Propose a change

The South Hook Combined Heat and Power Plant Order 2014

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

3 Development consent etc. granted by the Order

(1) Subject to the provisions of this Order and to the requirements the undertaker is granted development consent for the authorised development to be carried out within the Order limits, and Schedule 1 (authorised development) and Schedule 2 (requirements) have effect for that purpose. (2) Each numbered work comprised in the authorised development must be constructed within the correspondingly numbered area shown on the works plan (partA). (3) Subject to paragraph (4), in constructing or maintaining the key buildings shown and identified on the works plan (part B), the undertaker may— (a) deviate laterally from the building outlines shown for those key buildings shown and identified on the works plan (part B) to any such extent inwards as may be necessary, convenient or expedient; and (b) deviate vertically from the building levels shown for those key buildings on the sections shown and identified on the section drawing plan to any such extent downwards as may be necessary, convenient or expedient. (4) The works comprised in the electrical sub-station (HV switchgear indoor gas insulated building and compound) and the stack may be constructed within the limits of deviation subject to the relevant dimensions for these works set out in the design principles statement and as set out below— (a) for key building 4 (the electrical sub-station (HV switchgear indoor gas insulated building and compound))— (i) the limits of deviation dimensions are a length of 140m (approximate east/west axis), and width of 50m (approximate north/south axis); (ii) the key building dimensions are a height up to 7m, length up to 79m, and width up to 47m; (b) for key building 9 (the stack)— (i) the limits of deviation dimensions are a length of 23m (approximate east/west axis), and width of 8m (approximate north/south axis); (ii) the key building dimensions are a height up to 85m, and diameter up to 8m.

Your change, as a redline

3 Development consent etc. granted by the Order

(1) Subject to the provisions of this Order and to the requirements the undertaker is granted development consent for the authorised development to be carried out within the Order limits, and Schedule 1 (authorised development) and Schedule 2 (requirements) have effect for that purpose. (2) Each numbered work comprised in the authorised development must be constructed within the correspondingly numbered area shown on the works plan (partA). (3) Subject to paragraph (4), in constructing or maintaining the key buildings shown and identified on the works plan (part B), the undertaker may— (a) deviate laterally from the building outlines shown for those key buildings shown and identified on the works plan (part B) to any such extent inwards as may be necessary, convenient or expedient; and (b) deviate vertically from the building levels shown for those key buildings on the sections shown and identified on the section drawing plan to any such extent downwards as may be necessary, convenient or expedient. (4) The works comprised in the electrical sub-station (HV switchgear indoor gas insulated building and compound) and the stack may be constructed within the limits of deviation subject to the relevant dimensions for these works set out in the design principles statement and as set out below— (a) for key building 4 (the electrical sub-station (HV switchgear indoor gas insulated building and compound))— (i) the limits of deviation dimensions are a length of 140m (approximate east/west axis), and width of 50m (approximate north/south axis); (ii) the key building dimensions are a height up to 7m, length up to 79m, and width up to 47m; (b) for key building 9 (the stack)— (i) the limits of deviation dimensions are a length of 23m (approximate east/west axis), and width of 8m (approximate north/south axis); (ii) the key building dimensions are a height up to 85m, and diameter up to 8m.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds