The A122 (Lower Thames Crossing) Development Consent Order 2025
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 11 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
Article 35 (1) Plot Reference Number shown on Land Plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development 01-01, 01-03, 01-05, 01-08, 01-09, 01-10, 01-11, 01-13, 01-15, 01-16, 01-17, 01-18, 01-19, 01-20, 01-21 and 01-22 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition. | Work No. E1 02-04, 02-05, 02-06, 02-07, 02-08, 02-09, 02-10 and 02-11 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition. | Work No. E1 03-02, 03-03, 03-14, 03-16 and 03-17 | Installation of a medium-pressure gas pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G1a and MU1 03-04 and 03-08 | Improvement works to the existing public right of way along footpath NS179. | Work No. 1K 03-07 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU2, MU3 and MU4 03-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU4 03-36 and 03-80 | To facilitate the construction of a new public right of way from drainage pond to the improved public right of way south of the improved A2 mainline, and to provide temporary storage, laydown areas and working space. | Work No. 1K 03-87 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU3 03-96, 03-98, 03-112, 03-135, 03-139, 03-140, 03-141, 03-142, 03-143, 03-144 and 03-146 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU1 04-03 and 04-14 | Installation of a medium-pressure gas pipeline. | Work No. G1b 04-07, 04-12, 04-17, 04-45, 04-101 and 04-122 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E5 04-08, 04-16, 04-61, 04-72, 04-109, 04-128 and 04-154 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU9 04-25, 04-28 and 04-46 | Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L 04-37 | Construction of a new permissive path from Halfpence Lane roundabout to road leading to Scalers Hill House; and improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Works Nos. 1E and 1L 04-38 | Temporary construction compound at surface for facilitating main works; and installation of a medium-pressure gas pipeline. | Works Nos. CA2 and G1b 04-42 | Temporary construction compound at surface for facilitating main works; installation of a medium-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. CA2, G1b, MU10 and OH2 04-58 and 04-92 | Installation of a medium-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. G1b, MU10 and OH2 04-63, 04-93, 04-94 and 04-98 | Installation of a medium-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. G1b and OH2 04-89 | Implementation of environmental mitigation works to create a site for protected species; installation of a medium-pressure gas pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E4, G1a, G1b, MU10, MU11 and MUT1 04-96, 04-100 and 04-103 | To facilitate the construction of a new bridge to carry the realigned Thong Lane over the improved section of the A2 mainline, and to provide temporary storage, laydown areas and working space. | Work No. 1H 04-99 and 04-145 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E4 04-108, 04-137 and 04-141 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E4 04-123 | Construction of a new permissive path from Halfpence Lane roundabout to road leading to Scalers Hill House. | Work No. 1E 04-138 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU10 04-140, 04-223, 04-228, 04-244, 04-246, 04-247, 04-249, 04-251, 04-252, 04-266 and 04-268 | Installation of a medium-pressure gas pipeline. | Work No. G1a 04-148, 04-149, 04-151, 04-152 and 04-153 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU8 04-200, 04-233, 04-257 and 04-258 | Improvement works to the existing public right of way along footpath NS179. | Work No. 1K 04-215, 04-229, 04-243 and 04-259 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU4 04-225 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU5 04-226 and 04-227 | Installation of a medium-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G1a and MU5 04-253, 04-254 and 04-255 | To facilitate the installation of a medium-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G1a 04-274 | Implementation of environmental mitigation works to create a site for protected species; and installation of a medium-pressure gas pipeline. | Works Nos. E4 and G1a 04-276 | Temporary construction compound at surface for facilitating main works and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. CA2 and OH2 05-01, 05-02 and 05-03 | Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L 05-04, 05-05 and 05-06 | Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L 05-07, 05-08, 05-09, 05-10, 05-11, 05-12, 05-13, 05-14, 05-15, 05-16, 05-17 and 05-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU8 06-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU15 and MU16 06-08, 06-09 and 06-11 | Improvement works to a section of the existing public right of way from Church Road to existing public right of way footpath NS175. | Work No. 2P 06-18, 06-19, 06-98, 06-102, 06-104, 06-107, 06-111, 06-112, 06-113, 06-114 and 06-115 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU16 06-46 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH1 06-54 | Provision for access for overhead lines diversion works. | Work No. OH1 06-55 and 06-64 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU14 06-56 | Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland; implementation of environmental mitigation works to create a site for protected species Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 1L, E5 and OH1 06-67 and 06-117 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU14 and MU9 06-72, 06-78 and 06-131 | Installation of a medium-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G1b and MU16 06-75 | Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L 06-91, 06-96 and 06-99 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 2Q and MU16 06-109 and 06-123 | Construction of a new public right of way from Valley Drive to the existing public right of way footpath NS174. | Work No. 2Q 06-110 | To facilitate the construction of a new public right of way from Valley Drive to the existing public right of way footpath NS174, and to provide temporary storage, laydown areas and working space. | Work No. 2Q 06-116 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E5 06-121 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E5, MU14, MU9, OH1 and OHT1 06-132, 06-136, 06-137, 06-139, 06-151, 06-207, 06-208 and 06-209 | Installation of a medium-pressure gas pipeline. | Work No. G1b 06-135 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH1 06-144 | Installation of a medium-pressure gas pipeline Installation of a high-pressure gas pipeline. | Works Nos. G1b and G2 06-152 | Installation of a medium-pressure gas pipeline; installation of a high-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G1b, G2, G3, MU17, OH1 and OHT1 06-153 | Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland. | Work No. 1L 06-158 | Installation of a medium-pressure gas pipeline; installation of a high-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G1b, G2, G3, MU17 and OH1 06-182, 06-188 and 06-204 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E5 06-187 and 06-205 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU9 07-01, 07-02, 07-04, 07-05, 07-09, 07-11, 07-15, 07-17, 07-20, 07-22, 07-23, 07-26, 07-27, 07-28, 07-29, 07-40, 07-41 and 07-42 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU15 08-06, 08-07, 08-08, 08-09, 08-10, 08-11, 08-12, 08-13, 08-14 and 08-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU15 09-02, 09-03, 09-04, 09-05, 09-06, 09-07, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 09-21, 09-22, 09-23, 09-24, 09-25, 09-26, 09-27, 09-28, 09-29, 09-30, 09-31, 09-32, 09-33, 09-34, 09-35, 09-36, 09-37, 09-38, 09-39, 09-40, 09-41, 09-42, 09-43, 09-44, 09-45, 09-46, 09-47, 09-48, 09-49, 09-50, 09-51, 09-52, 09-53, 09-54, 09-55, 09-56, 09-57, 09-58, 09-59, 09-60, 09-61, 09-62, 09-63, 09-64, 09-65, 09-66, 09-67, 09-68 and 09-69 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 10-02 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 10-05, 10-06, 10-07, 10-08, 10-09 and 10-10 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition. | Work No. E13 11-02, 11-03, 11-04, 11-05, 11-06 and 11-07 | Improvements works of a section of the existing public right of way footpath NS169. | Work No. 2Q 11-15 | Installation of a medium-pressure gas pipeline Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G1b and OH1 11-24 | Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G3 and OH1 11-38 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU18 and OH1 11-39 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons | Works Nos. G3, MU18 and OH1 11-40 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH1 11-43, 11-46, 11-47 and 11-48 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU18 11-50 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G3 and MU18 11-52, 11-53 and 11-54 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G3 11-56, 11-57, 11-59, 11-60, 11-61, 11-62, 11-65, 11-67 and 11-76 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 11-63 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 11-64 and 11-70 | Installation of a high-pressure gas pipeline. | Work No. G4 11-68 and 11-69 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G4 11-71 | Overhead lines diversion works, including the removal of existing overhead lines and supports; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. OH2 and ULH13 11-73 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA3, G4 and OH1 11-75 | The establishment of a temporary utilities logistic hub for facilitating utility works. | Work No. ULH13 12-01, 12-03 and 12-04 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 12-02 | Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G4 and OH1 12-05 and 12-07 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 12-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works. | Works Nos. MU20 and OH1 12-08, 12-09, 12-12, 12-14, 12-15, 12-17, 12-18 and 12-19 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MU20 12-13 and 12-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU20 12-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. MU20 and OH2 12-21, 12-22, 12-23, 12-24, 12-25, 12-26, 12-27, 12-28, 12-29, 12-30, 12-31, 12-32, 12-33, 12-34, 12-35, 12-36, 12-37, 12-38, 12-39, 12-40, 12-41, 12-42, 12-43, 12-44, 12-45, 12-46, 12-47, 12-48, 12-49, 12-50, 12-51, 12-52, 12-53, 12-54, 12-55, 12-56, 12-57, 12-58, 12-59, 12-60, 12-61, 12-62, 12-63, 12-64, 12-65, 12-66 and 12-67 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 13-04 and 13-05 | Construction of a new public right of way, including the upgrade of a section of the existing footpath NG7 from the new public right of way between the existing Thong Lane to the new Thong Lane bridge over the A122 Lower Thames Crossing and Thong Lane; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Works Nos. 3N and CA3 13-06, 13-07, 13-11, 13-22, 13-66, 13-69, 13-81 and 13-88 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 13-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU23 and MUT3 13-13, 13-14, 13-15, 13-16, 13-17 and 13-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU23 13-19, 13-21, 13-24, 13-25, 13-26, 13-27, 13-28, 13-29, 13-30, 13-31, 13-32, 13-33, 13-34, 13-40 and 13-45 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT3 13-20 and 13-42 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MUT3 13-38, 13-41 and 13-50 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Works Nos. 4A and CA3 13-46 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, CA3, MU20, MU22, MU24 and MUT3 13-47 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, CA3, MU20, MU24 and MUT3 13-48 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, CA3, MU24 and MUT3 13-53, 13-60, 13-61 and 13-62 | Construction of a public right of way, including the upgrade of a section of existing footpath NG8 between the new public right of way from Thong Lane bridge over the A122 Lower Thames Crossing to NG7 and the A226; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; provision for temporary access for overhead lines diversion works. | Works Nos. 3P, CA3 and OH1 13-54, 13-55, 13-56, 13-70 and 13-71 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MU20 13-63, 13-72, 13-85, 13-89 and 13-90 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MU20 13-65 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA3, G4 and OH1 13-67 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; provision for temporary access for overhead lines diversion works. | Works Nos. CA3, G4 and OH1 13-68 and 13-77 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Works Nos. CA3 and OH1 13-73 and 13-76 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 13-74 and 13-75 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA3 and OH1 13-78 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH1 13-79 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; provision for access for overhead lines diversion works. | Works Nos. CA3 and OH1 14-01 | Provision for temporary outfall of drainage from temporary satellite construction compound to existing ditch; and implementation of temporary environmental works to create a compensatory habitat site. | Works Nos. 4C and ET1 14-02 and 14-03 | Provision for temporary outfall of drainage from temporary satellite construction compound to existing ditch. | Work No. 4C 14-11 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel ; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Temporary satellite construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, 4B, CA3, CA3A, MU25, MU26 and MUT3 14-16, 14-17 and 14-18 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, 4B and MU26 14-19 and 14-20 | Temporary satellite construction compound at surface for facilitating main works. | Work No. CA3A 15-01, 15-09, 15-21, 15-22 and 15-23 | Temporary satellite construction compound at surface for facilitating main works. | Work No. CA3B 15-02 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3B 15-03, 15-04, 15-05, 15-06 and 15-07 | Provision for repairs to existing culvert. | Work No. CA3B 15-08 | Implementation of temporary environmental works to create a compensatory habitat site. | Work No. ET1 15-17, 15-18 and 15-19 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel Temporary satellite construction compound at surface for facilitating main works. | Works Nos. 4A, 4B and CA3B 16-02, 16-04, 16-05, 16-10, 16-11, 16-12, 16-17, 16-18, 16-19, 16-20, 16-21, 16-30, 16-31 and 16-32 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 16-03, 16-06, 16-07, 16-08, 16-09, 16-13, 16-14, 16-15, 16-16, 16-23, 16-24, 16-25, 16-26, 16-27, 16-28, 16-29, 16-33, 16-34, 16-35 and 16-40 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 16-22 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal. | Works Nos. CA5, MU27, MUT4 and MUT5 16-44, 16-60, 16-62 and 16-63 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; construction a new public right of way along the existing footpath FP146; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A, 5O and CA5 16-47, 16-64, 16-67 and 16-69 | Provision for temporary outfall of drainage to the River Thames from the north portal of the A122 Lower Thames Crossing. | Work No. 5A 16-49, 16-54, 16-55, 16-56, 16-57, 16-58 and 16-59 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A and CA5 16-62 and 16-63 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; construction a new public right of way along the existing footpath FP146; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A, 5O and CA5 16-65 and 16-66 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 16-68 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames. | Work No. 5A 16-70 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new public right of way along the existing footpath FP146 and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 4A, 5O and CA5 17-01, 17-02, 17-03, 17-04, 17-05 and 17-06 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 17-08 and 17-09 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 18-01, 18-02, 18-03, 18-04, 18-05, 18-06, 18-07, 18-08, 18-09 and 18-10 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 19-02, 19-14 and 19-35 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E15 19-04, 19-06, 19-08, 19-10, 19-11, 19-15, 19-16, 19-21, 19-22, 19-26, 19-27 and 19-28 | To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space. | Work No. 5R 19-05 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure. | Work No. E17 19-36 | Construction of a new public right of way along the eastern section of FP200 and a new public right of way between Coalhouse Fort and FP200. | Work No. 5R 19-37 | Construction of a new water inlet with self-regulating valve. | Work No. 5X 19-38 | Construction of a new public right of way along the eastern section of FP200. | Work No. 5R 20-01 and 20-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU27 20-02, 20-03, 20-04, 20-05, 20-26, 20-27, 20-29, 20-30, 20-31, 20-33, 20-34, 20-35, 20-36, 20-37, 20-38, 20-39, 20-40, 20-43, 20-44, 20-46, 20-54, 20-71, 20-72, 20-90, 20-91, 20-92, 20-93, 20-95 and 20-97 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 20-06, 20-07, 20-08 and 20-09 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 20-10, 20-12, 20-15, 20-16, 20-17, 20-28 and 20-32 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH3 20-11, 20-23, 20-24 and 20-25 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA5 and OH3 20-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27 and OH4 20-18 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA5, MU28, OH3 and OH4 20-19 and 20-20 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH4 20-21 and 20-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28 and OH4 20-41 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27, MU29, MUT7, MUT8 and MUT9 20-42 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal. | Works Nos. CA5, MU27, MUT4 and MUT5 20-47, 20-48, 20-49, 20-50, 20-55, 20-56, 20-57 and 20-61 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MU27 20-75 and 20-76 | Construction of a new public rights of way along the existing footpath FP200; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 5U, CA5 and MU27 20-87 and 20-102 | To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space. | Work No. 5R 20-99 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A and CA5 21-01, 21-02, 21-03, 21-04, 21-05, 21-06, 21-07, 21-08, 21-09, 21-11, 21-12 and 21-37 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 21-13, 21-15, 21-16, 21-17, 21-23, 21-25, 21-26, 21-28 and 21-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU27 21-14 and 21-20 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MU27 21-18, 21-19, 21-27, 21-30 and 21-31 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 21-24 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 21-32 and 21-34 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA5 21-33, 21-35 and 21-36 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 22-01, 22-11, 22-13, 22-19, 22-21, 22-22, 22-23, 22-24, 22-35, 22-39, 22-47, 22-48, 22-56, 22-57, 22-58, 22-60, 22-61, 22-62, 22-63, 22-64, 22-65, 22-66, 22-67, 22-68, 22-69, 22-70, 22-71, 22-73, 22-74, 22-75, 22-76, 22-78, 22-79, 22-80, 22-81, 22-82, 22-83, 22-84, 22-85, 22-86, 22-87, 22-88, 22-89, 22-90 and 22-91 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E16 22-02, 22-15 and 22-18 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT6 22-03, 22-07, 22-09, 22-12, 22-16, 22-17, 22-20 and 22-116 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 22-04, 22-05, 22-06, 22-08, 22-10 and 22-14 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MUT6 22-25, 22-27, 22-29, 22-30, 22-31, 22-32, 22-34 and 22-37 | Provision for temporary access for environmental mitigation works to create a site for protected species; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E16 and MUT11 22-33, 22-36, 22-38, 22-41, 22-42, 22-43, 22-44, 22-49, 22-50, 22-51, 22-52, 22-53, 22-54 and 22-55 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT11 23-01, 23-02, 23-03, 23-04, 23-05, 23-06, 23-07, 23-08, 23-09, 23-10, 23-11, 23-12, 23-13, 23-14, 23-15, 23-18 and 23-170 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU29 23-16 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E18 and MU29 23-17 and 23-20 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E18 23-21 and 23-22 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E18 23-23 and 23-38 | Temporary possession of railway to facilitate the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct. | Work No. CA5 23-24, 23-25, 23-110, 23-112, 23-123, 23-127, 23-138, 23-142, 23-143 and 23-146 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU27 23-26 and 23-28 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27 and OH4 23-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27, MU28 and OH4 23-30 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. Temporary satellite construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. Installation of a high-pressure gas pipeline. | Works Nos. CA5, CA5A, MU27, MU28, MU29, MU30, MUT7, MUT8, MUT9, OH3, OH4 and TFGP1 23-32, 23-182, 23-183, 23-184, 23-185 and 23-186 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT8 23-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU28, MU29 and MUT8 23-35 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH5 23-39, 23-40 and 23-42 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 23-41, 23-46 and 23-48 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH5 23-43, 23-119, 23-124, 23-126, 23-155, 23-159, 23-166, 23-167 and 23-174 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 23-44, 23-45, 23-49, 23-53, 23-55 and 23-58 | Provision for access for overhead lines diversion works. | Work No. OH4 23-47 | Modification of an existing irrigation reservoir and the diversion and modification of irrigation infrastructure, including possible provision of a new groundwater abstraction well; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5K, FCA1, MU33 and OH4 23-50 | Construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. FCA1, MU33, OH4, OH5, OHT2 and ULH12 23-52 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory Temporary satellite construction compound at surface for facilitating main works. | Works Nos. CA5 and CA5A 23-54, 23-56, 23-60, 23-66, 23-67, 23-69 and 23-71 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH4 23-57 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU33 and OH4 23-59 and 23-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU28 23-61 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU33 and OH4 23-63 and 23-65 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27, MU28, MU30, MUT9 and OH4 23-64 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27, MU28, MU30, MU32, MUT9 and OH4 23-72 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, OH3 and OH4 23-76 | Modification of an existing irrigation reservoir and the diversion and modification of irrigation infrastructure, including possible provision of a new groundwater abstraction well; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5K, FCA1, MU28, MU33 and OH3 23-88, 23-90 and 23-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28 and OH3 23-95 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU30, MU31, MU32 and OH3 23-97 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU30 and OH3 23-115, 23-116 and 23-180 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU28 23-100 | Temporary possession of railway to facilitate the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Works Nos. CA5 and OH3 23-101 and 23-111 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Works Nos. CA5 and OH3 23-104, 23-105, 23-107, 23-109, 23-178 and 23-179 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU33 23-108 and 23-120 | Construction of a new public rights of way along the existing footpath FP200; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 5U and MU27 23-114 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH3 23-122 | Provision for temporary access for utility works. | Work No. MU27 23-125 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MU31 23-128, 23-129, 23-130, 23-132, 23-135, 23-136, 23-139, 23-150, 23-151, 23-153, 23-161 and 23-162 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MUT6 23-133 and 23-148 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27, MUT10 and MUT6 23-154 and 23-157 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MUT10 and MUT6 23-160 | To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space. | Work No. 5R 23-163, 23-164, 23-165 and 23-168 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E16 23-169, 23-175, 23-176 and 23-177 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT6 23-181 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E18, MU29 and MUT8 24-01, 24-03, 24-05, 24-160, 24-161, 24-162 and 24-163 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU35 24-06, 24-07 and 24-12 | Provision for access for utility works; provision for access for overhead lines diversion works. | Works Nos. MU37, OH6 and OH7 24-08, 24-25, 24-30 and 24-32 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU37, OH6 and OH7 24-09, 24-164, 24-166, 24-167, 24-171, 24-172, 24-173, 24-175, 24-178, 24-180, 24-181, 24-183, 24-186, 24-187, 24-188, 24-189 and 24-190 | To facilitate the construction of a new bridge to carry the realigned Muckingford Road over the new A122 Lower Thames Crossing, and to provide temporary storage, laydown areas and working space. | Work No. 6B 24-17, 24-22, 24-23, 24-27, 24-28, 24-29, 24-31 and 24-42 | Provision for access for overhead lines diversion works. | Work No. OH5 24-24 and 24-26 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU37 24-34 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6 and OH7 24-43 and 24-49 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works. | Works Nos. MU36 and OH5 24-45 and 24-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU34, MU36 and OH5 24-46, 24-56, 24-59, 24-68, 24-90, 24-126, 24-129 and 24-130 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU36 24-47, 24-48 and 24-74 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH5 24-53, 24-63, 24-67, 24-69, 24-80 and 24-81 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH5 24-71 | Temporary possession of property, to facilitate the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU36 24-82 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. OH5 and ULH12 24-83, 24-92, 24-93, 24-98 and 24-99 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH3, OH4, OHT2 and OHT3 24-84 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH3, OH4 and OHT2 24-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU36, OH3, OH4 and OHT2 24-95 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU36, MUT6, OH3, OH4, OHT2 and OHT3 24-96, 24-103 and 24-105 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU36, OH4 and OHT2 24-100 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU36, OH3, OH4, OHT2 and OHT3 24-109 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU36, OH4, OHT2 and OHT3 24-112 and 24-113 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU34 and OH4 24-120, 24-121 and 24-123 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5W and OH4 24-124 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5W, MU28, OH3 and OH4 24-125 and 24-128 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH3 24-133, 24-192 and 24-193 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT6 24-136 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works. | Works Nos. MU34, MU35, MU36, MUT6 and OH4 24-139 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT6 24-153 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU34 24-191 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5W, MU28, MU34, MUT6, OH3 and OH4 24-194, 24-195, 24-196, 24-197, 24-198 and 24-199 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61. | Work No. 5W 25-01, 25-02, 25-03, 25-04, 25-05, 25-06, 25-07, 25-08, 25-09, 25-10, 25-11, 25-12, 25-13, 25-14, 25-15, 25-16, 25-17, 25-18, 25-19, 25-20, 25-21, 25-22, 25-23, 25-24, 25-25, 25-26, 25-27, 25-28, 25-29, 25-30, 25-31, 25-32, 25-33, 25-34, 25-35, 25-36, 25-37, 25-38, 25-39, 25-40, 25-41, 25-42, 25-43, 25-44, 25-45, 25-46, 25-47, 25-48, 25-49, 25-50, 25-51, 25-52, 25-53, 25-54, 25-55, 25-56, 25-57, 25-58, 25-59, 25-60, 25-61, 25-62, 25-63, 25-64, 25-65, 25-66, 25-67, 25-68, 25-69, 25-70, 25-71, 25-72, 25-73, 25-74, 25-75, 25-76, 25-77, 25-78, 25-81, 25-82, 25-83, 25-84, 25-85, 25-86, 25-87, 25-88, 25-89, 25-90, 25-91 and 25-92 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT14 25-79 and 25-80 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT14 25-93, 25-95, 25-98, 25-99, 25-101, 25-102, 25-106, 25-109 and 25-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU35 26-17, 26-18, 26-19, 26-20, 26-21, 26-22, 26-23, 26-25, 26-26, 26-27, 26-28, 26-29, 26-30, 26-31, 26-32, 26-33, 26-35, 26-36, 26-37, 26-38, 26-39, 26-40, 26-41, 26-42, 26-44, 26-45, 26-46, 26-47, 26-48, 26-49, 26-50, 26-51, 26-52, 26-53, 26-54, 26-55, 26-56, 26-57, 26-58, 26-59, 26-60, 26-61, 26-62, 26-63, 26-64, 26-65 and 26-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT14 26-24, 26-34 and 26-43 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT14 27-01 | Implementation of environmental mitigation works to create a site for protected species. | Works Nos. E21 and E22 27-02, 27-09, 27-11 and 27-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU37, OH6 and OH7 27-06 and 27-16 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6 and OH7 27-07 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU37 27-25, 27-27, 27-36, 27-37, 27-38 and 27-39 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU37 27-35 | To facilitate the construction new highway, three-lane dual carriageway, and to provide temporary storage, laydown areas and working space; provision for temporary access for overhead lines diversion works. | Works Nos. 6C and OH5 27-40, 27-49, 27-52, 27-55, 27-56, 27-65 and 27-72 | Provision for temporary access for overhead lines diversion works | Work No. OH5 27-41, 27-42, 27-44, 27-51, 27-53 and 27-54 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH5 27-45, 27-47, 27-48, 27-50, 27-57, 27-58, 27-59, 27-60, 27-61 and 27-62 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E21 27-66 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH4 27-67, 27-68, 27-69, 27-71, 27-74, 27-75, 27-76, 27-80, 27-82, 27-96 and 27-101 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH4 27-70 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; provision for temporary access for overhead lines diversion works. | Works Nos. OH4 and OH5 27-77, 27-78, 27-79, 27-81, 27-83, 27-84, 27-86, 27-88, 27-89, 27-91, 27-92, 27-93, 27-94, 27-95, 27-98, 27-99, 27-100, 27-102 and 27-103 | Provision for access for overhead lines diversion works. | Work No. OH4 28-01 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. MU47, MUT16, MUT18, OH6, OH7, OHT4, OHT5 and ULH9 28-02 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47, MU48 and MUT16 28-03, 28-13 and 28-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MUT16, MUT18, OH6 and OHT5 28-04 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18, OH6 and OHT5 28-05 | Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; and temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S, CA7, MU40, MU41, MU47, MUT13, MUT16, MUT17 and MUT18 28-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MUT16, MUT18, OH6, OH7, OHT4 and OHT5 28-08 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA7, E28 and MU41 28-09 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18, OH6, OH7 and OHT5 28-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18 and OHT5 28-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47, MU48, MUT16 and MUT18 28-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47, MUT16 and MUT18 28-16 | The establishment of a temporary utilities logistic hub for facilitating utility works. | Work No. ULH9 28-21 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, OH6 and OHT5 28-27 and 28-30 | Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S, MU41 and MU47 28-31 | Construction of a new private means of access from the new Hornsby Lane turning head north of the new A122 Lower Thames Crossing to Heath Place. | Work No. 7S 28-34, 28-58, 28-104 and 28-107 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU40 28-35 | Construction of a new private means of access from the new Hornsby Lane turning head north of the new A122 Lower Thames Crossing to Heath Place; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S, MU41 and MU47 28-37 and 28-39 | Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S and MU47 28-38, 28-98, 28-100 and 28-103 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU40 and MUT13 28-42 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA6, E27, MU41 and MU47 28-43 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU47 28-45 and 28-46 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU41 28-47 and 28-63 | Temporary construction compound at surface for facilitating main works. | Work No. CA6 28-49, 28-52, 28-53, 28-54, 28-56, 28-57, 28-59, 28-61, 28-69, 28-70, 28-71, 28-72 and 28-73 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor | Work No. MUT14 28-50 and 28-51 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MUT14 28-60 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU40, MUT13, OH6 and OH7 28-62 | Temporary construction compound at surface for facilitating main works; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. CA6 and ULH10 28-64 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA6, E27 and MU41 28-65 and 28-68 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road. | Work No. 7X 28-67 | Construction of a new private means of access from the improved Brentwood Road; and temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. 7B, CA6, MU40, MU41, MUT12, MUT13, MUT15 and ULH10 28-106 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU38, MU40, OH6 and OH7 28-124 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G5, MU39, MU40, MUT12 and MUT15 28-125 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor | Works Nos. MU39, MU40 and MUT12 28-127 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU40 and MUT12 28-128 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G5, MU40 and MUT12 28-129 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MU40 28-131 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39, MU40 and MUT15 28-132 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G5, MU39, MU40 and MUT15 28-133 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MUT15 28-134 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU40, MU41 and MUT12 28-135 | Provision for access for utility works. | Work No. MU40 28-137 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU38 and MUT12 28-139 and 28-141 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU38 28-143 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6 and OH7 28-144 | Installation of a high-pressure gas pipeline. | Work No. G5 28-145 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G5 29-03 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA8A, E30, MU54, MU55, MU56, MUT20, OH6, OH7 and OHT6 29-04 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E30, MU55, MU56, MUT20, OH6 and OH7 29-05 | The establishment of a temporary utilities logistic hub for facilitating utility works. | Work No. ULH8 29-10 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU56 29-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU55, MU56, MUT16, OH6, OH7 and OHT6 29-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU56, OH6 and OHT6 29-17 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU55, MU56, MUT16, MUT20, OH6, OH7 and OHT6 29-20 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA8A, MU55, MU56, MUT16, MUT20, OH6, OH7 and OHT6 29-26 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH6 29-29, 29-33, 29-39 and 29-51 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU44 29-31 | Overhead lines diversion works, including the removal of existing overhead lines and pylons. | Works Nos. OH6 and OH7 29-49 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU55, MUT16, MUT20, OH6 and OH7 29-61, 29-62, 29-63 and 29-65 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU52 and MUT13 29-113 | Improvements to Woolings Close. | Work No. 7G 29-115 | Improvements to Woolings Close; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7G and MU53 29-140 and 29-211 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU53 29-202 and 29-205 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU50 29-212 and 29-215 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 29-213 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU49, MUT16, OH6 and OH7 29-231, 29-238 and 29-242 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU49, MUT16, MUT18, OH6 and OH7 29-236 and 29-237 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU49 and OH7 29-245, 29-251 and 29-256 | To facilitate the construction of a realigned section of Rectory Road, and to provide temporary storage, laydown areas and working space. | Work No. 7J 29-247 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU49 and MUT18 29-248 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18, OH6, OH7, OHT4 and OHT5 29-249 and 29-250 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU49 29-258 and 29-268 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU41 and MUT13 29-262 and 29-267 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47 and MUT16 29-263 and 29-266 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU47 29-264 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU46 29-277 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6, OH7, OHT4 and OHT5 29-282 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E30 and MU57 29-283 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E30, MU54, MU55, MU57, MUT20 and OH6 30-01, 30-02, 30-04, 30-05, 30-06, 30-07, 30-08, 30-09, 30-10 and 30-11 | Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species; provision for temporary access for overhead lines diversion works. | Works Nos. CA13, E38, OH6 and OH7 30-12, 30-14, 30-17, 30-19, 30-20, 30-21, 30-22, 30-23, 30-24, 30-25, 30-26, 30-27, 30-28, 30-29, 30-30, 30-31, 30-32, 30-33, 30-34, 30-35, 30-36, 30-37, 30-38, 30-39, 30-40, 30-41, 30-42, 30-43, 30-44, 30-45, 30-46, 30-47, 30-48, 30-49, 30-50, 30-51, 30-52, 30-53, 30-54, 30-55, 30-56, 30-57, 30-58, 30-59, 30-60, 30-61, 30-62, 30-63, 30-64, 30-65, 30-66, 30-67, 30-68, 30-69, 30-71, 30-72 and 30-73 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA9 30-74, 30-75, 30-76, 30-77, 30-78, 30-79 and 30-80 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT23 31-02, 31-08, 31-09, 31-13, 31-18 and 31-19 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 31-05 and 31-06 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G6 and ULH6 31-07 and 31-11 | Installation of a high-pressure gas pipeline. | Work No. G6 31-10, 31-14, 31-16, 31-17, 31-20, 31-21 and 31-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU42 31-15 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU42 32-05 and 32-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU46 32-07, 32-12, 32-13, 32-14, 32-57, 32-66, 32-92, 32-102, 32-115, 32-117, 32-119, 32-134, 32-137, 32-147, 32-149, 32-152 and 32-186 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 32-11, 32-15, 32-16 and 32-17 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU46 32-25 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU46, MU47 and MUT17 32-33, 32-35 and 32-36 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU47 32-39, 32-44, 32-48, 32-55, 32-135, 32-157, 32-164 and 32-169 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU43 32-49 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7X, MU41 and MU43 32-53 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU41 32-58 and 32-59 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU45 32-61 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU43 32-63 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6, MU45 and MUT19 32-78, 32-81 and 32-85 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road. | Work No. 7X 32-84 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7X and MU43 32-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU43 and MUT19 32-93 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MUT19 32-103, 32-116, 32-118, 32-120, 32-130, 32-138, 32-143 and 32-144 | Installation of a high-pressure gas pipeline. | Work No. G6 32-104 | Provision for temporary access for works involving the installation of a high-pressure gas pipeline. | Work No. G6 32-109 | To facilitate the improvement to the existing dual carriageway A13, and to provide temporary storage, laydown areas and working space. | Work No. 7F 32-110 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT19 32-111, 32-122, 32-124, 32-125, 32-128, 32-129 and 32-133 | Provision for access for works involving the installation of a high-pressure gas pipeline. | Work No. G6 32-136 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39, MU43 and MUT15 32-139, 32-140, 32-141, 32-142, 32-145, 32-148, 32-155, 32-159, 32-160, 32-168, 32-170, 32-171, 32-172, 32-173, 32-174 and 32-179 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MUT15 32-153, 32-158 and 32-166 | Provision for access for works involving the diversion of existing gas pipeline. | Work No. G6b 32-156 and 32-163 | Installation of a isolation valve | Work No. G6b 32-162, 32-165, 32-175, 32-176, 32-180 and 32-181 | Provision for temporary access for works involving the diversion of existing gas pipeline. | Work No. G6b 32-177 and 32-178 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E22 32-182 and 32-183 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G6 and ULH6 33-01 and 33-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works. | Works Nos. MUT24, OH6 and OH7 33-02 and 33-08 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA9, MU60 and MUT23 33-05 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G6, MU55, MUT13, MUT24, OH6, OH7 and OHT7 33-06, 33-92, 33-179, 33-242, 33-249, 33-254, 33-255, 33-257, 33-259, 33-263, 33-265, 33-268, 33-276, 33-280, 33-281, 33-282 and 33-285 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 33-17 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6, OH7 and OHT7 33-19 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU57 33-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT23 33-30 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. CA9, MU55, MU57, MU58, OH6, OH7 and ULH7 33-35 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU54, MU55, MU57, MUT20 and OH6 33-36 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species; and installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA10, E34, G6, MU55, MU60, MUT13, MUT21 and MUT22 33-37 | Temporary construction compound at surface for facilitating main works. To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Works Nos. CA10 and G6 33-42 | To facilitate the construction of a new private means of access for maintenance of the new drainage structures and to provide temporary storage, laydown areas and working space. | Work No. 8K 33-47, 33-48, 33-49, 33-53, 33-54, 33-55, 33-56, 33-61, 33-82, 33-83, 33-84, 33-93, 33-94, 33-100, 33-101, 33-104, 33-106, 33-108, 33-115, 33-116, 33-118, 33-154, 33-155, 33-173, 33-178, 33-184, 33-188 and 33-221 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT22 33-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU59 and MUT13 33-67 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU59 and MU60 33-68 and 33-70 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT21 33-69, 33-71, 33-77, 33-78, 33-79, 33-80 and 33-81 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU59, MU60 and MUT21 33-74 and 33-75 | To facilitate the construction of a realigned section of Stifford Clays road, and to provide temporary storage, laydown areas and working space. | Work No. 7L 33-86, 33-88 and 33-89 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MUT22 33-87 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E33 and MUT22 33-90, 33-91, 33-99, 33-103, 33-105, 33-107, 33-114, 33-119, 33-129, 33-134, 33-146, 33-152, 33-157, 33-158, 33-159, 33-160, 33-162, 33-165, 33-168, 33-169, 33-170, 33-172, 33-174, 33-176, 33-177, 33-181, 33-183, 33-187, 33-190, 33-192, 33-195, 33-196, 33-197, 33-199, 33-200, 33-202, 33-203, 33-205, 33-206, 33-208, 33-209, 33-210, 33-211, 33-212, 33-215, 33-217, 33-219, 33-220, 33-222, 33-225, 33-227, 33-228, 33-230, 33-231, 33-232, 33-233, 33-236, 33-238, 33-239, 33-240, 33-241, 33-243, 33-244, 33-245, 33-246, 33-247, 33-251, 33-252, 33-256, 33-258, 33-260, 33-261, 33-267, 33-269, 33-271, 33-272, 33-274, 33-275, 33-279, 33-283, 33-284, 33-286 and 33-287 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU60 and MUT21 33-98 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT13 33-109, 33-113, 33-117, 33-120, 33-121, 33-122, 33-123, 33-124, 33-125, 33-126, 33-127, 33-128, 33-130, 33-131, 33-132, 33-133, 33-135, 33-136, 33-137, 33-138, 33-139, 33-140, 33-141, 33-142, 33-143, 33-144, 33-145, 33-147, 33-148, 33-149, 33-150, 33-151, 33-153, 33-156, 33-161, 33-163, 33-164, 33-166, 33-167, 33-171, 33-180, 33-185 and 33-186 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU52 33-110 and 33-112 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU52, MU60, MUT21 and MUT22 33-175, 33-248, 33-250, 33-266, 33-270, 33-273 and 33-277 | Installation of a high-pressure gas pipeline. | Work No. G6 33-182, 33-189 and 33-191 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU52 and MUT13 33-194 and 33-229 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E32 33-201 and 33-207 | Improvements to Woolings Close. | Work No. 7G 33-224, 33-226, 33-234, 33-235 and 33-237 | Provision for temporary access for works involving the installation of a high-pressure gas pipeline. | Work No. G6 33-253, 33-262 and 33-264 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6, MU60 and MUT21 33-278 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU46 33-290 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU46 34-01, 34-03 and 34-05 | Provision for temporary access and traffic management for the temporary construction compound; provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works. | Works Nos. CA13, E38, MUT24, OH6 and OH7 34-02, 34-24 and 34-42 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT24 34-04 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA13 34-06, 34-15, 34-17, 34-19, 34-23, 34-25, 34-26, 34-41, 34-43, 34-47 and 34-48 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works. | Works Nos. MUT24, OH6 and OH7 34-20 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G6 and ULH5 34-27 and 34-28 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; provision for temporary access to the temporary utilities logistic hub. | Works Nos. G6 and ULH5 34-29, 34-32 and 34-46 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 34-30, 34-31 and 34-45 | Installation of a high-pressure gas pipeline. | Work No. G6 34-33, 34-38, 34-39 and 34-40 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT23 34-44 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU60 and MUT23 35-01, 35-03 and 35-07 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT24 35-02 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 35-05, 35-06, 35-19, 35-20, 35-21, 35-53, 35-54 and 35-56 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Work No. E36 35-09 and 35-55 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E36 and OH7 35-13 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area. Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E36, FCA3 and OH7 35-29 and 35-30 | Temporary construction compound at surface for facilitating main works. | Work No. CA11 35-32 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA11, MUT13, MUT22 and MUT25 35-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MUT22 and MUT25 35-34 and 35-35 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT25 35-36, 35-42, 35-58, 35-59 and 35-61 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT22 36-01 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E38 36-02 | Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA13, E38 and MUT24 36-03 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E38 36-04 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA13 36-05 | Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species. | Works Nos. CA13 and E38 36-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT24 37-05 | Implementation of environmental mitigation works to create a site for protected species. | Works Nos. E37 and E39 37-06 and 37-07 | Provision for access for environmental mitigation works to create a site for protected species. | Works Nos. E37 and E39 38-01 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and temporary construction compound at surface for facilitating main works; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M, CA13, MU64, MU65, MUT26 and MUT27 38-02 and 38-10 | Temporary construction compound at surface for facilitating main works. | Work No. CA13 38-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU64 and MUT27 38-09 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU65 38-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU65 38-14 and 38-24 | Provision for temporary access and traffic management for the temporary construction compound; and implementation of environmental mitigation works to create a site for protected species. | Works Nos. CA13 and E40 38-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU64 38-16 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA13 38-18 | To facilitate the construction of a new public right of way over the new A122 Lower Thames Crossing, and to provide temporary storage, laydown areas and working space. | Work No. 8C 38-19 | To facilitate the construction of a new drainage attenuation pond with associated drainage facilities, laydown areas and working space. | Work No. 8H 38-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU63 38-22 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 8M, G8, MU63 and OH7 38-23 | To facilitate the construction of a new public right of way and to provide temporary storage, laydown areas and working space. | Work No. 8M 38-25 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 8M and OH7 38-28 and 38-29 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136. | Work No. 8M 38-31 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G8 and MU63 38-32 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G8, MU62, MU63, OH7, OHT8 and ULH4 38-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU62, MU63 and OH7 38-34 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E40 38-35 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH7 and OHT8 38-36 and 38-39 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G8 38-37 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G8 and ULH4 38-38 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 38-40, 38-41, 38-42, 38-44, 38-46, 38-49, 38-51, 38-52, 38-59 and 38-64 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Work No. E36 38-43, 38-60, 38-61 and 38-65 | Construction of a new public right of way along the Mardyke channel, between south of the new Mardyke viaduct and the new public right of way; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Works Nos. 8J and E36 38-47 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E36, FCA4 and MU61 38-53, 38-54 and 38-55 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area. | Works Nos. E36 and FCA3 39-01 | Temporary construction compound at surface for facilitating main works. | Work No. CA14 39-02 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Works Nos. 8D and G9 39-04 | Diversion of existing gas pipeline. | Work No. G9 39-05, 39-14 and 39-15 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU71 39-06 and 39-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU71 39-08, 39-26 and 39-46 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space. | Work No. 8D 39-12 | Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane. | Work No. 8N 39-13 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA14 and MUT29 39-17, 39-18, 39-21, 39-27 and 39-28 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT29 39-20 | Construction of a new public right of way from the realigned North Road to the new public right of way to Church Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8D and MUT29 39-22 and 39-25 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G9 39-23 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G9, MU68, MU69 and MU70 39-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MUT28 and MUT29 39-30 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU69 39-31 and 39-32 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT28 39-33 | Construction of a new public right of way from the realigned North Road to the new public right of way to Church Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8D, MUT28 and MUT29 39-50, 39-52, 39-54, 39-55, 39-57 and 39-59 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU66 39-65 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M, MU69 and MUT26 39-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU69 and MUT26 39-67 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G9, MU69 and MUT27 39-68 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Works Nos. G9 and MUT27 39-69, 39-70 and 39-74 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT26 39-72 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT27 39-77 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G8 39-78 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G8, MU64 and MUT27 39-80 and 39-81 | To facilitate the construction of a three-lane carriageway northbound and two-lane carriageway southbound, and to provide temporary storage, laydown areas and working space. | Work No. 8A 39-82 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E42 39-83 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M, E42 and MUT26 39-84 | Temporary construction compound at surface for facilitating main works. | Work No. CA13 40-21 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space; and yo facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Works Nos. 8D, G9 and MU71 40-22 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G9 and MU71 41-01 and 41-02 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E42 41-03 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E42 41-04, 41-05, 41-08 and 41-32 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 41-06, 41-07, 41-09, 41-15, 41-16, 41-18, 41-19, 41-25, 41-26 and 41-27 | Provision for temporary access for overhead lines diversion works. | Work No. OH7 41-10 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MUT26 and OH7 41-11 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M and MUT26 41-13, 41-14, 41-44, 41-46, 41-47, 41-48, 41-49 and 41-51 | Provision for access for overhead lines diversion works. | Work No. OH7 41-23 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU63, MUT26 and OH7 41-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU63 and OH7 41-28, 41-29, 41-30, 41-31, 41-45 and 41-50 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH7 41-33, 41-34, 41-35, 41-36, 41-37, 41-41 and 41-42 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Work No. E36 41-38 and 41-43 | Construction of a new public right of way along the Mardyke channel, between south of the new Mardyke viaduct and the new public right of way; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Works Nos. 8J and E36 41-39 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136. | Work No. 8M 41-40 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Works Nos. 8M and E36 42-01, 42-02 and 42-03 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E43 42-04 and 42-07 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU72 42-05, 42-06 and 42-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU75 and MU76 42-08 and 42-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72 and MU76 42-09, 42-10 and 42-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72 and MU75 42-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU73 and MU75 42-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU75 42-17 and 42-21 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU72 42-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU75 and MU76 42-23 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU75 and MUT30 42-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU76, MU77 and MUT30 42-25 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU75, MU76 and MUT30 42-34 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU73 42-75 | To facilitate the improvements to the existing highway M25 northbound and existing highway M25 southbound, and to provide temporary storage, laydown areas and working space. | Work No. 9E 42-99 and 42-124 | Temporary possession of the railway line railway to facilitate the construction of a new bridge to carry a new public right of way over the existing Upminster and Grays Branch railway line. | Work No. 9M 42-115 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU73, MU74 and MU76 42-116 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU74 42-127 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space. | Work No. 8D 42-128 | Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane; and temporary construction compound at surface for facilitating main works. | Works Nos. 8N and CA14 42-131, 42-132, 42-133 and 42-134 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA15A and MU76 42-135, 42-136 and 42-137 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA15A 42-138 | Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane. | Work No. 8N 42-139, 42-140, 42-141, 42-142, 42-143, 42-144, 42-145, 42-146, 42-147, 42-148, 42-149, 42-150, 42-151, 42-152, 42-153, 42-154, 42-155, 42-156, 42-157, 42-158, 42-159, 42-160, 42-161, 42-162, 42-163, 42-164, 42-165, 42-166, 42-167, 42-168, 42-169, 42-170, 42-171, 42-172, 42-173, 42-174, 42-175, 42-177, 42-178, 42-179, 42-180, 42-181, 42-182, 42-184 and 42-185 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT28 42-176 and 42-183 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MUT28 and MUT29 43-01, 43-02, 43-03 and 43-05 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU72 43-07 | Construction of a new permissive path over the new A122 Lower Thames Crossing and the improved section of the M25 Junction; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 9O, MU72, MU78 and OH8 43-09 and 43-108 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU72, MU78 and OH8 43-10 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU72 43-18 and 43-104 | Construction of a new permissive path from Thames Chase Forest, and a new private means of access from Thames Chase Forest to the new culvert; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 9O, MU72, MU78 and OH8 43-19 | Construction of a new permissive path from Thames Chase Forest, and a new private means of access from Thames Chase Forest to the new culvert; implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 9O, E46, MU72 and OH8 43-27 | Landscaping associated with the new public right of way and permissive path over the new A122 Lower Thames Crossing. | Work No. 9O 43-28 | Construction of a new permissive path along the existing FP230, and landscaping associated with the new public right of way and permissive path over the new A122 Lower Thames Crossing. | Work No. 9O 43-35, 43-47, 43-53, 43-106, 43-107, 43-109 and 43-110 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH8 43-40, 43-41, 43-43, 43-46, 43-63, 43-64, 43-65, 43-66, 43-67, 43-68, 43-69, 43-70, 43-71, 43-72, 43-73, 43-74, 43-75, 43-76, 43-77, 43-78, 43-79, 43-80, 43-82, 43-83, 43-84, 43-85, 43-86, 43-87, 43-88, 43-90, 43-93, 43-94, 43-95, 43-98, 43-101, 43-102, 43-112, 43-113 and 43-114 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA15A 43-49 | Construction of a new permissive path along the existing FP230. | Work No. 9O 43-54, 43-55, 43-56, 43-57, 43-58, 43-59, 43-60, 43-61, 43-62, 43-81, 43-89, 43-91 and 43-92 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA15A and MUT28 43-96, 43-97, 43-99 and 43-100 | Provision for access for overhead lines diversion works. | Work No. OH8 43-103 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT28 43-105 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU72 and OH8 43-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU78 44-01, 44-02, 44-03 and 44-06 | Construction of a new flood compensation area. | Work No. FCA7 44-04 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU87 44-05 | Construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. FCA7 and MU72 44-07 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU83 44-08 | Construction of a new permissive path from Thames Chase Forest, a new permissive path to the new culvert and a new private means of access from Thames Chase Forest to the new culvert; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9O and MU72 44-09 and 44-17 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU79, MU80, MU82 and MU83 44-10, 44-44 and 44-84 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU80 44-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU86 44-13, 44-14 and 44-94 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU72 44-16 and 44-90 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU84 44-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU83 44-22 and 44-56 | Temporary possession of railway line to facilitate the construction of earthworks associated with the new A122 Lower Thames Crossing two-lane link road from the M25 northbound carriageway to M25 junction 29 link road. | Work No. 9D 44-64, 44-72 and 44-73 | To facilitate the improvements to the existing highway M25 northbound and existing highway M25 southbound, and to provide temporary storage, laydown areas and working space. | Work No. 9E 44-68 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU81 and MU84 44-80 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU81 and MU83 44-81 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU79, MU81, MU82 and MU83 44-85, 44-87 and 44-93 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU72 44-86 and 44-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU79, MU80, MU81, MU82 and MU83 44-88 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU79, MU80 and MU82 44-89, 44-95 and 44-96 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU80 and MU81 44-92 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU84 44-98, 44-99 and 44-100 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU81 44-101, 44-102, 44-103, 44-104, 44-105, 44-106, 44-107, 44-108, 44-109, 44-110, 44-111, 44-113, 44-114, 44-115, 44-116, 44-117, 44-118 and 44-119 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA15A 44-112, 44-120, 44-121, 44-122, 44-123 and 44-124 | Provision for access for utility works. | Work No. MU84 45-01, 45-02, 45-03, 45-04, 45-05, 45-06, 45-07, 45-09, 45-12, 45-39, 45-43, 45-45, 45-46, 45-69 and 45-70 | Improvement works to a section of the existing two-lane dual carriageway A127 highway. | Work No. 9J 45-08, 45-15, 45-16, 45-17, 45-18, 45-20, 45-22, 45-28, 45-67 and 45-68 | To facilitate the improvement works to a section of the existing two-lane dual carriageway A127 highway, and to provide temporary storage, laydown areas and working space. | Work No. 9J 45-10, 45-11, 45-19, 45-21, 45-23, 45-24, 45-25, 45-26, 45-29, 45-31, 45-33, 45-38, 45-42, 45-50, 45-52 and 45-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU91 45-47, 45-48 and 45-49 | Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout. | Work No. 9H 45-66 | Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9H and MU91 45-71 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU88 45-72 | Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9H and MU88 45-79, 45-88 and 45-107 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU87 45-87, 45-89 and 45-108 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers. | Work No. MU87 45-99 and 45-100 | Improvement works to the existing private means of access between the improved M25 junction 29 roundabout and Codham Hall Lane.; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9I and MU88 45-105 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU88 45-110 and 45-112 | Provision for access for utility works. | Work No. MU87 45-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers. | Works Nos. MU86 and MU87 45-120 | Construction of protection measures for retention of the existing infrastructure. | Work No. 9P 45-121 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers. | Works Nos. CA16, MU85, MU87 and MUT32 45-132 | Temporary construction compound at surface for facilitating main works. | Work No. CA16 45-137, 45-139, 45-141, 45-143, 45-144, 45-145, 45-146, 45-147, 45-148, 45-149, 45-150, 45-151, 45-152, 45-153, 45-154, 45-159, 45-161, 45-164, 45-166, 45-167, 45-178, 45-179 and 45-180 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA16 45-155 and 45-160 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA16, MU85 and MUT32 45-158 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA16 and MU85 45-165, 45-168, 45-171, 45-172, 45-173 and 45-174 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU85 45-169 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU85 and MUT32 45-175, 45-176 and 45-177 | Provision for access for utility works. | Work No. MU84 46-01, 46-02 and 46-03 | Improvement works to a section of the existing two-lane dual carriageway A127 highway. | Work No. 9J 46-04 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds. | Work No. E51 46-06 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds Installation of a high-pressure gas pipeline; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. E51, G10 and ULH2 46-08, 46-09, 46-11, 46-12 and 46-13 | Installation of a high-pressure gas pipeline. | Work No. G10 46-23, 46-24 and 46-25 | Provision for access for utility works. | Work No. MU92 46-26 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU92 46-52 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU92 46-55 | Installation of a high-pressure gas pipeline; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G10 and ULH2 47-26 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds. | Work No. E51
SCHEDULE 11 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
Article 35 (1) Plot Reference Number shown on Land Plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development 01-01, 01-03, 01-05, 01-08, 01-09, 01-10, 01-11, 01-13, 01-15, 01-16, 01-17, 01-18, 01-19, 01-20, 01-21 and 01-22 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition. | Work No. E1 02-04, 02-05, 02-06, 02-07, 02-08, 02-09, 02-10 and 02-11 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition. | Work No. E1 03-02, 03-03, 03-14, 03-16 and 03-17 | Installation of a medium-pressure gas pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G1a and MU1 03-04 and 03-08 | Improvement works to the existing public right of way along footpath NS179. | Work No. 1K 03-07 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU2, MU3 and MU4 03-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU4 03-36 and 03-80 | To facilitate the construction of a new public right of way from drainage pond to the improved public right of way south of the improved A2 mainline, and to provide temporary storage, laydown areas and working space. | Work No. 1K 03-87 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU3 03-96, 03-98, 03-112, 03-135, 03-139, 03-140, 03-141, 03-142, 03-143, 03-144 and 03-146 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU1 04-03 and 04-14 | Installation of a medium-pressure gas pipeline. | Work No. G1b 04-07, 04-12, 04-17, 04-45, 04-101 and 04-122 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E5 04-08, 04-16, 04-61, 04-72, 04-109, 04-128 and 04-154 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU9 04-25, 04-28 and 04-46 | Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L 04-37 | Construction of a new permissive path from Halfpence Lane roundabout to road leading to Scalers Hill House; and improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Works Nos. 1E and 1L 04-38 | Temporary construction compound at surface for facilitating main works; and installation of a medium-pressure gas pipeline. | Works Nos. CA2 and G1b 04-42 | Temporary construction compound at surface for facilitating main works; installation of a medium-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. CA2, G1b, MU10 and OH2 04-58 and 04-92 | Installation of a medium-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. G1b, MU10 and OH2 04-63, 04-93, 04-94 and 04-98 | Installation of a medium-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. G1b and OH2 04-89 | Implementation of environmental mitigation works to create a site for protected species; installation of a medium-pressure gas pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E4, G1a, G1b, MU10, MU11 and MUT1 04-96, 04-100 and 04-103 | To facilitate the construction of a new bridge to carry the realigned Thong Lane over the improved section of the A2 mainline, and to provide temporary storage, laydown areas and working space. | Work No. 1H 04-99 and 04-145 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E4 04-108, 04-137 and 04-141 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E4 04-123 | Construction of a new permissive path from Halfpence Lane roundabout to road leading to Scalers Hill House. | Work No. 1E 04-138 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU10 04-140, 04-223, 04-228, 04-244, 04-246, 04-247, 04-249, 04-251, 04-252, 04-266 and 04-268 | Installation of a medium-pressure gas pipeline. | Work No. G1a 04-148, 04-149, 04-151, 04-152 and 04-153 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU8 04-200, 04-233, 04-257 and 04-258 | Improvement works to the existing public right of way along footpath NS179. | Work No. 1K 04-215, 04-229, 04-243 and 04-259 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU4 04-225 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU5 04-226 and 04-227 | Installation of a medium-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G1a and MU5 04-253, 04-254 and 04-255 | To facilitate the installation of a medium-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G1a 04-274 | Implementation of environmental mitigation works to create a site for protected species; and installation of a medium-pressure gas pipeline. | Works Nos. E4 and G1a 04-276 | Temporary construction compound at surface for facilitating main works and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. CA2 and OH2 05-01, 05-02 and 05-03 | Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L 05-04, 05-05 and 05-06 | Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L 05-07, 05-08, 05-09, 05-10, 05-11, 05-12, 05-13, 05-14, 05-15, 05-16, 05-17 and 05-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU8 06-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU15 and MU16 06-08, 06-09 and 06-11 | Improvement works to a section of the existing public right of way from Church Road to existing public right of way footpath NS175. | Work No. 2P 06-18, 06-19, 06-98, 06-102, 06-104, 06-107, 06-111, 06-112, 06-113, 06-114 and 06-115 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU16 06-46 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH1 06-54 | Provision for access for overhead lines diversion works. | Work No. OH1 06-55 and 06-64 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU14 06-56 | Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland; implementation of environmental mitigation works to create a site for protected species Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 1L, E5 and OH1 06-67 and 06-117 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU14 and MU9 06-72, 06-78 and 06-131 | Installation of a medium-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G1b and MU16 06-75 | Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L 06-91, 06-96 and 06-99 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 2Q and MU16 06-109 and 06-123 | Construction of a new public right of way from Valley Drive to the existing public right of way footpath NS174. | Work No. 2Q 06-110 | To facilitate the construction of a new public right of way from Valley Drive to the existing public right of way footpath NS174, and to provide temporary storage, laydown areas and working space. | Work No. 2Q 06-116 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E5 06-121 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E5, MU14, MU9, OH1 and OHT1 06-132, 06-136, 06-137, 06-139, 06-151, 06-207, 06-208 and 06-209 | Installation of a medium-pressure gas pipeline. | Work No. G1b 06-135 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH1 06-144 | Installation of a medium-pressure gas pipeline Installation of a high-pressure gas pipeline. | Works Nos. G1b and G2 06-152 | Installation of a medium-pressure gas pipeline; installation of a high-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G1b, G2, G3, MU17, OH1 and OHT1 06-153 | Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland. | Work No. 1L 06-158 | Installation of a medium-pressure gas pipeline; installation of a high-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G1b, G2, G3, MU17 and OH1 06-182, 06-188 and 06-204 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E5 06-187 and 06-205 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU9 07-01, 07-02, 07-04, 07-05, 07-09, 07-11, 07-15, 07-17, 07-20, 07-22, 07-23, 07-26, 07-27, 07-28, 07-29, 07-40, 07-41 and 07-42 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU15 08-06, 08-07, 08-08, 08-09, 08-10, 08-11, 08-12, 08-13, 08-14 and 08-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU15 09-02, 09-03, 09-04, 09-05, 09-06, 09-07, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 09-21, 09-22, 09-23, 09-24, 09-25, 09-26, 09-27, 09-28, 09-29, 09-30, 09-31, 09-32, 09-33, 09-34, 09-35, 09-36, 09-37, 09-38, 09-39, 09-40, 09-41, 09-42, 09-43, 09-44, 09-45, 09-46, 09-47, 09-48, 09-49, 09-50, 09-51, 09-52, 09-53, 09-54, 09-55, 09-56, 09-57, 09-58, 09-59, 09-60, 09-61, 09-62, 09-63, 09-64, 09-65, 09-66, 09-67, 09-68 and 09-69 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 10-02 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 10-05, 10-06, 10-07, 10-08, 10-09 and 10-10 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition. | Work No. E13 11-02, 11-03, 11-04, 11-05, 11-06 and 11-07 | Improvements works of a section of the existing public right of way footpath NS169. | Work No. 2Q 11-15 | Installation of a medium-pressure gas pipeline Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G1b and OH1 11-24 | Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G3 and OH1 11-38 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU18 and OH1 11-39 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons | Works Nos. G3, MU18 and OH1 11-40 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH1 11-43, 11-46, 11-47 and 11-48 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU18 11-50 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G3 and MU18 11-52, 11-53 and 11-54 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G3 11-56, 11-57, 11-59, 11-60, 11-61, 11-62, 11-65, 11-67 and 11-76 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 11-63 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 11-64 and 11-70 | Installation of a high-pressure gas pipeline. | Work No. G4 11-68 and 11-69 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G4 11-71 | Overhead lines diversion works, including the removal of existing overhead lines and supports; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. OH2 and ULH13 11-73 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA3, G4 and OH1 11-75 | The establishment of a temporary utilities logistic hub for facilitating utility works. | Work No. ULH13 12-01, 12-03 and 12-04 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 12-02 | Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G4 and OH1 12-05 and 12-07 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 12-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works. | Works Nos. MU20 and OH1 12-08, 12-09, 12-12, 12-14, 12-15, 12-17, 12-18 and 12-19 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MU20 12-13 and 12-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU20 12-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. MU20 and OH2 12-21, 12-22, 12-23, 12-24, 12-25, 12-26, 12-27, 12-28, 12-29, 12-30, 12-31, 12-32, 12-33, 12-34, 12-35, 12-36, 12-37, 12-38, 12-39, 12-40, 12-41, 12-42, 12-43, 12-44, 12-45, 12-46, 12-47, 12-48, 12-49, 12-50, 12-51, 12-52, 12-53, 12-54, 12-55, 12-56, 12-57, 12-58, 12-59, 12-60, 12-61, 12-62, 12-63, 12-64, 12-65, 12-66 and 12-67 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 13-04 and 13-05 | Construction of a new public right of way, including the upgrade of a section of the existing footpath NG7 from the new public right of way between the existing Thong Lane to the new Thong Lane bridge over the A122 Lower Thames Crossing and Thong Lane; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Works Nos. 3N and CA3 13-06, 13-07, 13-11, 13-22, 13-66, 13-69, 13-81 and 13-88 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 13-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU23 and MUT3 13-13, 13-14, 13-15, 13-16, 13-17 and 13-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU23 13-19, 13-21, 13-24, 13-25, 13-26, 13-27, 13-28, 13-29, 13-30, 13-31, 13-32, 13-33, 13-34, 13-40 and 13-45 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT3 13-20 and 13-42 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MUT3 13-38, 13-41 and 13-50 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Works Nos. 4A and CA3 13-46 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, CA3, MU20, MU22, MU24 and MUT3 13-47 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, CA3, MU20, MU24 and MUT3 13-48 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, CA3, MU24 and MUT3 13-53, 13-60, 13-61 and 13-62 | Construction of a public right of way, including the upgrade of a section of existing footpath NG8 between the new public right of way from Thong Lane bridge over the A122 Lower Thames Crossing to NG7 and the A226; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; provision for temporary access for overhead lines diversion works. | Works Nos. 3P, CA3 and OH1 13-54, 13-55, 13-56, 13-70 and 13-71 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MU20 13-63, 13-72, 13-85, 13-89 and 13-90 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MU20 13-65 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA3, G4 and OH1 13-67 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; provision for temporary access for overhead lines diversion works. | Works Nos. CA3, G4 and OH1 13-68 and 13-77 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Works Nos. CA3 and OH1 13-73 and 13-76 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 13-74 and 13-75 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA3 and OH1 13-78 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH1 13-79 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; provision for access for overhead lines diversion works. | Works Nos. CA3 and OH1 14-01 | Provision for temporary outfall of drainage from temporary satellite construction compound to existing ditch; and implementation of temporary environmental works to create a compensatory habitat site. | Works Nos. 4C and ET1 14-02 and 14-03 | Provision for temporary outfall of drainage from temporary satellite construction compound to existing ditch. | Work No. 4C 14-11 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel ; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Temporary satellite construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, 4B, CA3, CA3A, MU25, MU26 and MUT3 14-16, 14-17 and 14-18 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, 4B and MU26 14-19 and 14-20 | Temporary satellite construction compound at surface for facilitating main works. | Work No. CA3A 15-01, 15-09, 15-21, 15-22 and 15-23 | Temporary satellite construction compound at surface for facilitating main works. | Work No. CA3B 15-02 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3B 15-03, 15-04, 15-05, 15-06 and 15-07 | Provision for repairs to existing culvert. | Work No. CA3B 15-08 | Implementation of temporary environmental works to create a compensatory habitat site. | Work No. ET1 15-17, 15-18 and 15-19 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel Temporary satellite construction compound at surface for facilitating main works. | Works Nos. 4A, 4B and CA3B 16-02, 16-04, 16-05, 16-10, 16-11, 16-12, 16-17, 16-18, 16-19, 16-20, 16-21, 16-30, 16-31 and 16-32 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 16-03, 16-06, 16-07, 16-08, 16-09, 16-13, 16-14, 16-15, 16-16, 16-23, 16-24, 16-25, 16-26, 16-27, 16-28, 16-29, 16-33, 16-34, 16-35 and 16-40 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 16-22 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal. | Works Nos. CA5, MU27, MUT4 and MUT5 16-44, 16-60, 16-62 and 16-63 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; construction a new public right of way along the existing footpath FP146; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A, 5O and CA5 16-47, 16-64, 16-67 and 16-69 | Provision for temporary outfall of drainage to the River Thames from the north portal of the A122 Lower Thames Crossing. | Work No. 5A 16-49, 16-54, 16-55, 16-56, 16-57, 16-58 and 16-59 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A and CA5 16-62 and 16-63 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; construction a new public right of way along the existing footpath FP146; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A, 5O and CA5 16-65 and 16-66 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 16-68 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames. | Work No. 5A 16-70 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new public right of way along the existing footpath FP146 and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 4A, 5O and CA5 17-01, 17-02, 17-03, 17-04, 17-05 and 17-06 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 17-08 and 17-09 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 18-01, 18-02, 18-03, 18-04, 18-05, 18-06, 18-07, 18-08, 18-09 and 18-10 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 19-02, 19-14 and 19-35 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E15 19-04, 19-06, 19-08, 19-10, 19-11, 19-15, 19-16, 19-21, 19-22, 19-26, 19-27 and 19-28 | To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space. | Work No. 5R 19-05 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure. | Work No. E17 19-36 | Construction of a new public right of way along the eastern section of FP200 and a new public right of way between Coalhouse Fort and FP200. | Work No. 5R 19-37 | Construction of a new water inlet with self-regulating valve. | Work No. 5X 19-38 | Construction of a new public right of way along the eastern section of FP200. | Work No. 5R 20-01 and 20-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU27 20-02, 20-03, 20-04, 20-05, 20-26, 20-27, 20-29, 20-30, 20-31, 20-33, 20-34, 20-35, 20-36, 20-37, 20-38, 20-39, 20-40, 20-43, 20-44, 20-46, 20-54, 20-71, 20-72, 20-90, 20-91, 20-92, 20-93, 20-95 and 20-97 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 20-06, 20-07, 20-08 and 20-09 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 20-10, 20-12, 20-15, 20-16, 20-17, 20-28 and 20-32 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH3 20-11, 20-23, 20-24 and 20-25 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA5 and OH3 20-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27 and OH4 20-18 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA5, MU28, OH3 and OH4 20-19 and 20-20 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH4 20-21 and 20-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28 and OH4 20-41 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27, MU29, MUT7, MUT8 and MUT9 20-42 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal. | Works Nos. CA5, MU27, MUT4 and MUT5 20-47, 20-48, 20-49, 20-50, 20-55, 20-56, 20-57 and 20-61 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MU27 20-75 and 20-76 | Construction of a new public rights of way along the existing footpath FP200; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 5U, CA5 and MU27 20-87 and 20-102 | To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space. | Work No. 5R 20-99 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A and CA5 21-01, 21-02, 21-03, 21-04, 21-05, 21-06, 21-07, 21-08, 21-09, 21-11, 21-12 and 21-37 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 21-13, 21-15, 21-16, 21-17, 21-23, 21-25, 21-26, 21-28 and 21-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU27 21-14 and 21-20 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MU27 21-18, 21-19, 21-27, 21-30 and 21-31 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 21-24 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 21-32 and 21-34 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA5 21-33, 21-35 and 21-36 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 22-01, 22-11, 22-13, 22-19, 22-21, 22-22, 22-23, 22-24, 22-35, 22-39, 22-47, 22-48, 22-56, 22-57, 22-58, 22-60, 22-61, 22-62, 22-63, 22-64, 22-65, 22-66, 22-67, 22-68, 22-69, 22-70, 22-71, 22-73, 22-74, 22-75, 22-76, 22-78, 22-79, 22-80, 22-81, 22-82, 22-83, 22-84, 22-85, 22-86, 22-87, 22-88, 22-89, 22-90 and 22-91 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E16 22-02, 22-15 and 22-18 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT6 22-03, 22-07, 22-09, 22-12, 22-16, 22-17, 22-20 and 22-116 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 22-04, 22-05, 22-06, 22-08, 22-10 and 22-14 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MUT6 22-25, 22-27, 22-29, 22-30, 22-31, 22-32, 22-34 and 22-37 | Provision for temporary access for environmental mitigation works to create a site for protected species; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E16 and MUT11 22-33, 22-36, 22-38, 22-41, 22-42, 22-43, 22-44, 22-49, 22-50, 22-51, 22-52, 22-53, 22-54 and 22-55 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT11 23-01, 23-02, 23-03, 23-04, 23-05, 23-06, 23-07, 23-08, 23-09, 23-10, 23-11, 23-12, 23-13, 23-14, 23-15, 23-18 and 23-170 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU29 23-16 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E18 and MU29 23-17 and 23-20 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E18 23-21 and 23-22 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E18 23-23 and 23-38 | Temporary possession of railway to facilitate the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct. | Work No. CA5 23-24, 23-25, 23-110, 23-112, 23-123, 23-127, 23-138, 23-142, 23-143 and 23-146 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU27 23-26 and 23-28 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27 and OH4 23-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27, MU28 and OH4 23-30 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. Temporary satellite construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. Installation of a high-pressure gas pipeline. | Works Nos. CA5, CA5A, MU27, MU28, MU29, MU30, MUT7, MUT8, MUT9, OH3, OH4 and TFGP1 23-32, 23-182, 23-183, 23-184, 23-185 and 23-186 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT8 23-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU28, MU29 and MUT8 23-35 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH5 23-39, 23-40 and 23-42 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 23-41, 23-46 and 23-48 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH5 23-43, 23-119, 23-124, 23-126, 23-155, 23-159, 23-166, 23-167 and 23-174 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 23-44, 23-45, 23-49, 23-53, 23-55 and 23-58 | Provision for access for overhead lines diversion works. | Work No. OH4 23-47 | Modification of an existing irrigation reservoir and the diversion and modification of irrigation infrastructure, including possible provision of a new groundwater abstraction well; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5K, FCA1, MU33 and OH4 23-50 | Construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. FCA1, MU33, OH4, OH5, OHT2 and ULH12 23-52 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory Temporary satellite construction compound at surface for facilitating main works. | Works Nos. CA5 and CA5A 23-54, 23-56, 23-60, 23-66, 23-67, 23-69 and 23-71 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH4 23-57 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU33 and OH4 23-59 and 23-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU28 23-61 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU33 and OH4 23-63 and 23-65 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27, MU28, MU30, MUT9 and OH4 23-64 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27, MU28, MU30, MU32, MUT9 and OH4 23-72 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, OH3 and OH4 23-76 | Modification of an existing irrigation reservoir and the diversion and modification of irrigation infrastructure, including possible provision of a new groundwater abstraction well; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5K, FCA1, MU28, MU33 and OH3 23-88, 23-90 and 23-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28 and OH3 23-95 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU30, MU31, MU32 and OH3 23-97 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU30 and OH3 23-115, 23-116 and 23-180 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU28 23-100 | Temporary possession of railway to facilitate the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Works Nos. CA5 and OH3 23-101 and 23-111 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Works Nos. CA5 and OH3 23-104, 23-105, 23-107, 23-109, 23-178 and 23-179 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU33 23-108 and 23-120 | Construction of a new public rights of way along the existing footpath FP200; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 5U and MU27 23-114 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH3 23-122 | Provision for temporary access for utility works. | Work No. MU27 23-125 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MU31 23-128, 23-129, 23-130, 23-132, 23-135, 23-136, 23-139, 23-150, 23-151, 23-153, 23-161 and 23-162 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MUT6 23-133 and 23-148 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27, MUT10 and MUT6 23-154 and 23-157 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MUT10 and MUT6 23-160 | To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space. | Work No. 5R 23-163, 23-164, 23-165 and 23-168 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E16 23-169, 23-175, 23-176 and 23-177 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT6 23-181 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E18, MU29 and MUT8 24-01, 24-03, 24-05, 24-160, 24-161, 24-162 and 24-163 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU35 24-06, 24-07 and 24-12 | Provision for access for utility works; provision for access for overhead lines diversion works. | Works Nos. MU37, OH6 and OH7 24-08, 24-25, 24-30 and 24-32 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU37, OH6 and OH7 24-09, 24-164, 24-166, 24-167, 24-171, 24-172, 24-173, 24-175, 24-178, 24-180, 24-181, 24-183, 24-186, 24-187, 24-188, 24-189 and 24-190 | To facilitate the construction of a new bridge to carry the realigned Muckingford Road over the new A122 Lower Thames Crossing, and to provide temporary storage, laydown areas and working space. | Work No. 6B 24-17, 24-22, 24-23, 24-27, 24-28, 24-29, 24-31 and 24-42 | Provision for access for overhead lines diversion works. | Work No. OH5 24-24 and 24-26 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU37 24-34 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6 and OH7 24-43 and 24-49 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works. | Works Nos. MU36 and OH5 24-45 and 24-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU34, MU36 and OH5 24-46, 24-56, 24-59, 24-68, 24-90, 24-126, 24-129 and 24-130 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU36 24-47, 24-48 and 24-74 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH5 24-53, 24-63, 24-67, 24-69, 24-80 and 24-81 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH5 24-71 | Temporary possession of property, to facilitate the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU36 24-82 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. OH5 and ULH12 24-83, 24-92, 24-93, 24-98 and 24-99 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH3, OH4, OHT2 and OHT3 24-84 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH3, OH4 and OHT2 24-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU36, OH3, OH4 and OHT2 24-95 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU36, MUT6, OH3, OH4, OHT2 and OHT3 24-96, 24-103 and 24-105 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU36, OH4 and OHT2 24-100 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU36, OH3, OH4, OHT2 and OHT3 24-109 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU36, OH4, OHT2 and OHT3 24-112 and 24-113 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU34 and OH4 24-120, 24-121 and 24-123 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5W and OH4 24-124 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5W, MU28, OH3 and OH4 24-125 and 24-128 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH3 24-133, 24-192 and 24-193 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT6 24-136 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works. | Works Nos. MU34, MU35, MU36, MUT6 and OH4 24-139 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT6 24-153 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU34 24-191 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5W, MU28, MU34, MUT6, OH3 and OH4 24-194, 24-195, 24-196, 24-197, 24-198 and 24-199 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61. | Work No. 5W 25-01, 25-02, 25-03, 25-04, 25-05, 25-06, 25-07, 25-08, 25-09, 25-10, 25-11, 25-12, 25-13, 25-14, 25-15, 25-16, 25-17, 25-18, 25-19, 25-20, 25-21, 25-22, 25-23, 25-24, 25-25, 25-26, 25-27, 25-28, 25-29, 25-30, 25-31, 25-32, 25-33, 25-34, 25-35, 25-36, 25-37, 25-38, 25-39, 25-40, 25-41, 25-42, 25-43, 25-44, 25-45, 25-46, 25-47, 25-48, 25-49, 25-50, 25-51, 25-52, 25-53, 25-54, 25-55, 25-56, 25-57, 25-58, 25-59, 25-60, 25-61, 25-62, 25-63, 25-64, 25-65, 25-66, 25-67, 25-68, 25-69, 25-70, 25-71, 25-72, 25-73, 25-74, 25-75, 25-76, 25-77, 25-78, 25-81, 25-82, 25-83, 25-84, 25-85, 25-86, 25-87, 25-88, 25-89, 25-90, 25-91 and 25-92 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT14 25-79 and 25-80 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT14 25-93, 25-95, 25-98, 25-99, 25-101, 25-102, 25-106, 25-109 and 25-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU35 26-17, 26-18, 26-19, 26-20, 26-21, 26-22, 26-23, 26-25, 26-26, 26-27, 26-28, 26-29, 26-30, 26-31, 26-32, 26-33, 26-35, 26-36, 26-37, 26-38, 26-39, 26-40, 26-41, 26-42, 26-44, 26-45, 26-46, 26-47, 26-48, 26-49, 26-50, 26-51, 26-52, 26-53, 26-54, 26-55, 26-56, 26-57, 26-58, 26-59, 26-60, 26-61, 26-62, 26-63, 26-64, 26-65 and 26-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT14 26-24, 26-34 and 26-43 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT14 27-01 | Implementation of environmental mitigation works to create a site for protected species. | Works Nos. E21 and E22 27-02, 27-09, 27-11 and 27-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU37, OH6 and OH7 27-06 and 27-16 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6 and OH7 27-07 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU37 27-25, 27-27, 27-36, 27-37, 27-38 and 27-39 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU37 27-35 | To facilitate the construction new highway, three-lane dual carriageway, and to provide temporary storage, laydown areas and working space; provision for temporary access for overhead lines diversion works. | Works Nos. 6C and OH5 27-40, 27-49, 27-52, 27-55, 27-56, 27-65 and 27-72 | Provision for temporary access for overhead lines diversion works | Work No. OH5 27-41, 27-42, 27-44, 27-51, 27-53 and 27-54 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH5 27-45, 27-47, 27-48, 27-50, 27-57, 27-58, 27-59, 27-60, 27-61 and 27-62 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E21 27-66 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH4 27-67, 27-68, 27-69, 27-71, 27-74, 27-75, 27-76, 27-80, 27-82, 27-96 and 27-101 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH4 27-70 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; provision for temporary access for overhead lines diversion works. | Works Nos. OH4 and OH5 27-77, 27-78, 27-79, 27-81, 27-83, 27-84, 27-86, 27-88, 27-89, 27-91, 27-92, 27-93, 27-94, 27-95, 27-98, 27-99, 27-100, 27-102 and 27-103 | Provision for access for overhead lines diversion works. | Work No. OH4 28-01 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. MU47, MUT16, MUT18, OH6, OH7, OHT4, OHT5 and ULH9 28-02 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47, MU48 and MUT16 28-03, 28-13 and 28-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MUT16, MUT18, OH6 and OHT5 28-04 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18, OH6 and OHT5 28-05 | Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; and temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S, CA7, MU40, MU41, MU47, MUT13, MUT16, MUT17 and MUT18 28-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MUT16, MUT18, OH6, OH7, OHT4 and OHT5 28-08 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA7, E28 and MU41 28-09 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18, OH6, OH7 and OHT5 28-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18 and OHT5 28-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47, MU48, MUT16 and MUT18 28-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47, MUT16 and MUT18 28-16 | The establishment of a temporary utilities logistic hub for facilitating utility works. | Work No. ULH9 28-21 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, OH6 and OHT5 28-27 and 28-30 | Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S, MU41 and MU47 28-31 | Construction of a new private means of access from the new Hornsby Lane turning head north of the new A122 Lower Thames Crossing to Heath Place. | Work No. 7S 28-34, 28-58, 28-104 and 28-107 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU40 28-35 | Construction of a new private means of access from the new Hornsby Lane turning head north of the new A122 Lower Thames Crossing to Heath Place; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S, MU41 and MU47 28-37 and 28-39 | Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S and MU47 28-38, 28-98, 28-100 and 28-103 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU40 and MUT13 28-42 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA6, E27, MU41 and MU47 28-43 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU47 28-45 and 28-46 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU41 28-47 and 28-63 | Temporary construction compound at surface for facilitating main works. | Work No. CA6 28-49, 28-52, 28-53, 28-54, 28-56, 28-57, 28-59, 28-61, 28-69, 28-70, 28-71, 28-72 and 28-73 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor | Work No. MUT14 28-50 and 28-51 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MUT14 28-60 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU40, MUT13, OH6 and OH7 28-62 | Temporary construction compound at surface for facilitating main works; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. CA6 and ULH10 28-64 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA6, E27 and MU41 28-65 and 28-68 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road. | Work No. 7X 28-67 | Construction of a new private means of access from the improved Brentwood Road; and temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. 7B, CA6, MU40, MU41, MUT12, MUT13, MUT15 and ULH10 28-106 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU38, MU40, OH6 and OH7 28-124 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G5, MU39, MU40, MUT12 and MUT15 28-125 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor | Works Nos. MU39, MU40 and MUT12 28-127 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU40 and MUT12 28-128 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G5, MU40 and MUT12 28-129 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MU40 28-131 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39, MU40 and MUT15 28-132 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G5, MU39, MU40 and MUT15 28-133 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MUT15 28-134 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU40, MU41 and MUT12 28-135 | Provision for access for utility works. | Work No. MU40 28-137 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU38 and MUT12 28-139 and 28-141 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU38 28-143 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6 and OH7 28-144 | Installation of a high-pressure gas pipeline. | Work No. G5 28-145 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G5 29-03 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA8A, E30, MU54, MU55, MU56, MUT20, OH6, OH7 and OHT6 29-04 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E30, MU55, MU56, MUT20, OH6 and OH7 29-05 | The establishment of a temporary utilities logistic hub for facilitating utility works. | Work No. ULH8 29-10 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU56 29-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU55, MU56, MUT16, OH6, OH7 and OHT6 29-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU56, OH6 and OHT6 29-17 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU55, MU56, MUT16, MUT20, OH6, OH7 and OHT6 29-20 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA8A, MU55, MU56, MUT16, MUT20, OH6, OH7 and OHT6 29-26 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH6 29-29, 29-33, 29-39 and 29-51 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU44 29-31 | Overhead lines diversion works, including the removal of existing overhead lines and pylons. | Works Nos. OH6 and OH7 29-49 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU55, MUT16, MUT20, OH6 and OH7 29-61, 29-62, 29-63 and 29-65 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU52 and MUT13 29-113 | Improvements to Woolings Close. | Work No. 7G 29-115 | Improvements to Woolings Close; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7G and MU53 29-140 and 29-211 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU53 29-202 and 29-205 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU50 29-212 and 29-215 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 29-213 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU49, MUT16, OH6 and OH7 29-231, 29-238 and 29-242 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU49, MUT16, MUT18, OH6 and OH7 29-236 and 29-237 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU49 and OH7 29-245, 29-251 and 29-256 | To facilitate the construction of a realigned section of Rectory Road, and to provide temporary storage, laydown areas and working space. | Work No. 7J 29-247 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU49 and MUT18 29-248 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18, OH6, OH7, OHT4 and OHT5 29-249 and 29-250 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU49 29-258 and 29-268 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU41 and MUT13 29-262 and 29-267 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47 and MUT16 29-263 and 29-266 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU47 29-264 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU46 29-277 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6, OH7, OHT4 and OHT5 29-282 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E30 and MU57 29-283 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E30, MU54, MU55, MU57, MUT20 and OH6 30-01, 30-02, 30-04, 30-05, 30-06, 30-07, 30-08, 30-09, 30-10 and 30-11 | Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species; provision for temporary access for overhead lines diversion works. | Works Nos. CA13, E38, OH6 and OH7 30-12, 30-14, 30-17, 30-19, 30-20, 30-21, 30-22, 30-23, 30-24, 30-25, 30-26, 30-27, 30-28, 30-29, 30-30, 30-31, 30-32, 30-33, 30-34, 30-35, 30-36, 30-37, 30-38, 30-39, 30-40, 30-41, 30-42, 30-43, 30-44, 30-45, 30-46, 30-47, 30-48, 30-49, 30-50, 30-51, 30-52, 30-53, 30-54, 30-55, 30-56, 30-57, 30-58, 30-59, 30-60, 30-61, 30-62, 30-63, 30-64, 30-65, 30-66, 30-67, 30-68, 30-69, 30-71, 30-72 and 30-73 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA9 30-74, 30-75, 30-76, 30-77, 30-78, 30-79 and 30-80 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT23 31-02, 31-08, 31-09, 31-13, 31-18 and 31-19 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 31-05 and 31-06 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G6 and ULH6 31-07 and 31-11 | Installation of a high-pressure gas pipeline. | Work No. G6 31-10, 31-14, 31-16, 31-17, 31-20, 31-21 and 31-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU42 31-15 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU42 32-05 and 32-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU46 32-07, 32-12, 32-13, 32-14, 32-57, 32-66, 32-92, 32-102, 32-115, 32-117, 32-119, 32-134, 32-137, 32-147, 32-149, 32-152 and 32-186 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 32-11, 32-15, 32-16 and 32-17 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU46 32-25 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU46, MU47 and MUT17 32-33, 32-35 and 32-36 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU47 32-39, 32-44, 32-48, 32-55, 32-135, 32-157, 32-164 and 32-169 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU43 32-49 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7X, MU41 and MU43 32-53 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU41 32-58 and 32-59 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU45 32-61 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU43 32-63 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6, MU45 and MUT19 32-78, 32-81 and 32-85 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road. | Work No. 7X 32-84 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7X and MU43 32-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU43 and MUT19 32-93 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MUT19 32-103, 32-116, 32-118, 32-120, 32-130, 32-138, 32-143 and 32-144 | Installation of a high-pressure gas pipeline. | Work No. G6 32-104 | Provision for temporary access for works involving the installation of a high-pressure gas pipeline. | Work No. G6 32-109 | To facilitate the improvement to the existing dual carriageway A13, and to provide temporary storage, laydown areas and working space. | Work No. 7F 32-110 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT19 32-111, 32-122, 32-124, 32-125, 32-128, 32-129 and 32-133 | Provision for access for works involving the installation of a high-pressure gas pipeline. | Work No. G6 32-136 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39, MU43 and MUT15 32-139, 32-140, 32-141, 32-142, 32-145, 32-148, 32-155, 32-159, 32-160, 32-168, 32-170, 32-171, 32-172, 32-173, 32-174 and 32-179 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MUT15 32-153, 32-158 and 32-166 | Provision for access for works involving the diversion of existing gas pipeline. | Work No. G6b 32-156 and 32-163 | Installation of a isolation valve | Work No. G6b 32-162, 32-165, 32-175, 32-176, 32-180 and 32-181 | Provision for temporary access for works involving the diversion of existing gas pipeline. | Work No. G6b 32-177 and 32-178 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E22 32-182 and 32-183 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G6 and ULH6 33-01 and 33-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works. | Works Nos. MUT24, OH6 and OH7 33-02 and 33-08 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA9, MU60 and MUT23 33-05 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G6, MU55, MUT13, MUT24, OH6, OH7 and OHT7 33-06, 33-92, 33-179, 33-242, 33-249, 33-254, 33-255, 33-257, 33-259, 33-263, 33-265, 33-268, 33-276, 33-280, 33-281, 33-282 and 33-285 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 33-17 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6, OH7 and OHT7 33-19 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU57 33-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT23 33-30 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. CA9, MU55, MU57, MU58, OH6, OH7 and ULH7 33-35 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU54, MU55, MU57, MUT20 and OH6 33-36 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species; and installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA10, E34, G6, MU55, MU60, MUT13, MUT21 and MUT22 33-37 | Temporary construction compound at surface for facilitating main works. To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Works Nos. CA10 and G6 33-42 | To facilitate the construction of a new private means of access for maintenance of the new drainage structures and to provide temporary storage, laydown areas and working space. | Work No. 8K 33-47, 33-48, 33-49, 33-53, 33-54, 33-55, 33-56, 33-61, 33-82, 33-83, 33-84, 33-93, 33-94, 33-100, 33-101, 33-104, 33-106, 33-108, 33-115, 33-116, 33-118, 33-154, 33-155, 33-173, 33-178, 33-184, 33-188 and 33-221 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT22 33-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU59 and MUT13 33-67 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU59 and MU60 33-68 and 33-70 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT21 33-69, 33-71, 33-77, 33-78, 33-79, 33-80 and 33-81 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU59, MU60 and MUT21 33-74 and 33-75 | To facilitate the construction of a realigned section of Stifford Clays road, and to provide temporary storage, laydown areas and working space. | Work No. 7L 33-86, 33-88 and 33-89 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MUT22 33-87 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E33 and MUT22 33-90, 33-91, 33-99, 33-103, 33-105, 33-107, 33-114, 33-119, 33-129, 33-134, 33-146, 33-152, 33-157, 33-158, 33-159, 33-160, 33-162, 33-165, 33-168, 33-169, 33-170, 33-172, 33-174, 33-176, 33-177, 33-181, 33-183, 33-187, 33-190, 33-192, 33-195, 33-196, 33-197, 33-199, 33-200, 33-202, 33-203, 33-205, 33-206, 33-208, 33-209, 33-210, 33-211, 33-212, 33-215, 33-217, 33-219, 33-220, 33-222, 33-225, 33-227, 33-228, 33-230, 33-231, 33-232, 33-233, 33-236, 33-238, 33-239, 33-240, 33-241, 33-243, 33-244, 33-245, 33-246, 33-247, 33-251, 33-252, 33-256, 33-258, 33-260, 33-261, 33-267, 33-269, 33-271, 33-272, 33-274, 33-275, 33-279, 33-283, 33-284, 33-286 and 33-287 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU60 and MUT21 33-98 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT13 33-109, 33-113, 33-117, 33-120, 33-121, 33-122, 33-123, 33-124, 33-125, 33-126, 33-127, 33-128, 33-130, 33-131, 33-132, 33-133, 33-135, 33-136, 33-137, 33-138, 33-139, 33-140, 33-141, 33-142, 33-143, 33-144, 33-145, 33-147, 33-148, 33-149, 33-150, 33-151, 33-153, 33-156, 33-161, 33-163, 33-164, 33-166, 33-167, 33-171, 33-180, 33-185 and 33-186 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU52 33-110 and 33-112 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU52, MU60, MUT21 and MUT22 33-175, 33-248, 33-250, 33-266, 33-270, 33-273 and 33-277 | Installation of a high-pressure gas pipeline. | Work No. G6 33-182, 33-189 and 33-191 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU52 and MUT13 33-194 and 33-229 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E32 33-201 and 33-207 | Improvements to Woolings Close. | Work No. 7G 33-224, 33-226, 33-234, 33-235 and 33-237 | Provision for temporary access for works involving the installation of a high-pressure gas pipeline. | Work No. G6 33-253, 33-262 and 33-264 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6, MU60 and MUT21 33-278 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU46 33-290 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU46 34-01, 34-03 and 34-05 | Provision for temporary access and traffic management for the temporary construction compound; provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works. | Works Nos. CA13, E38, MUT24, OH6 and OH7 34-02, 34-24 and 34-42 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT24 34-04 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA13 34-06, 34-15, 34-17, 34-19, 34-23, 34-25, 34-26, 34-41, 34-43, 34-47 and 34-48 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works. | Works Nos. MUT24, OH6 and OH7 34-20 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G6 and ULH5 34-27 and 34-28 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; provision for temporary access to the temporary utilities logistic hub. | Works Nos. G6 and ULH5 34-29, 34-32 and 34-46 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 34-30, 34-31 and 34-45 | Installation of a high-pressure gas pipeline. | Work No. G6 34-33, 34-38, 34-39 and 34-40 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT23 34-44 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU60 and MUT23 35-01, 35-03 and 35-07 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT24 35-02 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 35-05, 35-06, 35-19, 35-20, 35-21, 35-53, 35-54 and 35-56 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Work No. E36 35-09 and 35-55 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E36 and OH7 35-13 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area. Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E36, FCA3 and OH7 35-29 and 35-30 | Temporary construction compound at surface for facilitating main works. | Work No. CA11 35-32 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA11, MUT13, MUT22 and MUT25 35-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MUT22 and MUT25 35-34 and 35-35 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT25 35-36, 35-42, 35-58, 35-59 and 35-61 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT22 36-01 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E38 36-02 | Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA13, E38 and MUT24 36-03 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E38 36-04 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA13 36-05 | Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species. | Works Nos. CA13 and E38 36-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT24 37-05 | Implementation of environmental mitigation works to create a site for protected species. | Works Nos. E37 and E39 37-06 and 37-07 | Provision for access for environmental mitigation works to create a site for protected species. | Works Nos. E37 and E39 38-01 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and temporary construction compound at surface for facilitating main works; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M, CA13, MU64, MU65, MUT26 and MUT27 38-02 and 38-10 | Temporary construction compound at surface for facilitating main works. | Work No. CA13 38-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU64 and MUT27 38-09 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU65 38-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU65 38-14 and 38-24 | Provision for temporary access and traffic management for the temporary construction compound; and implementation of environmental mitigation works to create a site for protected species. | Works Nos. CA13 and E40 38-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU64 38-16 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA13 38-18 | To facilitate the construction of a new public right of way over the new A122 Lower Thames Crossing, and to provide temporary storage, laydown areas and working space. | Work No. 8C 38-19 | To facilitate the construction of a new drainage attenuation pond with associated drainage facilities, laydown areas and working space. | Work No. 8H 38-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU63 38-22 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 8M, G8, MU63 and OH7 38-23 | To facilitate the construction of a new public right of way and to provide temporary storage, laydown areas and working space. | Work No. 8M 38-25 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 8M and OH7 38-28 and 38-29 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136. | Work No. 8M 38-31 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G8 and MU63 38-32 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G8, MU62, MU63, OH7, OHT8 and ULH4 38-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU62, MU63 and OH7 38-34 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E40 38-35 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH7 and OHT8 38-36 and 38-39 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G8 38-37 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G8 and ULH4 38-38 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 38-40, 38-41, 38-42, 38-44, 38-46, 38-49, 38-51, 38-52, 38-59 and 38-64 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Work No. E36 38-43, 38-60, 38-61 and 38-65 | Construction of a new public right of way along the Mardyke channel, between south of the new Mardyke viaduct and the new public right of way; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Works Nos. 8J and E36 38-47 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E36, FCA4 and MU61 38-53, 38-54 and 38-55 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area. | Works Nos. E36 and FCA3 39-01 | Temporary construction compound at surface for facilitating main works. | Work No. CA14 39-02 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Works Nos. 8D and G9 39-04 | Diversion of existing gas pipeline. | Work No. G9 39-05, 39-14 and 39-15 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU71 39-06 and 39-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU71 39-08, 39-26 and 39-46 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space. | Work No. 8D 39-12 | Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane. | Work No. 8N 39-13 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA14 and MUT29 39-17, 39-18, 39-21, 39-27 and 39-28 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT29 39-20 | Construction of a new public right of way from the realigned North Road to the new public right of way to Church Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8D and MUT29 39-22 and 39-25 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G9 39-23 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G9, MU68, MU69 and MU70 39-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MUT28 and MUT29 39-30 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU69 39-31 and 39-32 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT28 39-33 | Construction of a new public right of way from the realigned North Road to the new public right of way to Church Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8D, MUT28 and MUT29 39-50, 39-52, 39-54, 39-55, 39-57 and 39-59 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU66 39-65 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M, MU69 and MUT26 39-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU69 and MUT26 39-67 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G9, MU69 and MUT27 39-68 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Works Nos. G9 and MUT27 39-69, 39-70 and 39-74 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT26 39-72 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT27 39-77 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G8 39-78 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G8, MU64 and MUT27 39-80 and 39-81 | To facilitate the construction of a three-lane carriageway northbound and two-lane carriageway southbound, and to provide temporary storage, laydown areas and working space. | Work No. 8A 39-82 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E42 39-83 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M, E42 and MUT26 39-84 | Temporary construction compound at surface for facilitating main works. | Work No. CA13 40-21 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space; and yo facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Works Nos. 8D, G9 and MU71 40-22 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G9 and MU71 41-01 and 41-02 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E42 41-03 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E42 41-04, 41-05, 41-08 and 41-32 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 41-06, 41-07, 41-09, 41-15, 41-16, 41-18, 41-19, 41-25, 41-26 and 41-27 | Provision for temporary access for overhead lines diversion works. | Work No. OH7 41-10 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MUT26 and OH7 41-11 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M and MUT26 41-13, 41-14, 41-44, 41-46, 41-47, 41-48, 41-49 and 41-51 | Provision for access for overhead lines diversion works. | Work No. OH7 41-23 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU63, MUT26 and OH7 41-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU63 and OH7 41-28, 41-29, 41-30, 41-31, 41-45 and 41-50 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH7 41-33, 41-34, 41-35, 41-36, 41-37, 41-41 and 41-42 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Work No. E36 41-38 and 41-43 | Construction of a new public right of way along the Mardyke channel, between south of the new Mardyke viaduct and the new public right of way; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Works Nos. 8J and E36 41-39 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136. | Work No. 8M 41-40 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Works Nos. 8M and E36 42-01, 42-02 and 42-03 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E43 42-04 and 42-07 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU72 42-05, 42-06 and 42-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU75 and MU76 42-08 and 42-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72 and MU76 42-09, 42-10 and 42-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72 and MU75 42-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU73 and MU75 42-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU75 42-17 and 42-21 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU72 42-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU75 and MU76 42-23 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU75 and MUT30 42-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU76, MU77 and MUT30 42-25 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU75, MU76 and MUT30 42-34 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU73 42-75 | To facilitate the improvements to the existing highway M25 northbound and existing highway M25 southbound, and to provide temporary storage, laydown areas and working space. | Work No. 9E 42-99 and 42-124 | Temporary possession of the railway line railway to facilitate the construction of a new bridge to carry a new public right of way over the existing Upminster and Grays Branch railway line. | Work No. 9M 42-115 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU73, MU74 and MU76 42-116 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU74 42-127 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space. | Work No. 8D 42-128 | Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane; and temporary construction compound at surface for facilitating main works. | Works Nos. 8N and CA14 42-131, 42-132, 42-133 and 42-134 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA15A and MU76 42-135, 42-136 and 42-137 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA15A 42-138 | Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane. | Work No. 8N 42-139, 42-140, 42-141, 42-142, 42-143, 42-144, 42-145, 42-146, 42-147, 42-148, 42-149, 42-150, 42-151, 42-152, 42-153, 42-154, 42-155, 42-156, 42-157, 42-158, 42-159, 42-160, 42-161, 42-162, 42-163, 42-164, 42-165, 42-166, 42-167, 42-168, 42-169, 42-170, 42-171, 42-172, 42-173, 42-174, 42-175, 42-177, 42-178, 42-179, 42-180, 42-181, 42-182, 42-184 and 42-185 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT28 42-176 and 42-183 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MUT28 and MUT29 43-01, 43-02, 43-03 and 43-05 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU72 43-07 | Construction of a new permissive path over the new A122 Lower Thames Crossing and the improved section of the M25 Junction; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 9O, MU72, MU78 and OH8 43-09 and 43-108 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU72, MU78 and OH8 43-10 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU72 43-18 and 43-104 | Construction of a new permissive path from Thames Chase Forest, and a new private means of access from Thames Chase Forest to the new culvert; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 9O, MU72, MU78 and OH8 43-19 | Construction of a new permissive path from Thames Chase Forest, and a new private means of access from Thames Chase Forest to the new culvert; implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 9O, E46, MU72 and OH8 43-27 | Landscaping associated with the new public right of way and permissive path over the new A122 Lower Thames Crossing. | Work No. 9O 43-28 | Construction of a new permissive path along the existing FP230, and landscaping associated with the new public right of way and permissive path over the new A122 Lower Thames Crossing. | Work No. 9O 43-35, 43-47, 43-53, 43-106, 43-107, 43-109 and 43-110 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH8 43-40, 43-41, 43-43, 43-46, 43-63, 43-64, 43-65, 43-66, 43-67, 43-68, 43-69, 43-70, 43-71, 43-72, 43-73, 43-74, 43-75, 43-76, 43-77, 43-78, 43-79, 43-80, 43-82, 43-83, 43-84, 43-85, 43-86, 43-87, 43-88, 43-90, 43-93, 43-94, 43-95, 43-98, 43-101, 43-102, 43-112, 43-113 and 43-114 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA15A 43-49 | Construction of a new permissive path along the existing FP230. | Work No. 9O 43-54, 43-55, 43-56, 43-57, 43-58, 43-59, 43-60, 43-61, 43-62, 43-81, 43-89, 43-91 and 43-92 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA15A and MUT28 43-96, 43-97, 43-99 and 43-100 | Provision for access for overhead lines diversion works. | Work No. OH8 43-103 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT28 43-105 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU72 and OH8 43-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU78 44-01, 44-02, 44-03 and 44-06 | Construction of a new flood compensation area. | Work No. FCA7 44-04 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU87 44-05 | Construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. FCA7 and MU72 44-07 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU83 44-08 | Construction of a new permissive path from Thames Chase Forest, a new permissive path to the new culvert and a new private means of access from Thames Chase Forest to the new culvert; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9O and MU72 44-09 and 44-17 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU79, MU80, MU82 and MU83 44-10, 44-44 and 44-84 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU80 44-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU86 44-13, 44-14 and 44-94 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU72 44-16 and 44-90 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU84 44-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU83 44-22 and 44-56 | Temporary possession of railway line to facilitate the construction of earthworks associated with the new A122 Lower Thames Crossing two-lane link road from the M25 northbound carriageway to M25 junction 29 link road. | Work No. 9D 44-64, 44-72 and 44-73 | To facilitate the improvements to the existing highway M25 northbound and existing highway M25 southbound, and to provide temporary storage, laydown areas and working space. | Work No. 9E 44-68 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU81 and MU84 44-80 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU81 and MU83 44-81 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU79, MU81, MU82 and MU83 44-85, 44-87 and 44-93 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU72 44-86 and 44-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU79, MU80, MU81, MU82 and MU83 44-88 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU79, MU80 and MU82 44-89, 44-95 and 44-96 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU80 and MU81 44-92 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU84 44-98, 44-99 and 44-100 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU81 44-101, 44-102, 44-103, 44-104, 44-105, 44-106, 44-107, 44-108, 44-109, 44-110, 44-111, 44-113, 44-114, 44-115, 44-116, 44-117, 44-118 and 44-119 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA15A 44-112, 44-120, 44-121, 44-122, 44-123 and 44-124 | Provision for access for utility works. | Work No. MU84 45-01, 45-02, 45-03, 45-04, 45-05, 45-06, 45-07, 45-09, 45-12, 45-39, 45-43, 45-45, 45-46, 45-69 and 45-70 | Improvement works to a section of the existing two-lane dual carriageway A127 highway. | Work No. 9J 45-08, 45-15, 45-16, 45-17, 45-18, 45-20, 45-22, 45-28, 45-67 and 45-68 | To facilitate the improvement works to a section of the existing two-lane dual carriageway A127 highway, and to provide temporary storage, laydown areas and working space. | Work No. 9J 45-10, 45-11, 45-19, 45-21, 45-23, 45-24, 45-25, 45-26, 45-29, 45-31, 45-33, 45-38, 45-42, 45-50, 45-52 and 45-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU91 45-47, 45-48 and 45-49 | Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout. | Work No. 9H 45-66 | Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9H and MU91 45-71 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU88 45-72 | Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9H and MU88 45-79, 45-88 and 45-107 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU87 45-87, 45-89 and 45-108 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers. | Work No. MU87 45-99 and 45-100 | Improvement works to the existing private means of access between the improved M25 junction 29 roundabout and Codham Hall Lane.; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9I and MU88 45-105 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU88 45-110 and 45-112 | Provision for access for utility works. | Work No. MU87 45-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers. | Works Nos. MU86 and MU87 45-120 | Construction of protection measures for retention of the existing infrastructure. | Work No. 9P 45-121 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers. | Works Nos. CA16, MU85, MU87 and MUT32 45-132 | Temporary construction compound at surface for facilitating main works. | Work No. CA16 45-137, 45-139, 45-141, 45-143, 45-144, 45-145, 45-146, 45-147, 45-148, 45-149, 45-150, 45-151, 45-152, 45-153, 45-154, 45-159, 45-161, 45-164, 45-166, 45-167, 45-178, 45-179 and 45-180 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA16 45-155 and 45-160 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA16, MU85 and MUT32 45-158 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA16 and MU85 45-165, 45-168, 45-171, 45-172, 45-173 and 45-174 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU85 45-169 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU85 and MUT32 45-175, 45-176 and 45-177 | Provision for access for utility works. | Work No. MU84 46-01, 46-02 and 46-03 | Improvement works to a section of the existing two-lane dual carriageway A127 highway. | Work No. 9J 46-04 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds. | Work No. E51 46-06 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds Installation of a high-pressure gas pipeline; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. E51, G10 and ULH2 46-08, 46-09, 46-11, 46-12 and 46-13 | Installation of a high-pressure gas pipeline. | Work No. G10 46-23, 46-24 and 46-25 | Provision for access for utility works. | Work No. MU92 46-26 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU92 46-52 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU92 46-55 | Installation of a high-pressure gas pipeline; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G10 and ULH2 47-26 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds. | Work No. E51
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.