work No. 4 and Work No. 8 17-13, 17-29, 17-30, 17-34, 17-35, 17-37, 17-42, 17-67, 17-68, 17-69 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 17-34 – planting 17-35 – planting 17-37 – planting 17-42 – removal of pylon foundations only to a depth of 1.5m 17-68 – removal of pylon foundations only to a depth of 1.5m 17-70 | Temporary use for access | Work No. 4 and Work No. 8 17-104, 17-108, 17-109 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 17-109 – removal of pylon foundations only to a depth of 1.5m 17-109 – planting 19-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 4 and Work No. 8 | 19-08 – removal of pylon foundations only to a depth of 1.5m 19-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | 19-16 – removal of pylon foundations only to a depth of 1.5m 19-24, 19-25, 19-26 | Temporary use for access | Work No. 5 and Work No. 8 19-29, 19-30, 19-31, 19-32, 19-34, 19-36 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 20-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 20-06, 20-07 | Temporary use for access | Work No. 5 and Work No. 8 20-10 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 20-13, 20-14, 20-15, 20-16 | Temporary use for access | Work No. 5 and Work No. 8 20-46, 20-47, 20-48 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 20-53 | Temporary use for access | Work No. 5 and Work No. 8 20-57, 20-58 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | 20-58 – removal of pylon foundations only to a depth of 1.5m 21-01, 21-03, 21-04, 21-05, 21-06, 21-07, 21-09, 21-10, 21-11, 21-12, 21-13, 21-14 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 8 | 21-04 – removal of pylon foundations only to a depth of 1.5m 21-09 – removal of pylon foundations only to a depth of 1.5m 21-15, 21-16, 21-17, 21-18, 21-19 | Temporary use for access | Work No. 8 21-20, 21-21 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 21-21 – removal of pylon foundations only to a depth of 1.5m 21-22 | Temporary use for access | Work No. 8 21-23 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 21-24 | Temporary use for access | Work No. 8 21-25 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 8 | 21-25 – removal of pylon foundations only to a depth of 1.5m 21-26, 21-27, 21-28, 21-29, 21-30, 21-31, 21-32 | Temporary use for access | Work No. 7 and Work No. 8 21-33, 21-34, 21-35 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 21-36 | Temporary use for access | Work No. 7 and Work No. 8 21-37, 21-38 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 | 21-38 – removal of pylon foundations only to a depth of 1.5m 21-39, 21-40 | Temporary use for access | Work No. 7 and Work No. 8 21-41, 21-42, 21-44, 21-47, 21-49, 21-50, 21-51, 21-52, 21-55, 21-56, 21-57, 21-58, 21-59, 21-61 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 21-62, 21-63, 21-64, 21-65 | Temporary use for access | Work No. 7 and Work No. 8 21-66, 21-67, 21-68, 21-69, 21-70, 21-71 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 7 and Work No. 8 | 21-68 – removal of pylon foundations only to a depth of 1.5m 21-71 – removal of pylon foundations only to a depth of 1.5m 21-72 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 21-73 | Temporary use for access | Work No. 10 22-01 | Temporary use for access | Work No. 10 22-02 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 22-03, 22-04, 22-05, 22-06, 22-07, 22-08, 22-09, 22-10, 22-11, 22-12 | Temporary use for access | Work No 10 22-13 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 22-14, 22-15, 22-16, 22-17, 22-18, 22-19 | Temporary use for access | Work No. 10 22-20 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 22-21 | Temporary use for access | Work No. 10 22-22, 23-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 23-02, 23-03 | Temporary use for access | Work No. 10 23-04 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 9 and Work No. 10 and Work No. 11 23-06, 23-07, 23-08, 23-09, 23-10 | Temporary use for access | Work No. 10 23-11, 23-16, 23-15, 23-18, 23-21, 23-22, 23-25 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 9, Work No. 10 and Work No. 11 23-26, 23-27 | Temporary use for access | Work No. 9, Work No. 10 and Work No. 11 23-33, 23-37, 23-45, 23-47, 23-49, 23-55 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 9 and Work No. 10 and Work No. 11 23-50, 23-51, 23-53, 23-54, 23-56 | Temporary use for access | Work No. 9 and Work No. 10 and Work No. 11 23-57 | Temporary use for access | Work No. 9 and Work No. 10 and Work No. 11 23-58, 23-59, 23-60 | Temporary use for access | Work No. 9 and Work No. 10 and Work No. 11 24-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No 10 24-02, 24-03, 24-04 | Temporary use for access | Work No 10 24-05, 24-06, 24-07 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No 10 24-08 | Temporary use for access | Work No. 10 24-09 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 24-10, 24-11, 24-12, 24-13, 24-14, 24-15 | Temporary use for access | Work No. 10 24-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 24-17 | Temporary use for access | Work No. 10 24-18 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 24-19, 24-20 | Temporary use for access | Work No. 10 24-21 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 24-22, 24-23 | Temporary use for access | Work No. 10 24-24 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 10 24-25, 24-26, 24-27, 24-28 | Temporary use for access | Work No. 10 25-02, 25-03, 25-04, 25-05, 25-06, 25-07, 25-09, 25-10, 25-11, 25-12 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 25-13 | Temporary use for access | Work No. 11 26-01 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 26-02, 26-03 | Temporary use for access | Work No. 11 26-04 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 26-05, 26-06, 26-07 | Temporary use for access | Work No. 11 26-08 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 26-09 | Temporary use for access | Work No. 11 26-10 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 26-11, 26-12, 26-13, 26-14, 26-15 | Temporary use for access | Work No. 11 26-16 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 11 27-09, 27-30, 27-31, 27-33, 27-36, 27-38, 27-46, 27-47, 27-48, 27-56 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5 and Work No. 7 27-49, 27-52 | Temporary use for access | Work No. 5 and Work No. 7 28-01, 28-02, 28-18, 28-19, 28-22, 28-23, 28-24, 28-25, 28-27, 28-28, 28-29, 28-33, 28-37, 28-44, 28-58 | Temporary use for construction, mitigation, maintenance, and dismantling of redundant infrastructure | Work No. 5, Work No. 6 and Work No. 7

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.