Propose a change

The M3 Junction 9 Development Consent Order 2024

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

8 Limits of deviation

In carrying out the authorised development the undertaker may— (a) Subject to paragraphs (b), (c) and (d), deviate laterally from the lines or situations of the authorised development shown on the works plans to the extent of the limits of deviation shown on those plans; (b) in respect of Work Nos. 1(i), 1(l), 1(k), 3(b), 8, 9(c), 9(d), 11, 30, 33, 42, between points A and B, C and D, G and H and I and L only, as shown on the works plans, deviate laterally from the lines or situations of the authorised development shown on the works plans to a maximum of 2.0 metres; (c) in respect of Work Nos. 1(j) and 1(m) as shown on the works plans, deviate laterally from the lines or situations of the authorised development shown on the works plans to a maximum of 5.0 metres; (d) deviate vertically from the levels of the authorised development shown on the engineering and structural drawings and sections— (i) to a maximum of 1 metre upwards or downwards in respect of the construction of the gyratory northern overbridge (Work No. 27), gyratory southern overbridge (Work No. 28), A34 southbound underpass (Work No. 13), A33 underpass (Work No. 14), attenuation basin (Work Nos. 1(j) and 1(m)), M3 southern bridge portal gantry (Work No. 36) and bridleway (Work No. 9); (ii) to a maximum of 0.75 metres upwards or downwards in respect of the construction of the retaining walls (Work Nos. 2(d), 12(a), 12(c), 31(a), 32(c), 32(d)), subways (Work Nos. 2(e), 24(a), 24(d), 33(a)), A34 footway/cycleway overbridge (work number 4) and gyratory (Work No. 29); (iii) in respect of any other work comprised in the authorised development, to a maximum of 0.5 metres upwards or downwards, except that those maximum limits of deviation do not apply where it is demonstrated by the undertaker to the Secretary of State’s satisfaction and the Secretary of State, following consultation with the relevant planning authority and the local highway authority, certifies accordingly, that a deviation in excess of those limits would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.

Your change, as a redline

8 Limits of deviation

In carrying out the authorised development the undertaker may— (a) Subject to paragraphs (b), (c) and (d), deviate laterally from the lines or situations of the authorised development shown on the works plans to the extent of the limits of deviation shown on those plans; (b) in respect of Work Nos. 1(i), 1(l), 1(k), 3(b), 8, 9(c), 9(d), 11, 30, 33, 42, between points A and B, C and D, G and H and I and L only, as shown on the works plans, deviate laterally from the lines or situations of the authorised development shown on the works plans to a maximum of 2.0 metres; (c) in respect of Work Nos. 1(j) and 1(m) as shown on the works plans, deviate laterally from the lines or situations of the authorised development shown on the works plans to a maximum of 5.0 metres; (d) deviate vertically from the levels of the authorised development shown on the engineering and structural drawings and sections— (i) to a maximum of 1 metre upwards or downwards in respect of the construction of the gyratory northern overbridge (Work No. 27), gyratory southern overbridge (Work No. 28), A34 southbound underpass (Work No. 13), A33 underpass (Work No. 14), attenuation basin (Work Nos. 1(j) and 1(m)), M3 southern bridge portal gantry (Work No. 36) and bridleway (Work No. 9); (ii) to a maximum of 0.75 metres upwards or downwards in respect of the construction of the retaining walls (Work Nos. 2(d), 12(a), 12(c), 31(a), 32(c), 32(d)), subways (Work Nos. 2(e), 24(a), 24(d), 33(a)), A34 footway/cycleway overbridge (work number 4) and gyratory (Work No. 29); (iii) in respect of any other work comprised in the authorised development, to a maximum of 0.5 metres upwards or downwards, except that those maximum limits of deviation do not apply where it is demonstrated by the undertaker to the Secretary of State’s satisfaction and the Secretary of State, following consultation with the relevant planning authority and the local highway authority, certifies accordingly, that a deviation in excess of those limits would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds