Propose a change

The M40 Motorway (Junction 10 Improvements) (Connecting Roads) Scheme 2014

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 1 Route of the Connecting Roads

Article 2(2)(c) The routes of the connecting roads are as follows: (1) a route to connect the roundabout on the A43 Trunk Road on the east side of the M40 Motorway (known as Cherwell Roundabout) to the existing slip road leading to the southbound carriageway of the M40 from Cherwell Valley Motorway Service Area. The connecting road along this route is given the reference number 1 on the plan and is 85 metres in length; (2) a route to connect the exit road from the Cherwell Valley Motorway Service Area to the new route described in (1) above. The connecting road along this route is given the reference number 2 on the plan and is 18 metres in length; all at Junction 10 of the M40 Motorway near Ardley in the County of Oxfordshire.

Your change, as a redline

SCHEDULE 1 Route of the Connecting Roads

Article 2(2)(c) The routes of the connecting roads are as follows: (1) a route to connect the roundabout on the A43 Trunk Road on the east side of the M40 Motorway (known as Cherwell Roundabout) to the existing slip road leading to the southbound carriageway of the M40 from Cherwell Valley Motorway Service Area. The connecting road along this route is given the reference number 1 on the plan and is 85 metres in length; (2) a route to connect the exit road from the Cherwell Valley Motorway Service Area to the new route described in (1) above. The connecting road along this route is given the reference number 2 on the plan and is 18 metres in length; all at Junction 10 of the M40 Motorway near Ardley in the County of Oxfordshire.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds