27 Dams and reservoirs
(1) The construction of a dam or reservoir is within section 14(1)(m) only if—
(a) the dam or reservoir (when constructed) will be in England,
(b) the construction will be carried out by , or by a person appointed by, one or more water undertakers, and
(c) it is expected that—
(i) the volume of water to be held back by the dam or stored in the reservoir will exceed 30 million cubic metres, or
(ii) the deployable output of the dam or reservoir will exceed 80 million litres per day.
(2) The alteration of a dam or reservoir is within section 14(1)(m) only if—
(a) the dam or reservoir is in England,
(b) the alteration will be carried out by , or by a person appointed by, one or more water undertakers, and
(c) it is expected that—
(i) the additional volume of water to be held back by the dam or stored in the reservoir as a result of the alteration will exceed 30 million cubic metres, or
(ii) the additional deployable output of the dam or reservoir as a result of the alteration will exceed 80 million litres per day.
(3) “Water undertaker” means a company appointed as a water undertaker under the Water Industry Act 1991 (c. 56).
(4) In this section, references to “a person appointed by” a water undertaker include a person whose bid is accepted by a water undertaker under regulation 6(6) of the Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582) and is designated as an Infrastructure Provider under regulation 8 of those Regulations.
Your change, as a redline
27 Dams and reservoirs
(1) The construction of a dam or reservoir is within section 14(1)(m) only if—
(a) the dam or reservoir (when constructed) will be in England,
(b) the construction will be carried out by , or by a person appointed by, one or more water undertakers, and
(c) it is expected that—
(i) the volume of water to be held back by the dam or stored in the reservoir will exceed 30 million cubic metres, or
(ii) the deployable output of the dam or reservoir will exceed 80 million litres per day.
(2) The alteration of a dam or reservoir is within section 14(1)(m) only if—
(a) the dam or reservoir is in England,
(b) the alteration will be carried out by , or by a person appointed by, one or more water undertakers, and
(c) it is expected that—
(i) the additional volume of water to be held back by the dam or stored in the reservoir as a result of the alteration will exceed 30 million cubic metres, or
(ii) the additional deployable output of the dam or reservoir as a result of the alteration will exceed 80 million litres per day.
(3) “Water undertaker” means a company appointed as a water undertaker under the Water Industry Act 1991 (c. 56).
(4) In this section, references to “a person appointed by” a water undertaker include a person whose bid is accepted by a water undertaker under regulation 6(6) of the Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582) and is designated as an Infrastructure Provider under regulation 8 of those Regulations.
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.