Propose a change

The Morecambe Offshore Windfarm Generation Assets Order 2025

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 1 Authorised Project

Article 2 PART 1 Authorised Development 1 A nationally significant infrastructure project as defined in sections 14 (nationally significant infrastructure projects: general) and 15 (generating stations) of the 2008 Act located in the east Irish Sea approximately 30 kilometres from the coast of Lancashire being an offshore wind turbine generating station with electrical output capacity of over 100MW comprising— Work No. 1— (a) up to 35 wind turbine generators each fixed to the seabed by a foundation; and (b) a network of subsea inter-array cables between the wind turbine generators and between the wind turbine generators and the offshore substation platforms forming part of Work No. 2 including cable crossings and cable protection; and associated development within the meaning of section 115(2) (development for which development consent may be granted) of the 2008 Act comprising— Work No. 2— (a) one or two offshore substation platforms each fixed to the seabed by a foundation; and (b) a network of subsea platform link cables including cable crossings and cable protection. In connection with Work No. 1 and Work No. 2 further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project and which fall within the scope of the works assessed by the environmental statement, including— (a) scour protection around the foundations of the offshore structures; (b) cable protection measures; (c) the removal of material from the seabed and the disposal of inert material of natural origin within the Order limits produced during seabed preparation for and installation of foundations and cables (including sandwave clearance and seabed levelling) and boulder clearance; (d) removal of out of service cables and static fishing equipment; and (e) disposal of drill arisings in connection with any foundation drilling up to a total of 55,865 m³. 2 Work No. 1 and Work No. 2 are to be constructed seaward of MHWS within the area delineated by the coordinates shown on the offshore order limits and grid coordinates plan and listed in Table 1 below— Table 1 Point | Latitude | Longitude 1 | 53° 50′ 11.03673656″ N | 003° 36′ 31.65915051″ W 2 | 53° 49′ 41.72634557″ N | 003° 34′ 15.69323747″ W 3 | 53° 49′ 45.14948499″ N | 003° 29′ 48.00160838″ W 4 | 53° 45′ 16.81576507″ N | 003° 29′ 38.45882862″ W 5 | 53° 45′ 00.78002400″ N | 003° 36′ 04.79995593″ W 6 | 53° 46′ 45.95836718″ N | 003° 40′ 53.89383116″ W PART 2 Ancillary works 1 Works within the Order limits which fall within the scope of the works assessed by the environmental statement comprising— (a) moorings or other means of accommodating vessels in the construction or maintenance of the authorised development; and (b) marking buoys, beacons, fenders and other navigational warning or ship impact protection works.

Your change, as a redline

SCHEDULE 1 Authorised Project

Article 2 PART 1 Authorised Development 1 A nationally significant infrastructure project as defined in sections 14 (nationally significant infrastructure projects: general) and 15 (generating stations) of the 2008 Act located in the east Irish Sea approximately 30 kilometres from the coast of Lancashire being an offshore wind turbine generating station with electrical output capacity of over 100MW comprising— Work No. 1— (a) up to 35 wind turbine generators each fixed to the seabed by a foundation; and (b) a network of subsea inter-array cables between the wind turbine generators and between the wind turbine generators and the offshore substation platforms forming part of Work No. 2 including cable crossings and cable protection; and associated development within the meaning of section 115(2) (development for which development consent may be granted) of the 2008 Act comprising— Work No. 2— (a) one or two offshore substation platforms each fixed to the seabed by a foundation; and (b) a network of subsea platform link cables including cable crossings and cable protection. In connection with Work No. 1 and Work No. 2 further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project and which fall within the scope of the works assessed by the environmental statement, including— (a) scour protection around the foundations of the offshore structures; (b) cable protection measures; (c) the removal of material from the seabed and the disposal of inert material of natural origin within the Order limits produced during seabed preparation for and installation of foundations and cables (including sandwave clearance and seabed levelling) and boulder clearance; (d) removal of out of service cables and static fishing equipment; and (e) disposal of drill arisings in connection with any foundation drilling up to a total of 55,865 m³. 2 Work No. 1 and Work No. 2 are to be constructed seaward of MHWS within the area delineated by the coordinates shown on the offshore order limits and grid coordinates plan and listed in Table 1 below— Table 1 Point | Latitude | Longitude 1 | 53° 50′ 11.03673656″ N | 003° 36′ 31.65915051″ W 2 | 53° 49′ 41.72634557″ N | 003° 34′ 15.69323747″ W 3 | 53° 49′ 45.14948499″ N | 003° 29′ 48.00160838″ W 4 | 53° 45′ 16.81576507″ N | 003° 29′ 38.45882862″ W 5 | 53° 45′ 00.78002400″ N | 003° 36′ 04.79995593″ W 6 | 53° 46′ 45.95836718″ N | 003° 40′ 53.89383116″ W PART 2 Ancillary works 1 Works within the Order limits which fall within the scope of the works assessed by the environmental statement comprising— (a) moorings or other means of accommodating vessels in the construction or maintenance of the authorised development; and (b) marking buoys, beacons, fenders and other navigational warning or ship impact protection works.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds