The A12 Chelmsford to A120 Widening Development Consent Order 2024

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 7 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Article 40 (1) Plot reference number shown on land plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development 1/5a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(i) All works 1/10f | Access for utility diversion works. | Work No. U2 1/10g | Access for utility diversion works. | Work No. U2 1/11e | Temporary haul road. Access and working area for construction of temporary soil storage bunds. Soil storage area during construction works. Access and working area for repositioning private irrigation pipe. | Work No. U1A Work No. T1 All works in respect of bunds, storage and haul road 1/12c | Access and working area for utility diversion works. | Work No. U2 1/13f | Access and working area for utility diversion works. | Work No. U2A Work No. 1(a) 1/16a | Access and working area for utility diversion works. | Work No. U2 2/1d | Improvements to existing highway and installation of signage and associated works. | All works 2/2a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary traffic management. | All works 2/2i | Access and working area for utility diversion works. | Work No. U21 Work No. U22 2/2j | Access and working area for utility diversion works. | Work No. U21 Work No. U22 2/7b | Access and working area for utility diversion works. | Work No. U21 Work No. U22 2/10a | Access and working area for utility diversion works. | Work No. U21 Work No. U22 2/12i | Compound and traffic management and recovery yard. | Work No. T6 All works 2/12m | Temporary storage, laydown areas, access and working space to facilitate the construction of Paynes Lane Bridge. Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 5 All works 2/15b | Temporary haul road. Temporary storage, laydown areas, access and working space to facilitate the construction of Work No. 5. | Work No. T5 Work No. 5 2/15f | Temporary haul road. Temporary storage, laydown areas, access and working space to facilitate the construction of Work No. 5. | Work No. T5 Work No. 5 2/15g | Temporary haul road. Temporary storage, laydown areas, access and working space to facilitate the construction of Work No. 5. | Work No. T5 Work No. 5 2/17b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(c) Work No. 5 All works 2/17h | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 1(c) Work No. 5 All works 2/17k | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 1(c) All works 2/17n | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 1(c) 2/17o | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(c) All works 2/18a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 1(c) Work No. 2(b) All works 2/18c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 1(c) All works 3/1a | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/1b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/1c | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/2a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/3a | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/3b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/3c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/3d | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/3e | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/3f | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/4a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/5a | Improvements to existing highway and installation of signage and associated works. Access and working area for utility diversion works. | Work No. U21 Work No. U22 All works 3/5b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/7a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 4/1a | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 4/1b | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 4/1c | Improvements to existing highway and installation of signage and associated works. | Work No. 12 4/1d | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | Work No. 12 4/2a | Access and working area for utility diversion works. | Work No. U22 4/2b | Access and working area for utility diversion works. | Work No. U22 4/3a | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | Work No. 12 4/3b | Access and working area for utility diversion works. | Work No. U22 4/3c | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 4/4a | Access and working area. Improvements to existing highway and installation of signage and associated works. | Work No. 9 Work No. 10 Work No. 12 Work No. 18(b) 4/5a | Improvements to existing highway and installation of signage and associated works. Access and working area for utility diversion works. | Work No. U21 Work No. U22 Work No. 12 4/5b | Ecology Mitigation. Access and working area. Improvements to existing highway and installation of signage and associated works. | Work No. 9 Work No. 10 Work No. 12 Work No. 18(b) 4/9b | Access and working area. Ecology Mitigation. | Work No. 9 Work No. 10 Work No. 18(b) 5/2b | Access and working area for utility diversion works. | Work No. U22 Work No. U22A Work No. U35 5/2c | Access and working area for utility diversion works. | Work No. U22 Work No. U22A Work No. U35 5/2f | Access and working area for utility diversion works. | Work No. U22 Work No. U27 Work No. U28 Work No. U35 Work No. U36 5/2h | Access and working area for utility diversion works. | Work No. U22 Work No. U27 Work No. U28 Work No. U35 Work No. U36 5/2j | To maintain access to properties (Moorings) during demolition and construction of Bury Lane bridge structure. Access and working area for utility diversion works. | Work No. 9 Work No. U27 Work No. U28 Work No. U29 Work No. U36 5/2k | Access and working area for utility diversion works. | Work No. U22 Work No. U35 5/2l | Access and working area for utility diversion works. | Work No. U22 Work No. U35 5/2m | Access and working area for utility diversion works. | Work No. U22 Work No. U35 5/2n | Access and working area for utility diversion works. | Work No. U22 Work No. U35 5/2o | Access and working area for utility diversion works. | Work No. U22 Work No. U30 Work No. U31 Work No. U33 Work No. U35 5/2r | Access and working area for utility diversion works. | Work No. U22 Work No. U35 5/2s | Access and working area for utility diversion works. | Work No. U22Work No. U35 5/2t | Access and working area for utility diversion works. | Work No. U22 Work No. U35 Work No. U37 5/6a | Access and working area for utility diversion works. Temporary access to property. | Work No. 9 Work No. 10 Work No. U22 Work No. U22A Work No. U23 Work No. U24 Work No. U26 Work No. U27 Work No. U28 Work No. U29 Work No. U35 Work No. U36 Work No. T10 Work No. T12 5/6c | Access and working area for utility diversion works. | Work No. U22 Work No. U30 Work No. U31 Work No. U33 Work No. U35 Work No. T9 5/6d | Access to temporary car park. Access for bus shuttle service. To maintain access to properties adjoining Station Road. Access and working area for utility diversion works. | Work No. 10 Work No. T9 5/6e | Installation of traffic signs. Access and working area. | Work No. 18(a) 5/12f | Access to temporary car park. Access for bus shuttle service. | Work No. 9 Work No. 10 5/12g | Access to properties adjoining Station Road. Access to temporary car park. Access for bus shuttle service. | Work No. T13 Work No. 9 Work No. 10 5/12i | Laydown areas, storage, access and working space. | Work No. 8(b) Work No. 9 5/16a | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access. Access and working area for utility diversion works. | Work No. U23 Work No. U25 Work No. 12(a) All Works 5/20a | Temporary road. Access and diversion route for properties to the north of the A12 in Hatfield Peverel. | Work No. T8 Work No. 9 Work No. 10 5/21a | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access. Temporary access to adjoining land. Working area for the construction of retaining structure works. | Work No. 9 All Works 5/25a | Temporary access to adjoining land. | Work No. T10 Work No. 9 5/27a | Access and working area to construct temporary footbridge. Temporary path. Access and working area for utility diversion works. | Work No. T9 Work No. 10 Work No. U30 Work No. U31 Work No. U33 5/27b | Access and working area to construct temporary footbridge. Temporary path. Access and working area for utility diversion works. | Work No. T11 Work No. 10 5/28a | Access and working area to construct temporary footbridge. Temporary path. Access and working area for utility diversion works. | Work No. U22A Work No. U30 Work No. U31 Work No. U33 Work No. T9 Work No. T11 5/29a | Access and working area to construct temporary footbridge. Temporary path. Access and working area for utility diversion works. | Work No. U22 Work No. U22A Work No. U30 Work No. U31 Work No. U33 Work No. T9 5/30a | Access and working area for construction of retaining structures on adjoining land. | Work No. 10 5/34a | Temporary access to adjoining land. Access and working area for construction of retaining structures on adjoining land. | Work No. T12 Work No. 10 5/35a | Temporary car park. Access to temporary car park. Access for bus shuttle service. | Work No. T13 Work No. 9 Work No. 10 Work No. 18 5/35d | Temporary car park. | Work No. T13 Work No. 9 Work No. 10 Work No. 18 5/36b | Temporary access. Access and working area for construction of temporary soil storage bunds and soil storage area. Temporary construction area for off-line construction of Hatfield Peverel bridge superstructures. | Work No. T7 Work No. 9 Work No. 10 Work No. 18(b) All works in respect of bunds 5/38a | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. | Work No. 10 Work No. 12(a) All works 5/38b | Access and working area for construction of retaining structures on adjoining land. | Work No. 10 6/11a | Temporary car park. Temporary roads. Temporary path and footway diversion routes. Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T13 Work No. T14 Work No. 18 All works 6/12a | Temporary roads. Temporary path and footway diversion routes. Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Construction of temporary soil storage bunds and soil storage area during construction works. Access and working area for repositioning private irrigation pipe. | Work No. U41A Work No. T13 Work No. T14 Work No. T16 All works. 6/12e | Temporary works ... associated with the excavation of a borrow pit including, access routes, temporary diversion of private rights of way, water management, soil storage and material processing. Maintenance of access to adjoining land. | Work No. T17 Work No. 17 All works 6/12f | Temporary roads. Temporary path and footway diversion routes. Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T14 Work No. T18 All works 6/12h | Temporary roads. Temporary path and footway diversion routes. Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T14 Work No. T16 All works 6/15a | Temporary roads. Temporary path and footway diversion routes. | Work No. T14 All works 6/15d | Temporary roads. Temporary path and footway diversion routes. | Work No. T14 All works 6/18b | Temporary roads. Construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T15 Work No. 23(a) 6/18d | Access and working area for construction of drainage infrastructure. Access and working area for construction of a maintenance access track to drainage infrastructure. | Work No. 23(a) Work No. 23(b) 6/18f | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, temporary pond, storage of plant and construction access. | Work No. 12(b) Work No. 18(a) All works 6/20c | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Haul road and construction access. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T20 All works 7/4b | Access and working area. | Work No. 25 Work No. 29(a) Work No. 29(b) 7/4c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 7/8a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 7/8b | Access and working area for utility diversion works. | Work No. U44 Work No. U54 Work No. U56 7/8c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 7/10b | Haul road and construction access. Temporary works ... associated with the excavation of a borrow pit including, access routes, temporary diversion of private rights of way, water management, soil storage and material processing. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T20 Work No. T21 All works 7/10g | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Haul road and construction access. | Work No. T23 All works 7/10h | Access and working area for works on adjoining land. | Work No. 25 Work No. 29(a) Work No. 29(b) 7/10l | Haul road and construction access. | Work No. T23 All works 7/12a | Access and working area for utility diversion works. | Work No. U44 Work No. U54 Work No. U56 7/13a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of drainage infrastructure. Access and working area for the construction of a retaining structure. | Work No. 12(c) All works 7/16a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Access and working area for the construction of a retaining structure. | Work No. U54 Work No. U56 Work No. 12(c) All works 7/16b | Temporary traffic management and recovery area. | Work No. T22 All works 7/16c | Temporary traffic management and recovery area. | Work No. T22 All works 7/16g | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Access and working area for construction of drainage infrastructure. | Work No. U54 Work No. U56 Work No. 12(c) All works 7/17a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Access and working area for construction of drainage infrastructure. | Work No. U54 Work No. U56 Work No. 12(c) All works 7/17b | Temporary traffic management and recovery area. | Work No. T22 All works 7/17c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 Work No. 27 7/18a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 7/19b | Temporary traffic management and recovery area. | Work No. T22 All works 7/19c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 12(c) All works 7/19d | Temporary haul road. Access for construction of northern abutment, northern ramps and approach for Gershwin Boulevard Bridge. | Work No. T24 Work No. 27 7/21a | Ecology Mitigation. | All works 7/21d | Temporary haul road. | Work No. T23 All works 8/1l | Access and working area for construction of drainage infrastructure. Access and working area for construction of a retaining structure. | Work No. 12(c) 8/1o | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary haul road. | Work No. T23 Work No. 12(c) All works 8/2a | Access, storage and working area for the construction of a retaining structure. Access and working area for utility diversion works. | Work No. U60 Work No. U61 Work No. U62 Work No. 24 8/2d | Access, storage and working area for the construction of a retaining structure. Access and working area for utility diversion works. Temporary haul road. | Work No. U22A Work No. U49 Work No. U51 Work No. U60 Work No. U62 Work No. U64 Work No. U71 Work No. T23 All works 8/7a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/8a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/9a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/9b | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/10a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/10b | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/10c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/11a | Temporary haul road. Access for construction of northern abutment, approaches and northern ramps for Gershwin Boulevard Bridge. Temporary storage, laydown areas, access and working space to facilitate the construction of Gershwin Boulevard Bridge. | Work No. T24 Work No. 27 8/11c | Temporary haul road. Access for construction of northern abutment, approaches and northern ramps for Gershwin Boulevard Bridge. Temporary storage, laydown areas, access and working space to facilitate the construction of Gershwin Boulevard Bridge. | Work No. T24 Work No. 12 Work No. 27 8/11v | Temporary haul road and bridge over the River Brain. Access and working area for construction activities at Brain Bridge structure. Temporary storage, laydown areas, access and working space. | Work No. T25 Work No. 24(e) All works 8/11aj | Temporary haul road. | Work No. T24 Work No. 27 8/11am | Access for construction of northern abutment, approaches and northern ramps for Gershwin Boulevard Bridge. Temporary storage, laydown areas, access and working area to facilitate the construction of Gershwin Boulevard Bridge. | Work No. 12(c) Work No. 27 8/12a | Access and working area for utility diversion works. | Work No. U59 8/12b | Temporary haul road. Access for construction of northern abutment approaches and northern ramps for Gershwin Boulevard Bridge. | Work No.27 Work No. T24 8/13a | Access for construction of northern abutment approaches and northern ramps for Gershwin Boulevard Bridge. Temporary haul road. | Work No. 27 Work No. T24 8/13c | Access, storage and working area for the construction of a retaining structure. Access and working area for construction activities at Brain Bridge structure. Temporary haul road including temporary bridge over the River Brain. | Work No. 12(c) Work No. 24(e) Work No. T25 8/15a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/16a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/19d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary haul road. | Work No. T23 Work No. 12(c) All works 8/21a | Access and working area for utility diversion works. | Work No. U60 Work No. U61 Work No. U62 8/21c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/21d | Access, storage and working area for the construction of a retaining structure. Access and working area for utility diversion works. Temporary haul road. Temporary path and footway diversion routes. | Work No. U22A Work No. U49 Work No. U51 Work No. U60 Work No. U62 Work No. U64 Work No. U71 Work No. T23 All works 8/21h | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/23c | Temporary haul road. Access, storage and working area for the construction of a retaining structure. Temporary storage, laydown areas, access and working space to facilitate the construction of Oliver’s Bridge. | Work No. T23 Work No. 12(c) Work No. 24(c) All works 8/25d | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/28a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/29a | Access, storage and working area for the construction of a retaining structure. Access storage and working area for construction activities at Brain Bridge structure. Temporary haul road including a temporary bridge over the River Brain. | Work No. 12(c) Work No. 24(e) Work No. T25 All works 8/30a | Temporary haul road including a temporary bridge over the River Brain. Access, storage and working area for the construction of a retaining structure. Access, storage and working area for the reconstruction of Brain Bridge. | Work No. T25 Work No. 12(c) Work No. 24(e) 8/30b | Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) 8/31b | Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) 8/41d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary haul road. | Work No. T23 Work No. 12(c) All works 8/42a | Access, storage and working area for the construction of a retaining structure. Temporary storage, laydown areas, access and working space to facilitate the construction of Oliver’s Bridge. | Work No. 12(c) Work No. 24(c) 8/47i | Temporary haul road and bridge over the River Brain. Access and working area for construction activities at Brain Bridge structure. Temporary storage, laydown areas, access and working space. Access, storage and working area for the construction of a retaining structure. | Work No. T25 Work No. 24(e) All works 8/68a | Access and working area for construction of drainage infrastructure. Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) 8/68b | Access and working area for construction of drainage infrastructure. Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) 8/68d | Access and working area for construction of drainage infrastructure. Access, storage and working area for the construction of a retaining structure. Access and working area for utility diversion works. | Work No. U60 Work No. U61 Work No. U62 9/4a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/5a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/6a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/6b | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/6c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/7a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/8b | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/8d | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/13c | Temporary haul road. | Work No. T26 All works 10/5a | Access and working area for utility diversion works. | Work No. U22A Work No. U44 Work No. U49 Work No. U56 Work No. U76 Work No. U77 10/8c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. | Work No. U22A Work No. U44 Work No. U49 Work No. U56 Work No. 24(a) Work No. 24(b) Work No. 32(c) All works 10/8e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. | Work No. U22A Work No. U44 Work No. U49 Work No. U56 Work No. U76 Work No. U95 Work No. 24(a) Work No. 24(b) All works 10/11b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Temporary path and footway diversion routes. | Work No. U81 Work No. U84A All works 10/12c | Temporary path and footway diversion routes. Access and working area for utility diversion works. | Work No. U85 Work No. U85A Work No. 32(c) 10/12d | Temporary path and footway diversion routes. Access and working area for utility diversion works. | Work No. U85 Work No. U85B Work No. 32(c) 10/12e | Temporary path and footway diversion routes. Access and working area for utility diversion works. | Work No. U85A Work No. 32(c) 10/20b | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access. | Work No. T29 All works 10/20d | Temporary path and footway diversion routes. Access and working area for construction of drainage infrastructure. Access and working area for the construction of a new roundabout. Access and working area for the construction of Farm access. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 37(a) 10/21a | Access and working area for construction of modifications to existing bell mouth. | Work No. 32(c) 11/2a | Installation of traffic signs. Access and working area for installation of traffic signs. | Work No. 37(a) 11/4a | Ecology Mitigation. Temporary path and footway diversion routes. Access and working area for construction of drainage infrastructure. Access and working area for the construction of a new roundabout. Access and working area for the construction of farm access. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 37(a) All works 11/4e | Temporary works associated with borrow pit excavation, maintenance and decommissioning. | Work No. 48 All works 11/4l | Access and working area for construction of drainage infrastructure. | Work No. 46(a) 11/5a | Temporary path and footway diversion routes. | Work No. 37(a) 11/5b | Ecology Mitigation. | All works 11/7a | Temporary road. | Work No. T30 All works 11/12a | Temporary road. | Work No. T30 All works 11/24a | Installation of traffic signs. | All works 11/24b | Installation of traffic signs. | All works 12/1j | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 45(a) 12/2c | Access and working area for utility diversion works. | Work No. U124A Work No. U128 Work No. U128A 12/5b | Temporary haul road. Access and working area for construction of drainage infrastructure. Access and working area for construction of local access road into Kelvedon. Temporary storage, laydown areas, access and working space to facilitate the construction of Sniveller’s Lane Bridge. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T34 All works 12/6b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Access and working are for the construction of an upgraded access into Essex County Fire & Rescue Centre. | Work No. U111A Work No. U111B Work No. 52 All works 12/6e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Access and working are for the construction of an upgraded access into Essex County Fire & Rescue Centre. | Work No. U111A Work No. U111B Work No. 52 All works 12/9b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 52 All works 12/13a | Access and working area for construction of drainage infrastructure. | Work No. 45(a) 12/14a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of drainage infrastructure. | Work No. 45(a) All works 12/19b | Access and working area for construction of drainage infrastructure. Access and working area for construction of local access road. Temporary storage, laydown areas, access and working space to facilitate the construction of Sniveller’s Lane Bridge. Access and working area for utility diversion works. Temporary works ... associated with the excavation of a borrow pit including, access routes, temporary diversion of private rights of way, water management, soil storage and material processing. Temporary haul road. | Work No. U123 Work No. U124 Work No. T32 Work No. T34 All works 12/19c | Access and working area for utility diversion works. | Work No. U124A Work No. U128 Work No. U128A 12/28a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 45(a) 13/1f | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 45(a) 13/1h | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 54(b) Work No. 55(a) All works 13/5b | Temporary haul road. Access and working area for the construction of the realigned Highfield Lane. | Work No. T37 All works 13/8b | Access and working area for utility diversion works. | Work No. U124A Work No. U128A 13/8c | Access and working area for the construction of the realigned Highfield Lane. Access and working area for utility diversion works. Temporary haul road. | Work No. U134 Work No. U139 Work No. T37 All works 13/11c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary haul road. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T38 All works 13/13b | Temporary haul road. Access and working area for the construction of the realigned Highfield Lane. | Work No. T37 13/14l | Temporary path and footway diversion routes. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 60A Work No. 61(d) Work No. 62(a) All works 14/3b | Temporary haul road. Access and working area for construction of a maintenance access track to drainage infrastructure. Access and working area for utility diversion works. | Work No. U142 Work No. T43 All works 14/3d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary haul road. Temporary path and footway diversion routes. | Work No. T39 Work No. 59 All works 14/3f | Temporary haul road. Access and working area for construction of drainage infrastructure. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T39 All works 14/3l | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Access and working area for construction of a maintenance access track to drainage infrastructure. | Work No. 69(a) Work No. 69(b) All works 14/5a | Access and working area for maintenance of existing watercourse. | Work No. 67(b) Work No. 68(a) 14/5c | Access and working area for construction of access track. | Work No. 79(c) 14/5e | Access and working area for construction of drainage infrastructure. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 66(a) Work No. 66(b) 14/5f | Access and working area for construction of drainage infrastructure. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 66(a) Work No. 66(b) 14/6a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for maintenance of existing watercourse. | Work No. 67(b) Work No. 68(a) All works 14/8a | Access and working area for maintenance of existing watercourse. | Work No. 67(b) Work No. 68(a) 14/9a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access, storage and working area for the construction of a retaining structure. Temporary storage, laydown areas, access and working space to facilitate the construction of Park Bridge. | Work No. 45(a) Work No. 45(b) All works 14/12a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of access track. | Work No. 79(c) All works 14/24a | Access, storage and working area for the construction of a retaining structure. Temporary storage, laydown areas, access and working space to facilitate the construction of Park Bridge. | Work No. 45(a) Work No. 45(f) Work No. 65(b) 15/4a | Installation of traffic signs. Access and working area for utility diversion works. | Work No. 74(c) Work No. U124A Work No. U128A 15/4b | Installation of traffic signs. Access and working area for the construction works at traffic sign locations. | Work No. 82(a) 15/7a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of access track. | Work No. 79(c) All works 15/8a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of access track. | Work No. 79(c) All works 15/8c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Access and working area for construction of access track. | Work No. 79(c) 15/8e | Access and working area for construction of drainage infrastructure. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 66(a) Work No. 66(b) 16/5c | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) 16/5d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access to properties. | Work No. 68(a) All works 16/5f | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) Work No. 88(b) All works 16/5g | Temporary road. Compound and traffic management and recovery yard. Access and working area for repositioning private irrigation pipe. Access and working area for utility diversion works. | Work No. U167B Work No. U167C Work No. T48 Work No. T49 All works 16/5h | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Temporary storage, laydown areas, access and working space to facilitate construction of Easthorpe Road Bridge. | Work No. 68(a) Work No. 88(a) Work No. 88(c) Work No. 99(b) All works 16/5k | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Temporary storage, laydown areas, access and working space to facilitate construction of Easthorpe Road Bridge. | Work No. 68(a) Work No. 88(a) Work No. 88(c) Work No. 99(b) All works 17/3a | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) 17/3b | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Temporary storage, laydown areas, access and working space to facilitate construction of Easthorpe Road Bridge. | Work No. 68(a) Work No. 88(c) Work No. 99(a) Work No. 99(b) All works 18/1l | Access and working area for utility diversion works. | Work No. U185 Work No. U186 Work No. U187 Work No. U191 Work No. U192 18/2a | Access and working area for utility diversion works. | Work No. U185 Work No. U186 Work No. U187 Work No. U191 Work No. U192 18/3e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 104 All works 18/6a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Temporary storage, laydown areas, access and working space to facilitate the construction of Potts Green Bridge. | Work No. 68(a) Work No. 100 All works 18/6d | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) Work No. 68(b) Work No. 101 18/6e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of drainage infrastructure. | Work No. 101 Work No. 102(c) All works 18/6i | Temporary path and footway diversion routes. Temporary storage, laydown areas, access and working space to facilitate the construction of Potts Green Bridge. | Work No. 100 18/8a | Temporary storage, laydown areas, access and working space to facilitate the construction of Potts Green Bridge. | Work No. 100 18/13c | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) Work No. 68(b) 18/13e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 68(b) All works 18/18b | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access. | Work No. T52 All works 18/20c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 104 All works 19/1g | Compound and traffic management and recovery yard. | Work No. T54 All works 19/2f | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 104 All works 19/6b | Access and working area for utility diversion works. | Work No. U202 Work No. U203 Work No. U206 Work No. U207 19/6c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 112 All works 19/17a | Ecology Mitigation. Access to works. | All works 20/2a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. | Work No. U147A Work No. U147B Work No. U147C Work No. 122 All works 20/7a | Access and working area for widening B1023 Kelvedon Road. Access and working area to allow for vegetation clearance to enable the construction of the permanent works. | Work No. 122 20/8a | Access and working area for widening B1023 Kelvedon Road. Access and working area to allow for vegetation clearance to enable the construction of the permanent works. | Work No. 122 20/9b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access / working room for construction of drainage infrastructure. | All Works 20/13a | Access and working area for widening B1023 Kelvedon Road. Access and working area to allow for vegetation clearance to enable the construction of the permanent works. | Work No. 122 21/1a | Access and working area for utility diversion works. | Work No. U124A Work No. U128A

Your change, as a redline

