Propose a change

The Gatwick Airport (Northern Runway Project) Development Consent Order 2025

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 11 MAXIMUM PARAMETER HEIGHTS

Article 6 (1) Work No. | (2) Work description | (3) Maximum building (or other works) height (m)*¹ 6(a) and (b) | Three-floor pier (Pier 7) and the Pier 7 Autonomous vehicle station | 18.00 9 | Replacement central area recycling enclosure (CARE) facility | 15.00 10 | Replacement motor transport facilities | 15.25 11 | Replacement grounds maintenance facilities | 8.00 12 | Replacement airfield surface transport facilities | 15.00 13 | Replacement Rendezvous Point North | 5.00 15 | Satellite airport fire service facility | 15.00 16 | New aircraft hangar | 32.00 22(a) and (d) | North Terminal International Departure Lounge extension (north) and the North Terminal autonomous vehicle station | 32.50 22(b) | North Terminal International Departure Lounge extension (south) | 30.00 22(c) | North Terminal baggage hall and baggage reclaim extension | 12.50 22(e) | Autonomous vehicle maintenance building | 12.00 22(g) | North Terminal multi-storey car park | 27.00 23(a) | South Terminal International Departure Lounge extension | 27.00 23(c) | South Terminal autonomous vehicle station | 13.00 23(d) | Additional coaching gates | 13.00 26 | Hotel north of multi-storey car park 3 | 27.00 27 | Hotel on the car rental site | 16.30 28 | Car Park H site | 27.00 30(b) | Car Park Y multi-storey car park | 27.00 31(e) | Deck parking provision at Car Park X | 11.00 32 | Decked car parking structure at North Terminal Long Stay car park | 11.00 38(d) | Earthworks, landscaping and a bund around the southern and eastern perimeter of Museum Field | 6.00*² 41(c) | Spoil deposition at Pentagon Field | 4.00*² 43 | Water treatment works | 3.00 to 4.00*³ 44(b) | Wastewater treatment works | 9.40 * ¹ Maximum parameter height for the cited work shown as height in metres from the datum level shown on the parameter plans for that work. This table is for information only and, in the event of conflict with the parameter plans, the parameter plans are to be determinative. *² Maximum heights provided for in the design principles in appendix 1 of the design and access statement and not on the parameter plans. * ³ Maximum building (or other works) height is between 3.00 to 4.00m across the work area. Please refer to the parameter plans for information.

Your change, as a redline

SCHEDULE 11 MAXIMUM PARAMETER HEIGHTS

Article 6 (1) Work No. | (2) Work description | (3) Maximum building (or other works) height (m)*¹ 6(a) and (b) | Three-floor pier (Pier 7) and the Pier 7 Autonomous vehicle station | 18.00 9 | Replacement central area recycling enclosure (CARE) facility | 15.00 10 | Replacement motor transport facilities | 15.25 11 | Replacement grounds maintenance facilities | 8.00 12 | Replacement airfield surface transport facilities | 15.00 13 | Replacement Rendezvous Point North | 5.00 15 | Satellite airport fire service facility | 15.00 16 | New aircraft hangar | 32.00 22(a) and (d) | North Terminal International Departure Lounge extension (north) and the North Terminal autonomous vehicle station | 32.50 22(b) | North Terminal International Departure Lounge extension (south) | 30.00 22(c) | North Terminal baggage hall and baggage reclaim extension | 12.50 22(e) | Autonomous vehicle maintenance building | 12.00 22(g) | North Terminal multi-storey car park | 27.00 23(a) | South Terminal International Departure Lounge extension | 27.00 23(c) | South Terminal autonomous vehicle station | 13.00 23(d) | Additional coaching gates | 13.00 26 | Hotel north of multi-storey car park 3 | 27.00 27 | Hotel on the car rental site | 16.30 28 | Car Park H site | 27.00 30(b) | Car Park Y multi-storey car park | 27.00 31(e) | Deck parking provision at Car Park X | 11.00 32 | Decked car parking structure at North Terminal Long Stay car park | 11.00 38(d) | Earthworks, landscaping and a bund around the southern and eastern perimeter of Museum Field | 6.00*² 41(c) | Spoil deposition at Pentagon Field | 4.00*² 43 | Water treatment works | 3.00 to 4.00*³ 44(b) | Wastewater treatment works | 9.40 * ¹ Maximum parameter height for the cited work shown as height in metres from the datum level shown on the parameter plans for that work. This table is for information only and, in the event of conflict with the parameter plans, the parameter plans are to be determinative. *² Maximum heights provided for in the design principles in appendix 1 of the design and access statement and not on the parameter plans. * ³ Maximum building (or other works) height is between 3.00 to 4.00m across the work area. Please refer to the parameter plans for information.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds