The North Killingholme (Generating Station) Order 2014
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
3 Development consent etc. granted by the Order
(1) Subject to the provisions of this Order, the undertaker is granted development consent for the authorised development to be carried out within the Order limits, and Schedule 1 (authorised development) has effect for that purpose. (2) For the purposes of the authorised development, development consent granted by this Order shall include and permit the alteration, removal, clearance, refurbishment, reconstruction, decommissioning and demolition of any buildings or other structures within the Order limits to the extent that they relate to, are required by, or are incidental to the carrying out of the authorised development. (3) The development authorised by this Order shall be constructed in the lines or situations shown on the land plans and works plans. (4) The scheduled works shall be constructed within the limits of deviation. (5) In constructing the scheduled works, the undertaker may— (a) deviate laterally from the lines or situations shown on the works plans within the limits of deviation; and (b) deviate vertically to any extent downwards and (except in the case of maintaining) no more than 5 metres upwards from the heights specified in Part 2 of Schedule 1 for each building comprised in the authorised development and shown on the works plans as may be necessary, convenient or expedient. (6) The main stack comprised in Work No. 1 and shown on the works plans shall not be constructed so as to be lower than 85 metres above ordnance datum and the flare stack comprised in Work No. 2b shall not be constructed so as to be lower than 140 metres above ordnance datum. (7) The pipe conveyor comprised in Work No. 6b shall not be constructed above 21 metres above ordnance datum except in the locations shown on drawing 2.28 Conveyor Section in the works plans.
3 Development consent etc. granted by the Order
(1) Subject to the provisions of this Order, the undertaker is granted development consent for the authorised development to be carried out within the Order limits, and Schedule 1 (authorised development) has effect for that purpose. (2) For the purposes of the authorised development, development consent granted by this Order shall include and permit the alteration, removal, clearance, refurbishment, reconstruction, decommissioning and demolition of any buildings or other structures within the Order limits to the extent that they relate to, are required by, or are incidental to the carrying out of the authorised development. (3) The development authorised by this Order shall be constructed in the lines or situations shown on the land plans and works plans. (4) The scheduled works shall be constructed within the limits of deviation. (5) In constructing the scheduled works, the undertaker may— (a) deviate laterally from the lines or situations shown on the works plans within the limits of deviation; and (b) deviate vertically to any extent downwards and (except in the case of maintaining) no more than 5 metres upwards from the heights specified in Part 2 of Schedule 1 for each building comprised in the authorised development and shown on the works plans as may be necessary, convenient or expedient. (6) The main stack comprised in Work No. 1 and shown on the works plans shall not be constructed so as to be lower than 85 metres above ordnance datum and the flare stack comprised in Work No. 2b shall not be constructed so as to be lower than 140 metres above ordnance datum. (7) The pipe conveyor comprised in Work No. 6b shall not be constructed above 21 metres above ordnance datum except in the locations shown on drawing 2.28 Conveyor Section in the works plans.
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.