SCHEDULE 7 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Article 40 (1) Plot reference number shown on land plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development 1/5a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(i) All works 1/10f | Access for utility diversion works. | Work No. U2 1/10g | Access for utility diversion works. | Work No. U2 1/11e | Temporary haul road. Access and working area for construction of temporary soil storage bunds. Soil storage area during construction works. Access and working area for repositioning private irrigation pipe. | Work No. U1A Work No. T1 All works in respect of bunds, storage and haul road 1/12c | Access and working area for utility diversion works. | Work No. U2 1/13f | Access and working area for utility diversion works. | Work No. U2A Work No. 1(a) 1/16a | Access and working area for utility diversion works. | Work No. U2 2/1d | Improvements to existing highway and installation of signage and associated works. | All works 2/2a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary traffic management. | All works 2/2i | Access and working area for utility diversion works. | Work No. U21 Work No. U22 2/2j | Access and working area for utility diversion works. | Work No. U21 Work No. U22 2/7b | Access and working area for utility diversion works. | Work No. U21 Work No. U22 2/10a | Access and working area for utility diversion works. | Work No. U21 Work No. U22 2/12i | Compound and traffic management and recovery yard. | Work No. T6 All works 2/12m | Temporary storage, laydown areas, access and working space to facilitate the construction of Paynes Lane Bridge. Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 5 All works 2/15b | Temporary haul road. Temporary storage, laydown areas, access and working space to facilitate the construction of Work No. 5. | Work No. T5 Work No. 5 2/15f | Temporary haul road. Temporary storage, laydown areas, access and working space to facilitate the construction of Work No. 5. | Work No. T5 Work No. 5 2/15g | Temporary haul road. Temporary storage, laydown areas, access and working space to facilitate the construction of Work No. 5. | Work No. T5 Work No. 5 2/17b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(c) Work No. 5 All works 2/17h | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 1(c) Work No. 5 All works 2/17k | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 1(c) All works 2/17n | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 1(c) 2/17o | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(c) All works 2/18a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 1(c) Work No. 2(b) All works 2/18c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a) Work No. 1(c) All works 3/1a | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/1b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/1c | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/2a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/3a | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/3b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/3c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/3d | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/3e | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/3f | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 3/4a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/5a | Improvements to existing highway and installation of signage and associated works. Access and working area for utility diversion works. | Work No. U21 Work No. U22 All works 3/5b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 3/7a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Improvements to existing highway and installation of signage and associated works. | All works 4/1a | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 4/1b | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 4/1c | Improvements to existing highway and installation of signage and associated works. | Work No. 12 4/1d | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | Work No. 12 4/2a | Access and working area for utility diversion works. | Work No. U22 4/2b | Access and working area for utility diversion works. | Work No. U22 4/3a | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | Work No. 12 4/3b | Access and working area for utility diversion works. | Work No. U22 4/3c | Temporary traffic management. Improvements to existing highway and installation of signage and associated works. | All works 4/4a | Access and working area. Improvements to existing highway and installation of signage and associated works. | Work No. 9 Work No. 10 Work No. 12 Work No. 18(b) 4/5a | Improvements to existing highway and installation of signage and associated works. Access and working area for utility diversion works. | Work No. U21 Work No. U22 Work No. 12 4/5b | Ecology Mitigation. Access and working area. Improvements to existing highway and installation of signage and associated works. | Work No. 9 Work No. 10 Work No. 12 Work No. 18(b) 4/9b | Access and working area. Ecology Mitigation. | Work No. 9 Work No. 10 Work No. 18(b) 5/2b | Access and working area for utility diversion works. | Work No. U22 Work No. U22A Work No. U35 5/2c | Access and working area for utility diversion works. | Work No. U22 Work No. U22A Work No. U35 5/2f | Access and working area for utility diversion works. | Work No. U22 Work No. U27 Work No. U28 Work No. U35 Work No. U36 5/2h | Access and working area for utility diversion works. | Work No. U22 Work No. U27 Work No. U28 Work No. U35 Work No. U36 5/2j | To maintain access to properties (Moorings) during demolition and construction of Bury Lane bridge structure. Access and working area for utility diversion works. | Work No. 9 Work No. U27 Work No. U28 Work No. U29 Work No. U36 5/2k | Access and working area for utility diversion works. | Work No. U22 Work No. U35 5/2l | Access and working area for utility diversion works. | Work No. U22 Work No. U35 5/2m | Access and working area for utility diversion works. | Work No. U22 Work No. U35 5/2n | Access and working area for utility diversion works. | Work No. U22 Work No. U35 5/2o | Access and working area for utility diversion works. | Work No. U22 Work No. U30 Work No. U31 Work No. U33 Work No. U35 5/2r | Access and working area for utility diversion works. | Work No. U22 Work No. U35 5/2s | Access and working area for utility diversion works. | Work No. U22Work No. U35 5/2t | Access and working area for utility diversion works. | Work No. U22 Work No. U35 Work No. U37 5/6a | Access and working area for utility diversion works. Temporary access to property. | Work No. 9 Work No. 10 Work No. U22 Work No. U22A Work No. U23 Work No. U24 Work No. U26 Work No. U27 Work No. U28 Work No. U29 Work No. U35 Work No. U36 Work No. T10 Work No. T12 5/6c | Access and working area for utility diversion works. | Work No. U22 Work No. U30 Work No. U31 Work No. U33 Work No. U35 Work No. T9 5/6d | Access to temporary car park. Access for bus shuttle service. To maintain access to properties adjoining Station Road. Access and working area for utility diversion works. | Work No. 10 Work No. T9 5/6e | Installation of traffic signs. Access and working area. | Work No. 18(a) 5/12f | Access to temporary car park. Access for bus shuttle service. | Work No. 9 Work No. 10 5/12g | Access to properties adjoining Station Road. Access to temporary car park. Access for bus shuttle service. | Work No. T13 Work No. 9 Work No. 10 5/12i | Laydown areas, storage, access and working space. | Work No. 8(b) Work No. 9 5/16a | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access. Access and working area for utility diversion works. | Work No. U23 Work No. U25 Work No. 12(a) All Works 5/20a | Temporary road. Access and diversion route for properties to the north of the A12 in Hatfield Peverel. | Work No. T8 Work No. 9 Work No. 10 5/21a | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access. Temporary access to adjoining land. Working area for the construction of retaining structure works. | Work No. 9 All Works 5/25a | Temporary access to adjoining land. | Work No. T10 Work No. 9 5/27a | Access and working area to construct temporary footbridge. Temporary path. Access and working area for utility diversion works. | Work No. T9 Work No. 10 Work No. U30 Work No. U31 Work No. U33 5/27b | Access and working area to construct temporary footbridge. Temporary path. Access and working area for utility diversion works. | Work No. T11 Work No. 10 5/28a | Access and working area to construct temporary footbridge. Temporary path. Access and working area for utility diversion works. | Work No. U22A Work No. U30 Work No. U31 Work No. U33 Work No. T9 Work No. T11 5/29a | Access and working area to construct temporary footbridge. Temporary path. Access and working area for utility diversion works. | Work No. U22 Work No. U22A Work No. U30 Work No. U31 Work No. U33 Work No. T9 5/30a | Access and working area for construction of retaining structures on adjoining land. | Work No. 10 5/34a | Temporary access to adjoining land. Access and working area for construction of retaining structures on adjoining land. | Work No. T12 Work No. 10 5/35a | Temporary car park. Access to temporary car park. Access for bus shuttle service. | Work No. T13 Work No. 9 Work No. 10 Work No. 18 5/35d | Temporary car park. | Work No. T13 Work No. 9 Work No. 10 Work No. 18 5/36b | Temporary access. Access and working area for construction of temporary soil storage bunds and soil storage area. Temporary construction area for off-line construction of Hatfield Peverel bridge superstructures. | Work No. T7 Work No. 9 Work No. 10 Work No. 18(b) All works in respect of bunds 5/38a | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. | Work No. 10 Work No. 12(a) All works 5/38b | Access and working area for construction of retaining structures on adjoining land. | Work No. 10 6/11a | Temporary car park. Temporary roads. Temporary path and footway diversion routes. Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T13 Work No. T14 Work No. 18 All works 6/12a | Temporary roads. Temporary path and footway diversion routes. Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Construction of temporary soil storage bunds and soil storage area during construction works. Access and working area for repositioning private irrigation pipe. | Work No. U41A Work No. T13 Work No. T14 Work No. T16 All works. 6/12e | Temporary works ... associated with the excavation of a borrow pit including, access routes, temporary diversion of private rights of way, water management, soil storage and material processing. Maintenance of access to adjoining land. | Work No. T17 Work No. 17 All works 6/12f | Temporary roads. Temporary path and footway diversion routes. Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T14 Work No. T18 All works 6/12h | Temporary roads. Temporary path and footway diversion routes. Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T14 Work No. T16 All works 6/15a | Temporary roads. Temporary path and footway diversion routes. | Work No. T14 All works 6/15d | Temporary roads. Temporary path and footway diversion routes. | Work No. T14 All works 6/18b | Temporary roads. Construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T15 Work No. 23(a) 6/18d | Access and working area for construction of drainage infrastructure. Access and working area for construction of a maintenance access track to drainage infrastructure. | Work No. 23(a) Work No. 23(b) 6/18f | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, temporary pond, storage of plant and construction access. | Work No. 12(b) Work No. 18(a) All works 6/20c | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Haul road and construction access. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T20 All works 7/4b | Access and working area. | Work No. 25 Work No. 29(a) Work No. 29(b) 7/4c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 7/8a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 7/8b | Access and working area for utility diversion works. | Work No. U44 Work No. U54 Work No. U56 7/8c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 7/10b | Haul road and construction access. Temporary works ... associated with the excavation of a borrow pit including, access routes, temporary diversion of private rights of way, water management, soil storage and material processing. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T20 Work No. T21 All works 7/10g | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. Haul road and construction access. | Work No. T23 All works 7/10h | Access and working area for works on adjoining land. | Work No. 25 Work No. 29(a) Work No. 29(b) 7/10l | Haul road and construction access. | Work No. T23 All works 7/12a | Access and working area for utility diversion works. | Work No. U44 Work No. U54 Work No. U56 7/13a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of drainage infrastructure. Access and working area for the construction of a retaining structure. | Work No. 12(c) All works 7/16a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Access and working area for the construction of a retaining structure. | Work No. U54 Work No. U56 Work No. 12(c) All works 7/16b | Temporary traffic management and recovery area. | Work No. T22 All works 7/16c | Temporary traffic management and recovery area. | Work No. T22 All works 7/16g | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Access and working area for construction of drainage infrastructure. | Work No. U54 Work No. U56 Work No. 12(c) All works 7/17a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Access and working area for construction of drainage infrastructure. | Work No. U54 Work No. U56 Work No. 12(c) All works 7/17b | Temporary traffic management and recovery area. | Work No. T22 All works 7/17c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 Work No. 27 7/18a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 7/19b | Temporary traffic management and recovery area. | Work No. T22 All works 7/19c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 12(c) All works 7/19d | Temporary haul road. Access for construction of northern abutment, northern ramps and approach for Gershwin Boulevard Bridge. | Work No. T24 Work No. 27 7/21a | Ecology Mitigation. | All works 7/21d | Temporary haul road. | Work No. T23 All works 8/1l | Access and working area for construction of drainage infrastructure. Access and working area for construction of a retaining structure. | Work No. 12(c) 8/1o | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary haul road. | Work No. T23 Work No. 12(c) All works 8/2a | Access, storage and working area for the construction of a retaining structure. Access and working area for utility diversion works. | Work No. U60 Work No. U61 Work No. U62 Work No. 24 8/2d | Access, storage and working area for the construction of a retaining structure. Access and working area for utility diversion works. Temporary haul road. | Work No. U22A Work No. U49 Work No. U51 Work No. U60 Work No. U62 Work No. U64 Work No. U71 Work No. T23 All works 8/7a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/8a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/9a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/9b | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/10a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/10b | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/10c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/11a | Temporary haul road. Access for construction of northern abutment, approaches and northern ramps for Gershwin Boulevard Bridge. Temporary storage, laydown areas, access and working space to facilitate the construction of Gershwin Boulevard Bridge. | Work No. T24 Work No. 27 8/11c | Temporary haul road. Access for construction of northern abutment, approaches and northern ramps for Gershwin Boulevard Bridge. Temporary storage, laydown areas, access and working space to facilitate the construction of Gershwin Boulevard Bridge. | Work No. T24 Work No. 12 Work No. 27 8/11v | Temporary haul road and bridge over the River Brain. Access and working area for construction activities at Brain Bridge structure. Temporary storage, laydown areas, access and working space. | Work No. T25 Work No. 24(e) All works 8/11aj | Temporary haul road. | Work No. T24 Work No. 27 8/11am | Access for construction of northern abutment, approaches and northern ramps for Gershwin Boulevard Bridge. Temporary storage, laydown areas, access and working area to facilitate the construction of Gershwin Boulevard Bridge. | Work No. 12(c) Work No. 27 8/12a | Access and working area for utility diversion works. | Work No. U59 8/12b | Temporary haul road. Access for construction of northern abutment approaches and northern ramps for Gershwin Boulevard Bridge. | Work No.27 Work No. T24 8/13a | Access for construction of northern abutment approaches and northern ramps for Gershwin Boulevard Bridge. Temporary haul road. | Work No. 27 Work No. T24 8/13c | Access, storage and working area for the construction of a retaining structure. Access and working area for construction activities at Brain Bridge structure. Temporary haul road including temporary bridge over the River Brain. | Work No. 12(c) Work No. 24(e) Work No. T25 8/15a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/16a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/19d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary haul road. | Work No. T23 Work No. 12(c) All works 8/21a | Access and working area for utility diversion works. | Work No. U60 Work No. U61 Work No. U62 8/21c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/21d | Access, storage and working area for the construction of a retaining structure. Access and working area for utility diversion works. Temporary haul road. Temporary path and footway diversion routes. | Work No. U22A Work No. U49 Work No. U51 Work No. U60 Work No. U62 Work No. U64 Work No. U71 Work No. T23 All works 8/21h | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/23c | Temporary haul road. Access, storage and working area for the construction of a retaining structure. Temporary storage, laydown areas, access and working space to facilitate the construction of Oliver’s Bridge. | Work No. T23 Work No. 12(c) Work No. 24(c) All works 8/25d | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/28a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 8/29a | Access, storage and working area for the construction of a retaining structure. Access storage and working area for construction activities at Brain Bridge structure. Temporary haul road including a temporary bridge over the River Brain. | Work No. 12(c) Work No. 24(e) Work No. T25 All works 8/30a | Temporary haul road including a temporary bridge over the River Brain. Access, storage and working area for the construction of a retaining structure. Access, storage and working area for the reconstruction of Brain Bridge. | Work No. T25 Work No. 12(c) Work No. 24(e) 8/30b | Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) 8/31b | Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) 8/41d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary haul road. | Work No. T23 Work No. 12(c) All works 8/42a | Access, storage and working area for the construction of a retaining structure. Temporary storage, laydown areas, access and working space to facilitate the construction of Oliver’s Bridge. | Work No. 12(c) Work No. 24(c) 8/47i | Temporary haul road and bridge over the River Brain. Access and working area for construction activities at Brain Bridge structure. Temporary storage, laydown areas, access and working space. Access, storage and working area for the construction of a retaining structure. | Work No. T25 Work No. 24(e) All works 8/68a | Access and working area for construction of drainage infrastructure. Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) 8/68b | Access and working area for construction of drainage infrastructure. Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) 8/68d | Access and working area for construction of drainage infrastructure. Access, storage and working area for the construction of a retaining structure. Access and working area for utility diversion works. | Work No. U60 Work No. U61 Work No. U62 9/4a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/5a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/6a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/6b | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/6c | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/7a | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/8b | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/8d | Access and working area for utility diversion works. | Work No. U44 Work No. U56 9/13c | Temporary haul road. | Work No. T26 All works 10/5a | Access and working area for utility diversion works. | Work No. U22A Work No. U44 Work No. U49 Work No. U56 Work No. U76 Work No. U77 10/8c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. | Work No. U22A Work No. U44 Work No. U49 Work No. U56 Work No. 24(a) Work No. 24(b) Work No. 32(c) All works 10/8e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. | Work No. U22A Work No. U44 Work No. U49 Work No. U56 Work No. U76 Work No. U95 Work No. 24(a) Work No. 24(b) All works 10/11b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Temporary path and footway diversion routes. | Work No. U81 Work No. U84A All works 10/12c | Temporary path and footway diversion routes. Access and working area for utility diversion works. | Work No. U85 Work No. U85A Work No. 32(c) 10/12d | Temporary path and footway diversion routes. Access and working area for utility diversion works. | Work No. U85 Work No. U85B Work No. 32(c) 10/12e | Temporary path and footway diversion routes. Access and working area for utility diversion works. | Work No. U85A Work No. 32(c) 10/20b | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access. | Work No. T29 All works 10/20d | Temporary path and footway diversion routes. Access and working area for construction of drainage infrastructure. Access and working area for the construction of a new roundabout. Access and working area for the construction of Farm access. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 37(a) 10/21a | Access and working area for construction of modifications to existing bell mouth. | Work No. 32(c) 11/2a | Installation of traffic signs. Access and working area for installation of traffic signs. | Work No. 37(a) 11/4a | Ecology Mitigation. Temporary path and footway diversion routes. Access and working area for construction of drainage infrastructure. Access and working area for the construction of a new roundabout. Access and working area for the construction of farm access. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 37(a) All works 11/4e | Temporary works associated with borrow pit excavation, maintenance and decommissioning. | Work No. 48 All works 11/4l | Access and working area for construction of drainage infrastructure. | Work No. 46(a) 11/5a | Temporary path and footway diversion routes. | Work No. 37(a) 11/5b | Ecology Mitigation. | All works 11/7a | Temporary road. | Work No. T30 All works 11/12a | Temporary road. | Work No. T30 All works 11/24a | Installation of traffic signs. | All works 11/24b | Installation of traffic signs. | All works 12/1j | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 45(a) 12/2c | Access and working area for utility diversion works. | Work No. U124A Work No. U128 Work No. U128A 12/5b | Temporary haul road. Access and working area for construction of drainage infrastructure. Access and working area for construction of local access road into Kelvedon. Temporary storage, laydown areas, access and working space to facilitate the construction of Sniveller’s Lane Bridge. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T34 All works 12/6b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Access and working are for the construction of an upgraded access into Essex County Fire & Rescue Centre. | Work No. U111A Work No. U111B Work No. 52 All works 12/6e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. Access and working are for the construction of an upgraded access into Essex County Fire & Rescue Centre. | Work No. U111A Work No. U111B Work No. 52 All works 12/9b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 52 All works 12/13a | Access and working area for construction of drainage infrastructure. | Work No. 45(a) 12/14a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of drainage infrastructure. | Work No. 45(a) All works 12/19b | Access and working area for construction of drainage infrastructure. Access and working area for construction of local access road. Temporary storage, laydown areas, access and working space to facilitate the construction of Sniveller’s Lane Bridge. Access and working area for utility diversion works. Temporary works ... associated with the excavation of a borrow pit including, access routes, temporary diversion of private rights of way, water management, soil storage and material processing. Temporary haul road. | Work No. U123 Work No. U124 Work No. T32 Work No. T34 All works 12/19c | Access and working area for utility diversion works. | Work No. U124A Work No. U128 Work No. U128A 12/28a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 45(a) 13/1f | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 45(a) 13/1h | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 54(b) Work No. 55(a) All works 13/5b | Temporary haul road. Access and working area for the construction of the realigned Highfield Lane. | Work No. T37 All works 13/8b | Access and working area for utility diversion works. | Work No. U124A Work No. U128A 13/8c | Access and working area for the construction of the realigned Highfield Lane. Access and working area for utility diversion works. Temporary haul road. | Work No. U134 Work No. U139 Work No. T37 All works 13/11c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary haul road. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T38 All works 13/13b | Temporary haul road. Access and working area for the construction of the realigned Highfield Lane. | Work No. T37 13/14l | Temporary path and footway diversion routes. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 60A Work No. 61(d) Work No. 62(a) All works 14/3b | Temporary haul road. Access and working area for construction of a maintenance access track to drainage infrastructure. Access and working area for utility diversion works. | Work No. U142 Work No. T43 All works 14/3d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Temporary haul road. Temporary path and footway diversion routes. | Work No. T39 Work No. 59 All works 14/3f | Temporary haul road. Access and working area for construction of drainage infrastructure. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T39 All works 14/3l | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Access and working area for construction of a maintenance access track to drainage infrastructure. | Work No. 69(a) Work No. 69(b) All works 14/5a | Access and working area for maintenance of existing watercourse. | Work No. 67(b) Work No. 68(a) 14/5c | Access and working area for construction of access track. | Work No. 79(c) 14/5e | Access and working area for construction of drainage infrastructure. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 66(a) Work No. 66(b) 14/5f | Access and working area for construction of drainage infrastructure. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 66(a) Work No. 66(b) 14/6a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for maintenance of existing watercourse. | Work No. 67(b) Work No. 68(a) All works 14/8a | Access and working area for maintenance of existing watercourse. | Work No. 67(b) Work No. 68(a) 14/9a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access, storage and working area for the construction of a retaining structure. Temporary storage, laydown areas, access and working space to facilitate the construction of Park Bridge. | Work No. 45(a) Work No. 45(b) All works 14/12a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of access track. | Work No. 79(c) All works 14/24a | Access, storage and working area for the construction of a retaining structure. Temporary storage, laydown areas, access and working space to facilitate the construction of Park Bridge. | Work No. 45(a) Work No. 45(f) Work No. 65(b) 15/4a | Installation of traffic signs. Access and working area for utility diversion works. | Work No. 74(c) Work No. U124A Work No. U128A 15/4b | Installation of traffic signs. Access and working area for the construction works at traffic sign locations. | Work No. 82(a) 15/7a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of access track. | Work No. 79(c) All works 15/8a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of access track. | Work No. 79(c) All works 15/8c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Access and working area for construction of access track. | Work No. 79(c) 15/8e | Access and working area for construction of drainage infrastructure. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 66(a) Work No. 66(b) 16/5c | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) 16/5d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access to properties. | Work No. 68(a) All works 16/5f | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) Work No. 88(b) All works 16/5g | Temporary road. Compound and traffic management and recovery yard. Access and working area for repositioning private irrigation pipe. Access and working area for utility diversion works. | Work No. U167B Work No. U167C Work No. T48 Work No. T49 All works 16/5h | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Temporary storage, laydown areas, access and working space to facilitate construction of Easthorpe Road Bridge. | Work No. 68(a) Work No. 88(a) Work No. 88(c) Work No. 99(b) All works 16/5k | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Temporary storage, laydown areas, access and working space to facilitate construction of Easthorpe Road Bridge. | Work No. 68(a) Work No. 88(a) Work No. 88(c) Work No. 99(b) All works 17/3a | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) 17/3b | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Temporary storage, laydown areas, access and working space to facilitate construction of Easthorpe Road Bridge. | Work No. 68(a) Work No. 88(c) Work No. 99(a) Work No. 99(b) All works 18/1l | Access and working area for utility diversion works. | Work No. U185 Work No. U186 Work No. U187 Work No. U191 Work No. U192 18/2a | Access and working area for utility diversion works. | Work No. U185 Work No. U186 Work No. U187 Work No. U191 Work No. U192 18/3e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 104 All works 18/6a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. Temporary storage, laydown areas, access and working space to facilitate the construction of Potts Green Bridge. | Work No. 68(a) Work No. 100 All works 18/6d | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) Work No. 68(b) Work No. 101 18/6e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for construction of drainage infrastructure. | Work No. 101 Work No. 102(c) All works 18/6i | Temporary path and footway diversion routes. Temporary storage, laydown areas, access and working space to facilitate the construction of Potts Green Bridge. | Work No. 100 18/8a | Temporary storage, laydown areas, access and working space to facilitate the construction of Potts Green Bridge. | Work No. 100 18/13c | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) Work No. 68(b) 18/13e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 68(b) All works 18/18b | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access. | Work No. T52 All works 18/20c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 104 All works 19/1g | Compound and traffic management and recovery yard. | Work No. T54 All works 19/2f | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 104 All works 19/6b | Access and working area for utility diversion works. | Work No. U202 Work No. U203 Work No. U206 Work No. U207 19/6c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 112 All works 19/17a | Ecology Mitigation. Access to works. | All works 20/2a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access and working area for utility diversion works. | Work No. U147A Work No. U147B Work No. U147C Work No. 122 All works 20/7a | Access and working area for widening B1023 Kelvedon Road. Access and working area to allow for vegetation clearance to enable the construction of the permanent works. | Work No. 122 20/8a | Access and working area for widening B1023 Kelvedon Road. Access and working area to allow for vegetation clearance to enable the construction of the permanent works. | Work No. 122 20/9b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. Access / working room for construction of drainage infrastructure. | All Works 20/13a | Access and working area for widening B1023 Kelvedon Road. Access and working area to allow for vegetation clearance to enable the construction of the permanent works. | Work No. 122 21/1a | Access and working area for utility diversion works. | Work No. U124A Work No. U128A

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds