Propose a change

The M20 Motorway (Junctions 7 to 11) (Temporary Restriction and Prohibition of Traffic) Regulations 2023

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 1 LENGTH OF CARRIAGEWAY

Regulation 3 In these Regulations— “first length of carriageway” means the coast-bound carriageway of the M20 between a point 605 metres south-east of the centreline of Eyhorne Street overbridge and a point 70 metres south-east of the centreline of Sandyhurst Lane overbridge; “second length of carriageway” means the London-bound carriageway of the M20 between a point 450 metres north-west of the tip of the nosing of the entry slip road at junction 10 and a point 2100 metres south-east of the centreline of Hockers Lane overbridge; “third length of carriageway” means the coast-bound carriageway of the M20 between a point 640 metres south-east of the centreline of Hockers Lane overbridge to the point where it enters the sixth length of carriageway, and from the point where it leaves the sixth length of carriageway to the centreline of the western overbridge at junction 9 of the M20; “fourth length of carriageway” means— the coast-bound carriageway of the M20 between the tip of the nosing of the exit slip road at junction 7 and the tip of the nosing of the entry slip road at junction 11; and the London-bound carriageway of the M20 between the tip of the nosing of the exit slip road at junction 9 and the tip of the nosing of the entry slip road at junction 7; “fifth length of carriageway” means the coast-bound carriageway of the M20 between a point 305 metres south-east of the centreline of Eyhorne Street overbridge and a point 320 metres south-east of the centreline of Sandyhurst Lane overbridge; “sixth length of carriageway” means the M20 between junctions 8 and 9 from the entry point to the contraflow, at a maximum extent of 305 metres south-east of the centreline of Eyhorne Street overbridge, to the exit point from the contraflow, at a maximum extent of 320 metres south-east of the centreline of Sandyhurst Lane overbridge.

Your change, as a redline

SCHEDULE 1 LENGTH OF CARRIAGEWAY

Regulation 3 In these Regulations— “first length of carriageway” means the coast-bound carriageway of the M20 between a point 605 metres south-east of the centreline of Eyhorne Street overbridge and a point 70 metres south-east of the centreline of Sandyhurst Lane overbridge; “second length of carriageway” means the London-bound carriageway of the M20 between a point 450 metres north-west of the tip of the nosing of the entry slip road at junction 10 and a point 2100 metres south-east of the centreline of Hockers Lane overbridge; “third length of carriageway” means the coast-bound carriageway of the M20 between a point 640 metres south-east of the centreline of Hockers Lane overbridge to the point where it enters the sixth length of carriageway, and from the point where it leaves the sixth length of carriageway to the centreline of the western overbridge at junction 9 of the M20; “fourth length of carriageway” means— the coast-bound carriageway of the M20 between the tip of the nosing of the exit slip road at junction 7 and the tip of the nosing of the entry slip road at junction 11; and the London-bound carriageway of the M20 between the tip of the nosing of the exit slip road at junction 9 and the tip of the nosing of the entry slip road at junction 7; “fifth length of carriageway” means the coast-bound carriageway of the M20 between a point 305 metres south-east of the centreline of Eyhorne Street overbridge and a point 320 metres south-east of the centreline of Sandyhurst Lane overbridge; “sixth length of carriageway” means the M20 between junctions 8 and 9 from the entry point to the contraflow, at a maximum extent of 305 metres south-east of the centreline of Eyhorne Street overbridge, to the exit point from the contraflow, at a maximum extent of 320 metres south-east of the centreline of Sandyhurst Lane overbridge.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds