Propose a change

Planning Act 2008

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

19 Gas reception facilities

(1) The construction of a gas reception facility is within section 14(1)(e) only if (when constructed)— (a) the facility will be in England and will be within subsection (4), and (b) the maximum flow rate of the facility is expected to be at least 4.5 million standard cubic metres per day. (2) The alteration of a gas reception facility is within section 14(1)(e) only if— (a) the facility is in England and is within subsection (4), and (b) the effect of the alteration is expected to be to increase by at least 4.5 million standard cubic metres per day the maximum flow rate of the facility. (3) “Gas reception facility” means a facility for— (a) the reception of natural gas in gaseous form from outside England, and (b) the handling of natural gas (other than its storage). (4) A gas reception facility is within this subsection if— (a) the gas handled by the facility does not originate in England, Wales or Scotland, (b) the gas does not arrive at the facility from Scotland or Wales, and (c) the gas has not already been handled at another facility after its arrival in England. (5) “Maximum flow rate” means the maximum rate at which gas is able to flow out of the facility.

Your change, as a redline

19 Gas reception facilities

(1) The construction of a gas reception facility is within section 14(1)(e) only if (when constructed)— (a) the facility will be in England and will be within subsection (4), and (b) the maximum flow rate of the facility is expected to be at least 4.5 million standard cubic metres per day. (2) The alteration of a gas reception facility is within section 14(1)(e) only if— (a) the facility is in England and is within subsection (4), and (b) the effect of the alteration is expected to be to increase by at least 4.5 million standard cubic metres per day the maximum flow rate of the facility. (3) “Gas reception facility” means a facility for— (a) the reception of natural gas in gaseous form from outside England, and (b) the handling of natural gas (other than its storage). (4) A gas reception facility is within this subsection if— (a) the gas handled by the facility does not originate in England, Wales or Scotland, (b) the gas does not arrive at the facility from Scotland or Wales, and (c) the gas has not already been handled at another facility after its arrival in England. (5) “Maximum flow rate” means the maximum rate at which gas is able to flow out of the facility.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds