The Building (Higher-Risk Buildings Procedures) (England) Regulations 2023

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

2 Interpretation

(1) In these Regulations— “the 1984 Act” means the Building Act 1984; “the 2022 Act” means the Building Safety Act 2022; “the 2010 Regulations” means the Building Regulations 2010; “active fire safety measures” includes sprinkler systems (including isolating valves and control equipment for that system), smoke control systems (including heating or ventilation and air conditioning systems with a smoke control function), fire or smoke dampers, fire alarm systems, lifts and lift shafts (including evacuation or fire-fighting lifts), and fire main and hydrants; “agreed document” means— a description, plan or document in relation to HRB work, stage of HRB work or work to existing HRB that was approved by virtue of regulation 7(8) or (10) (building control approval applications for HRB work or stage of HRB work: decisions) or regulation 15(8) or (10) (building control approval applications for work to existing HRB: decisions), or where such a description, plan or document is revised— in relation to a major change, the plan or document that was approved in accordance with regulation 24(8) or (10) (change control applications: decisions); in relation to a notifiable change, the version of the plan or document that accompanied the notice to the regulator given under regulation 20(1) (change control: notification requirements); in relation to a recordable change, the version of the plan or document that was revised in accordance with regulation 18(2)(b) (change control) and in respect of which a record was made in accordance with regulation 18(2)(a); “bedspace” has the meaning given in the BSL Regulations; “BSL Regulations” means the Building Safety Levy (England) Regulations 2025; “building”— in the application of any provision of these Regulations to the construction of a higher-risk building, has the meaning given in regulation 4 of the Higher-Risk Buildings (Descriptions and Supplementary Provisions) Regulations 2023; in any other case, has the same meaning as under the 2010 Regulations; “building control approval application for HRB work” has the meaning given in regulation 3 (building control approval for HRB work or stage of HRB work); “building control approval application for a stage of HRB work” has the meaning given in regulation 3 (building control approval for HRB work or stage of HRB work); “building control approval application for work to existing HRB” has the meaning given in regulation 11 (building control approval for work to existing HRB); “Building Regulations compliance statement” means a document in accordance with paragraph 4 of Schedule 1; “change control application” has the meaning given in regulation 18(5) (change control); “change control log” has the meaning given in regulation 19(1) (change control: record-keeping); “change control plan” means a document in accordance with paragraph 3 of Schedule 1; “collecting authority” has the meaning given in the BSL Regulations; “commercial unit” means a part of a building in separate occupation which does not contain a flat or a residential room; “communal space for residents” has the meaning given in the BSL Regulations; “completion certificate application” has the meaning given in regulation 40 (completion certificate applications); “competence declaration” means a statement in accordance with paragraph 1 of Schedule 1; “compliance declaration” means— where any appointment of a principal contractor (or sole contractor) or principal designer (or sole or lead designer) ends before a completion certificate application is submitted to the regulator, a statement provided in accordance with regulation 29(3) (new principal contractor or principal designer etc: notification); in any other case, has the meaning given in regulation 40 (completion certificate applications); “compliance explanation” has the meaning given in regulation 19(2)(g) (change control: record-keeping); “construction control plan” means a document in accordance with paragraph 2 of Schedule 1; “controlled change” has the meaning given in regulation 18 (change control); “development” has the same meaning as in section 55 of the TCPA 1990; “exempt person” has the meaning given in the BSL Regulations; “exempt work” has the meaning in regulation 57 (exempt work); “fire and emergency file” means a document in accordance with paragraph 5 of Schedule 1; “fire safety compliance information” has the meaning given in regulation 12(3) (building control approval applications for work to existing HRB); “fire safety information” has the meaning in regulation 39 (information to be provided where work is scheme work); “golden thread information” has the meaning given in regulation 31 (golden thread); “gross internal area” has the meaning given in the BSL Regulations; “HRB work” means— the construction of a higher-risk building; work to an existing building that causes it to become a higher-risk building together with any work to the building carried out at the same time as that work; such work, if any, which is necessary to ensure a building that undergoes a material change of use to become a higher-risk building complies with the applicable requirements listed in regulation 6 of the 2010 Regulations (requirements relating to material change of use) together with any work to the building carried out at the same time as that work; “levy determination notice” has the meaning given in the BSL Regulations; “major change” has the meaning given in regulation 26 (change control: major changes and notifiable changes); “major residential development” has the meaning given in the BSL Regulations; “mandatory occurrence reporting plan” is a plan describing the mandatory occurrence reporting system; “mandatory occurrence reporting system” means a system required under regulation 32 (mandatory occurrence reporting system); “named client” has the meaning given in the BSL Regulations; “notifiable change” has the meaning given in regulation 26 (change control: major changes and notifiable changes); “ordinary residential dwelling” has the meaning given in the BSL Regulations; “original application” has the meaning given in the BSL Regulations; “other units” has the meaning given in regulation 11(2) of the BSL Regulations; “part of a wider development” has the meaning given in the BSL Regulations; “passive fire safety measures” includes the cavity barriers, fire door sets, duct dampers, fire shutters and other fire separating elements; “partial completion certificate application” has the meaning given in regulation 45 (partial completion certificates); “partial completion strategy” means a document in accordance with paragraph 6 of Schedule 1; “previous development condition” has the meaning given in the BSL Regulations; “prior approval” means an approval given or deemed to be given following a prior approval application; “prior approval application” has the meaning given in section 69A(2) of TCPA 1990; “purpose-built student accommodation” has the meaning given in the BSL Regulations; “recordable change” means a controlled change which is neither a major change nor a notifiable change; “regularisation certificate application” has the meaning given in regulation 47 (regularisation of unauthorised building work); “relevant day” means any day excluding Christmas Day, Good Friday or a day which is a bank holiday in England and Wales under section 1 of the Banking and Financial Dealings Act 1971; “relevant person” has the meaning given in regulation 38 (handover of information on completion etc); “relevant residential building” has the meaning given in the BSL Regulations; “relevant residential units” has the meaning given in regulation 11(2) of the BSL Regulations; “residential floorspace” has the meaning given in the BSL Regulations; “residential room” means a room, or a suite of rooms, which is not a flat and which is used solely by one or more persons to live and sleep and includes a room in a hall of residence or a residential home, but does not include a room in a hospital, or similar establishment, which is used for patient accommodation; “scheme work” means work to which— regulation 20 (provisions applicable to self-certification schemes) of the 2010 Regulations applies, or regulation 20A (provisions applicable to third party certification schemes) of the 2010 Regulations applies. “TCPA 1990” means the Town and Country Planning Act 1990; “updated application” has the meaning given in the BSL Regulations; “variation application” has the meaning given in the BSL Regulations. “work to existing HRB” means any higher-risk building work which is not HRB work; “working day” means any day excluding Saturday, Sunday, Christmas Day, Good Friday or a day which is a bank holiday in England and Wales under section 1 of the Banking and Financial Dealings Act 1971. (2) In these Regulations— (a) “building work”, “client”, “contractor”, “designer”, “domestic client”, “flat”, “material change of use”, “principal contractor”, “principal designer”, “project”, “sole contractor” and “sole or lead designer” have the meanings given in 2010 Regulations; (b) a reference to appointment as a principal contractor or principal designer is to appointment under regulation 11D (principal designer and principal contractor) of the 2010 Regulations, and that reference includes an appointment which is certified under regulation 11D(2) of those Regulations. (3) In the provisions referred to in paragraph (4), references to a dwelling do not include references to purpose-built student accommodation. (4) The provisions are— (a) regulation 4(1)(f), (b) regulation 9(3A), (c) regulation 12(1)(f), (d) regulation 17(3A), (e) regulation 17A, and (f) regulation 21(2)(g) and (3).

Your change, as a redline

2 Interpretation

(1) In these Regulations— “the 1984 Act” means the Building Act 1984; “the 2022 Act” means the Building Safety Act 2022; “the 2010 Regulations” means the Building Regulations 2010; “active fire safety measures” includes sprinkler systems (including isolating valves and control equipment for that system), smoke control systems (including heating or ventilation and air conditioning systems with a smoke control function), fire or smoke dampers, fire alarm systems, lifts and lift shafts (including evacuation or fire-fighting lifts), and fire main and hydrants; “agreed document” means— a description, plan or document in relation to HRB work, stage of HRB work or work to existing HRB that was approved by virtue of regulation 7(8) or (10) (building control approval applications for HRB work or stage of HRB work: decisions) or regulation 15(8) or (10) (building control approval applications for work to existing HRB: decisions), or where such a description, plan or document is revised— in relation to a major change, the plan or document that was approved in accordance with regulation 24(8) or (10) (change control applications: decisions); in relation to a notifiable change, the version of the plan or document that accompanied the notice to the regulator given under regulation 20(1) (change control: notification requirements); in relation to a recordable change, the version of the plan or document that was revised in accordance with regulation 18(2)(b) (change control) and in respect of which a record was made in accordance with regulation 18(2)(a); “bedspace” has the meaning given in the BSL Regulations; “BSL Regulations” means the Building Safety Levy (England) Regulations 2025; “building”— in the application of any provision of these Regulations to the construction of a higher-risk building, has the meaning given in regulation 4 of the Higher-Risk Buildings (Descriptions and Supplementary Provisions) Regulations 2023; in any other case, has the same meaning as under the 2010 Regulations; “building control approval application for HRB work” has the meaning given in regulation 3 (building control approval for HRB work or stage of HRB work); “building control approval application for a stage of HRB work” has the meaning given in regulation 3 (building control approval for HRB work or stage of HRB work); “building control approval application for work to existing HRB” has the meaning given in regulation 11 (building control approval for work to existing HRB); “Building Regulations compliance statement” means a document in accordance with paragraph 4 of Schedule 1; “change control application” has the meaning given in regulation 18(5) (change control); “change control log” has the meaning given in regulation 19(1) (change control: record-keeping); “change control plan” means a document in accordance with paragraph 3 of Schedule 1; “collecting authority” has the meaning given in the BSL Regulations; “commercial unit” means a part of a building in separate occupation which does not contain a flat or a residential room; “communal space for residents” has the meaning given in the BSL Regulations; “completion certificate application” has the meaning given in regulation 40 (completion certificate applications); “competence declaration” means a statement in accordance with paragraph 1 of Schedule 1; “compliance declaration” means— where any appointment of a principal contractor (or sole contractor) or principal designer (or sole or lead designer) ends before a completion certificate application is submitted to the regulator, a statement provided in accordance with regulation 29(3) (new principal contractor or principal designer etc: notification); in any other case, has the meaning given in regulation 40 (completion certificate applications); “compliance explanation” has the meaning given in regulation 19(2)(g) (change control: record-keeping); “construction control plan” means a document in accordance with paragraph 2 of Schedule 1; “controlled change” has the meaning given in regulation 18 (change control); “development” has the same meaning as in section 55 of the TCPA 1990; “exempt person” has the meaning given in the BSL Regulations; “exempt work” has the meaning in regulation 57 (exempt work); “fire and emergency file” means a document in accordance with paragraph 5 of Schedule 1; “fire safety compliance information” has the meaning given in regulation 12(3) (building control approval applications for work to existing HRB); “fire safety information” has the meaning in regulation 39 (information to be provided where work is scheme work); “golden thread information” has the meaning given in regulation 31 (golden thread); “gross internal area” has the meaning given in the BSL Regulations; “HRB work” means— the construction of a higher-risk building; work to an existing building that causes it to become a higher-risk building together with any work to the building carried out at the same time as that work; such work, if any, which is necessary to ensure a building that undergoes a material change of use to become a higher-risk building complies with the applicable requirements listed in regulation 6 of the 2010 Regulations (requirements relating to material change of use) together with any work to the building carried out at the same time as that work; “levy determination notice” has the meaning given in the BSL Regulations; “major change” has the meaning given in regulation 26 (change control: major changes and notifiable changes); “major residential development” has the meaning given in the BSL Regulations; “mandatory occurrence reporting plan” is a plan describing the mandatory occurrence reporting system; “mandatory occurrence reporting system” means a system required under regulation 32 (mandatory occurrence reporting system); “named client” has the meaning given in the BSL Regulations; “notifiable change” has the meaning given in regulation 26 (change control: major changes and notifiable changes); “ordinary residential dwelling” has the meaning given in the BSL Regulations; “original application” has the meaning given in the BSL Regulations; “other units” has the meaning given in regulation 11(2) of the BSL Regulations; “part of a wider development” has the meaning given in the BSL Regulations; “passive fire safety measures” includes the cavity barriers, fire door sets, duct dampers, fire shutters and other fire separating elements; “partial completion certificate application” has the meaning given in regulation 45 (partial completion certificates); “partial completion strategy” means a document in accordance with paragraph 6 of Schedule 1; “previous development condition” has the meaning given in the BSL Regulations; “prior approval” means an approval given or deemed to be given following a prior approval application; “prior approval application” has the meaning given in section 69A(2) of TCPA 1990; “purpose-built student accommodation” has the meaning given in the BSL Regulations; “recordable change” means a controlled change which is neither a major change nor a notifiable change; “regularisation certificate application” has the meaning given in regulation 47 (regularisation of unauthorised building work); “relevant day” means any day excluding Christmas Day, Good Friday or a day which is a bank holiday in England and Wales under section 1 of the Banking and Financial Dealings Act 1971; “relevant person” has the meaning given in regulation 38 (handover of information on completion etc); “relevant residential building” has the meaning given in the BSL Regulations; “relevant residential units” has the meaning given in regulation 11(2) of the BSL Regulations; “residential floorspace” has the meaning given in the BSL Regulations; “residential room” means a room, or a suite of rooms, which is not a flat and which is used solely by one or more persons to live and sleep and includes a room in a hall of residence or a residential home, but does not include a room in a hospital, or similar establishment, which is used for patient accommodation; “scheme work” means work to which— regulation 20 (provisions applicable to self-certification schemes) of the 2010 Regulations applies, or regulation 20A (provisions applicable to third party certification schemes) of the 2010 Regulations applies. “TCPA 1990” means the Town and Country Planning Act 1990; “updated application” has the meaning given in the BSL Regulations; “variation application” has the meaning given in the BSL Regulations. “work to existing HRB” means any higher-risk building work which is not HRB work; “working day” means any day excluding Saturday, Sunday, Christmas Day, Good Friday or a day which is a bank holiday in England and Wales under section 1 of the Banking and Financial Dealings Act 1971. (2) In these Regulations— (a) “building work”, “client”, “contractor”, “designer”, “domestic client”, “flat”, “material change of use”, “principal contractor”, “principal designer”, “project”, “sole contractor” and “sole or lead designer” have the meanings given in 2010 Regulations; (b) a reference to appointment as a principal contractor or principal designer is to appointment under regulation 11D (principal designer and principal contractor) of the 2010 Regulations, and that reference includes an appointment which is certified under regulation 11D(2) of those Regulations. (3) In the provisions referred to in paragraph (4), references to a dwelling do not include references to purpose-built student accommodation. (4) The provisions are— (a) regulation 4(1)(f), (b) regulation 9(3A), (c) regulation 12(1)(f), (d) regulation 17(3A), (e) regulation 17A, and (f) regulation 21(2)(g) and (3).

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds