Propose a change

The Heckington Fen Solar Park Order 2025

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 8 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Article 19 Interpretation 1 In this Schedule— “access rights” means rights over land to, for the purposes of the authorised development and in connection with the authorised development— alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and to remove impediments to such access; pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the authorised development; and restrict the erection of buildings or structures, restrict the altering of ground levels, restrict the planting of trees or carrying out operations or actions which may obstruct, interrupt or interfere with the exercise of the access rights. “cable rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures; alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and to remove impediments to such access; install, use, support, protect, inspect, alter, remove, replace retain, renew, improve and maintain watercourses, public sewers and drains and drainage apparatus and equipment; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain soft landscaping and biodiversity measures. “substation connection rights” means rights over land to— in connection with and for the purposes of facilitating Work No. 6A, install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures and to connect such cables and services to the National Grid Bicker Fen substation; in connection with and for the purposes of facilitating Work No. 6A, install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain watercourses, public sewers and drains and drainage apparatus and equipment; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with Work No. 6A; in connection with and for the purposes of facilitating Work No. 6A restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and remove landscaping measures. (1) Plot reference number shown on the land plans | (2) Purposes for which rights over land may be acquired and restrictive covenants imposed 12 | Access rights and cable rights 60A | Access rights and cable rights 60B | Access rights and cable rights 60C | Access rights and cable rights 63A | Access rights and cable rights 63B | Access rights and cable rights 63C | Access rights 63D | Access rights 64 | Access rights 66A | Access rights 66B | Access rights and cable rights 67A | Access rights 67B | Access rights and cable rights 67C | Access rights 67D | Access rights 68A | Access rights 68B | Access rights 68C | Access rights and cable rights 68D | Access rights 68E | Access rights 68F | Access rights 69 | Access rights and cable rights 72 | Access rights and cable rights 73A | Access rights 73B | Access rights 75A | Access rights 75B | Access rights 75C | Access rights 75D | Access rights and cable rights 75E | Access rights 75F | Access rights 75G | Access rights 75H | Access rights 75I | Access rights and cable rights 75J | Access rights 76A | Access rights 76B | Access rights and cable rights 89 | Access rights 90 | Access rights 94 | Access rights 97 | Access rights 99B | Access rights and cable rights 99C | Access rights and cable rights 99D | Access rights and cable rights 99E | Access rights 99F | Access rights 99G | Substation connection rights 99H | Substation connection rights 100A | Access rights and cable rights 100B | Access rights and cable rights 101A | Access rights and cable rights 101B | Access rights and cable rights 101C | Access rights and cable rights 104A | Access rights and cable rights 104B | Access rights 104C | Access rights 104D | Access rights and cable rights 104E | Access rights and cable rights 107A | Access rights 107B | Access rights 108A | Access rights and cable rights 108B | Access rights and cable rights 108C | Access rights and cable rights 109A | Access rights 109B | Access rights 124 | Access rights and cable rights 173 | Access rights 184 | Access rights and cable rights 190 | Access rights and cable rights 245 | Access rights and cable rights 248 | Access rights and cable rights 255 | Access rights and cable rights 265 | Access rights 266A | Access rights and cable rights 266B | Access rights and cable rights 269 | Access rights and cable rights 273 | Access rights 274 | Access rights 279 | Access rights 284 | Access rights and cable rights 285 | Access rights and cable rights 286 | Access rights and cable rights 287 | Access rights 288 | Access rights and cable rights 289 | Access rights 290 | Access rights 293A | Access rights and cable rights 293B | Access rights and cable rights 294 | Access rights 295 | Access rights and cable rights 296 | Access rights 297 | Access rights 298 | Access rights 301 | Access rights 302A | Access rights and cable rights 302B | Access rights 303 | Access rights and cable rights 304 | Access rights and cable rights 307 | Access rights 312 | Access rights 313 | Access rights 316 | Access rights and cable rights 317 | Access rights 322 | Access rights 323 | Access rights and cable rights 324 | Access rights 325 | Access rights 326 | Access rights 329 | Access rights and cable rights 333 | Access rights and cable rights 334 | Access rights and cable rights 335 | Access rights 337 | Access rights 338 | Access rights 339 | Access rights 341 | Access rights 346 | Access rights and cable rights 347 | Access rights and cable rights 348 | Access rights and cable rights 349 | Access rights

Your change, as a redline

SCHEDULE 8 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Article 19 Interpretation 1 In this Schedule— “access rights” means rights over land to, for the purposes of the authorised development and in connection with the authorised development— alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and to remove impediments to such access; pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the authorised development; and restrict the erection of buildings or structures, restrict the altering of ground levels, restrict the planting of trees or carrying out operations or actions which may obstruct, interrupt or interfere with the exercise of the access rights. “cable rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures; alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and to remove impediments to such access; install, use, support, protect, inspect, alter, remove, replace retain, renew, improve and maintain watercourses, public sewers and drains and drainage apparatus and equipment; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain soft landscaping and biodiversity measures. “substation connection rights” means rights over land to— in connection with and for the purposes of facilitating Work No. 6A, install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures and to connect such cables and services to the National Grid Bicker Fen substation; in connection with and for the purposes of facilitating Work No. 6A, install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain watercourses, public sewers and drains and drainage apparatus and equipment; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with Work No. 6A; in connection with and for the purposes of facilitating Work No. 6A restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and remove landscaping measures. (1) Plot reference number shown on the land plans | (2) Purposes for which rights over land may be acquired and restrictive covenants imposed 12 | Access rights and cable rights 60A | Access rights and cable rights 60B | Access rights and cable rights 60C | Access rights and cable rights 63A | Access rights and cable rights 63B | Access rights and cable rights 63C | Access rights 63D | Access rights 64 | Access rights 66A | Access rights 66B | Access rights and cable rights 67A | Access rights 67B | Access rights and cable rights 67C | Access rights 67D | Access rights 68A | Access rights 68B | Access rights 68C | Access rights and cable rights 68D | Access rights 68E | Access rights 68F | Access rights 69 | Access rights and cable rights 72 | Access rights and cable rights 73A | Access rights 73B | Access rights 75A | Access rights 75B | Access rights 75C | Access rights 75D | Access rights and cable rights 75E | Access rights 75F | Access rights 75G | Access rights 75H | Access rights 75I | Access rights and cable rights 75J | Access rights 76A | Access rights 76B | Access rights and cable rights 89 | Access rights 90 | Access rights 94 | Access rights 97 | Access rights 99B | Access rights and cable rights 99C | Access rights and cable rights 99D | Access rights and cable rights 99E | Access rights 99F | Access rights 99G | Substation connection rights 99H | Substation connection rights 100A | Access rights and cable rights 100B | Access rights and cable rights 101A | Access rights and cable rights 101B | Access rights and cable rights 101C | Access rights and cable rights 104A | Access rights and cable rights 104B | Access rights 104C | Access rights 104D | Access rights and cable rights 104E | Access rights and cable rights 107A | Access rights 107B | Access rights 108A | Access rights and cable rights 108B | Access rights and cable rights 108C | Access rights and cable rights 109A | Access rights 109B | Access rights 124 | Access rights and cable rights 173 | Access rights 184 | Access rights and cable rights 190 | Access rights and cable rights 245 | Access rights and cable rights 248 | Access rights and cable rights 255 | Access rights and cable rights 265 | Access rights 266A | Access rights and cable rights 266B | Access rights and cable rights 269 | Access rights and cable rights 273 | Access rights 274 | Access rights 279 | Access rights 284 | Access rights and cable rights 285 | Access rights and cable rights 286 | Access rights and cable rights 287 | Access rights 288 | Access rights and cable rights 289 | Access rights 290 | Access rights 293A | Access rights and cable rights 293B | Access rights and cable rights 294 | Access rights 295 | Access rights and cable rights 296 | Access rights 297 | Access rights 298 | Access rights 301 | Access rights 302A | Access rights and cable rights 302B | Access rights 303 | Access rights and cable rights 304 | Access rights and cable rights 307 | Access rights 312 | Access rights 313 | Access rights 316 | Access rights and cable rights 317 | Access rights 322 | Access rights 323 | Access rights and cable rights 324 | Access rights 325 | Access rights 326 | Access rights 329 | Access rights and cable rights 333 | Access rights and cable rights 334 | Access rights and cable rights 335 | Access rights 337 | Access rights 338 | Access rights 339 | Access rights 341 | Access rights 346 | Access rights and cable rights 347 | Access rights and cable rights 348 | Access rights and cable rights 349 | Access rights

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds