Propose a change

The Worcestershire County Council (Hampton Bridge) Scheme 2025 Confirmation Instrument 2025

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

THE SCHEDULE TO THE SCHEME

Article 3 PLANS AND SPECIFICATIONS OF THE HAMPTON BRIDGE The location and general design of the bridge are shown on the plans numbered sealed with the Common Seal of the Council and attached hereto. • HFB-COW-HFB-ALL-DR-CB-1010-S3_P4 General Arrangement Site Plan • HFB-COW-HFB-ALL-DR-CB-1015-S3_P4 General Arrangement Developed Elevation • HFB-COW-HFB-ALL-DR-CB-1020-S3_P4 -General Arrangement Cross Sections – Main Span • HFB-COW-HFB-ALL-DR-CB-1021-S3_P4 General Arrangement Cross Sections – Ramp POINTS OF COMMENCEMENT AND TERMINATION The bridge spans over the River Avon, 650 metres downstream of Abbey Bridge. On the west bank it connects to a ramped pedestrian and cyclist shared-use footway from the Severn Trent Water Access Road at a point 240 metres north of the B4084 Pershore Road. On the east bank it connects to steps and a ramped pedestrian and cyclist shared-use causeway at a point 330 metres to the west of Evesham Leisure Centre off the A4184 Abbey Road. SPAN AND DIMENSIONS The bridge has a main span of 86.5 metres. This comprises: • A western approach span of 24 metres measured from the earthwork embankment. • A central section span over the river of 36 metres. • An eastern approach span of 26.5 metres, measured to the point where the bridge meets the steps and causeway. The bridge has an overall width of 4.3 metres from outside of handrail to outside of handrail. The shared-use pedestrian and cyclist footway width between handrails is 3.5 metres. WATERWAY The minimum navigable waterway width required is 3.7 metres width. Over the river the bridge will provide an air draft of not less than 4.3 metres high above the typical (non-flood) water level of +19.93 metres Above Ordnance Datum, for a width of not less than 21.0 metres. HEADWAY At its highest point, the deck will measure approximately 8.3 metres above the River Avon’s typical summer water level, with a parapet extending 1.5 metres above this. To allow passage of vehicles below the bridge, to the landward side of the bridge support on either side of the river there is a vehicle access accommodation underpass below the bridge structure. On the west side this is a minimum 4.65 metres clear headroom for 4 metres clear width below the western approach span. On the east side this is a minimum 4.65 metres clear headroom for 6 metres clear width below the causeway immediately to the east of the bridge connection point. There are Public Rights of Way along the riverbanks on both sides below the approach spans. A minimum 2.4 metres clear headroom for a minimum width of 2.0 metres is provided. FORM AND MATERIALS The bridge will be of a below-deck arch design to optimise views from the bridge while minimising its impact on existing key vantage points including the nearby listed buildings. In terms of materials, the steelwork of the main span and approach ramps will be weathering steel. The main span will be a deck arch bridge with crossbeams and a longitudinally stiffened steel deck plate. The primary structure will be formed from fabricated structural steel. The bridge deck will be formed from a steel deck plate with longitudinal stiffeners. Pedestrian/cycle parapets of height approximately 1.4 metres will be installed along the edges of all raised footpaths. On the bridge and ramps, two rails are provided at approximately 1 metre and 1.4 metres to provide a handrail for pedestrians and a rail to protect against falling for cyclists respectively. The steelwork will be left unpainted as the weathering steel that will be used has a chemical composition that provides increased resistance to corrosion after developing a protective surface patina. The surface finish will be characteristically that of rust but provides the major benefit of avoiding any need for future repainting thus offer significant environmental benefits as well as significantly reducing long-term maintenance costs. This finish will complement the natural surroundings of the structure. The surfacing on the deck plate will be a thin epoxy grit slip resistant combined waterproofing and surfacing. The deck will have long-fall and cross-fall and include drainage outlets at intervals. By sloping both along the length of the bridge and causeway, and from the centre of the structure to the sides across the width the potential for flooding will be reduced, as will the risk of ice forming on the bridge.

Your change, as a redline

THE SCHEDULE TO THE SCHEME

Article 3 PLANS AND SPECIFICATIONS OF THE HAMPTON BRIDGE The location and general design of the bridge are shown on the plans numbered sealed with the Common Seal of the Council and attached hereto. • HFB-COW-HFB-ALL-DR-CB-1010-S3_P4 General Arrangement Site Plan • HFB-COW-HFB-ALL-DR-CB-1015-S3_P4 General Arrangement Developed Elevation • HFB-COW-HFB-ALL-DR-CB-1020-S3_P4 -General Arrangement Cross Sections – Main Span • HFB-COW-HFB-ALL-DR-CB-1021-S3_P4 General Arrangement Cross Sections – Ramp POINTS OF COMMENCEMENT AND TERMINATION The bridge spans over the River Avon, 650 metres downstream of Abbey Bridge. On the west bank it connects to a ramped pedestrian and cyclist shared-use footway from the Severn Trent Water Access Road at a point 240 metres north of the B4084 Pershore Road. On the east bank it connects to steps and a ramped pedestrian and cyclist shared-use causeway at a point 330 metres to the west of Evesham Leisure Centre off the A4184 Abbey Road. SPAN AND DIMENSIONS The bridge has a main span of 86.5 metres. This comprises: • A western approach span of 24 metres measured from the earthwork embankment. • A central section span over the river of 36 metres. • An eastern approach span of 26.5 metres, measured to the point where the bridge meets the steps and causeway. The bridge has an overall width of 4.3 metres from outside of handrail to outside of handrail. The shared-use pedestrian and cyclist footway width between handrails is 3.5 metres. WATERWAY The minimum navigable waterway width required is 3.7 metres width. Over the river the bridge will provide an air draft of not less than 4.3 metres high above the typical (non-flood) water level of +19.93 metres Above Ordnance Datum, for a width of not less than 21.0 metres. HEADWAY At its highest point, the deck will measure approximately 8.3 metres above the River Avon’s typical summer water level, with a parapet extending 1.5 metres above this. To allow passage of vehicles below the bridge, to the landward side of the bridge support on either side of the river there is a vehicle access accommodation underpass below the bridge structure. On the west side this is a minimum 4.65 metres clear headroom for 4 metres clear width below the western approach span. On the east side this is a minimum 4.65 metres clear headroom for 6 metres clear width below the causeway immediately to the east of the bridge connection point. There are Public Rights of Way along the riverbanks on both sides below the approach spans. A minimum 2.4 metres clear headroom for a minimum width of 2.0 metres is provided. FORM AND MATERIALS The bridge will be of a below-deck arch design to optimise views from the bridge while minimising its impact on existing key vantage points including the nearby listed buildings. In terms of materials, the steelwork of the main span and approach ramps will be weathering steel. The main span will be a deck arch bridge with crossbeams and a longitudinally stiffened steel deck plate. The primary structure will be formed from fabricated structural steel. The bridge deck will be formed from a steel deck plate with longitudinal stiffeners. Pedestrian/cycle parapets of height approximately 1.4 metres will be installed along the edges of all raised footpaths. On the bridge and ramps, two rails are provided at approximately 1 metre and 1.4 metres to provide a handrail for pedestrians and a rail to protect against falling for cyclists respectively. The steelwork will be left unpainted as the weathering steel that will be used has a chemical composition that provides increased resistance to corrosion after developing a protective surface patina. The surface finish will be characteristically that of rust but provides the major benefit of avoiding any need for future repainting thus offer significant environmental benefits as well as significantly reducing long-term maintenance costs. This finish will complement the natural surroundings of the structure. The surfacing on the deck plate will be a thin epoxy grit slip resistant combined waterproofing and surfacing. The deck will have long-fall and cross-fall and include drainage outlets at intervals. By sloping both along the length of the bridge and causeway, and from the centre of the structure to the sides across the width the potential for flooding will be reduced, as will the risk of ice forming on the bridge.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds