The Willington C Gas Pipeline Order 2014

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

7 Limits of deviation

In carrying out, maintaining or diverting the authorised development, the undertaker may— (a) deviate Works No. 1, 2, 3(f), 3(k), 4, 5 and 6 laterally from the lines or situations of the authorised development shown on the works plans within the extent of the limits of deviation shown on those plans; and (b) deviate Works No. 1 and 2 vertically— (i) upwards to a limit of not less than 1.1 metres below the surface of the ground; and (ii) to any extent downwards as may be found to be necessary or practical to a maximum depth of 70metres below the surface of the ground, except that sub-paragraph (i) does not apply to those parts of Works No. 1 and 2 that are built within the Yoxall AGI site, where such works may deviate upwards to a limit of 2.8 metres above ground level; (c) deviate or place Works No. 3, 4, 5 and 6 vertically upwards or above ground level to the height limits set for each of these works in Part 1 of Schedule 1.

Your change, as a redline

7 Limits of deviation

In carrying out, maintaining or diverting the authorised development, the undertaker may— (a) deviate Works No. 1, 2, 3(f), 3(k), 4, 5 and 6 laterally from the lines or situations of the authorised development shown on the works plans within the extent of the limits of deviation shown on those plans; and (b) deviate Works No. 1 and 2 vertically— (i) upwards to a limit of not less than 1.1 metres below the surface of the ground; and (ii) to any extent downwards as may be found to be necessary or practical to a maximum depth of 70metres below the surface of the ground, except that sub-paragraph (i) does not apply to those parts of Works No. 1 and 2 that are built within the Yoxall AGI site, where such works may deviate upwards to a limit of 2.8 metres above ground level; (c) deviate or place Works No. 3, 4, 5 and 6 vertically upwards or above ground level to the height limits set for each of these works in Part 1 of Schedule 1.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through