Propose a change

The M25 Junction 28 Development Consent (Correction) Order 2024

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE

Article 2 (1) Where the correction is to be made | (2) How the correction is to be made | (3) Text to be substituted, inserted or omitted (if any) Article 2 (interpretation) – definition of “CEMP” | After “requirement 4” for “(construction environmental management plans)” substitute | “(construction environmental management plan)” Article 9(1) (consent to transfer benefit of Order) | For “Subject to paragraph (4),” substitute | “Subject to paragraphs (4) and (5),” Article 10(1) (application of the 1991 Act) | After “Part 3” insert | “(street works in England and Wales)” Article 11(2) (construction and maintenance of new, altered or diverted streets and other structures) | After “the altered or diverted part of the highway” delete “must, be” and substitute | “must be” Article 11(3) (construction and maintenance of new, altered or diverted streets and other structures) | After “to the reasonable satisfaction of the street” for “authority,” substitute | “authority” Schedule 2 (requirements), paragraph 1 (interpretation), definition of “Preliminary Environmental Design” | For “certified by the Secretary of State as the Preliminary Environmental Design for the purposes of this Order” substitute | “comprised within Figure 2.2 of the Environmental Statement” Schedule 2 (requirements), requirement 3(3) (detailed design) | After “design of the bridges and” insert | “any significant” Schedule 9 (protective provisions), Part 7 (for the protection of Transport for London), paragraph 71 (Interpretation), definition of “Commuted Sum” | After “of this Part” insert | “and that calculation must take into account any savings to Transport for London’s future highways assets maintenance costs arising from the carrying out of the authorised development” Schedule 10 (document to be certified) | The row relating to the document “Outline Landscape and Ecology Management and Monitoring Plan”, in column (2) for “R010029/APP/6.3” substitute | “TR010029/APP/6.3” Schedule 10 (documents to be certified) | The row relating to the document “Preliminary Environmental Design” omit | The entire row

Your change, as a redline

SCHEDULE

Article 2 (1) Where the correction is to be made | (2) How the correction is to be made | (3) Text to be substituted, inserted or omitted (if any) Article 2 (interpretation) – definition of “CEMP” | After “requirement 4” for “(construction environmental management plans)” substitute | “(construction environmental management plan)” Article 9(1) (consent to transfer benefit of Order) | For “Subject to paragraph (4),” substitute | “Subject to paragraphs (4) and (5),” Article 10(1) (application of the 1991 Act) | After “Part 3” insert | “(street works in England and Wales)” Article 11(2) (construction and maintenance of new, altered or diverted streets and other structures) | After “the altered or diverted part of the highway” delete “must, be” and substitute | “must be” Article 11(3) (construction and maintenance of new, altered or diverted streets and other structures) | After “to the reasonable satisfaction of the street” for “authority,” substitute | “authority” Schedule 2 (requirements), paragraph 1 (interpretation), definition of “Preliminary Environmental Design” | For “certified by the Secretary of State as the Preliminary Environmental Design for the purposes of this Order” substitute | “comprised within Figure 2.2 of the Environmental Statement” Schedule 2 (requirements), requirement 3(3) (detailed design) | After “design of the bridges and” insert | “any significant” Schedule 9 (protective provisions), Part 7 (for the protection of Transport for London), paragraph 71 (Interpretation), definition of “Commuted Sum” | After “of this Part” insert | “and that calculation must take into account any savings to Transport for London’s future highways assets maintenance costs arising from the carrying out of the authorised development” Schedule 10 (document to be certified) | The row relating to the document “Outline Landscape and Ecology Management and Monitoring Plan”, in column (2) for “R010029/APP/6.3” substitute | “TR010029/APP/6.3” Schedule 10 (documents to be certified) | The row relating to the document “Preliminary Environmental Design” omit | The entire row

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds