The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 13 LAND IN WHICH ONLY NEW RIGHTS AND RESTRICTIVE COVENANTS ETC. MAY BE ACQUIRED
Article 25 PART 1 NATIONAL GRID City of York Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development A1-01, A1-02 | Compulsory acquisition of rights for the authorised development | Work No. 1 A1-04 | Compulsory acquisition of rights of access | Work No. 1 B1-01, B1-02, B1-05, B1-08, B1-09, B1-13, B1-15, B1-16, B1-23A, B1-27, B1-28, B1-29, B1-31 | Compulsory acquisition of rights for the authorised development | Work No. 2 B1-03, B1-04, B1-06, B1-07, B1-10, B1-11, B1-26, B1-32, B1-35, B1-37, B1-42, B1-50A | Compulsory acquisition of rights of access | Work No. 2 B1-64, B2-08, B2-13 | Compulsory acquisition of rights for the authorised development | Work No. 3 B1-65, B1-66 | Compulsory acquisition of rights for the authorised development | Work Nos. 3, U2 B2-03, B2-09, B2-23a, B2-23b | Compulsory acquisition of rights of access | Work No. 3 B2-10 | Compulsory acquisition of rights for the authorised development | Work No. 4 B2-27 | Compulsory acquisition of rights for the authorised development | Work Nos. 5, 6 B2-74, B2-75, B2-79 | Compulsory acquisition of rights for the authorised development | Work Nos. 3, U3 B2-78 | Compulsory acquisition of rights for the authorised development | Work No. 3 B3-26A | Compulsory acquisition of rights of access | Work No. 5 B3-09A, B3-14A | Compulsory acquisition of rights of access | Work Nos. 5 B3-15, B3-18, B3-27, B3-33, B3-35, B3-36, B3-37, B3-38 | Compulsory acquisition of rights for the authorised development | Work No. 5 B3-61, B3-64, B3-71, B4-11, B4-13, B4-15, B4-16, B4-21, B4-22, B4-25 | Compulsory acquisition of rights for the authorised development | Work No. 6 B3-67, B3-68, B3-69, B3-70, B3-72, B4-26 | Compulsory acquisition of rights for the authorised development | Work No. 6, U4 B4-01, B4-02, B4-03, B4-04, B4-05, B4-07, B4-08, B4-17, B4-20 | Compulsory acquisition of rights of access | Work No. 6 Leeds City Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development D1-65, D2-02, D2-03, D2-04, D2-05 | Compulsory acquisition of rights of access | Work No. 8 D1-66, D2-01, D2-06 | Compulsory acquisition of rights for the authorised development | Work No. 8 North Yorkshire Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development B1-12, B1-14, B1-17, B1-24, B1-35, B1-38, B1-44, B1-50A, B1-52, B1-56, B1-57 | Compulsory acquisition of rights of access | Work No. 2 B1-16, B1-18, B1-23A, B1-33A, B1-34A, B1-47A, B1-51, B1-53, B1-58, B1-59, B1-62 | Compulsory acquisition of rights for the authorised development | Work No. 2 B1-60, B1-61, B1-63 | Compulsory acquisition of rights for the authorised development | Work No. 2, U1 B2-05, B2-07, B2-29, B2-33, B2-38, B2-45, B2-52, B2-56, B2-58, B2-69 | Compulsory acquisition of rights of access | Work No. 4 B2-10, B2-15, B2-43, B2-62, B2-63, B2-68 | Compulsory acquisition of rights for the authorised development | Work No. 4 B2-13, B2-19, B2-24, B2-26, B2-78 | Compulsory acquisition of rights for the authorised development | Work No. 3 B2-23, B2-23a, B2-23b, B2-76, B2-77 | Compulsory acquisition of rights of access | Work No. 3 B2-27 | Compulsory acquisition of rights for the authorised development | Work Nos. 5, 6 B2-36, B2-37, B2-40, B2-41, B2-46, B2-50, B2-51, B2-73, B3-28, B3-42, B3-43, B3-47, B3-48, B3-60, B3-61, B4-15, B4-16, B4-21, B4-22, B4-25, B5-04, B5-09, B5-11, B5-12, B5-14, B5-22, B5-23, B5-26, B5-33, B5-36, B5-40, B5-50, B5-51, B5-57 | Compulsory acquisition of rights for the authorised development | Work No. 6 B2-42, B2-53, B2-54, B2-57, B2-72, B3-50, B3-51, B3-53, B3-56, B5-01, B5-05, B5-07, B5-08, B5-13, B5-15, B5-17, B5-18, B5-19, B5-20, B5-25, B5-31, B5-32, B5-34, B5-35, B5-43, B5-49, C1-01 | Compulsory acquisition of rights of access | Work No. 6 B3-33, B3-35, B3-38, B3-15, B3-16, B3-18, B3-19, B3-21, B3-27 | Compulsory acquisition of rights for the authorised development | Work No. 5 B3-22, B3-23, B3-24 | Compulsory acquisition of rights of access | Work No. 5 B5-54, B5-55, B5--56 | Compulsory acquisition of rights for the authorised development | Work Nos. 6, U5 B5-41, B5-42, B5-45, B5-47, C1-02, C1-16 | Compulsory acquisition of rights of access | Work No. 7 B5-44, B5-46, B5-48, B5-52, B5-53, C1-03, C1-04, C1-12, C1-13, C1-15, C1-17, C1-18, C2-07, C2-07a, C2-08, C2-09, C2-10, C2-12, C2-14, C2-15, C3-13, C3-14, C3-16, C3-17, C3-18, C3-21, C3-22, C3-24, C4-03, C4-04, C4-08, C4-09, C4-11, C4-12, C4-13, C4-14, C4-16, C5-05, C5-06, C6-04, C6-05, C6-06, C7-01, C7-02, C7-04, C7-05, C8-07, C8-08, C8-09, C8-13, C8-20, C8-25, C8-27, C8-28, C8-29, C8-32, C9-01, C9-02, C9-03, C9-04, C9-05, C9-06, C9-07, C9-08, C9-10, C9-11, C9-13, C9-14, C9-15, C9-20, C9-21, C9-22, C9-23, C9-30, C9-43, C9-46, C9-47 | Compulsory acquisition of rights for the authorised development | Work No. 7 C1-05, C1-06, C1-07, C1-08, C1-09, C1-09a, C1-10, C1-11, C1-14, C2-02, C2-03, C2-04, C2-05, C2-06, C2-11, C2-13, C2-16, C2-16a, C3-01, C3-02, C3-03, C3-04, C3-05, C3-06, C3-07, C3-08, C3-09, C3-10, C3-11, C3-12, C3-15, C3-19, C3-20, C3-23, C3-25, C3-26, C4-01, C4-02, C4-05, C4-06, C4-07, C4-10, C4-15, C4-17, C4-18, C5-01, C5-02, C5-03, C5-07, C5-08, C6-01, C6-02, C6-03, C6-07, C6-08, C6-09, C6-10, C6-11, C7-03, C7-06, C7-07, C7-08, C7-09, C7-10, C7-11, C7-12, C8-01, C8-02, C8-03, C8-04, C8-05, C8-06, C8-10, C8-11, C8-12, C8-14, C8-15, C8-16, C8-17, C8-18, C8-19, C8-21, C8-22, C8-23, C8-24, C8-26, C8-30, C8-31, C8-33, C8-34, C9-09, C9-12, C9-16, C9-17, C9-18, C9-19, C9-24, C9-25, C9-26, C9-27, C9-31, C9-32, C9-34 | Compulsory acquisition of rights of access | Work No. 7 C9-33, C9-36, C9-38, C9-41, D1-02, D1-03, D1-12, D1-24, D1-31, D1-48, D1-50, D1-55, D1-58, D1-63, D1-79 | Compulsory acquisition of rights of access | Work No. 8 C9-35, C9-39, C9-52, D1-01, D1-16 | Compulsory acquisition of rights for the authorised development | Work Nos. 8, U7 C9-42, C9-44, C9-45 | Compulsory acquisition of rights for the authorised development | Work Nos. 7, U6 C9-48, C9-50 | Compulsory acquisition of rights for the authorised development | Work Nos. 7 D1-04, D1-08 | To extinguish private rights of access | Work No. 8 D1-06, D1-07, D1-11, D1-13, D1-17, D1-20, D1-22, D1-36, D1-38, D1-40, D1-44, D1-45, D1-49, D1-64, D1-66 | Compulsory acquisition of rights for the authorised development | Work No. 8 D1-10, D1-23, D1-27 | Compulsory acquisition of rights for the authorised development | Work Nos. 8, U8 D1-25, D1-28, D1-29, D1-39, D1-42, D1-43, D1-46, D1-51, D1-52, D1-54, D1-56, D1-60, E1-03, E1-04, E1-06, E1-07, E1-08, E1-09, E1-10, E1-11, E2-01, E2-02, E2-03, E2-09, E2-10, E2-11, E3-01, E3-02, E3-03, E3-05, E3-06, E3-09, E3-10, E3-12, E3-14, E3-16, E3-20, E3-24, E3-25, E3-26, E3-27, E3-28, E3-29, E3-30, E3-31, E3-32, E4-01, E4-04, E4-06, E4-08, E4-13, E4-14, E4-15, E4-16, E4-17, E4-18, E4-19, E5-01, E5-02, E5-03, E5-04, E5-05, E5-06, E5-07, E5-08, E5-09, E5-18, E5-19, E5-20, E6-01, E6-02, E6-03, E6-04, E6-05, E6-06, E6-07, E6-08, E6-09, E6-11, E6-14, E6-15, E6-16, E6-17, E6-32, E6-33, E6-34, E6-35, E6-36, E6-37, E6-38, E6-39, E6-40, E7-01, E7-02, E7-03, E7-04, E7-07, E7-09, E7-11, E7-13, E7-13a, E7-14, E7-15, E7-26, E7-56, E7-57 | Compulsory acquisition of rights of access | Work No. 9 D1-32, D1-57, E1-01, E1-02, E1-05, E2-04, E3-04, E3-07, E3-08, E3-11, E3-13, E3-15, E3-17, E3-18, E3-21, E3-22, E3-23, E3-23a, E3-36, E3-37, E3-38, E3-39, E3-39a, E3-44, E3-47, E4-02, E4-03, E4-05, E4-07, E4-09, E4-10, E4-11, E5-10, E5-11, E5-12, E5-13, E5-14, E5-15, E5-16, E5-17, E5-21, E5-22, E6-10, E6-18, E6-19, E6-20, E6-21, E6-22, E6-23, E6-24, E6-25, E6-26, E6-27, E6-28, E6-29, E6-30, E7-05, E7-06, E7-08, E7-10, E7-12, E7-53, E7-54, E7-55 | Compulsory acquisition of rights for the authorised development | Work No. 9 D1-59, D1-61, D1-67, D1-68, D1-74, D1-76 | Compulsory acquisition of rights for the authorised development | Work Nos. 8, U7 D1-71, D1-82 | Compulsory acquisition of rights of access | Work Nos. 8, U7 D1-84 | Compulsory acquisition of rights for the authorised development | Work Nos. 8, U8 E2-05, E2-08, E2-12, E2-13, E2-14, E2-15, E2-16, E2-17, E2-18 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U9 E3-19, E3-33, E3-34, E3-35, E3-40, E3-41, E3-41a, E3-42, E3-43 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U10 E3-45, E3-46, E3-48, E3-49 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U11 E5-23 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U12 E6-12, E6-41, E6-42, E6-43, E6-44, E6-45, E6-46, E6-47 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U13 F1-01, F1-02, F1-11, F1-12 | Compulsory acquisition of rights of access | Work No. 11 E7-17, E7-18, E7-20, E7-21, E7-22, E7-23, E7-24, E7-25, E7-31, E7-36, E7-39, F1-17, F1-19, F1-22, F1-24, F1-28, F1-30 | Compulsory acquisition of rights of access | Work No. 10 E7-19, E7-28, E7-29, E7-30, E7-32, E7-33, E7-38, E7-38a, E7-40, E7-41, E7-41a, E7-44, E7-44a, E7-45, E7-46, E7-47, E7-48, E7-49, E7-50, E7-51, E7-52, F1-13, F1-14, F1-18, F1-20, F1-27, F1-33, F1-36, F1-39 | Compulsory acquisition of rights for the authorised development | Work No. 10 F1-03, F1-04 | Compulsory acquisition of rights for the authorised development | Work No. 11 PART 2 NPG City of York Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development B1-65, B1-66 | Compulsory acquisition of rights for the authorised development | Work Nos. 3, U2 B2-74, B2-75, B2-79 | Compulsory acquisition of rights for the authorised development | Work Nos. 3, U3 B3-67, B3-68, B3-69, B3-70, B3-72 | Compulsory acquisition of rights for the authorised development | Work Nos. 6, U4 B4-26 | Compulsory acquisition of rights for the authorised development | Work Nos. 6, U4 North Yorkshire Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development B1-60, B1-61, B1-63 | Compulsory acquisition of rights for the authorised development | Work Nos. 2, U1 B5-50, B5-51 | Compulsory acquisition of rights for the authorised development | Work No. 6 B5-54, B5-55, B5-56 | Compulsory acquisition of rights for the authorised development | Work Nos. 6, U5 C9-35, C9-39, C9-52, D1-01, D1-16, D1-30, D1-59, D1-61, D1-67, D1-68, D1-73, D1-74, D1-75, D1-76 | Compulsory acquisition of rights for the authorised development | Work Nos. 8, U7 C9-42, C9-44, C9-45 | Compulsory acquisition of rights for the authorised development | Work Nos. 7, U6 E2-05, E2-08, E2-12, E2-13, E2-14, E2-15, E2-16, E2-17, E2-18 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U9 E3-19, E3-33, E3-34, E3-35, E3-40, E3-41, E3-41a, E3-42, E3-43 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U10 E3-45, E3-46, E3-48, E3-49 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U11 E5-23 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U12 E6-12, E6-41, E6-42, E6-43, E6-44, E6-46, E6-47 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U13 E7-30, E7-38a, E7-41a, E7-44a | Compulsory acquisition of rights for the authorised development | Work No. 10 PART 3 NGN North Yorkshire Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development D1-10 | Compulsory Acquisition of Rights for Authorised Development | Work Nos. 8, U8 D1-15, D1-19, D1-84 | Compulsory Acquisition of Rights for Authorised Development | Work Nos. 8, U8
SCHEDULE 13 LAND IN WHICH ONLY NEW RIGHTS AND RESTRICTIVE COVENANTS ETC. MAY BE ACQUIRED
Article 25 PART 1 NATIONAL GRID City of York Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development A1-01, A1-02 | Compulsory acquisition of rights for the authorised development | Work No. 1 A1-04 | Compulsory acquisition of rights of access | Work No. 1 B1-01, B1-02, B1-05, B1-08, B1-09, B1-13, B1-15, B1-16, B1-23A, B1-27, B1-28, B1-29, B1-31 | Compulsory acquisition of rights for the authorised development | Work No. 2 B1-03, B1-04, B1-06, B1-07, B1-10, B1-11, B1-26, B1-32, B1-35, B1-37, B1-42, B1-50A | Compulsory acquisition of rights of access | Work No. 2 B1-64, B2-08, B2-13 | Compulsory acquisition of rights for the authorised development | Work No. 3 B1-65, B1-66 | Compulsory acquisition of rights for the authorised development | Work Nos. 3, U2 B2-03, B2-09, B2-23a, B2-23b | Compulsory acquisition of rights of access | Work No. 3 B2-10 | Compulsory acquisition of rights for the authorised development | Work No. 4 B2-27 | Compulsory acquisition of rights for the authorised development | Work Nos. 5, 6 B2-74, B2-75, B2-79 | Compulsory acquisition of rights for the authorised development | Work Nos. 3, U3 B2-78 | Compulsory acquisition of rights for the authorised development | Work No. 3 B3-26A | Compulsory acquisition of rights of access | Work No. 5 B3-09A, B3-14A | Compulsory acquisition of rights of access | Work Nos. 5 B3-15, B3-18, B3-27, B3-33, B3-35, B3-36, B3-37, B3-38 | Compulsory acquisition of rights for the authorised development | Work No. 5 B3-61, B3-64, B3-71, B4-11, B4-13, B4-15, B4-16, B4-21, B4-22, B4-25 | Compulsory acquisition of rights for the authorised development | Work No. 6 B3-67, B3-68, B3-69, B3-70, B3-72, B4-26 | Compulsory acquisition of rights for the authorised development | Work No. 6, U4 B4-01, B4-02, B4-03, B4-04, B4-05, B4-07, B4-08, B4-17, B4-20 | Compulsory acquisition of rights of access | Work No. 6 Leeds City Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development D1-65, D2-02, D2-03, D2-04, D2-05 | Compulsory acquisition of rights of access | Work No. 8 D1-66, D2-01, D2-06 | Compulsory acquisition of rights for the authorised development | Work No. 8 North Yorkshire Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development B1-12, B1-14, B1-17, B1-24, B1-35, B1-38, B1-44, B1-50A, B1-52, B1-56, B1-57 | Compulsory acquisition of rights of access | Work No. 2 B1-16, B1-18, B1-23A, B1-33A, B1-34A, B1-47A, B1-51, B1-53, B1-58, B1-59, B1-62 | Compulsory acquisition of rights for the authorised development | Work No. 2 B1-60, B1-61, B1-63 | Compulsory acquisition of rights for the authorised development | Work No. 2, U1 B2-05, B2-07, B2-29, B2-33, B2-38, B2-45, B2-52, B2-56, B2-58, B2-69 | Compulsory acquisition of rights of access | Work No. 4 B2-10, B2-15, B2-43, B2-62, B2-63, B2-68 | Compulsory acquisition of rights for the authorised development | Work No. 4 B2-13, B2-19, B2-24, B2-26, B2-78 | Compulsory acquisition of rights for the authorised development | Work No. 3 B2-23, B2-23a, B2-23b, B2-76, B2-77 | Compulsory acquisition of rights of access | Work No. 3 B2-27 | Compulsory acquisition of rights for the authorised development | Work Nos. 5, 6 B2-36, B2-37, B2-40, B2-41, B2-46, B2-50, B2-51, B2-73, B3-28, B3-42, B3-43, B3-47, B3-48, B3-60, B3-61, B4-15, B4-16, B4-21, B4-22, B4-25, B5-04, B5-09, B5-11, B5-12, B5-14, B5-22, B5-23, B5-26, B5-33, B5-36, B5-40, B5-50, B5-51, B5-57 | Compulsory acquisition of rights for the authorised development | Work No. 6 B2-42, B2-53, B2-54, B2-57, B2-72, B3-50, B3-51, B3-53, B3-56, B5-01, B5-05, B5-07, B5-08, B5-13, B5-15, B5-17, B5-18, B5-19, B5-20, B5-25, B5-31, B5-32, B5-34, B5-35, B5-43, B5-49, C1-01 | Compulsory acquisition of rights of access | Work No. 6 B3-33, B3-35, B3-38, B3-15, B3-16, B3-18, B3-19, B3-21, B3-27 | Compulsory acquisition of rights for the authorised development | Work No. 5 B3-22, B3-23, B3-24 | Compulsory acquisition of rights of access | Work No. 5 B5-54, B5-55, B5--56 | Compulsory acquisition of rights for the authorised development | Work Nos. 6, U5 B5-41, B5-42, B5-45, B5-47, C1-02, C1-16 | Compulsory acquisition of rights of access | Work No. 7 B5-44, B5-46, B5-48, B5-52, B5-53, C1-03, C1-04, C1-12, C1-13, C1-15, C1-17, C1-18, C2-07, C2-07a, C2-08, C2-09, C2-10, C2-12, C2-14, C2-15, C3-13, C3-14, C3-16, C3-17, C3-18, C3-21, C3-22, C3-24, C4-03, C4-04, C4-08, C4-09, C4-11, C4-12, C4-13, C4-14, C4-16, C5-05, C5-06, C6-04, C6-05, C6-06, C7-01, C7-02, C7-04, C7-05, C8-07, C8-08, C8-09, C8-13, C8-20, C8-25, C8-27, C8-28, C8-29, C8-32, C9-01, C9-02, C9-03, C9-04, C9-05, C9-06, C9-07, C9-08, C9-10, C9-11, C9-13, C9-14, C9-15, C9-20, C9-21, C9-22, C9-23, C9-30, C9-43, C9-46, C9-47 | Compulsory acquisition of rights for the authorised development | Work No. 7 C1-05, C1-06, C1-07, C1-08, C1-09, C1-09a, C1-10, C1-11, C1-14, C2-02, C2-03, C2-04, C2-05, C2-06, C2-11, C2-13, C2-16, C2-16a, C3-01, C3-02, C3-03, C3-04, C3-05, C3-06, C3-07, C3-08, C3-09, C3-10, C3-11, C3-12, C3-15, C3-19, C3-20, C3-23, C3-25, C3-26, C4-01, C4-02, C4-05, C4-06, C4-07, C4-10, C4-15, C4-17, C4-18, C5-01, C5-02, C5-03, C5-07, C5-08, C6-01, C6-02, C6-03, C6-07, C6-08, C6-09, C6-10, C6-11, C7-03, C7-06, C7-07, C7-08, C7-09, C7-10, C7-11, C7-12, C8-01, C8-02, C8-03, C8-04, C8-05, C8-06, C8-10, C8-11, C8-12, C8-14, C8-15, C8-16, C8-17, C8-18, C8-19, C8-21, C8-22, C8-23, C8-24, C8-26, C8-30, C8-31, C8-33, C8-34, C9-09, C9-12, C9-16, C9-17, C9-18, C9-19, C9-24, C9-25, C9-26, C9-27, C9-31, C9-32, C9-34 | Compulsory acquisition of rights of access | Work No. 7 C9-33, C9-36, C9-38, C9-41, D1-02, D1-03, D1-12, D1-24, D1-31, D1-48, D1-50, D1-55, D1-58, D1-63, D1-79 | Compulsory acquisition of rights of access | Work No. 8 C9-35, C9-39, C9-52, D1-01, D1-16 | Compulsory acquisition of rights for the authorised development | Work Nos. 8, U7 C9-42, C9-44, C9-45 | Compulsory acquisition of rights for the authorised development | Work Nos. 7, U6 C9-48, C9-50 | Compulsory acquisition of rights for the authorised development | Work Nos. 7 D1-04, D1-08 | To extinguish private rights of access | Work No. 8 D1-06, D1-07, D1-11, D1-13, D1-17, D1-20, D1-22, D1-36, D1-38, D1-40, D1-44, D1-45, D1-49, D1-64, D1-66 | Compulsory acquisition of rights for the authorised development | Work No. 8 D1-10, D1-23, D1-27 | Compulsory acquisition of rights for the authorised development | Work Nos. 8, U8 D1-25, D1-28, D1-29, D1-39, D1-42, D1-43, D1-46, D1-51, D1-52, D1-54, D1-56, D1-60, E1-03, E1-04, E1-06, E1-07, E1-08, E1-09, E1-10, E1-11, E2-01, E2-02, E2-03, E2-09, E2-10, E2-11, E3-01, E3-02, E3-03, E3-05, E3-06, E3-09, E3-10, E3-12, E3-14, E3-16, E3-20, E3-24, E3-25, E3-26, E3-27, E3-28, E3-29, E3-30, E3-31, E3-32, E4-01, E4-04, E4-06, E4-08, E4-13, E4-14, E4-15, E4-16, E4-17, E4-18, E4-19, E5-01, E5-02, E5-03, E5-04, E5-05, E5-06, E5-07, E5-08, E5-09, E5-18, E5-19, E5-20, E6-01, E6-02, E6-03, E6-04, E6-05, E6-06, E6-07, E6-08, E6-09, E6-11, E6-14, E6-15, E6-16, E6-17, E6-32, E6-33, E6-34, E6-35, E6-36, E6-37, E6-38, E6-39, E6-40, E7-01, E7-02, E7-03, E7-04, E7-07, E7-09, E7-11, E7-13, E7-13a, E7-14, E7-15, E7-26, E7-56, E7-57 | Compulsory acquisition of rights of access | Work No. 9 D1-32, D1-57, E1-01, E1-02, E1-05, E2-04, E3-04, E3-07, E3-08, E3-11, E3-13, E3-15, E3-17, E3-18, E3-21, E3-22, E3-23, E3-23a, E3-36, E3-37, E3-38, E3-39, E3-39a, E3-44, E3-47, E4-02, E4-03, E4-05, E4-07, E4-09, E4-10, E4-11, E5-10, E5-11, E5-12, E5-13, E5-14, E5-15, E5-16, E5-17, E5-21, E5-22, E6-10, E6-18, E6-19, E6-20, E6-21, E6-22, E6-23, E6-24, E6-25, E6-26, E6-27, E6-28, E6-29, E6-30, E7-05, E7-06, E7-08, E7-10, E7-12, E7-53, E7-54, E7-55 | Compulsory acquisition of rights for the authorised development | Work No. 9 D1-59, D1-61, D1-67, D1-68, D1-74, D1-76 | Compulsory acquisition of rights for the authorised development | Work Nos. 8, U7 D1-71, D1-82 | Compulsory acquisition of rights of access | Work Nos. 8, U7 D1-84 | Compulsory acquisition of rights for the authorised development | Work Nos. 8, U8 E2-05, E2-08, E2-12, E2-13, E2-14, E2-15, E2-16, E2-17, E2-18 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U9 E3-19, E3-33, E3-34, E3-35, E3-40, E3-41, E3-41a, E3-42, E3-43 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U10 E3-45, E3-46, E3-48, E3-49 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U11 E5-23 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U12 E6-12, E6-41, E6-42, E6-43, E6-44, E6-45, E6-46, E6-47 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U13 F1-01, F1-02, F1-11, F1-12 | Compulsory acquisition of rights of access | Work No. 11 E7-17, E7-18, E7-20, E7-21, E7-22, E7-23, E7-24, E7-25, E7-31, E7-36, E7-39, F1-17, F1-19, F1-22, F1-24, F1-28, F1-30 | Compulsory acquisition of rights of access | Work No. 10 E7-19, E7-28, E7-29, E7-30, E7-32, E7-33, E7-38, E7-38a, E7-40, E7-41, E7-41a, E7-44, E7-44a, E7-45, E7-46, E7-47, E7-48, E7-49, E7-50, E7-51, E7-52, F1-13, F1-14, F1-18, F1-20, F1-27, F1-33, F1-36, F1-39 | Compulsory acquisition of rights for the authorised development | Work No. 10 F1-03, F1-04 | Compulsory acquisition of rights for the authorised development | Work No. 11 PART 2 NPG City of York Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development B1-65, B1-66 | Compulsory acquisition of rights for the authorised development | Work Nos. 3, U2 B2-74, B2-75, B2-79 | Compulsory acquisition of rights for the authorised development | Work Nos. 3, U3 B3-67, B3-68, B3-69, B3-70, B3-72 | Compulsory acquisition of rights for the authorised development | Work Nos. 6, U4 B4-26 | Compulsory acquisition of rights for the authorised development | Work Nos. 6, U4 North Yorkshire Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development B1-60, B1-61, B1-63 | Compulsory acquisition of rights for the authorised development | Work Nos. 2, U1 B5-50, B5-51 | Compulsory acquisition of rights for the authorised development | Work No. 6 B5-54, B5-55, B5-56 | Compulsory acquisition of rights for the authorised development | Work Nos. 6, U5 C9-35, C9-39, C9-52, D1-01, D1-16, D1-30, D1-59, D1-61, D1-67, D1-68, D1-73, D1-74, D1-75, D1-76 | Compulsory acquisition of rights for the authorised development | Work Nos. 8, U7 C9-42, C9-44, C9-45 | Compulsory acquisition of rights for the authorised development | Work Nos. 7, U6 E2-05, E2-08, E2-12, E2-13, E2-14, E2-15, E2-16, E2-17, E2-18 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U9 E3-19, E3-33, E3-34, E3-35, E3-40, E3-41, E3-41a, E3-42, E3-43 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U10 E3-45, E3-46, E3-48, E3-49 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U11 E5-23 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U12 E6-12, E6-41, E6-42, E6-43, E6-44, E6-46, E6-47 | Compulsory acquisition of rights for the authorised development | Work Nos. 9, U13 E7-30, E7-38a, E7-41a, E7-44a | Compulsory acquisition of rights for the authorised development | Work No. 10 PART 3 NGN North Yorkshire Council (1) Plot number of land shown on land plan | (2) Purpose for which rights over land may be acquired or restrictive covenants imposed | (3) Relevant part of the authorised development D1-10 | Compulsory Acquisition of Rights for Authorised Development | Work Nos. 8, U8 D1-15, D1-19, D1-84 | Compulsory Acquisition of Rights for Authorised Development | Work Nos. 8, U8
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.