The Network Rail (Huyton) Order 2014

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

15 Power to survey and investigate land

(1) Network Rail may for the purposes of this Order— (a) survey or investigate any land shown within the Order limits; (b) without limitation on the scope of sub-paragraph (a), make trial holes in such positions as Network Rail thinks fit on the land to investigate the nature of the surface layer and subsoil and remove soil samples; (c) without limitation on the scope of sub-paragraph (a), carry out ecological or archaeological investigations on such land; (d) place on, leave on and remove from the land apparatus for use in connection with the survey and investigation of land and making of trial holes; and (e) enter on the land for the purpose of exercising the powers conferred by sub-paragraphs (a) to (d). (2) No land may be entered or equipment placed or left on or removed from the land under paragraph (1), unless at least 7 days’ notice has been served on every owner and occupier of the land. (3) Any person entering land under this article on behalf of Network Rail— (a) must, if so required, before or after entering the land produce written evidence of authority to do so; and (b) may take onto the land such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes. (4) No trial holes are to be made under this article— (a) in a carriageway or footway without the consent of the highway authority; or (b) in a private street without the consent of the street authority, but such consent must not be unreasonably withheld. (5) Network Rail must compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the powers conferred by this article, such compensation to be determined, in case of dispute, under Part 1 of the 1961 Act. (6) Nothing in this article obviates the need to obtain scheduled monument consent under the Ancient Monuments and Archaeological Areas Act 1979. (7) If within 14 days of receiving an application for consent under paragraph (4) a highway authority or street authority fails to notify Network Rail of its decision that authority is deemed to have granted consent.

Your change, as a redline

15 Power to survey and investigate land

(1) Network Rail may for the purposes of this Order— (a) survey or investigate any land shown within the Order limits; (b) without limitation on the scope of sub-paragraph (a), make trial holes in such positions as Network Rail thinks fit on the land to investigate the nature of the surface layer and subsoil and remove soil samples; (c) without limitation on the scope of sub-paragraph (a), carry out ecological or archaeological investigations on such land; (d) place on, leave on and remove from the land apparatus for use in connection with the survey and investigation of land and making of trial holes; and (e) enter on the land for the purpose of exercising the powers conferred by sub-paragraphs (a) to (d). (2) No land may be entered or equipment placed or left on or removed from the land under paragraph (1), unless at least 7 days’ notice has been served on every owner and occupier of the land. (3) Any person entering land under this article on behalf of Network Rail— (a) must, if so required, before or after entering the land produce written evidence of authority to do so; and (b) may take onto the land such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes. (4) No trial holes are to be made under this article— (a) in a carriageway or footway without the consent of the highway authority; or (b) in a private street without the consent of the street authority, but such consent must not be unreasonably withheld. (5) Network Rail must compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the powers conferred by this article, such compensation to be determined, in case of dispute, under Part 1 of the 1961 Act. (6) Nothing in this article obviates the need to obtain scheduled monument consent under the Ancient Monuments and Archaeological Areas Act 1979. (7) If within 14 days of receiving an application for consent under paragraph (4) a highway authority or street authority fails to notify Network Rail of its decision that authority is deemed to have granted consent.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds