The Longfield Solar Farm Order 2023
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 9 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
Article 20 Interpretation 1 In this Schedule— “access rights” means rights over land to— alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access; and pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the authorised development; “cable rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; “substation connection rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures and to connect such cables and services to the National Grid Bulls Lodge substation; install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain watercourses, public sewers and drains and drainage apparatus and equipment; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the Bulls Lodge substation works; restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain soft landscaping and biodiversity measures. (1) Plot reference number shown on the Land Plans | (2) Purposes for which rights over land may be required and restrictive covenants imposed Land Plans – Sheet 1 1/1A (excluding subsoil interests) | access rights 1/1B | cable rights 1/2A (excluding subsoil interests) | access rights 1/2A/2 | cable rights 1/2B | cable rights and access rights 1/2D/1 (excluding subsoil interests) | access rights 1/2E | cable rights 1/2F | cable rights 1/3A | substation connection rights Land Plans – Sheet 2 2/1A | cable rights 2/1B | cable rights 2/1E | cable rights 2/2 | cable rights 2/3 | cable rights 2/4 | cable rights 2/5 | cable rights 2/6 | cable rights Land Plans – Sheet 3 3/4 | cable rights Land Plans – Sheet 4 4/2 (excluding subsoil interests) | access rights 5/1A (excluding subsoil interests) | access rights Land Plans – Sheet 5 5/1B (excluding subsoil interests) | access rights Land Plans – Sheet 6 6/1 (excluding subsoil interests) | access rights Land Plans – Sheet 7 7/2 | access rights 7/2/2 | access rights Land Plans – Sheet 8 8/2 | access rights 8/2/1 (excluding subsoil interests) | access rights 8/2/2 | access rights
SCHEDULE 9 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
Article 20 Interpretation 1 In this Schedule— “access rights” means rights over land to— alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation) to such access; and pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the authorised development; “cable rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; “substation connection rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures and to connect such cables and services to the National Grid Bulls Lodge substation; install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain watercourses, public sewers and drains and drainage apparatus and equipment; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the Bulls Lodge substation works; restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain soft landscaping and biodiversity measures. (1) Plot reference number shown on the Land Plans | (2) Purposes for which rights over land may be required and restrictive covenants imposed Land Plans – Sheet 1 1/1A (excluding subsoil interests) | access rights 1/1B | cable rights 1/2A (excluding subsoil interests) | access rights 1/2A/2 | cable rights 1/2B | cable rights and access rights 1/2D/1 (excluding subsoil interests) | access rights 1/2E | cable rights 1/2F | cable rights 1/3A | substation connection rights Land Plans – Sheet 2 2/1A | cable rights 2/1B | cable rights 2/1E | cable rights 2/2 | cable rights 2/3 | cable rights 2/4 | cable rights 2/5 | cable rights 2/6 | cable rights Land Plans – Sheet 3 3/4 | cable rights Land Plans – Sheet 4 4/2 (excluding subsoil interests) | access rights 5/1A (excluding subsoil interests) | access rights Land Plans – Sheet 5 5/1B (excluding subsoil interests) | access rights Land Plans – Sheet 6 6/1 (excluding subsoil interests) | access rights Land Plans – Sheet 7 7/2 | access rights 7/2/2 | access rights Land Plans – Sheet 8 8/2 | access rights 8/2/1 (excluding subsoil interests) | access rights 8/2/2 | access rights
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.