Propose a change

The Plugs and Sockets etc. (Safety) Regulations 1994 and Electricity Safety, Quality and Continuity Regulations 2002 (Amendment) Regulations 2026

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

3 Amendment of the Electricity Safety, Quality and Continuity Regulations 2002

(1) The Electricity Safety, Quality and Continuity Regulations 2002 are amended as follows. (2) In regulation 1(5), at the appropriate place insert— “plug-in microgenerator” means a source of energy which— generates electricity from the direct conversion of sunlight into electricity; has a maximum rated alternating current output not exceeding 800 watts; is intended for connection to a low voltage consumer’s installation by means of a standard plug and socket; is designed to operate in parallel with a distributor’s network; and is not designed to import electrical energy from a low voltage consumer’s installation for the purpose of storing energy for later supply, other than for control or auxiliary functions permitted by the Plug-in Solar Device Interim Product Specification; “Plug-in Solar Device Interim Product Specification” means the Plug-in Solar Device Interim Product Specification, version 2, published by the Secretary of State on 16 July 2026; . (3) In regulation 22(1), for sub-paragraph (c) substitute— (c) where the source of energy— (i) is part of a low voltage consumer’s installation, complies with British Standard Requirements; or (ii) is a plug-in microgenerator, complies with the Plug-in Solar Device Interim Product Specification; and .

Your change, as a redline

3 Amendment of the Electricity Safety, Quality and Continuity Regulations 2002

(1) The Electricity Safety, Quality and Continuity Regulations 2002 are amended as follows. (2) In regulation 1(5), at the appropriate place insert— “plug-in microgenerator” means a source of energy which— generates electricity from the direct conversion of sunlight into electricity; has a maximum rated alternating current output not exceeding 800 watts; is intended for connection to a low voltage consumer’s installation by means of a standard plug and socket; is designed to operate in parallel with a distributor’s network; and is not designed to import electrical energy from a low voltage consumer’s installation for the purpose of storing energy for later supply, other than for control or auxiliary functions permitted by the Plug-in Solar Device Interim Product Specification; “Plug-in Solar Device Interim Product Specification” means the Plug-in Solar Device Interim Product Specification, version 2, published by the Secretary of State on 16 July 2026; . (3) In regulation 22(1), for sub-paragraph (c) substitute— (c) where the source of energy— (i) is part of a low voltage consumer’s installation, complies with British Standard Requirements; or (ii) is a plug-in microgenerator, complies with the Plug-in Solar Device Interim Product Specification; and .

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds