Propose a change

High Speed Rail (West Midlands - Crewe) Act 2021

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 6 Acquisition of land for particular purposes

Section 4(2) The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table. Area | Number of land shown on deposited plans | Purpose for which land may be acquired or used County of Staffordshire District of Lichfield Parish of Fradley and Streethay | 1 to 15, 22a | Provision of railway infrastructure and access 16 | Provision of railway infrastructure and access Utility works 20, 21, 24, 25c, 29, 35 | Worksite and access for construction 23, 28 | Utility works 19b, 30a, 31a, 32a | Provision of environmental mitigationWorksite and access for construction Parish of Kings Bromley | 1, 2, 23, 37, 41, 42, 87, 88, 90, 200, 222, AP2-31 | Provision of environmental mitigation 9, 16a, 16b, 50, 96, AP2-37, AP2-38, AP2-51, AP2-52, AP2-56, AP2-58, AP2-65, AP2-69, AP2-71a, AP2-72, AP2-84 | Provision of environmental mitigationWorksite and access for construction 12, 116a, AP2-28 | Utility works Worksite and access for construction 15, 17, 25a, 29 to 31, 43, 55, 56, 58, 62, 63, 84, 102, 141, 153, 160, 182, 185, 187, 198, 202 to 206, 209, 214, 243 to 246, 248 to 250, 252, AP1-4 to AP1-8, AP1-10 to AP1-13, AP2-101 | Utility works 20, 21, 35, 101, 136, 137a, 137b, 139a, 142, 147, 149, 152, 155, 162, 211, AP2-34, AP2-85, AP2-88 | Worksite and access for construction 38, 39, 52, 54, 134a, 172 | Borrow pit 49 | Highway works 51 | Provision of railway infrastructure and access Borrow pit 66, 140 | Worksite and access for construction Borrow pit 70, 169 | Provision of railway infrastructure and access Provision of environmental mitigation 77 | Highway works Worksite and access for construction 92a, 93, 100c, 112, 129b, 138b | Provision of environmental mitigation Utility works 100a | Provision of environmental mitigationUtility worksProvision of a public right of way 122a | Provision of environmental mitigation Worksite and access for construction Borrow pit 143 | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 148 | Provision of environmental mitigation Borrow pit 260 | Provision of environmental mitigation Utility works Worksite and access for construction Provision of a public right of way 261 | Provision of environmental mitigation Utility works Worksite and access for construction AP2-26, AP2-29, AP2-75, AP2-86, AP2-90, AP2-93 | Dewatering operations AP2-50, AP2-50a, AP2-73 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction AP2-89, AP2-96 | Worksite and access for construction Dewatering operations Parish of Alrewas | 1 | Provision of environmental mitigation Worksite and access for construction 3, 7 | Worksite and access for construction 11 to 13 | Borrow pit AP2-1 | Utility works Worksite and access for construction Parish of Armitage with Handsacre | 3, 7, 10, 11 | Provision of environmental mitigation 6, 17, 18, 20, 21 | Worksite and access for construction AP2-5, AP2-5a, AP2-9, AP2-10 | Utility works AP2-14 to AP2-18 | Provision of railway infrastructure and access Parish of Hamstall Ridware | 1, 3 | Worksite and access for construction 2 | Provision of environmental mitigation 4, 5, 8 | Worksite and access for constructionBorrow pit Parish of Mavesyn Ridware | 2, 4, 39a, 46, 50, 63, 80, 112, 113, 115, 125, 132, 133, 148, 152, 179, 180, 190, 192, 193, AP1-13a, AP1-13b, AP1-23a, AP1-24a, AP1-25, AP2-10, AP2-17 | Worksite and access for construction 6 to 8, 51, 53, 97, 102, 118, 119, 126, 131, 139, 159, 161, 162, 166, 167, 172, 173, AP2-56, AP2-57, AP2-63 to AP2-67 | Provision of environmental mitigation 9 | Borrow pit 11 | Borrow pit Provision of a public right of way 23, 30, 32a, 33a, AP1-16a, AP1-17a, AP1-18a, AP1-19a, AP1-21a, AP2-16, AP2-19, AP2-32, AP2-33, AP2-35, AP2-36 | Utility works Worksite and access for construction 98, 104, 117, 216, AP1-27 to AP1-29, AP2-21, AP2-23, AP2-70 to AP2-75, AP2-79 to AP2-81 | Utility works 42 to 44, 89 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 49 | Provision of environmental mitigation Provision of a public right of way 64, 105 | Provision of railway infrastructure and access Provision of environmental mitigation 66, 93, 114, 134, 147, 150, 156, 205, AP2-25, AP2-26, AP2-30, AP2-31, AP2-52, AP2-54 | Provision of environmental mitigation Highway works 71 | Highway works Worksite and access for construction 74 | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 76, 82 | Worksite and access for construction Provision of a public right of way 90 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 93a, 95a, 108, 140, 142, 143, 160, 163, 169, 175, 177, 182 | Provision of environmental mitigation Worksite and access for construction 185, 202, AP1-15, AP1-30, AP1-32, AP1-34 | Highway works AP1-33, AP1-35, AP1-37 | Highway works Utility Works AP2-6 to AP2-8 | Dewatering operations AP2-1 to AP2-5, AP2-9, AP2-11, AP2-14, AP2-20, AP2-37, AP2-39, AP2-44 to AP2-51 | Provision of railway infrastructure and access AP2-38, AP2-40, AP2-41, AP2-43 | Provision of residential facility Parish of Colton | 45a, 46a, 48, 56, 57a, 61a, 63a, 73a, 95, 98, 100, 103, 106, 111, 112, 120, 121, 124, 134 to 136, 144, 145, 183, 187, 191, 215, 221 to 224, 226, 232, 243, 244, AP1-1 to AP1-3, AP1-7 to AP1-9, AP2-1, AP2-3 to AP2-7, AP2-14, AP2-18, AP2-20, AP2-25, AP2-31 to AP2-33, AP2-35, AP2-36, AP2-43, AP2-48 to AP2-51 | Utility works 32, 67, 70, 90, 115, 118, 127, 138, 155, 169, 177, 195, 199, 201, 205, 206, 209, 228, 230, 238, AP2-16, AP2-26 to AP2-28, AP2-56 to AP2-60 | Provision of environmental mitigation 197, AP2-9, AP2-24, AP2-34, AP2-40, AP2-54, AP2-55 | Provision of environmental mitigation Utility works 33 | Provision of environmental mitigation Highway works 43, 44, 49, 65, 65a, 66, 69, 71, 78, 82, 83, 109, 137, 185, 186, 193, 202, 212, 250 | Worksite and access for construction 79a, 79b, 91, 113, 117 | Provision of environmental mitigation Worksite and access for construction 151, 158, 161, 165, 220, AP1-5 | Highway works 214 | Provision of environmental mitigation Highway works Worksite and access for construction 217, 218, 240, 242, AP2-45, AP2-47 | Utility works Worksite and access for construction 231, 236 | Provision of railway infrastructure and access Provision of environmental mitigation Borough of East Staffordshire Parish of Blithfield | 1 | Highway works Parish of Abbots Bromley | AP2-1 to AP2-8, AP2-23, AP2-25, AP2-26, AP2-30, AP2-37, AP2-38, AP2-43, AP2-46, AP2-47, AP2-52, AP2-64, AP2-66, AP2-67, AP2-72, AP2-74, AP2-76, AP2-77, AP2-79, AP2-80, AP2-117, AP2-118 | Provision of environmental mitigation AP2-9, AP2-11, AP2-12, AP2-15, AP2-16, AP2-19, AP2-21, AP2-24, AP2-29, AP2-34, AP2-48, AP2-49, AP2-55, AP2-58, AP2-62, AP2-63, AP2-78, AP2-82, AP2-83, AP2-84, AP2-86 to AP2-90, AP2-93, AP2-93a, AP2-94, AP2-95, AP2-95a, AP2-96 | Utility works AP2-14, AP2-17, AP2-20, AP2-27, AP2-31, AP2-33, AP2-40, AP2-41, AP2-54, AP2-59, AP2-68, AP2-70 | Provision of environmental mitigation Utility works AP2-44, AP2-60 | Worksite and access for construction AP2-98 | Provision of environmental mitigation Utility works Worksite and access for construction Parish of Hoar Cross | AP2-1, AP2-3 | Utility works AP2-5 | Provision of environmental mitigation Utility works Worksite and access for construction AP2-6 to AP2-9, AP2-34 | Provision of environmental mitigation Utility works AP2-15, AP2-22, AP2-23, AP2-26 | Provision of environmental mitigation AP2-28, AP2-37, AP2-38 | Worksite and access for construction Parish of Newborough | AP2-1 to AP2-6, AP2-8 | Provision of environmental mitigation Utility works Borough of Stafford Parish of Colwich | 22, 142 to 144, 151 | Provision of environmental mitigation Worksite and access for construction 25, 52a, 54, 58, 64a, 76 to 79, 158, 220a | Provision of environmental mitigation 28, 30, 32, 33, 37, 40, 42, 52, 55, 57, 59, 60, 64, 65, 94c, 104, 107, 110, 161a, 177b, 180, AP1-2, AP1-4, AP1-9, AP1-11, AP1-13, AP1-19 to AP1-22, AP2-1, AP2-2, AP2-4, AP2-7a, AP2-11a, AP2-12, AP2-22, AP2-23, AP2-36 to AP2-38 | Utility works 47, 83, 85, 86a, 95 | Worksite and access for construction Provision of a public right of way 49, 51, 86b, 86c, 86d, 99, 100, 133, 134, 140, 146, 159, 171, 172, 182a, 185, 187, 193, 198a, 199a, 201, 210, 212, 216a, 217, 224 to 228, AP2-8, AP2-9 | Worksite and access for construction 69, 90a, 101a | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 94b, 103a, 103b, 109c, 109d, 111b, 112a, 121a, 129, 130, 157, 164, 167a, 170a, 184, 188, 197b, AP2-15, AP2-18, AP2-42, AP2-65 to AP2-67 | Utility works Worksite and access for construction 126a, 149a, 215a | Provision of railway infrastructure and access Worksite and access for construction 132 | Highway works Worksite and access for construction 155 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 229 to 232 | Provision of railway infrastructure and access 108a, 109b, AP2-31, AP2-34, AP2-35 | Utility works Creation of new rights of way Parish of Hixon | 1 | Provision of railway infrastructure and access 2 | Provision of railway infrastructure and accessWorksite and access for construction Parish of Ingestre | 1, 4, 5, 7a, 7b, 10, 11, 43, AP2-4, AP2-24 | Utility works 12 | Provision of environmental mitigation Worksite and access for construction 14, 18, 21, 23, 30, 33 | Provision of environmental mitigation 15 | Highway works 16 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 19 | Provision of railway infrastructure and access Worksite and access for construction 20, AP2-2 | Provision of environmental mitigation Utility works 27 | Worksite and access for construction AP2-6, AP2-7, AP2-9 to AP2-11, AP2-13, AP2-14, AP2-14a, AP2-15 | Utility works Worksite and access for construction AP2-18, AP2-19, AP2-21, AP2-22 | Reinstatement of golf facilities Parish of Tixall | 4, 5, 39, 73, AP2-1, AP2-10, AP2-16 | Utility works 7, 38, 43, AP2-12, AP2-13, AP2-15 | Provision of railway infrastructure and access Provision of environmental mitigation 8, 30, 36, 49, 51, 56, 57a, 60, 84 | Worksite and access for construction 40 | Highway works 15, 24, 62, AP2-3 to AP2-5 | Utility works Worksite and access for construction 20, 27, 33, 46, 47, 55, 61, 64, 67, 72 | Provision of environmental mitigation 48 | Provision of environmental mitigation Worksite and access for construction 50 | Provision of environmental mitigation Utility works Worksite and access for construction 63 | Provision of railway infrastructure and access Parish of Hopton and Coton | 1, 15, 21, 28, 29, 32, 80, 103, 104a, 104b, 108a, 109a, 121a, 161, 173a, 175 | Provision of environmental mitigation 34, 56, 81b, 89a, 93, 94a, 95, 96, 100b, 101b, 101c, 117, 166, 186a, AP2-12, AP2-17, AP2-56a, AP2-72 | Worksite and access for construction 11, 16a, 17, 23a, 23b, 123a | Provision of railway infrastructure and access Provision of environmental mitigation 36, 42, 44, 48, 66, 68, 72, 73, 84, 85, 99, 105, 148, 153, 156, 157, 163, 164, 180, 188, 194, AP1-12, AP1-14, AP1-15a, AP1-16, AP2-25, AP2-28, AP2-36, AP2-37, AP2-41, AP2-45 to AP2-48, AP2-59, AP2-60, AP2-62 to AP2-64, AP2-66, AP2-70, AP2-74, AP2-76 to AP2-79, AP2-81 to AP2-86, AP2-95, AP2-98 | Utility works 18a, 19a, 64, AP2-3 to AP2-6, AP2-93 | Utility works Worksite and access for construction 33, 37a, 74, AP2-65 | Provision of environmental mitigation Utility works 35a | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 57, 181 | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 60, 61, 63, 65 | Provision of environmental mitigation Provision of a public right of way 70, 116, 187 | Provision of railway infrastructure and access 78, AP2-24 | Highway works 91a, 92b, 97b, 100c, 183, 184a, AP2-31 to AP2-34 | Provision of environmental mitigation Worksite and access for construction AP2-16, AP2-18, AP2-19, AP2-21 | Reinstatement of business or facilities AP2-92 | Utility works Provision of a public right of way Parish of Salt and Enson | 2, 3 | Utility works AP2-1 | Worksite and access for construction Parish of Marston | 1, 44, 61, 70, 103, 105, 109, AP2-9, AP2-10 | Provision of environmental mitigation Worksite and access for construction 6, 43 | Provision of railway infrastructure and access 7, 16, 29, 31, 36, 63, 74, 78, 82, 83, 110, AP1-3, AP1-5, AP1-6a, AP2-11, AP2-19, AP2-21, AP2-23, AP2-26, AP2-29 to AP2-32, AP2-33a, AP2-34 | Utility works 12, 39, 46, 47, 50, 53, 56, 59, 60, 62, 64, 69, 75, 77, 94, 99, 104, 108 | Provision of environmental mitigation 20, 54, 92 | Provision of railway infrastructure and access Worksite and access for construction 27, 49 | Worksite and access for construction 42, AP1-1, AP1-2 | Highway works 45 | Worksite and access for construction Provision of a public right of way 90 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 98 | Provision of railway infrastructure and access Provision of environmental mitigation AP2-8 | Provision of environmental mitigation Utility works AP2-22, AP2-24 | Utility works Worksite and access for construction Parish of Creswell | AP2-3 | Highway works Parish of Whitgreave | 3 | Provision of environmental mitigation Worksite and access for construction 4 | Provision of environmental mitigation AP2-2 | Utility works Worksite and access for construction Parish of Stone Rural | 1, 3, 10a, 30, 35, 40, 47, 59 to 61, 68, 88a, 113, 118, 119 | Worksite and access for construction 4, 13, 24 to 26, 44a, 51, 55, 56, 74 to 76, 81a, 122, 123, 126, 153, 155, AP2-48, AP2-49 | Provision of environmental mitigation 6 | Worksite and access for construction Provision of a public right of way 11a, 14, 17, 31, 41, 42, 70, 105, 128a | Provision of environmental mitigation Worksite and access for construction 15, 18, 19a, 22, 23, 48, 135, 139, 140, AP1-2 to AP1-11, AP1-15, AP2-10, AP2-11, AP2-22, AP2-30a, AP2-31 to AP2-33, AP2-38, AP2-39, AP2-62, AP2-63, AP2-68, AP2-77, AP2-82, AP2-83 | Utility works 20, 91, 92 | Provision of railway infrastructure and access Worksite and access for construction 37, 107a, 116a | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 54, 57 | Provision of environmental mitigation Provision of a public right of way 73a, 157 | Provision of railway infrastructure and access Provision of environmental mitigation Utility works Worksite and access for construction 77, 129 | Provision of railway infrastructure and access 90a, 90b | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 131 | Provision of railway infrastructure and access Provision of environmental mitigation AP2-3 to AP2-6, AP2-8, AP2-29, AP2-81, AP2-84, AP2-85 | Utility works Worksite and access for construction AP2-57 | Highway works Utility works AP2-58, AP2-59 | Provision of environmental mitigation Highway works Utility works AP2-72 to AP2-74 | Provision of environmental mitigation Provision of water treatment facility Parish of Stone | 5, 7 | Provision of environmental mitigation Worksite and access for construction AP1-1, AP2-22a, AP2-26 | Utility works Parish of Chebsey | 1, 3 | Provision of environmental mitigation 4, 7, 11 | Provision of railway infrastructure and access Parish of Swynnerton | 1, 221, 273, 274 | Provision of railway infrastructure and access 13, 14, 28, 32, 34, 39, 40, 44, 60, 75, 83, 84, 98, 99, 107, 108, 111, 140, 169a, 170a, 188, 190 to 192, 199, 200, 204, 218, 223, 231, 234, 236, 237, 240, 242, 245, 247, 269, 278, 284a, 294, 308, 322, 324, 325, AP1-41, AP2-39 | Provision of environmental mitigation 19, 23, 55, 56, 62, 92, 104, 112, 115, 117, 174, 179, 208, 219, 225, 246, 256, 264, 271, 272, 281, 283, 288, 290, 292, 293, 298, 329, AP1-72 | Worksite and access for construction 35, 38, 41, 46, 51 to 53, 57, 109a, 121a, 122, 125, 165b, 196, 201, 228, 232, 241, 251 to 253, 266, 279, 282 | Provision of environmental mitigation Worksite and access for construction 63, 77, 81, 82, 85, 91b, 95, 97, 105, 118, 135, 144b, 144c, 144d, 146, 148, 153 to 155, 157, 159, 163, 175, 177, 257, 301, 309, 310, 316, 319, AP1-21, AP1-22, AP1-26, AP1-32, AP1-33, AP1-35, AP1-37, AP1-39, AP1-42, AP1-44, AP1-45, AP1-47, AP1-79, AP1-83 to AP1-88, AP2-3, AP2-4, AP2-13, AP2-14, AP2-21, AP2-22, AP2-27, AP2-30 to AP2-32, AP2-34, AP2-41, AP2-42, AP2-44, AP2-45 | Utility works 64a, 261, AP1-4 | Provision of railway infrastructure and access Provision of environmental mitigation 67, 72a, 259 | Provision of environmental mitigation Utility works Worksite and access for construction 68 | Provision of environmental mitigation Utility works Worksite and access for construction Provision of a public right of way 86, 88, 137, AP2-28 | Utility works Worksite and access for construction 132a | Provision of railway infrastructure and access Provision of environmental mitigation Utility works Worksite and access for construction 149, 150, 156, 158 | Utility works Provision of a public right of way 151 | Utility works Worksite and access for construction Provision of a public right of way 152a, 152b, 167, 168 | Worksite and access for construction Provision of a public right of way 202, 226, 227, 229, 230, 332a | Highway works 203, 326a | Provision of environmental mitigation Highway works 207 | Highway works Worksite and access for construction 217 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 295a | Provision of railway infrastructure and access Utility works Worksite and access for construction Provision of a public right of way 276, 300a, 300b | Provision of railway infrastructure and access Worksite and access for construction AP2-25, AP2-26, AP2-40 | Provision of environmental mitigation Utility works AP2-66, AP2-68 to AP2-71 | Provision of water treatment facility AP2-67 | Provision of environmental mitigation Provision of water treatment facility Parish of Standon | AP2-1, AP2-3, AP2-8, AP2-11 | Provision of water treatment facility AP2-5 | Provision of environmental mitigation Provision of water treatment facility Borough of Newcastle-under-Lyme Parish of Whitmore | 1, 2, 38, 57, 62, 131, 133, 136, 137, 148a, 166, AP2-2 | Worksite and access for construction 11, 13, 14, 18 to 20, 32, 44, 49, 66, 118, AP2-1, AP2-7, AP2-9 | Utility works 16 | Utility works Worksite and access for construction 21 | Provision of environmental mitigation Highway works Worksite and access for construction 23 to 25, 102, 134a, 141b, 142, 146a, 147a 152, 153, 158, 163, 165, 168, 169, 174 | Provision of environmental mitigation 30 | Highway works 27, 42, 91b, 139, 141d, 149a, 150, AP2-14 | Provision of environmental mitigation Worksite and access for construction 36 | Provision of environmental mitigation Highway works 120a | Provision of railway infrastructure and access Provision of environmental mitigation 140, 143 | Provision of environmental mitigation and installation of ground anchors 151, 159, 172, 173, 176, 177 | Provision of railway infrastructure and access 114a | Provision of environmental mitigation Creation of new rights of way 144a | Provision of railway infrastructure Provision of environmental mitigation Creation of new rights of way Town of Newcastle-under-Lyme | AP2-6, AP2-7 | Utility works Parish of Maer | AP2-3, AP2-6 | Highway works Parish of Madeley | 1, 2, 3, 23, 24, 26, 29, 34, 36, 37, 65, 81, 99 to 101, 134, 135, 147, 148, 174, 175, 183, 184, 191, 192, 199, 200, 219 to 221, 242, 243 | Provision of railway infrastructure and access 5, 12a, 12b, 25, 30, 83, 85, 89, 91, 126, 139, 140, 156, 180, 185, 198, 251 | Provision of environmental mitigation Worksite and access for construction 6, 27, 40a, 45 to 47, 51, 52, 68, 71, 72, 74, 76, 78, 82, 102, 104, 109, 112, 116, 138, 177, 179, 188, 189, AP2-21, AP2-22 | Provision of environmental mitigation 10b, 14, 15, 17, 18, 39, 57, 60, 61, 63, 73, 79, 90, 115, 117, 121, 129, 136, 186, 190, 193, 210, 211, 214, 216 to 218, AP2-49 to AP2-54 | Worksite and access for construction 31, 37a, 77, 241 | Provision of environmental mitigation Worksite and access for construction Borrow pit 35, 48 | Utility works Worksite and access for construction 69 | Provision of railway infrastructure and access Utility works 70 | Borrow pit 92, 173, 209, AP2-10, AP2-12, AP2-13, AP2-35, AP2-36 | Utility works 97, 144, 197, 202 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 152 to 155 | Provision of railway infrastructure and access Provision of environmental mitigation 203 | Worksite and access for construction Provision of a public right of way 206 | Provision of environmental mitigation Utility works Worksite and access for construction 222, 232, 237 | Provision of environmental mitigation Highway works AP2-2 | Dewatering operations AP2-14 | Provision of environmental mitigation Utility works Unitary District of Shropshire | 21 to 23 | Provision of environmental mitigation Highway works Parish of Woore | 26 | Provision of environmental mitigation Parish of Betley | 1, AP2-1, AP2-3, AP2-5, AP2-6 | Worksite and access for construction 2, 3, 5, 6a, 7, AP1-1 | Utility works 8, 10, 11 | Provision of railway infrastructure and access County of Cheshire Borough of Cheshire East Parish of Checkley cum Wrinehill | 1a, 3 | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 4, 5, 26, 27 | Provision of environmental mitigation 6, 7, 33 | Utility works 14, 15, 28 to 32 | Provision of railway infrastructure and access 16, 19 | Worksite and access for construction Provision of a public right of way 20, 24, AP2-1 to AP2-3, AP2-5, AP2-8, AP2-9 | Worksite and access for construction 22e | Borrow pit Provision of a public right of way 22b, 22c, 22d | Borrow pit AP2-12 | Utility works Worksite and access for construction Parish of Blakenhall | 1b, 1c, 1d | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 1a, 31a, 136, 136a, 143 | Provision of a public right of way Worksite and access for construction 3a, 3c | Provision of environmental mitigation Utility works Worksite and access for construction Creation of new rights of way 3b | Provision of environmental mitigation Utility works Worksite and access for construction Borrow pit 4 | Utility works Borrow pit 5a, 97, 121, 124, 126, 141 | Provision of environmental mitigation 7a, 7b, 7c, 10, 10a, 13, 50, 115, 123, 127, 130, AP2-1, AP2-2, AP2-5 to AP2-7, AP2-40, AP2-51, AP2-61 | Utility works Worksite and access for construction 8a, 8b, 9b, 9c | Utility works Worksite and access for construction Borrow pit 11a, 11b, 11c, 17b, 38b | Provision of railway infrastructure and access Provision of environmental mitigation Utility works 14a, 28a, 46, 52, 53a, 54 | Provision of railway infrastructure and access Provision of environmental mitigation 15a, 15b, 15c, 21a | Provision of environmental mitigation Borrow pit 16, 18, 24, 25 | Provision of railway infrastructure and access 19, 27, 31b, 31c, 49a, 60, 101a, 101b, 113a, 116, 120, 144, AP2-11, AP2-13, AP2-28, AP2-35 | Worksite and access for construction 23 | Borrow pit 7d, 29a, 35, 70, 74, AP1-1a, AP1-2a, AP1-4, AP1-6, AP1-8 to AP1-11, AP1-13, AP1-14a, AP1-18, AP1-19, AP2-23, AP2-27, AP2-66 to AP2-68 | Utility works 65, 79a, 81b, 106a, 125, 131, AP2-56 | Provision of environmental mitigation Worksite and access for construction 66a | Provision of environmental mitigation Highway works Worksite and access for construction 68a | Provision of environmental mitigation Highway works 85, 122, AP1-7a, AP1-7b | Provision of environmental mitigation Utility works 86 | Highway works 112, AP2-48 | Provision of environmental mitigation Utility works Worksite and access for construction 135 | Provision of environmental mitigation Utility works Provision of a public right of way AP2-62, AP2-63, AP2-65 | Highway works Utility works Parish of Hough | 1 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 2 | Worksite and access for construction 3, 6 | Utility works 4, 5 | Utility works Provision of a public right of way Parish of Chorlton | 3, 57, 82, 92, 93 | Provision of environmental mitigation Worksite and access for construction 4, 39 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 5, 9, 74, AP1-4 to AP1-6, AP1-8, AP1-9, AP1-11, AP1-13 to AP1-19, AP2-4, AP2-6, AP2-8, AP2-9, AP2-11 | Utility works 7, 90, 96, 97a, 98, 101, 102, 104, 106, 107, AP2-10 | Worksite and access for construction 8, 8a, 23, 29 | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 12, 48 | Worksite and access for construction Provision of a public right of way 16, 41, 44, 56, 59, 81, 84, 86 | Provision of environmental mitigation 22, 34, 36, 46, | Provision of railway infrastructure and access 25 | Highway works Utility works 38 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 47 | Provision of railway infrastructure and access Worksite and access for construction Provision of a public right of way 49 | Provision of environmental mitigation Provision of a public right of way 71, 73 | Provision of environmental mitigation Highway works AP2-1, AP2-2 | Utility works Worksite and access for construction AP2-5, AP2-7 | Provision of environmental mitigation Utility works Parish of Basford | 6, 7, 11, 48 | Provision of environmental mitigation Highway works 9, 13, AP1-1, AP1-5 to AP1-8, AP1-10 to AP1-12, AP1-14, AP1-15, AP1-22, AP2-1 to AP2-3 | Utility works 14, 16, 19, 22, 44 | Provision of environmental mitigation Worksite and access for construction 18, 20, 40, 41, 55, 56, 59, 69, 72, 73, 76 | Provision of environmental mitigation 23, 26, 27, 31, 37, 39, 43, 47, 63, 75, 78 to 81, 86, 88, 91a, 97, AP1-28, AP2-4, AP2-6 to AP2-10 | Worksite and access for construction 32 | Provision of environmental mitigation Provision of a public right of way 33 | Worksite and access for construction Provision of a public right of way 57 | Provision of railway infrastructure and access Provision of environmental mitigation 66 | Provision of railway infrastructure and access Parish of Weston | 1, 2, AP1-1, AP1-2 | Utility works Parish of Shavington cum Gresty | 2 to 5, 5a, 6, AP2-2, AP2-3 | Worksite and access for construction 7 | Provision of environmental mitigation Town of Crewe | 3, 41 | Worksite and access for construction 9, 16, 17, 19 to 22, 24, 26, 29 to 32, 34, 37, 38, AP2-4, AP2-8, AP2-9 | Provision of railway infrastructure and access Parish of Haslington | 2 | Provision of railway infrastructure and access Parish of Moston | 1 | Provision of railway infrastructure and access Town of Sandbach | 2 | Provision of railway infrastructure and access Worksite and access for construction 5 | Worksite and access for construction 6 to 9 | Provision of railway infrastructure and access

Your change, as a redline

SCHEDULE 6 Acquisition of land for particular purposes

Section 4(2) The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table. Area | Number of land shown on deposited plans | Purpose for which land may be acquired or used County of Staffordshire District of Lichfield Parish of Fradley and Streethay | 1 to 15, 22a | Provision of railway infrastructure and access 16 | Provision of railway infrastructure and access Utility works 20, 21, 24, 25c, 29, 35 | Worksite and access for construction 23, 28 | Utility works 19b, 30a, 31a, 32a | Provision of environmental mitigationWorksite and access for construction Parish of Kings Bromley | 1, 2, 23, 37, 41, 42, 87, 88, 90, 200, 222, AP2-31 | Provision of environmental mitigation 9, 16a, 16b, 50, 96, AP2-37, AP2-38, AP2-51, AP2-52, AP2-56, AP2-58, AP2-65, AP2-69, AP2-71a, AP2-72, AP2-84 | Provision of environmental mitigationWorksite and access for construction 12, 116a, AP2-28 | Utility works Worksite and access for construction 15, 17, 25a, 29 to 31, 43, 55, 56, 58, 62, 63, 84, 102, 141, 153, 160, 182, 185, 187, 198, 202 to 206, 209, 214, 243 to 246, 248 to 250, 252, AP1-4 to AP1-8, AP1-10 to AP1-13, AP2-101 | Utility works 20, 21, 35, 101, 136, 137a, 137b, 139a, 142, 147, 149, 152, 155, 162, 211, AP2-34, AP2-85, AP2-88 | Worksite and access for construction 38, 39, 52, 54, 134a, 172 | Borrow pit 49 | Highway works 51 | Provision of railway infrastructure and access Borrow pit 66, 140 | Worksite and access for construction Borrow pit 70, 169 | Provision of railway infrastructure and access Provision of environmental mitigation 77 | Highway works Worksite and access for construction 92a, 93, 100c, 112, 129b, 138b | Provision of environmental mitigation Utility works 100a | Provision of environmental mitigationUtility worksProvision of a public right of way 122a | Provision of environmental mitigation Worksite and access for construction Borrow pit 143 | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 148 | Provision of environmental mitigation Borrow pit 260 | Provision of environmental mitigation Utility works Worksite and access for construction Provision of a public right of way 261 | Provision of environmental mitigation Utility works Worksite and access for construction AP2-26, AP2-29, AP2-75, AP2-86, AP2-90, AP2-93 | Dewatering operations AP2-50, AP2-50a, AP2-73 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction AP2-89, AP2-96 | Worksite and access for construction Dewatering operations Parish of Alrewas | 1 | Provision of environmental mitigation Worksite and access for construction 3, 7 | Worksite and access for construction 11 to 13 | Borrow pit AP2-1 | Utility works Worksite and access for construction Parish of Armitage with Handsacre | 3, 7, 10, 11 | Provision of environmental mitigation 6, 17, 18, 20, 21 | Worksite and access for construction AP2-5, AP2-5a, AP2-9, AP2-10 | Utility works AP2-14 to AP2-18 | Provision of railway infrastructure and access Parish of Hamstall Ridware | 1, 3 | Worksite and access for construction 2 | Provision of environmental mitigation 4, 5, 8 | Worksite and access for constructionBorrow pit Parish of Mavesyn Ridware | 2, 4, 39a, 46, 50, 63, 80, 112, 113, 115, 125, 132, 133, 148, 152, 179, 180, 190, 192, 193, AP1-13a, AP1-13b, AP1-23a, AP1-24a, AP1-25, AP2-10, AP2-17 | Worksite and access for construction 6 to 8, 51, 53, 97, 102, 118, 119, 126, 131, 139, 159, 161, 162, 166, 167, 172, 173, AP2-56, AP2-57, AP2-63 to AP2-67 | Provision of environmental mitigation 9 | Borrow pit 11 | Borrow pit Provision of a public right of way 23, 30, 32a, 33a, AP1-16a, AP1-17a, AP1-18a, AP1-19a, AP1-21a, AP2-16, AP2-19, AP2-32, AP2-33, AP2-35, AP2-36 | Utility works Worksite and access for construction 98, 104, 117, 216, AP1-27 to AP1-29, AP2-21, AP2-23, AP2-70 to AP2-75, AP2-79 to AP2-81 | Utility works 42 to 44, 89 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 49 | Provision of environmental mitigation Provision of a public right of way 64, 105 | Provision of railway infrastructure and access Provision of environmental mitigation 66, 93, 114, 134, 147, 150, 156, 205, AP2-25, AP2-26, AP2-30, AP2-31, AP2-52, AP2-54 | Provision of environmental mitigation Highway works 71 | Highway works Worksite and access for construction 74 | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 76, 82 | Worksite and access for construction Provision of a public right of way 90 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 93a, 95a, 108, 140, 142, 143, 160, 163, 169, 175, 177, 182 | Provision of environmental mitigation Worksite and access for construction 185, 202, AP1-15, AP1-30, AP1-32, AP1-34 | Highway works AP1-33, AP1-35, AP1-37 | Highway works Utility Works AP2-6 to AP2-8 | Dewatering operations AP2-1 to AP2-5, AP2-9, AP2-11, AP2-14, AP2-20, AP2-37, AP2-39, AP2-44 to AP2-51 | Provision of railway infrastructure and access AP2-38, AP2-40, AP2-41, AP2-43 | Provision of residential facility Parish of Colton | 45a, 46a, 48, 56, 57a, 61a, 63a, 73a, 95, 98, 100, 103, 106, 111, 112, 120, 121, 124, 134 to 136, 144, 145, 183, 187, 191, 215, 221 to 224, 226, 232, 243, 244, AP1-1 to AP1-3, AP1-7 to AP1-9, AP2-1, AP2-3 to AP2-7, AP2-14, AP2-18, AP2-20, AP2-25, AP2-31 to AP2-33, AP2-35, AP2-36, AP2-43, AP2-48 to AP2-51 | Utility works 32, 67, 70, 90, 115, 118, 127, 138, 155, 169, 177, 195, 199, 201, 205, 206, 209, 228, 230, 238, AP2-16, AP2-26 to AP2-28, AP2-56 to AP2-60 | Provision of environmental mitigation 197, AP2-9, AP2-24, AP2-34, AP2-40, AP2-54, AP2-55 | Provision of environmental mitigation Utility works 33 | Provision of environmental mitigation Highway works 43, 44, 49, 65, 65a, 66, 69, 71, 78, 82, 83, 109, 137, 185, 186, 193, 202, 212, 250 | Worksite and access for construction 79a, 79b, 91, 113, 117 | Provision of environmental mitigation Worksite and access for construction 151, 158, 161, 165, 220, AP1-5 | Highway works 214 | Provision of environmental mitigation Highway works Worksite and access for construction 217, 218, 240, 242, AP2-45, AP2-47 | Utility works Worksite and access for construction 231, 236 | Provision of railway infrastructure and access Provision of environmental mitigation Borough of East Staffordshire Parish of Blithfield | 1 | Highway works Parish of Abbots Bromley | AP2-1 to AP2-8, AP2-23, AP2-25, AP2-26, AP2-30, AP2-37, AP2-38, AP2-43, AP2-46, AP2-47, AP2-52, AP2-64, AP2-66, AP2-67, AP2-72, AP2-74, AP2-76, AP2-77, AP2-79, AP2-80, AP2-117, AP2-118 | Provision of environmental mitigation AP2-9, AP2-11, AP2-12, AP2-15, AP2-16, AP2-19, AP2-21, AP2-24, AP2-29, AP2-34, AP2-48, AP2-49, AP2-55, AP2-58, AP2-62, AP2-63, AP2-78, AP2-82, AP2-83, AP2-84, AP2-86 to AP2-90, AP2-93, AP2-93a, AP2-94, AP2-95, AP2-95a, AP2-96 | Utility works AP2-14, AP2-17, AP2-20, AP2-27, AP2-31, AP2-33, AP2-40, AP2-41, AP2-54, AP2-59, AP2-68, AP2-70 | Provision of environmental mitigation Utility works AP2-44, AP2-60 | Worksite and access for construction AP2-98 | Provision of environmental mitigation Utility works Worksite and access for construction Parish of Hoar Cross | AP2-1, AP2-3 | Utility works AP2-5 | Provision of environmental mitigation Utility works Worksite and access for construction AP2-6 to AP2-9, AP2-34 | Provision of environmental mitigation Utility works AP2-15, AP2-22, AP2-23, AP2-26 | Provision of environmental mitigation AP2-28, AP2-37, AP2-38 | Worksite and access for construction Parish of Newborough | AP2-1 to AP2-6, AP2-8 | Provision of environmental mitigation Utility works Borough of Stafford Parish of Colwich | 22, 142 to 144, 151 | Provision of environmental mitigation Worksite and access for construction 25, 52a, 54, 58, 64a, 76 to 79, 158, 220a | Provision of environmental mitigation 28, 30, 32, 33, 37, 40, 42, 52, 55, 57, 59, 60, 64, 65, 94c, 104, 107, 110, 161a, 177b, 180, AP1-2, AP1-4, AP1-9, AP1-11, AP1-13, AP1-19 to AP1-22, AP2-1, AP2-2, AP2-4, AP2-7a, AP2-11a, AP2-12, AP2-22, AP2-23, AP2-36 to AP2-38 | Utility works 47, 83, 85, 86a, 95 | Worksite and access for construction Provision of a public right of way 49, 51, 86b, 86c, 86d, 99, 100, 133, 134, 140, 146, 159, 171, 172, 182a, 185, 187, 193, 198a, 199a, 201, 210, 212, 216a, 217, 224 to 228, AP2-8, AP2-9 | Worksite and access for construction 69, 90a, 101a | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 94b, 103a, 103b, 109c, 109d, 111b, 112a, 121a, 129, 130, 157, 164, 167a, 170a, 184, 188, 197b, AP2-15, AP2-18, AP2-42, AP2-65 to AP2-67 | Utility works Worksite and access for construction 126a, 149a, 215a | Provision of railway infrastructure and access Worksite and access for construction 132 | Highway works Worksite and access for construction 155 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 229 to 232 | Provision of railway infrastructure and access 108a, 109b, AP2-31, AP2-34, AP2-35 | Utility works Creation of new rights of way Parish of Hixon | 1 | Provision of railway infrastructure and access 2 | Provision of railway infrastructure and accessWorksite and access for construction Parish of Ingestre | 1, 4, 5, 7a, 7b, 10, 11, 43, AP2-4, AP2-24 | Utility works 12 | Provision of environmental mitigation Worksite and access for construction 14, 18, 21, 23, 30, 33 | Provision of environmental mitigation 15 | Highway works 16 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 19 | Provision of railway infrastructure and access Worksite and access for construction 20, AP2-2 | Provision of environmental mitigation Utility works 27 | Worksite and access for construction AP2-6, AP2-7, AP2-9 to AP2-11, AP2-13, AP2-14, AP2-14a, AP2-15 | Utility works Worksite and access for construction AP2-18, AP2-19, AP2-21, AP2-22 | Reinstatement of golf facilities Parish of Tixall | 4, 5, 39, 73, AP2-1, AP2-10, AP2-16 | Utility works 7, 38, 43, AP2-12, AP2-13, AP2-15 | Provision of railway infrastructure and access Provision of environmental mitigation 8, 30, 36, 49, 51, 56, 57a, 60, 84 | Worksite and access for construction 40 | Highway works 15, 24, 62, AP2-3 to AP2-5 | Utility works Worksite and access for construction 20, 27, 33, 46, 47, 55, 61, 64, 67, 72 | Provision of environmental mitigation 48 | Provision of environmental mitigation Worksite and access for construction 50 | Provision of environmental mitigation Utility works Worksite and access for construction 63 | Provision of railway infrastructure and access Parish of Hopton and Coton | 1, 15, 21, 28, 29, 32, 80, 103, 104a, 104b, 108a, 109a, 121a, 161, 173a, 175 | Provision of environmental mitigation 34, 56, 81b, 89a, 93, 94a, 95, 96, 100b, 101b, 101c, 117, 166, 186a, AP2-12, AP2-17, AP2-56a, AP2-72 | Worksite and access for construction 11, 16a, 17, 23a, 23b, 123a | Provision of railway infrastructure and access Provision of environmental mitigation 36, 42, 44, 48, 66, 68, 72, 73, 84, 85, 99, 105, 148, 153, 156, 157, 163, 164, 180, 188, 194, AP1-12, AP1-14, AP1-15a, AP1-16, AP2-25, AP2-28, AP2-36, AP2-37, AP2-41, AP2-45 to AP2-48, AP2-59, AP2-60, AP2-62 to AP2-64, AP2-66, AP2-70, AP2-74, AP2-76 to AP2-79, AP2-81 to AP2-86, AP2-95, AP2-98 | Utility works 18a, 19a, 64, AP2-3 to AP2-6, AP2-93 | Utility works Worksite and access for construction 33, 37a, 74, AP2-65 | Provision of environmental mitigation Utility works 35a | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 57, 181 | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 60, 61, 63, 65 | Provision of environmental mitigation Provision of a public right of way 70, 116, 187 | Provision of railway infrastructure and access 78, AP2-24 | Highway works 91a, 92b, 97b, 100c, 183, 184a, AP2-31 to AP2-34 | Provision of environmental mitigation Worksite and access for construction AP2-16, AP2-18, AP2-19, AP2-21 | Reinstatement of business or facilities AP2-92 | Utility works Provision of a public right of way Parish of Salt and Enson | 2, 3 | Utility works AP2-1 | Worksite and access for construction Parish of Marston | 1, 44, 61, 70, 103, 105, 109, AP2-9, AP2-10 | Provision of environmental mitigation Worksite and access for construction 6, 43 | Provision of railway infrastructure and access 7, 16, 29, 31, 36, 63, 74, 78, 82, 83, 110, AP1-3, AP1-5, AP1-6a, AP2-11, AP2-19, AP2-21, AP2-23, AP2-26, AP2-29 to AP2-32, AP2-33a, AP2-34 | Utility works 12, 39, 46, 47, 50, 53, 56, 59, 60, 62, 64, 69, 75, 77, 94, 99, 104, 108 | Provision of environmental mitigation 20, 54, 92 | Provision of railway infrastructure and access Worksite and access for construction 27, 49 | Worksite and access for construction 42, AP1-1, AP1-2 | Highway works 45 | Worksite and access for construction Provision of a public right of way 90 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 98 | Provision of railway infrastructure and access Provision of environmental mitigation AP2-8 | Provision of environmental mitigation Utility works AP2-22, AP2-24 | Utility works Worksite and access for construction Parish of Creswell | AP2-3 | Highway works Parish of Whitgreave | 3 | Provision of environmental mitigation Worksite and access for construction 4 | Provision of environmental mitigation AP2-2 | Utility works Worksite and access for construction Parish of Stone Rural | 1, 3, 10a, 30, 35, 40, 47, 59 to 61, 68, 88a, 113, 118, 119 | Worksite and access for construction 4, 13, 24 to 26, 44a, 51, 55, 56, 74 to 76, 81a, 122, 123, 126, 153, 155, AP2-48, AP2-49 | Provision of environmental mitigation 6 | Worksite and access for construction Provision of a public right of way 11a, 14, 17, 31, 41, 42, 70, 105, 128a | Provision of environmental mitigation Worksite and access for construction 15, 18, 19a, 22, 23, 48, 135, 139, 140, AP1-2 to AP1-11, AP1-15, AP2-10, AP2-11, AP2-22, AP2-30a, AP2-31 to AP2-33, AP2-38, AP2-39, AP2-62, AP2-63, AP2-68, AP2-77, AP2-82, AP2-83 | Utility works 20, 91, 92 | Provision of railway infrastructure and access Worksite and access for construction 37, 107a, 116a | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 54, 57 | Provision of environmental mitigation Provision of a public right of way 73a, 157 | Provision of railway infrastructure and access Provision of environmental mitigation Utility works Worksite and access for construction 77, 129 | Provision of railway infrastructure and access 90a, 90b | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 131 | Provision of railway infrastructure and access Provision of environmental mitigation AP2-3 to AP2-6, AP2-8, AP2-29, AP2-81, AP2-84, AP2-85 | Utility works Worksite and access for construction AP2-57 | Highway works Utility works AP2-58, AP2-59 | Provision of environmental mitigation Highway works Utility works AP2-72 to AP2-74 | Provision of environmental mitigation Provision of water treatment facility Parish of Stone | 5, 7 | Provision of environmental mitigation Worksite and access for construction AP1-1, AP2-22a, AP2-26 | Utility works Parish of Chebsey | 1, 3 | Provision of environmental mitigation 4, 7, 11 | Provision of railway infrastructure and access Parish of Swynnerton | 1, 221, 273, 274 | Provision of railway infrastructure and access 13, 14, 28, 32, 34, 39, 40, 44, 60, 75, 83, 84, 98, 99, 107, 108, 111, 140, 169a, 170a, 188, 190 to 192, 199, 200, 204, 218, 223, 231, 234, 236, 237, 240, 242, 245, 247, 269, 278, 284a, 294, 308, 322, 324, 325, AP1-41, AP2-39 | Provision of environmental mitigation 19, 23, 55, 56, 62, 92, 104, 112, 115, 117, 174, 179, 208, 219, 225, 246, 256, 264, 271, 272, 281, 283, 288, 290, 292, 293, 298, 329, AP1-72 | Worksite and access for construction 35, 38, 41, 46, 51 to 53, 57, 109a, 121a, 122, 125, 165b, 196, 201, 228, 232, 241, 251 to 253, 266, 279, 282 | Provision of environmental mitigation Worksite and access for construction 63, 77, 81, 82, 85, 91b, 95, 97, 105, 118, 135, 144b, 144c, 144d, 146, 148, 153 to 155, 157, 159, 163, 175, 177, 257, 301, 309, 310, 316, 319, AP1-21, AP1-22, AP1-26, AP1-32, AP1-33, AP1-35, AP1-37, AP1-39, AP1-42, AP1-44, AP1-45, AP1-47, AP1-79, AP1-83 to AP1-88, AP2-3, AP2-4, AP2-13, AP2-14, AP2-21, AP2-22, AP2-27, AP2-30 to AP2-32, AP2-34, AP2-41, AP2-42, AP2-44, AP2-45 | Utility works 64a, 261, AP1-4 | Provision of railway infrastructure and access Provision of environmental mitigation 67, 72a, 259 | Provision of environmental mitigation Utility works Worksite and access for construction 68 | Provision of environmental mitigation Utility works Worksite and access for construction Provision of a public right of way 86, 88, 137, AP2-28 | Utility works Worksite and access for construction 132a | Provision of railway infrastructure and access Provision of environmental mitigation Utility works Worksite and access for construction 149, 150, 156, 158 | Utility works Provision of a public right of way 151 | Utility works Worksite and access for construction Provision of a public right of way 152a, 152b, 167, 168 | Worksite and access for construction Provision of a public right of way 202, 226, 227, 229, 230, 332a | Highway works 203, 326a | Provision of environmental mitigation Highway works 207 | Highway works Worksite and access for construction 217 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 295a | Provision of railway infrastructure and access Utility works Worksite and access for construction Provision of a public right of way 276, 300a, 300b | Provision of railway infrastructure and access Worksite and access for construction AP2-25, AP2-26, AP2-40 | Provision of environmental mitigation Utility works AP2-66, AP2-68 to AP2-71 | Provision of water treatment facility AP2-67 | Provision of environmental mitigation Provision of water treatment facility Parish of Standon | AP2-1, AP2-3, AP2-8, AP2-11 | Provision of water treatment facility AP2-5 | Provision of environmental mitigation Provision of water treatment facility Borough of Newcastle-under-Lyme Parish of Whitmore | 1, 2, 38, 57, 62, 131, 133, 136, 137, 148a, 166, AP2-2 | Worksite and access for construction 11, 13, 14, 18 to 20, 32, 44, 49, 66, 118, AP2-1, AP2-7, AP2-9 | Utility works 16 | Utility works Worksite and access for construction 21 | Provision of environmental mitigation Highway works Worksite and access for construction 23 to 25, 102, 134a, 141b, 142, 146a, 147a 152, 153, 158, 163, 165, 168, 169, 174 | Provision of environmental mitigation 30 | Highway works 27, 42, 91b, 139, 141d, 149a, 150, AP2-14 | Provision of environmental mitigation Worksite and access for construction 36 | Provision of environmental mitigation Highway works 120a | Provision of railway infrastructure and access Provision of environmental mitigation 140, 143 | Provision of environmental mitigation and installation of ground anchors 151, 159, 172, 173, 176, 177 | Provision of railway infrastructure and access 114a | Provision of environmental mitigation Creation of new rights of way 144a | Provision of railway infrastructure Provision of environmental mitigation Creation of new rights of way Town of Newcastle-under-Lyme | AP2-6, AP2-7 | Utility works Parish of Maer | AP2-3, AP2-6 | Highway works Parish of Madeley | 1, 2, 3, 23, 24, 26, 29, 34, 36, 37, 65, 81, 99 to 101, 134, 135, 147, 148, 174, 175, 183, 184, 191, 192, 199, 200, 219 to 221, 242, 243 | Provision of railway infrastructure and access 5, 12a, 12b, 25, 30, 83, 85, 89, 91, 126, 139, 140, 156, 180, 185, 198, 251 | Provision of environmental mitigation Worksite and access for construction 6, 27, 40a, 45 to 47, 51, 52, 68, 71, 72, 74, 76, 78, 82, 102, 104, 109, 112, 116, 138, 177, 179, 188, 189, AP2-21, AP2-22 | Provision of environmental mitigation 10b, 14, 15, 17, 18, 39, 57, 60, 61, 63, 73, 79, 90, 115, 117, 121, 129, 136, 186, 190, 193, 210, 211, 214, 216 to 218, AP2-49 to AP2-54 | Worksite and access for construction 31, 37a, 77, 241 | Provision of environmental mitigation Worksite and access for construction Borrow pit 35, 48 | Utility works Worksite and access for construction 69 | Provision of railway infrastructure and access Utility works 70 | Borrow pit 92, 173, 209, AP2-10, AP2-12, AP2-13, AP2-35, AP2-36 | Utility works 97, 144, 197, 202 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 152 to 155 | Provision of railway infrastructure and access Provision of environmental mitigation 203 | Worksite and access for construction Provision of a public right of way 206 | Provision of environmental mitigation Utility works Worksite and access for construction 222, 232, 237 | Provision of environmental mitigation Highway works AP2-2 | Dewatering operations AP2-14 | Provision of environmental mitigation Utility works Unitary District of Shropshire | 21 to 23 | Provision of environmental mitigation Highway works Parish of Woore | 26 | Provision of environmental mitigation Parish of Betley | 1, AP2-1, AP2-3, AP2-5, AP2-6 | Worksite and access for construction 2, 3, 5, 6a, 7, AP1-1 | Utility works 8, 10, 11 | Provision of railway infrastructure and access County of Cheshire Borough of Cheshire East Parish of Checkley cum Wrinehill | 1a, 3 | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 4, 5, 26, 27 | Provision of environmental mitigation 6, 7, 33 | Utility works 14, 15, 28 to 32 | Provision of railway infrastructure and access 16, 19 | Worksite and access for construction Provision of a public right of way 20, 24, AP2-1 to AP2-3, AP2-5, AP2-8, AP2-9 | Worksite and access for construction 22e | Borrow pit Provision of a public right of way 22b, 22c, 22d | Borrow pit AP2-12 | Utility works Worksite and access for construction Parish of Blakenhall | 1b, 1c, 1d | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 1a, 31a, 136, 136a, 143 | Provision of a public right of way Worksite and access for construction 3a, 3c | Provision of environmental mitigation Utility works Worksite and access for construction Creation of new rights of way 3b | Provision of environmental mitigation Utility works Worksite and access for construction Borrow pit 4 | Utility works Borrow pit 5a, 97, 121, 124, 126, 141 | Provision of environmental mitigation 7a, 7b, 7c, 10, 10a, 13, 50, 115, 123, 127, 130, AP2-1, AP2-2, AP2-5 to AP2-7, AP2-40, AP2-51, AP2-61 | Utility works Worksite and access for construction 8a, 8b, 9b, 9c | Utility works Worksite and access for construction Borrow pit 11a, 11b, 11c, 17b, 38b | Provision of railway infrastructure and access Provision of environmental mitigation Utility works 14a, 28a, 46, 52, 53a, 54 | Provision of railway infrastructure and access Provision of environmental mitigation 15a, 15b, 15c, 21a | Provision of environmental mitigation Borrow pit 16, 18, 24, 25 | Provision of railway infrastructure and access 19, 27, 31b, 31c, 49a, 60, 101a, 101b, 113a, 116, 120, 144, AP2-11, AP2-13, AP2-28, AP2-35 | Worksite and access for construction 23 | Borrow pit 7d, 29a, 35, 70, 74, AP1-1a, AP1-2a, AP1-4, AP1-6, AP1-8 to AP1-11, AP1-13, AP1-14a, AP1-18, AP1-19, AP2-23, AP2-27, AP2-66 to AP2-68 | Utility works 65, 79a, 81b, 106a, 125, 131, AP2-56 | Provision of environmental mitigation Worksite and access for construction 66a | Provision of environmental mitigation Highway works Worksite and access for construction 68a | Provision of environmental mitigation Highway works 85, 122, AP1-7a, AP1-7b | Provision of environmental mitigation Utility works 86 | Highway works 112, AP2-48 | Provision of environmental mitigation Utility works Worksite and access for construction 135 | Provision of environmental mitigation Utility works Provision of a public right of way AP2-62, AP2-63, AP2-65 | Highway works Utility works Parish of Hough | 1 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 2 | Worksite and access for construction 3, 6 | Utility works 4, 5 | Utility works Provision of a public right of way Parish of Chorlton | 3, 57, 82, 92, 93 | Provision of environmental mitigation Worksite and access for construction 4, 39 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction 5, 9, 74, AP1-4 to AP1-6, AP1-8, AP1-9, AP1-11, AP1-13 to AP1-19, AP2-4, AP2-6, AP2-8, AP2-9, AP2-11 | Utility works 7, 90, 96, 97a, 98, 101, 102, 104, 106, 107, AP2-10 | Worksite and access for construction 8, 8a, 23, 29 | Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 12, 48 | Worksite and access for construction Provision of a public right of way 16, 41, 44, 56, 59, 81, 84, 86 | Provision of environmental mitigation 22, 34, 36, 46, | Provision of railway infrastructure and access 25 | Highway works Utility works 38 | Provision of railway infrastructure and access Provision of environmental mitigation Worksite and access for construction Provision of a public right of way 47 | Provision of railway infrastructure and access Worksite and access for construction Provision of a public right of way 49 | Provision of environmental mitigation Provision of a public right of way 71, 73 | Provision of environmental mitigation Highway works AP2-1, AP2-2 | Utility works Worksite and access for construction AP2-5, AP2-7 | Provision of environmental mitigation Utility works Parish of Basford | 6, 7, 11, 48 | Provision of environmental mitigation Highway works 9, 13, AP1-1, AP1-5 to AP1-8, AP1-10 to AP1-12, AP1-14, AP1-15, AP1-22, AP2-1 to AP2-3 | Utility works 14, 16, 19, 22, 44 | Provision of environmental mitigation Worksite and access for construction 18, 20, 40, 41, 55, 56, 59, 69, 72, 73, 76 | Provision of environmental mitigation 23, 26, 27, 31, 37, 39, 43, 47, 63, 75, 78 to 81, 86, 88, 91a, 97, AP1-28, AP2-4, AP2-6 to AP2-10 | Worksite and access for construction 32 | Provision of environmental mitigation Provision of a public right of way 33 | Worksite and access for construction Provision of a public right of way 57 | Provision of railway infrastructure and access Provision of environmental mitigation 66 | Provision of railway infrastructure and access Parish of Weston | 1, 2, AP1-1, AP1-2 | Utility works Parish of Shavington cum Gresty | 2 to 5, 5a, 6, AP2-2, AP2-3 | Worksite and access for construction 7 | Provision of environmental mitigation Town of Crewe | 3, 41 | Worksite and access for construction 9, 16, 17, 19 to 22, 24, 26, 29 to 32, 34, 37, 38, AP2-4, AP2-8, AP2-9 | Provision of railway infrastructure and access Parish of Haslington | 2 | Provision of railway infrastructure and access Parish of Moston | 1 | Provision of railway infrastructure and access Town of Sandbach | 2 | Provision of railway infrastructure and access Worksite and access for construction 5 | Worksite and access for construction 6 to 9 | Provision of railway infrastructure and access

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds