Propose a change

The A122 (Lower Thames Crossing) Development Consent Order 2025

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 10 LAND IN WHICH ONLY SUBSOIL OR NEW RIGHTS IN AND ABOVE SUBSOIL AND SURFACE MAY BE ACQUIRED

Articles 33, 35 and 36 In this Schedule, “the level of the surface of the land” means— (a) in the case of any land on which a building is erected, the level of the surface of the ground adjoining the building; (b) in the case of a river (except in the case of the river Thames as provided in sub-paragraph (c)), dock, canal, navigation, watercourse or other water area, the level of the surface of the ground covered by water; (c) in the case of the river Thames comprised in plots 15-10, 15-11, 15-12, 16-42 and 16-43, the level of Ordnance Datum Newlyn; or (d) in any other case, ground surface level, at the time of this Order coming into force. (1) Plot Reference Number shown on land plans | (2) Depth of subsoil beneath the level of the surface of the land | (3) Purpose for which the subsoil and new rights and restrictive covenants are required 13-38 | 14 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 13-41 | 13 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 13-46 | 14 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 13-47 | 14 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 13-48 | 14 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works ; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 13-50 | 16 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 14-04, 14-07, 14-08, 14-09, 14-10, 14-12, 14-13 and 14-14 | 1 metre | Acquisition of subsoil and rights (including restrictive covenants) for provision of a directional drill pipe from construction compound. 14-05 | 7 metres | Acquisition of subsoil and rights (including restrictive covenants) for provision of a directional drill pipe from construction compound. 14-06 | 4 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 14-11 | 9 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 14-15 | 11 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 14-16, 14-17 and 14-18 | 9 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 15-10 | 27 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-11 and 15-12 | 23 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-13 | 23 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-14 and 15-15 | 3 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-16 | 23 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-17 and 15-18 | 20 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 15-19 | 19 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 15-20 | 18 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 16-42 | 13 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 16-43 | 21 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 16-70 | 7 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.

Your change, as a redline

SCHEDULE 10 LAND IN WHICH ONLY SUBSOIL OR NEW RIGHTS IN AND ABOVE SUBSOIL AND SURFACE MAY BE ACQUIRED

Articles 33, 35 and 36 In this Schedule, “the level of the surface of the land” means— (a) in the case of any land on which a building is erected, the level of the surface of the ground adjoining the building; (b) in the case of a river (except in the case of the river Thames as provided in sub-paragraph (c)), dock, canal, navigation, watercourse or other water area, the level of the surface of the ground covered by water; (c) in the case of the river Thames comprised in plots 15-10, 15-11, 15-12, 16-42 and 16-43, the level of Ordnance Datum Newlyn; or (d) in any other case, ground surface level, at the time of this Order coming into force. (1) Plot Reference Number shown on land plans | (2) Depth of subsoil beneath the level of the surface of the land | (3) Purpose for which the subsoil and new rights and restrictive covenants are required 13-38 | 14 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 13-41 | 13 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 13-46 | 14 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 13-47 | 14 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 13-48 | 14 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works ; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 13-50 | 16 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 14-04, 14-07, 14-08, 14-09, 14-10, 14-12, 14-13 and 14-14 | 1 metre | Acquisition of subsoil and rights (including restrictive covenants) for provision of a directional drill pipe from construction compound. 14-05 | 7 metres | Acquisition of subsoil and rights (including restrictive covenants) for provision of a directional drill pipe from construction compound. 14-06 | 4 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 14-11 | 9 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 14-15 | 11 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 14-16, 14-17 and 14-18 | 9 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 15-10 | 27 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-11 and 15-12 | 23 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-13 | 23 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-14 and 15-15 | 3 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-16 | 23 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-17 and 15-18 | 20 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 15-19 | 19 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 15-20 | 18 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 16-42 | 13 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 16-43 | 21 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 16-70 | 7 metres | Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds