The Five Estuaries Offshore Wind Farm Order 2025

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 6 Land of which temporary possession may be taken

Article 30 In the District of Tendring— (1) Number of plot shown on land plans (onshore) | (2) Purpose for which temporary possession may be taken | (3) Relevant part of authorised development 01-001, 01-002 | Temporary use for access to facilitate construction of the authorised development | Work Nos. 2A, 3, 4, 4B, 5, 5A, 6, 6A and 17 01-003 | Temporary use as a construction compound (Work No 4B) and construction working area to facilitate construction of the authorised development | Work Nos. 2A, 3, 4, 4B, 5, 5A, 6, 6A and 17 01-004, 01-005, 01-006 | Temporary use for access to facilitate construction of the authorised development | Work Nos. 2A, 3, 4, 4B, 5, 5A, 6, 6A and 17 03-002 | Temporary use as a construction compound (Work No 6B) and construction working area to facilitate construction of the authorised development | Work Nos. 5, 5A, 6, 6A, 6B, 7, 7A, 7C, 7D, 7E, 8, 8A and 17 03-004, 03-004A, 03-006 | Temporary use for access to facilitate construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 5, 5A, 6, 6A, 6B, 7, 7A, 7C, 7D, 7E, 8, 8A and 17 03-008, 03-009, 03-010 | Temporary use for access to facilitate construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 5, 5A, 6, 6A, 7, 7A,7B, 7C, 7D, 7E, 8, 8A and 17 03-012 | Temporary use as a construction compound (Work No 7B) and construction working area to facilitate construction of the authorised development | Work Nos. 5, 5A, 6, 6A, 7, 7A,7B, 7C, 7D, 7E, 8, 8A and 17 04-005, 04-006 | Temporary use as a haul route (Work No. 7C) and construction working area to facilitate construction of the authorised development | Work Nos. 6, 6A, 7, 7A,7B, 7C, 7D, 7E, 8, 8A and 17 04-008, 04-009, 04-010, 04-011, 04-012, 04-013 | Temporary use as a haul route (Work No. 7D) and construction working area to facilitate construction of the authorised development | Work Nos. 6, 6A, 7, 7A,7B, 7C, 7D, 7E, 8, 8A and 17 05-007, 05-008, 05-010, 05-011 | Temporary use as a haul route (Work No. 7E) and construction working area to facilitate construction of the authorised development | Work Nos. 6, 6A, 7, 7A,7B, 7C, 7D, 7E, 8, 8A and 17 05-021, 05-022, 05-023 | Temporary use as a haul route (Work No. 8C) and construction working area to facilitate construction of the authorised development | Work Nos. 7, 7A, 8, 8A, 8B and 17 06-002 | Temporary use for access to facilitate construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A and 17 06-005, 06-007 | Temporary use as a construction compound (Work No. 8B) and construction working area to facilitate construction of the authorised development | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A and 17 06-008, 06-009 | Temporary use for access to facilitate construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9, 10, 10A and 17 07-002, 07-003, 07-005, 07-006 | Temporary use as a haul route (Work No. 9C) and construction working area to facilitate construction of the authorised development | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B and 17 07-009, 07-010 | Temporary use as a haul route (Work No. 9D) and construction working area to facilitate construction of the authorised development | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B and 17 07-012, 08-003, 08-004, 08-005, 08-007 | Temporary use as a haul route (Work No. 9E) and construction working area to facilitate construction of the authorised development, including improvement and temporary maintenance of visibility splays | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B and 17 08-001 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B and 17 08-024, 08-025 | Temporary use as a haul route (Work No. 9F) and construction working area to facilitate construction of the authorised development | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B and 17 09-002, 09-004 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B, 10C and 17 09-003, 09-005 | Temporary use as a construction compound (Work No. 9B) and construction working area to facilitate construction of the authorised development | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B, 10C and 17 09-015, 09-016, 09-018, 09-019 | Temporary use as a construction compound (Work No. 10B) and construction working area to facilitate construction of the authorised development | Work Nos. 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B, 10C, 11 11A and 17 10-004, 10-005, 10-006, 10-007 | Temporary use as a haul route (Work No. 10C) and construction working area to facilitate construction of the authorised development | Work Nos. 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B, 10C, 11 11A and 17 11-013 | Temporary use as a haul route (Work No. 11C) and construction working area to facilitate construction of the authorised development | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 11-014 | Temporary use as a haul route (Work No. 11D) and construction working area to facilitate construction of the authorised development | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 11-015, 11-016 | Temporary use as a haul route (Work No. 11C) and construction working area to facilitate construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 11-017 | Temporary use as a haul route (Work No. 11D) and construction working area to facilitate construction of the authorised development | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 12-001 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 12-002 | Temporary use as a haul route (Work No. 11D) and construction working area to facilitate construction of the authorised development | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 12-003 | Temporary use as a haul route (Work No. 11C) and construction working area to facilitate construction of the authorised development | Work Nos.10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 12-006, 12-007 | Temporary use as a construction compound (Work No. 11B), construction working area, and haul route to facilitate construction of the authorised development | All onshore works 12-008, 12-009, 12-010, 12-011 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 13-009 | Temporary use as a construction compound (Work No. 12B) and construction working area, and haul route to facilitate construction of the authorised development | Work Nos. 11 11A, 11B, 11C, 11D, 12, 12A, 13, 13A, 14, 14A, 15, 16 and 17 13-010, 13-012, 13-013, 13-014, 13-015, 13-016, | Temporary use as a construction compound (Work No. 12C), construction working area, and haul route to facilitate construction of the authorised development, including improvement and temporary maintenance of visibility splays | Work Nos. 11 11A, 11B, 11C, 11D, 12, 12A, 13, 13A, 14, 14A, 15, 16 and 17 13-017 | Temporary use as a construction compound (Work No. 14B) and construction working area, and haul route to facilitate construction of the authorised development, | Work Nos. 12, 12A, 13, 13A, 14, 14A, 14B, 14C, 14D, 15, 16 and 17 14-006 | Creation use and restoration of a public non-motorised user path | Work Nos. 12, 12A, 13, 13A, 14, 14A, 14B, 14C, 14D, 15, 16 and 17 14-014, 14-015 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 12, 12A, 13, 13A, 14, 14A, 14B, 14C, 14D, 15, 16 and 17 14-018, 14-019, 14-021, 14-022, 14-023, 14-024 | Creation, use and restoration of a public non-motorised user path | Work Nos. 12, 12A, 13, 13A, 14, 14A, 14B, 14C, 14D, 15, 16 and 17 14-035, 14-036 | Temporary use as a construction compound (Work No. 14C) and construction working area, and haul route to facilitate construction of the authorised development | Work Nos. 13 and 13A 15-012, 15-015, 15-016, 15-017, 15-018, 15-019, 15-020, 15-021, 15-022 | Creation, use and restoration of a public non-motorised user path | Work Nos. 14, 14A, 14B, 14C, 14D and 17 16-017 | Temporary use as a construction compound and construction working area to facilitate construction of the authorised development, including improvement and temporary maintenance of visibility splays. Creation, use and restoration of a public non-motorised user path | Work Nos. 14, 14A, 14B, 14C, 14D, 15, 15A, 15B, 15C, 15D, 15E, 16 and 17 17-003 | Temporary use for the purposes of carrying out Work Nos. 13 and 13A | Work Nos. 14, 14A, 14B, 14C, 14D, 15, 15A, 15B, 15C, 15D, 15E, 16 and 17 17-012, 17-013, 17-014 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 2A, 3, 4, 4B, 5, 5A, 6, 6a and 17

Your change, as a redline

SCHEDULE 6 Land of which temporary possession may be taken

Article 30 In the District of Tendring— (1) Number of plot shown on land plans (onshore) | (2) Purpose for which temporary possession may be taken | (3) Relevant part of authorised development 01-001, 01-002 | Temporary use for access to facilitate construction of the authorised development | Work Nos. 2A, 3, 4, 4B, 5, 5A, 6, 6A and 17 01-003 | Temporary use as a construction compound (Work No 4B) and construction working area to facilitate construction of the authorised development | Work Nos. 2A, 3, 4, 4B, 5, 5A, 6, 6A and 17 01-004, 01-005, 01-006 | Temporary use for access to facilitate construction of the authorised development | Work Nos. 2A, 3, 4, 4B, 5, 5A, 6, 6A and 17 03-002 | Temporary use as a construction compound (Work No 6B) and construction working area to facilitate construction of the authorised development | Work Nos. 5, 5A, 6, 6A, 6B, 7, 7A, 7C, 7D, 7E, 8, 8A and 17 03-004, 03-004A, 03-006 | Temporary use for access to facilitate construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 5, 5A, 6, 6A, 6B, 7, 7A, 7C, 7D, 7E, 8, 8A and 17 03-008, 03-009, 03-010 | Temporary use for access to facilitate construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 5, 5A, 6, 6A, 7, 7A,7B, 7C, 7D, 7E, 8, 8A and 17 03-012 | Temporary use as a construction compound (Work No 7B) and construction working area to facilitate construction of the authorised development | Work Nos. 5, 5A, 6, 6A, 7, 7A,7B, 7C, 7D, 7E, 8, 8A and 17 04-005, 04-006 | Temporary use as a haul route (Work No. 7C) and construction working area to facilitate construction of the authorised development | Work Nos. 6, 6A, 7, 7A,7B, 7C, 7D, 7E, 8, 8A and 17 04-008, 04-009, 04-010, 04-011, 04-012, 04-013 | Temporary use as a haul route (Work No. 7D) and construction working area to facilitate construction of the authorised development | Work Nos. 6, 6A, 7, 7A,7B, 7C, 7D, 7E, 8, 8A and 17 05-007, 05-008, 05-010, 05-011 | Temporary use as a haul route (Work No. 7E) and construction working area to facilitate construction of the authorised development | Work Nos. 6, 6A, 7, 7A,7B, 7C, 7D, 7E, 8, 8A and 17 05-021, 05-022, 05-023 | Temporary use as a haul route (Work No. 8C) and construction working area to facilitate construction of the authorised development | Work Nos. 7, 7A, 8, 8A, 8B and 17 06-002 | Temporary use for access to facilitate construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A and 17 06-005, 06-007 | Temporary use as a construction compound (Work No. 8B) and construction working area to facilitate construction of the authorised development | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A and 17 06-008, 06-009 | Temporary use for access to facilitate construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9, 10, 10A and 17 07-002, 07-003, 07-005, 07-006 | Temporary use as a haul route (Work No. 9C) and construction working area to facilitate construction of the authorised development | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B and 17 07-009, 07-010 | Temporary use as a haul route (Work No. 9D) and construction working area to facilitate construction of the authorised development | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B and 17 07-012, 08-003, 08-004, 08-005, 08-007 | Temporary use as a haul route (Work No. 9E) and construction working area to facilitate construction of the authorised development, including improvement and temporary maintenance of visibility splays | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B and 17 08-001 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B and 17 08-024, 08-025 | Temporary use as a haul route (Work No. 9F) and construction working area to facilitate construction of the authorised development | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B and 17 09-002, 09-004 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B, 10C and 17 09-003, 09-005 | Temporary use as a construction compound (Work No. 9B) and construction working area to facilitate construction of the authorised development | Work Nos. 8, 8A, 8B, 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B, 10C and 17 09-015, 09-016, 09-018, 09-019 | Temporary use as a construction compound (Work No. 10B) and construction working area to facilitate construction of the authorised development | Work Nos. 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B, 10C, 11 11A and 17 10-004, 10-005, 10-006, 10-007 | Temporary use as a haul route (Work No. 10C) and construction working area to facilitate construction of the authorised development | Work Nos. 9, 9A, 9B, 9C, 9D, 9E, 9F, 10, 10A, 10B, 10C, 11 11A and 17 11-013 | Temporary use as a haul route (Work No. 11C) and construction working area to facilitate construction of the authorised development | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 11-014 | Temporary use as a haul route (Work No. 11D) and construction working area to facilitate construction of the authorised development | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 11-015, 11-016 | Temporary use as a haul route (Work No. 11C) and construction working area to facilitate construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 11-017 | Temporary use as a haul route (Work No. 11D) and construction working area to facilitate construction of the authorised development | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 12-001 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 12-002 | Temporary use as a haul route (Work No. 11D) and construction working area to facilitate construction of the authorised development | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 12-003 | Temporary use as a haul route (Work No. 11C) and construction working area to facilitate construction of the authorised development | Work Nos.10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 12-006, 12-007 | Temporary use as a construction compound (Work No. 11B), construction working area, and haul route to facilitate construction of the authorised development | All onshore works 12-008, 12-009, 12-010, 12-011 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 10, 10A, 10B, 10C, 11 11A, 11B, 11C, 11D, 12, 12A and 17 13-009 | Temporary use as a construction compound (Work No. 12B) and construction working area, and haul route to facilitate construction of the authorised development | Work Nos. 11 11A, 11B, 11C, 11D, 12, 12A, 13, 13A, 14, 14A, 15, 16 and 17 13-010, 13-012, 13-013, 13-014, 13-015, 13-016, | Temporary use as a construction compound (Work No. 12C), construction working area, and haul route to facilitate construction of the authorised development, including improvement and temporary maintenance of visibility splays | Work Nos. 11 11A, 11B, 11C, 11D, 12, 12A, 13, 13A, 14, 14A, 15, 16 and 17 13-017 | Temporary use as a construction compound (Work No. 14B) and construction working area, and haul route to facilitate construction of the authorised development, | Work Nos. 12, 12A, 13, 13A, 14, 14A, 14B, 14C, 14D, 15, 16 and 17 14-006 | Creation use and restoration of a public non-motorised user path | Work Nos. 12, 12A, 13, 13A, 14, 14A, 14B, 14C, 14D, 15, 16 and 17 14-014, 14-015 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 12, 12A, 13, 13A, 14, 14A, 14B, 14C, 14D, 15, 16 and 17 14-018, 14-019, 14-021, 14-022, 14-023, 14-024 | Creation, use and restoration of a public non-motorised user path | Work Nos. 12, 12A, 13, 13A, 14, 14A, 14B, 14C, 14D, 15, 16 and 17 14-035, 14-036 | Temporary use as a construction compound (Work No. 14C) and construction working area, and haul route to facilitate construction of the authorised development | Work Nos. 13 and 13A 15-012, 15-015, 15-016, 15-017, 15-018, 15-019, 15-020, 15-021, 15-022 | Creation, use and restoration of a public non-motorised user path | Work Nos. 14, 14A, 14B, 14C, 14D and 17 16-017 | Temporary use as a construction compound and construction working area to facilitate construction of the authorised development, including improvement and temporary maintenance of visibility splays. Creation, use and restoration of a public non-motorised user path | Work Nos. 14, 14A, 14B, 14C, 14D, 15, 15A, 15B, 15C, 15D, 15E, 16 and 17 17-003 | Temporary use for the purposes of carrying out Work Nos. 13 and 13A | Work Nos. 14, 14A, 14B, 14C, 14D, 15, 15A, 15B, 15C, 15D, 15E, 16 and 17 17-012, 17-013, 17-014 | Temporary use to facilitate access for construction of the authorised development including improvement and temporary maintenance of visibility splays | Work Nos. 2A, 3, 4, 4B, 5, 5A, 6, 6a and 17

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds