Propose a change

Building Act 1984

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

21 Provision of drainage.

(1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (3) Any question arising under subsection (4) below between a building control authority and the person by whom, or on whose behalf, an application for building control approval is made as to whether a proposed drain shall be required to connect with a sewer may on the application of that person be determined by the appropriate court or tribunal. (4) Where an application for building control approval in respect of a building or an extension of a building is made to a building control authority, the building control authority, or on appeal the appropriate court or tribunal, may require a proposed drain to connect with a sewer where— (a) that sewer is within one hundred feet of the site of the building or, in the case of an extension, the site either of the extension or of the original building, and is at a level that makes it reasonably practicable to construct a drain to communicate with it, and, if it is not a public sewer, is a sewer that the person constructing the drain is entitled to use, and (b) the intervening land is land through which that person is entitled to construct a drain. (5) Notwithstanding paragraph (a) of subsection (4) above, a drain may be required to be made to connect with a sewer that is not within the distance mentioned in that paragraph, but is otherwise such a sewer as is therein mentioned, if the authority undertake to bear so much of the expenses reasonably incurred in constructing, and in maintaining and repairing, the drain as may be attributable to the fact that the distance of the sewer exceeds the distance so mentioned. (6) If any question arises as to the amount of a payment to be made to a person under subsection (5) above, that question may on his application be determined by the appropriate court or tribunal, or he may require it to be referred to arbitration. (7) This section does not apply to works in connection with which approval is required in accordance with Schedule 3 to the Flood and Water Management Act 2010 (sustainable drainage).

Your change, as a redline

21 Provision of drainage.

(1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (3) Any question arising under subsection (4) below between a building control authority and the person by whom, or on whose behalf, an application for building control approval is made as to whether a proposed drain shall be required to connect with a sewer may on the application of that person be determined by the appropriate court or tribunal. (4) Where an application for building control approval in respect of a building or an extension of a building is made to a building control authority, the building control authority, or on appeal the appropriate court or tribunal, may require a proposed drain to connect with a sewer where— (a) that sewer is within one hundred feet of the site of the building or, in the case of an extension, the site either of the extension or of the original building, and is at a level that makes it reasonably practicable to construct a drain to communicate with it, and, if it is not a public sewer, is a sewer that the person constructing the drain is entitled to use, and (b) the intervening land is land through which that person is entitled to construct a drain. (5) Notwithstanding paragraph (a) of subsection (4) above, a drain may be required to be made to connect with a sewer that is not within the distance mentioned in that paragraph, but is otherwise such a sewer as is therein mentioned, if the authority undertake to bear so much of the expenses reasonably incurred in constructing, and in maintaining and repairing, the drain as may be attributable to the fact that the distance of the sewer exceeds the distance so mentioned. (6) If any question arises as to the amount of a payment to be made to a person under subsection (5) above, that question may on his application be determined by the appropriate court or tribunal, or he may require it to be referred to arbitration. (7) This section does not apply to works in connection with which approval is required in accordance with Schedule 3 to the Flood and Water Management Act 2010 (sustainable drainage).

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds