The M25 Junction 10/A3 Wisley Interchange Development Consent (Amendment) Order 2026
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
2 Amendment of the M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022
(1) The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 is amended as follows. (2) In Schedule 3 (classification of roads, etc.) omit the following rows from the table at Part 5 (speed limits)— (1) Road name and number | (2) Extent | (3) Speed Limit M25 eastbound | Along the length of the improved M25 eastbound carriageway, for a total distance of 5,580 metres, as shown on Sheets 3, 5, 7 and 9 of the speed limits and traffic regulations plans. | National speed limit (70 miles per hour, as existing limit) M25 eastbound on-slip at M25 junction 10 | Along the length of the altered slip road, from its diverge from the M25 junction 10 circulatory carriageway to its merge with the M25 eastbound carriageway, for a total distance of 955 metres, as shown on Sheets 3 and 7 of the speed limits and traffic regulations plans. | National speed limit (70 miles per hour, as existing limit) M25 westbound | Along the length of the improved M25 westbound carriageway, for a total distance of 6,050 metres, as shown on Sheets 3, 5, 7 and 9 of the speed limits and traffic regulations plans. | National speed limit (70 miles per hour, as existing limit) M25 westbound on-slip at M25 junction 10 | Along the length of the improved slip road, from its diverge from the M25 junction 10 circulatory carriageway to its merge with the M25 westbound carriageway, for a total distance of 1,225 metres, as shown on Sheets 3 and 5 of the speed limits and traffic regulations plans. | National speed limit (70 miles per hour, as existing limit) A3 northbound to A245 westbound dedicated slip lane at the A3 Painshill junction | Along the length of the new slip road, from its diverge from the A3 northbound off-slip to its merge with the A245 westbound carriageway, for a total distance of 180 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans. | 40 miles per hour (3) In the table at Part 5 of Schedule 3— (a) in the row relating to the “A3 northbound to M25 westbound dedicated free-flow slip lane at M25 junction 10”, in column (2) for “205” substitute “39.12”; and (b) in the row relating to the “A3 southbound to M25 eastbound dedicated free-flow slip lane at M25 junction 10”, in column (2) for “210” substitute “45.25”. (4) In Schedule 11 (documents to be certified), in the entry in the table for “Speed Limits and Traffic Regulation Plans”— (a) in column (2), for “TR010030/APP/2.7” substitute “TR010030/APP/2.8”; and (b) in column (3), for “3” substitute “4”.
2 Amendment of the M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022
(1) The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 is amended as follows. (2) In Schedule 3 (classification of roads, etc.) omit the following rows from the table at Part 5 (speed limits)— (1) Road name and number | (2) Extent | (3) Speed Limit M25 eastbound | Along the length of the improved M25 eastbound carriageway, for a total distance of 5,580 metres, as shown on Sheets 3, 5, 7 and 9 of the speed limits and traffic regulations plans. | National speed limit (70 miles per hour, as existing limit) M25 eastbound on-slip at M25 junction 10 | Along the length of the altered slip road, from its diverge from the M25 junction 10 circulatory carriageway to its merge with the M25 eastbound carriageway, for a total distance of 955 metres, as shown on Sheets 3 and 7 of the speed limits and traffic regulations plans. | National speed limit (70 miles per hour, as existing limit) M25 westbound | Along the length of the improved M25 westbound carriageway, for a total distance of 6,050 metres, as shown on Sheets 3, 5, 7 and 9 of the speed limits and traffic regulations plans. | National speed limit (70 miles per hour, as existing limit) M25 westbound on-slip at M25 junction 10 | Along the length of the improved slip road, from its diverge from the M25 junction 10 circulatory carriageway to its merge with the M25 westbound carriageway, for a total distance of 1,225 metres, as shown on Sheets 3 and 5 of the speed limits and traffic regulations plans. | National speed limit (70 miles per hour, as existing limit) A3 northbound to A245 westbound dedicated slip lane at the A3 Painshill junction | Along the length of the new slip road, from its diverge from the A3 northbound off-slip to its merge with the A245 westbound carriageway, for a total distance of 180 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans. | 40 miles per hour (3) In the table at Part 5 of Schedule 3— (a) in the row relating to the “A3 northbound to M25 westbound dedicated free-flow slip lane at M25 junction 10”, in column (2) for “205” substitute “39.12”; and (b) in the row relating to the “A3 southbound to M25 eastbound dedicated free-flow slip lane at M25 junction 10”, in column (2) for “210” substitute “45.25”. (4) In Schedule 11 (documents to be certified), in the entry in the table for “Speed Limits and Traffic Regulation Plans”— (a) in column (2), for “TR010030/APP/2.7” substitute “TR010030/APP/2.8”; and (b) in column (3), for “3” substitute “4”.
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.