Propose a change

The M3 Junction 9 Development Consent Order 2024

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 7 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Article 34 (1) Plot Reference Number shown on land plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development Land Plans – Sheet 4 4/1a | Land required temporarily for temporary traffic management purposes. | Ancillary works 4/1b | Required to facilitate and provide a working space and temporary access for works associated with the diversion of power cables. | Work No. 35 4/1c | Required to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk and Easton Lane. | Work No. 9 4/1d | Land required temporarily for temporary traffic management purposes. | Ancillary works 4/2a | Required to facilitate and provide a working space and temporary access for works associated with the diversion of 50 metres in length of power cables. | Work No. 35 4/2b | Required to facilitate and provide a working space and temporary access for works associated with the diversion of power cables. | Work No. 35 4/2c | Land required temporarily for temporary traffic management purposes. | Ancillary works Land Plans – Sheet 5 5/5a | Requirement to facilitate and provide a working space and temporary access for works associated with the construction of a drainage outfall into the River Itchen. | Work No. 43 5/2d | Land required temporarily for temporary traffic management purposes. | Ancillary Works 5/2e | Required to facilitate and provide a working space and temporary access for works associated with: 1. the improvement and construction of the realignment of the northbound and southbound carriageways of the A33 between B3047 (London Road) / A33 junction and proposed A33 / M3 northbound onslip roundabout; 1(g). the construction of the extension of the existing central reserve with associated vehicle restraint system; 1(h). the construction of carriageway realignment on the existing River Itchen bridge (including possible remediation works); 3. the construction improvements and realignment of the southbound carriageway of the A34; 42. the construction of a drainage outfall into the River Itchen. | Work No. 1, 1(g), 1(h), 3, 42 5/3c | Required temporarily to facilitate construction generally and to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk to Easton Lane. | Work No. 9 5/4 | Required temporarily to facilitate construction of surface water drainage outfall. | Work No. 42 Land Plans – Sheet 6 6/1f | Required to facilitate and provide a working space and temporary access for works associated with: 9. the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk and Easton Lane; 9(a). the construction of an attenuation basin maintenance track; 20. the diversion of a low-pressure gas main pipeline; 26. the diversion of telecommunication equipment; 33. the realignment of the National Cycle Route 23 and associated earthworks and landscaping. | Work No. 9, 9(a), 20, 26, 33 6/1g | Required to construct a temporary construction site compound. | Work No. 38 6/4d | Required to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk to Easton Lane. | Work No. 9 6/6a | Required to facilitate and provide a working space and temporary access for works associated with the diversion of a low-pressure gas main pipeline. | Work No. 20 6/6b | Required to facilitate and provide a working space and temporary access for works associated with: 20. the diversion of a low-pressure gas main pipeline; 38: the construction of a temporary construction site compound situated on land to the east of the M3 Junction 9 gyratory. | Work Nos. 20, 38 Land Plans – Sheet 7 7/1a | Required to facilitate and provide a working space and temporary access for works associated with the construction of a temporary construction site compound situated on land to the east of the M3 Junction 9 gyratory. | Work No. 38 7/2c | Land required temporarily for temporary traffic management purposes. | Ancillary works 7/4g | Land required temporarily for temporary traffic management purposes. | Ancillary works 7/5 | Land required temporarily for temporary traffic management purposes. | Ancillary works 7/6 | Land required temporarily for temporary traffic management purposes | Ancillary works

Your change, as a redline

SCHEDULE 7 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Article 34 (1) Plot Reference Number shown on land plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development Land Plans – Sheet 4 4/1a | Land required temporarily for temporary traffic management purposes. | Ancillary works 4/1b | Required to facilitate and provide a working space and temporary access for works associated with the diversion of power cables. | Work No. 35 4/1c | Required to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk and Easton Lane. | Work No. 9 4/1d | Land required temporarily for temporary traffic management purposes. | Ancillary works 4/2a | Required to facilitate and provide a working space and temporary access for works associated with the diversion of 50 metres in length of power cables. | Work No. 35 4/2b | Required to facilitate and provide a working space and temporary access for works associated with the diversion of power cables. | Work No. 35 4/2c | Land required temporarily for temporary traffic management purposes. | Ancillary works Land Plans – Sheet 5 5/5a | Requirement to facilitate and provide a working space and temporary access for works associated with the construction of a drainage outfall into the River Itchen. | Work No. 43 5/2d | Land required temporarily for temporary traffic management purposes. | Ancillary Works 5/2e | Required to facilitate and provide a working space and temporary access for works associated with: 1. the improvement and construction of the realignment of the northbound and southbound carriageways of the A33 between B3047 (London Road) / A33 junction and proposed A33 / M3 northbound onslip roundabout; 1(g). the construction of the extension of the existing central reserve with associated vehicle restraint system; 1(h). the construction of carriageway realignment on the existing River Itchen bridge (including possible remediation works); 3. the construction improvements and realignment of the southbound carriageway of the A34; 42. the construction of a drainage outfall into the River Itchen. | Work No. 1, 1(g), 1(h), 3, 42 5/3c | Required temporarily to facilitate construction generally and to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk to Easton Lane. | Work No. 9 5/4 | Required temporarily to facilitate construction of surface water drainage outfall. | Work No. 42 Land Plans – Sheet 6 6/1f | Required to facilitate and provide a working space and temporary access for works associated with: 9. the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk and Easton Lane; 9(a). the construction of an attenuation basin maintenance track; 20. the diversion of a low-pressure gas main pipeline; 26. the diversion of telecommunication equipment; 33. the realignment of the National Cycle Route 23 and associated earthworks and landscaping. | Work No. 9, 9(a), 20, 26, 33 6/1g | Required to construct a temporary construction site compound. | Work No. 38 6/4d | Required to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk to Easton Lane. | Work No. 9 6/6a | Required to facilitate and provide a working space and temporary access for works associated with the diversion of a low-pressure gas main pipeline. | Work No. 20 6/6b | Required to facilitate and provide a working space and temporary access for works associated with: 20. the diversion of a low-pressure gas main pipeline; 38: the construction of a temporary construction site compound situated on land to the east of the M3 Junction 9 gyratory. | Work Nos. 20, 38 Land Plans – Sheet 7 7/1a | Required to facilitate and provide a working space and temporary access for works associated with the construction of a temporary construction site compound situated on land to the east of the M3 Junction 9 gyratory. | Work No. 38 7/2c | Land required temporarily for temporary traffic management purposes. | Ancillary works 7/4g | Land required temporarily for temporary traffic management purposes. | Ancillary works 7/5 | Land required temporarily for temporary traffic management purposes. | Ancillary works 7/6 | Land required temporarily for temporary traffic management purposes | Ancillary works

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds