The West Midlands Rail Freight Interchange (Amendment No. 2) Order 2025
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE CERTIFICATION DOCUMENTS
Article 2 1 Documents for certification that they are true copies of the documents referred to in this Order (1) Document/Plan | (2) Document Number | (3) Document date/Plan number with revision number Access and rights of way plans Key Plan | 2.3 | WSP-70001979-SK-060 Rev I Sheet 1 | 2.3A | WSP-70001979-SK-060 Rev H Sheet 2 | 2.3B | WSP-70001979-SK-060 Rev G Sheet 3 | 2.3C | WSP-70001979-SK-060 Rev F Sheet 4 | 2.3D | WSP-70001979-SK-060 Rev F Sheet 5 | 2.3E | WSP-70001979-SK-060 Rev F Sheet 6 | 2.3F | WSP-70001979-SK-060 Rev F Sheet 7 | 2.3G | WSP-70001979-SK-060 Rev B The book of reference | 4.3B | 21 August 2019 The bridge plans Proposed road bridges plan and long section | 2.18A | 1516-0425-WDK-SI-C-301-010 Rev P11 Road Bridge B1 | 2.18B | 1516-0425-WDK-SI-C-301-006 Rev P14 Road Bridge B2 and B3 | 2.18C | 1516-0425-WDK-SI-C-300-007 Rev P14 Proposed road bridge B4 section and elevation | 2.18D | 1516-0425-WDK-SI-C-301-008 Rev P17 The design and access statement | 7.5 | 3 August 2018 The environmental statement | 6.2 | 3 August 2018 (subject to the substitutions set out below): (i) Figures 10.001, 10.002, 10.003 and 10.004 – 12 September 2018; (ii) Annex 10.1.1 – 12 September 2018; (iii) Addendum to Chapter 13 (Noise and Vibration) – 5 April 2019 (iv) Appendix I to Transport Assessment (Appendix 15.1) (Site Wide HGV Management Plan) – 7 May 2019 (v) Appendix H to Transport Assessment (Appendix 15.1) (Site Wide Travel plan) – 5 July 2019 (vi) Appendix 2.3 (Outline Demolition and Construction Management Plan) – 5 July 2019 (vii) Appendix 10.4 (Framework Ecological Mitigation and Management Plan) – 5 July 2019 (viii) Updated Chapter 7 (Air Quality) and Appendices 7.2, 7.3, 7.4, 7.6 and 7.7 – 7 August 2019 The future highways maintenance plans Key Plan | 2.10 | WSP-70001979-SK-091 Rev F Sheet 1 | 2.10A | WSP-70001979-SK-091 Rev F Sheet 2 | 2.10B | WSP-70001979-SK-091 Rev C Sheet 3 | 2.10C | WSP-70001979-SK-091 Rev C The highway classification plans Key Plan | 2.13 | WSP-70001979-SK-068 Rev I Sheet 1 | 2.13A | WSP-70001979-SK-068 Rev H Sheet 2 | 2.13B | WSP-70001979-SK-068 Rev E Sheet 3 | 2.13C | WSP-70001979-SK-068 Rev E The highway general arrangement plans Key Plan/Highway Masterplan | 2.9 | WSP-70001979-GA-100 Rev M General Arrangement Plan 101 | 2.9A | WSP-70001979-GA-101 Rev E General Arrangement Plan 102 | 2.9B | WSP-70001979-GA-102 Rev E General Arrangement Plan 103 | 2.9C | WSP-70001979-GA-103 Rev I General Arrangement Plan 104 | 2.9D | WSP-70001979-GA-104 Rev M General Arrangement Plan 105 | 2.9E | WSP-70001979-GA-105 Rev E General Arrangement Plan 106 | 2.9F | WSP-70001979-GA-106 Rev G General Arrangement Plan 107 | 2.9G | WSP-70001979-GA-107 Rev H General Arrangement Plan 108 | 2.9H | WSP-70001979-GA-108 Rev F General Arrangement Plan 109 | 2.9I | WSP-70001979-GA-109 Rev G General Arrangement Plan 110 | 2.9J | WSP-70001979-GA-110 Rev H General Arrangement Plan 111 | 2.9K | WSP-70001979-GA-111 Rev H The land plans Key Plan | 2.1 | Key Plan v1 Sheet 1 | 2.1A | Sheet 1 of 12 v0 Sheet 2 | 2.1B | Sheet 2 of 12 v0 Sheet 3 | 2.1C | Sheet 3 of 12 v0 Sheet 4 | 2.1D | Sheet 4 of 12 v1 Sheet 5 | 2.1E | Sheet 5 of 12 v0 Sheet 6 | 2.1F | Sheet 6 of 12 v0 Sheet 7 | 2.1G | Sheet 7 of 12 v0 Sheet 8 | 2.1H | Sheet 8 of 12 v0 Sheet 9 | 2.1I | Sheet 9 of 12 v0 Sheet 10 | 2.1J | Sheet 10 of 12 v0 Sheet 11 | 2.1K | Sheet 11 of 12 v0 Sheet 12 | 2.1L | Sheet 12 of 12 v0 Order limits plan | 2.4 | 4990-00011 Rev 06 The parameters plans Development Zone Parameters Plan Key Plan | 2.5 | 4990-02000 Rev 11 Sheet 1 | 2.5A | 4990-02001 Rev 11 Sheet 2 | 2.5B | 4990-02002 Rev 08 Sheet 3 | 2.5C | 4990-02003 Rev 12 Sheet 4 | 2.5D | 4990-02004 Rev 07 Floor Levels and Building Heights Parameters Plan Key Plan | 2.6 | 4990-02010 Rev 12 Sheet 1 | 2.6A | 4990-02011 Rev 11 Sheet 2 | 2.6B | 4990-02012 Rev 07 Sheet 3 | 2.6C | 4990-02013 Rev 11 Sheet 4 | 2.6D | 4990-02014 Rev 07 Green Infrastructure Parameters Plan Key Plan | 2.7 | 4990-02020 Rev 14 Sheet 1 | 2.7A | 4990-02021 Rev 13 Sheet 2 | 2.7B | 4990-02022 Rev 10 Sheet 3 | 2.7C | 4990-02023 Rev 14 Sheet 4 | 2.7D | 4990-02024 Rev 09 The illustrative arrangement of railway alignment | 2.14 | TRS-DRG-FA-001003 Rev 05 The rail terminal – illustrative expanded rail terminal layout plan | 2.15B | TRS-DRG-FA-001010 Rev 04 The rail section plans Rail Alignment Cross Sections – Sheet 1 | 2.16A | TRS-DRG-FA-001005 Rev 02 Rail Alignment Cross Sections – Sheet 2 | 2.16B | TRS-DRG-FA-001006 Rev 03 Rail Alignment Cross Sections – Sheet 3 | 2.16C | TRS-DRG-FA-001007 Rev 02 Long sections rail alignment Sheet 1 | 2.16D | TRS-DRG-FA-001004 Rev 02 Long sections rail alignment Sheet 2 | 2.16E | TRS-DRG-FA-001008 Rev 02 The speed limit plans Key Plan | 2.12 | WSP-70001979-SK-062 Rev I Sheet 1 | 2.12A | WSP-70001979-SK-062 Rev K Sheet 2 | 2.12B | WSP-70001979-SK-062 Rev F Sheet 3 | 2.12C | WSP-70001979-SK-062 Rev E SI facility plan | 2.20 | 01 The traffic regulation plans Key Plan | 2.11 | WSP-70001979-SK-061 Rev I Sheet 1 | 2.11A | WSP-70001979-SK-061 Rev H Sheet 2 | 2.11B | WSP-70001979-SK-061 Rev E Sheet 3 | 2.11C | WSP-70001979-SK-061 Rev F Sheet 4 | 2.11D | WSP-70001979-SK-061 Rev A The works plans Key Plan | 2.2 | Key Plan v3.0 Sheet 1 | 2.2A | Sheet 1 of 9 v3.0 Sheet 2 | 2.2B | Sheet 2 of 9 v3.0 Sheet 3 | 2.2C | Sheet 3 of 9 v1 Sheet 4 | 2.2D | Sheet 4 of 9 v1 Sheet 5 | 2.2E | Sheet 5 of 9 v1 Sheet 6 | 2.2F | Sheet 6 of 9 v3.0 Sheet 7 | 2.2G | Sheet 7 of 9 v1 Sheet 8 | 2.2H | Sheet 8 of 9 v1 Sheet 9 | 2.2I | Sheet 9 of 9 v1
SCHEDULE CERTIFICATION DOCUMENTS
Article 2 1 Documents for certification that they are true copies of the documents referred to in this Order (1) Document/Plan | (2) Document Number | (3) Document date/Plan number with revision number Access and rights of way plans Key Plan | 2.3 | WSP-70001979-SK-060 Rev I Sheet 1 | 2.3A | WSP-70001979-SK-060 Rev H Sheet 2 | 2.3B | WSP-70001979-SK-060 Rev G Sheet 3 | 2.3C | WSP-70001979-SK-060 Rev F Sheet 4 | 2.3D | WSP-70001979-SK-060 Rev F Sheet 5 | 2.3E | WSP-70001979-SK-060 Rev F Sheet 6 | 2.3F | WSP-70001979-SK-060 Rev F Sheet 7 | 2.3G | WSP-70001979-SK-060 Rev B The book of reference | 4.3B | 21 August 2019 The bridge plans Proposed road bridges plan and long section | 2.18A | 1516-0425-WDK-SI-C-301-010 Rev P11 Road Bridge B1 | 2.18B | 1516-0425-WDK-SI-C-301-006 Rev P14 Road Bridge B2 and B3 | 2.18C | 1516-0425-WDK-SI-C-300-007 Rev P14 Proposed road bridge B4 section and elevation | 2.18D | 1516-0425-WDK-SI-C-301-008 Rev P17 The design and access statement | 7.5 | 3 August 2018 The environmental statement | 6.2 | 3 August 2018 (subject to the substitutions set out below): (i) Figures 10.001, 10.002, 10.003 and 10.004 – 12 September 2018; (ii) Annex 10.1.1 – 12 September 2018; (iii) Addendum to Chapter 13 (Noise and Vibration) – 5 April 2019 (iv) Appendix I to Transport Assessment (Appendix 15.1) (Site Wide HGV Management Plan) – 7 May 2019 (v) Appendix H to Transport Assessment (Appendix 15.1) (Site Wide Travel plan) – 5 July 2019 (vi) Appendix 2.3 (Outline Demolition and Construction Management Plan) – 5 July 2019 (vii) Appendix 10.4 (Framework Ecological Mitigation and Management Plan) – 5 July 2019 (viii) Updated Chapter 7 (Air Quality) and Appendices 7.2, 7.3, 7.4, 7.6 and 7.7 – 7 August 2019 The future highways maintenance plans Key Plan | 2.10 | WSP-70001979-SK-091 Rev F Sheet 1 | 2.10A | WSP-70001979-SK-091 Rev F Sheet 2 | 2.10B | WSP-70001979-SK-091 Rev C Sheet 3 | 2.10C | WSP-70001979-SK-091 Rev C The highway classification plans Key Plan | 2.13 | WSP-70001979-SK-068 Rev I Sheet 1 | 2.13A | WSP-70001979-SK-068 Rev H Sheet 2 | 2.13B | WSP-70001979-SK-068 Rev E Sheet 3 | 2.13C | WSP-70001979-SK-068 Rev E The highway general arrangement plans Key Plan/Highway Masterplan | 2.9 | WSP-70001979-GA-100 Rev M General Arrangement Plan 101 | 2.9A | WSP-70001979-GA-101 Rev E General Arrangement Plan 102 | 2.9B | WSP-70001979-GA-102 Rev E General Arrangement Plan 103 | 2.9C | WSP-70001979-GA-103 Rev I General Arrangement Plan 104 | 2.9D | WSP-70001979-GA-104 Rev M General Arrangement Plan 105 | 2.9E | WSP-70001979-GA-105 Rev E General Arrangement Plan 106 | 2.9F | WSP-70001979-GA-106 Rev G General Arrangement Plan 107 | 2.9G | WSP-70001979-GA-107 Rev H General Arrangement Plan 108 | 2.9H | WSP-70001979-GA-108 Rev F General Arrangement Plan 109 | 2.9I | WSP-70001979-GA-109 Rev G General Arrangement Plan 110 | 2.9J | WSP-70001979-GA-110 Rev H General Arrangement Plan 111 | 2.9K | WSP-70001979-GA-111 Rev H The land plans Key Plan | 2.1 | Key Plan v1 Sheet 1 | 2.1A | Sheet 1 of 12 v0 Sheet 2 | 2.1B | Sheet 2 of 12 v0 Sheet 3 | 2.1C | Sheet 3 of 12 v0 Sheet 4 | 2.1D | Sheet 4 of 12 v1 Sheet 5 | 2.1E | Sheet 5 of 12 v0 Sheet 6 | 2.1F | Sheet 6 of 12 v0 Sheet 7 | 2.1G | Sheet 7 of 12 v0 Sheet 8 | 2.1H | Sheet 8 of 12 v0 Sheet 9 | 2.1I | Sheet 9 of 12 v0 Sheet 10 | 2.1J | Sheet 10 of 12 v0 Sheet 11 | 2.1K | Sheet 11 of 12 v0 Sheet 12 | 2.1L | Sheet 12 of 12 v0 Order limits plan | 2.4 | 4990-00011 Rev 06 The parameters plans Development Zone Parameters Plan Key Plan | 2.5 | 4990-02000 Rev 11 Sheet 1 | 2.5A | 4990-02001 Rev 11 Sheet 2 | 2.5B | 4990-02002 Rev 08 Sheet 3 | 2.5C | 4990-02003 Rev 12 Sheet 4 | 2.5D | 4990-02004 Rev 07 Floor Levels and Building Heights Parameters Plan Key Plan | 2.6 | 4990-02010 Rev 12 Sheet 1 | 2.6A | 4990-02011 Rev 11 Sheet 2 | 2.6B | 4990-02012 Rev 07 Sheet 3 | 2.6C | 4990-02013 Rev 11 Sheet 4 | 2.6D | 4990-02014 Rev 07 Green Infrastructure Parameters Plan Key Plan | 2.7 | 4990-02020 Rev 14 Sheet 1 | 2.7A | 4990-02021 Rev 13 Sheet 2 | 2.7B | 4990-02022 Rev 10 Sheet 3 | 2.7C | 4990-02023 Rev 14 Sheet 4 | 2.7D | 4990-02024 Rev 09 The illustrative arrangement of railway alignment | 2.14 | TRS-DRG-FA-001003 Rev 05 The rail terminal – illustrative expanded rail terminal layout plan | 2.15B | TRS-DRG-FA-001010 Rev 04 The rail section plans Rail Alignment Cross Sections – Sheet 1 | 2.16A | TRS-DRG-FA-001005 Rev 02 Rail Alignment Cross Sections – Sheet 2 | 2.16B | TRS-DRG-FA-001006 Rev 03 Rail Alignment Cross Sections – Sheet 3 | 2.16C | TRS-DRG-FA-001007 Rev 02 Long sections rail alignment Sheet 1 | 2.16D | TRS-DRG-FA-001004 Rev 02 Long sections rail alignment Sheet 2 | 2.16E | TRS-DRG-FA-001008 Rev 02 The speed limit plans Key Plan | 2.12 | WSP-70001979-SK-062 Rev I Sheet 1 | 2.12A | WSP-70001979-SK-062 Rev K Sheet 2 | 2.12B | WSP-70001979-SK-062 Rev F Sheet 3 | 2.12C | WSP-70001979-SK-062 Rev E SI facility plan | 2.20 | 01 The traffic regulation plans Key Plan | 2.11 | WSP-70001979-SK-061 Rev I Sheet 1 | 2.11A | WSP-70001979-SK-061 Rev H Sheet 2 | 2.11B | WSP-70001979-SK-061 Rev E Sheet 3 | 2.11C | WSP-70001979-SK-061 Rev F Sheet 4 | 2.11D | WSP-70001979-SK-061 Rev A The works plans Key Plan | 2.2 | Key Plan v3.0 Sheet 1 | 2.2A | Sheet 1 of 9 v3.0 Sheet 2 | 2.2B | Sheet 2 of 9 v3.0 Sheet 3 | 2.2C | Sheet 3 of 9 v1 Sheet 4 | 2.2D | Sheet 4 of 9 v1 Sheet 5 | 2.2E | Sheet 5 of 9 v1 Sheet 6 | 2.2F | Sheet 6 of 9 v3.0 Sheet 7 | 2.2G | Sheet 7 of 9 v1 Sheet 8 | 2.2H | Sheet 8 of 9 v1 Sheet 9 | 2.2I | Sheet 9 of 9 v1
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.