The Willington C Gas Pipeline Order 2014
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 6 LAND OVER WHICH RESTRICTIVE OBLIGATIONS AND RIGHTS OF SUPPORT ARE REQUIRED
Article 18(2) (1) | (2) | (3) Area | Number of land shown on land plans | Details of restrictive covenants and right of support required East Staffordshire | 1 | (a) Not to erect, construct or place or allow to be erected, constructed or placed any building or structure on or carry out or allow to be carried out any excavation (save normal agricultural operations, which must not damage or otherwise affect the safety or integrity of the pipeline) of the part of the land comprising a strip 18.3 metres in width in which the pipeline is centrally situated (the “Plot 1 Easement Strip”). (b) Not to plant or allow to be planted or otherwise subsist on the Plot 1 Easement Strip any trees. (c) Not materially to raise or lower or allow to be raised or lowered the existing level of the Plot 1 Easement Strip. (d) Not to undermine or damage or allow to be undermined or damaged the pipeline comprising part of the authorised development or do or allow to be done anything which may interfere with free flow and passage through the pipeline. (e) The right to continuous vertical and lateral support for the authorised development. East Staffordshire and South Derbyshire | 7, 10, 11B, 19, 20, 24, 26, 54, 58, 83, 89, 90, 90C, 91, 92, 93, 95, 108, 108B, 109B, 109D, 109E, 110, 112, 128B, 134, 134B | (a) Not to erect, construct or place or allow to be erected, constructed or placed any building or structure on or carry out or allow to be carried out any excavation (save normal agricultural operations, which must not damage or otherwise affect the safety or integrity of the pipeline) of the part of the land comprising a strip 7 metres in width in which the pipeline is centrally situated (the “Easement Strip”). (b) Not to plant or allow to be planted or otherwise subsist on the Easement Strip any trees. (c) Not materially to raise or lower or allow to be raised or lowered the existing level of the Easement Strip. (d) Not to undermine or damage or allow to be undermined or damaged the pipeline comprising part of the authorised development or do or allow to be done anything which may interfere with free flow and passage through the pipeline. (e) The right to continuous vertical and lateral support for the authorised development. South Derbyshire | 130, 130B, 133, 138 | (a) Not to erect, construct or place or allow to be erected, constructed or placed any building or structure on or carry out or allow to be carried out any excavation (save normal railway apparatus and equipment, which must not damage or otherwise affect the safety or integrity of the pipeline) of the part of the land comprising the Easement Strip. (b) Not to plant or allow to be planted or otherwise subsist on the Easement Strip any trees. (c) Not materially to raise or lower or allow to be raised or lowered the existing level of the Easement Strip. (d) Not to undermine or damage or allow to be undermined or damaged the pipeline comprising part of the authorised development or do or allow to be done anything which may interfere with free flow and passage through the pipeline. (e) The right to continuous vertical and lateral support for the authorised development. South Derbyshire | 139 | (a) Not to erect, construct or place or allow to be erected, constructed or placed any building or structure on or carry out or allow to be carried out any excavation (save normal waterways apparatus and equipment, which must not damage or otherwise affect the safety or integrity of the pipeline) of the part of the land comprising the Easement Strip. (b) Not to plant or allow to be planted or otherwise subsist on the Easement Strip any trees. (c) Not materially to raise or lower or allow to be raised or lowered the existing level of the Easement Strip. (d) Not to undermine or damage or allow to be undermined or damaged the pipeline comprising part of the authorised development or do or allow to be done anything which may interfere with free flow and passage through the pipeline. (e) The right to continuous vertical and lateral support for the authorised development. South Derbyshire | 138B, 139B | (a) Not to erect, construct or place or allow to be erected, constructed or placed any building or structure on or carry out or allow to be carried out any excavation (save normal railways or waterways apparatus and equipment, which must not damage or otherwise affect the safety or integrity of the pipeline) of the part of the land comprising the Easement Strip. (b) Not to plant or allow to be planted or otherwise subsist on the Easement Strip any trees. (c) Not materially to raise or lower or allow to be raised or lowered the existing level of the Easement Strip. (d) Not to undermine or damage or allow to be undermined or damaged the pipeline comprising part of the authorised development or do or allow to be done anything which may interfere with free flow and passage through the pipeline. (e) The right to continuous vertical and lateral support for the authorised development.
SCHEDULE 6 LAND OVER WHICH RESTRICTIVE OBLIGATIONS AND RIGHTS OF SUPPORT ARE REQUIRED
Article 18(2) (1) | (2) | (3) Area | Number of land shown on land plans | Details of restrictive covenants and right of support required East Staffordshire | 1 | (a) Not to erect, construct or place or allow to be erected, constructed or placed any building or structure on or carry out or allow to be carried out any excavation (save normal agricultural operations, which must not damage or otherwise affect the safety or integrity of the pipeline) of the part of the land comprising a strip 18.3 metres in width in which the pipeline is centrally situated (the “Plot 1 Easement Strip”). (b) Not to plant or allow to be planted or otherwise subsist on the Plot 1 Easement Strip any trees. (c) Not materially to raise or lower or allow to be raised or lowered the existing level of the Plot 1 Easement Strip. (d) Not to undermine or damage or allow to be undermined or damaged the pipeline comprising part of the authorised development or do or allow to be done anything which may interfere with free flow and passage through the pipeline. (e) The right to continuous vertical and lateral support for the authorised development. East Staffordshire and South Derbyshire | 7, 10, 11B, 19, 20, 24, 26, 54, 58, 83, 89, 90, 90C, 91, 92, 93, 95, 108, 108B, 109B, 109D, 109E, 110, 112, 128B, 134, 134B | (a) Not to erect, construct or place or allow to be erected, constructed or placed any building or structure on or carry out or allow to be carried out any excavation (save normal agricultural operations, which must not damage or otherwise affect the safety or integrity of the pipeline) of the part of the land comprising a strip 7 metres in width in which the pipeline is centrally situated (the “Easement Strip”). (b) Not to plant or allow to be planted or otherwise subsist on the Easement Strip any trees. (c) Not materially to raise or lower or allow to be raised or lowered the existing level of the Easement Strip. (d) Not to undermine or damage or allow to be undermined or damaged the pipeline comprising part of the authorised development or do or allow to be done anything which may interfere with free flow and passage through the pipeline. (e) The right to continuous vertical and lateral support for the authorised development. South Derbyshire | 130, 130B, 133, 138 | (a) Not to erect, construct or place or allow to be erected, constructed or placed any building or structure on or carry out or allow to be carried out any excavation (save normal railway apparatus and equipment, which must not damage or otherwise affect the safety or integrity of the pipeline) of the part of the land comprising the Easement Strip. (b) Not to plant or allow to be planted or otherwise subsist on the Easement Strip any trees. (c) Not materially to raise or lower or allow to be raised or lowered the existing level of the Easement Strip. (d) Not to undermine or damage or allow to be undermined or damaged the pipeline comprising part of the authorised development or do or allow to be done anything which may interfere with free flow and passage through the pipeline. (e) The right to continuous vertical and lateral support for the authorised development. South Derbyshire | 139 | (a) Not to erect, construct or place or allow to be erected, constructed or placed any building or structure on or carry out or allow to be carried out any excavation (save normal waterways apparatus and equipment, which must not damage or otherwise affect the safety or integrity of the pipeline) of the part of the land comprising the Easement Strip. (b) Not to plant or allow to be planted or otherwise subsist on the Easement Strip any trees. (c) Not materially to raise or lower or allow to be raised or lowered the existing level of the Easement Strip. (d) Not to undermine or damage or allow to be undermined or damaged the pipeline comprising part of the authorised development or do or allow to be done anything which may interfere with free flow and passage through the pipeline. (e) The right to continuous vertical and lateral support for the authorised development. South Derbyshire | 138B, 139B | (a) Not to erect, construct or place or allow to be erected, constructed or placed any building or structure on or carry out or allow to be carried out any excavation (save normal railways or waterways apparatus and equipment, which must not damage or otherwise affect the safety or integrity of the pipeline) of the part of the land comprising the Easement Strip. (b) Not to plant or allow to be planted or otherwise subsist on the Easement Strip any trees. (c) Not materially to raise or lower or allow to be raised or lowered the existing level of the Easement Strip. (d) Not to undermine or damage or allow to be undermined or damaged the pipeline comprising part of the authorised development or do or allow to be done anything which may interfere with free flow and passage through the pipeline. (e) The right to continuous vertical and lateral support for the authorised development.
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.