SCHEDULE 7 Land of which only temporary possession may be taken

Article 34 PART 1 Land of which only temporary possession may be taken (1) Area | (2) Number of plot shown on land plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of authorised development Cheshire and Chester West | 1-05 | Temporary use as a construction working area and for access (as part of Work No.3) | Work Nos 1, 2, 3, 3A, 3B 4 and 5 Cheshire and Chester West | 1-06d | Temporary use as a construction access (Work No.3A) | Work Nos 1, 2, 3, 3A, 3B, 4 and 5 Cheshire and Chester West | 1-08 | Temporary use as a construction compound and working area (as part of Work No.1A) | Work Nos 1, 2, 3, 4 and 5 Cheshire and Chester West | 1-16, 1-17 | Temporary use as construction access (as part of Work No.3) | Work Nos 1, 2, 3, 4 and 5 Cheshire and Chester West | 2-02 | Temporary use as a construction working area and for access to facilitate construction (as part of Work No.5C) | Work Nos 2, 3, 4 and 5 Cheshire and Chester West | 2-04 | Temporary use as a construction access (as part of Work No.5C) | Work Nos 2, 3, 4, 5 and 6 Cheshire and Chester West | 2-07 | Temporary use as a construction access (as part of Work No.5A) | Work Nos 2, 3, 4, 5 and 6 Cheshire and Chester West | 2-11, 2-12 | Temporary use a construction access (as part of Work No.5B) | Work Nos 2, 3, 4, 5 and 6 Cheshire and Chester West | 3-01 | Temporary use as a construction access (Work No. 6C) | Work Nos 4, 5, 6, 7 and 11 Cheshire and Chester West | 3-02 | Temporary use as a construction compound and working area (as part of Work No. 6B) | Work Nos 4, 5, 6, 7, 11, 57A and 57B Cheshire and Chester West | 4-01, 4-02 | Temporary use as a construction compound and working area (as part of Work No. 6B) | Work Nos 4, 5, 6, 7, 11, 57A and 57B Cheshire and Chester West | 4-03, 4-04 | Temporary use for a construction access including visibility splay (as part of Work No. 6D) | Work Nos 4, 5, 6, 7, 11, 57A and 57B Cheshire and Chester West | 4-11 | Temporary use as a construction access (Work No. 6E) | Work Nos 4, 5, 6, 7, 11, 57A and 57B Cheshire and Chester West | 5-03, 5-04 | Temporary use as a construction access (as part of Work No 12) | Work Nos 11, 12, 13, 14, 57C and 57D Cheshire and Chester West | 5-19, 5-21, 5-24, 5-25, 5-26, 6-11, 6-13 | Temporary use for access and peat storage | Work Nos 13, 13A, 14, 57E and 57F Cheshire and Chester West | 6-20 | Temporary use as a construction compound and working area (as part of Work No. 15A) | Work Nos 14, 15 and 16 Cheshire and Chester West | 6-21 | Temporary use as a construction access (Work No.15B) | Work Nos 14, 15 and 16 Cheshire and Chester West | 7-02, 7-02a, 7-03b | Temporary use as a construction access (Work No.16B) | Work No. 16A Cheshire and Chester West | 7-10 | Temporary use as a working area (as part of Work No. 17) | Work No. 17 Cheshire and Chester West | 8-02 | Temporary use as a construction working are and access (Work No. 18A) | Work Nos. 17, 18, 19, 19A, 20 and 21 Cheshire and Chester West | 8-06, 8-08 | Temporary use as a construction working area (Work No. 18) | Work Nos. 18, 19, 19A, 20 and 21 Cheshire and Chester West | 8-09 | Temporary use as a construction access, compound and working area (Work Nos.19A and 19B) | Work Nos. 17, 18, 19, 19A, 20 and 21 Cheshire and Chester West | 8-14 | Temporary use as a construction access (Work No. 19C) | Work Nos. 20 and 21 Cheshire and Chester West | 9-02, 9-05, 9-06, 9-08, 9-11, 9-13 | Temporary use as a construction access and working area (as part of Work No. 22) | Work Nos. 19, 22, 23, 24 and 57G Cheshire and Chester West | 9-18 | Temporary use as a construction access (Work No. 23A) | Work Nos. 19, 22, 23 and 24 Cheshire and Chester West | 9-20 | Temporary use as a construction access and working area (as part of Work No. 23B) | Work Nos. 22, 23 and 24 Cheshire and Chester West | 9-23 | Temporary use as a construction access (as part of Work No.24A) | Work Nos. 24 and 25 Cheshire and Chester West | 10-04a | Temporary possession for traffic management | Work No. 25 Cheshire and Chester West | 10-14 10-15 | Temporary use as a construction access (as part of Work No.25) | Work Nos. 25, 26, 27, 28 Cheshire and Chester West | 10-17 | Temporary use as a construction access (Work No.28A) | Work Nos. 25, 26, 26A, 27, 28, 28A, 28B Cheshire and Chester West | 10-19 | Temporary use as a construction access and working area (as part of Work Nos.25, 26, 26A and 27 | Work Nos. 25, 26, 26A, 27 and 28 Cheshire and Chester West | 11-01, 11-02 | Temporary use as a construction access (Work No.28A) | Work Nos. 25, 26, 26A, 27, 28, 28A, 28B Flintshire | 12-12a, 12-13 | Temporary use as a construction compound and working area (as part of Work Nos. 29A and 30A) | Work Nos. 28, 29. 29A, 30 and 30A Flintshire | 12-15, 12-16, 12-17 | Temporary use as a construction access (Works No.30 and 30A) | Work Nos. 28, 29, 29A, 30 and 30A Flintshire | 13-14, 13-16 | Temporary use as a construction compound and working area (as part of Work No. 30D) | Work Nos. 30 and 31 Flintshire | 13-19 | Temporary use as a construction access (as part of Work No.30E) | Work Nos. 30 and 31 Flintshire | 14-01 | Temporary use as a construction compound and working area (as part of Work No. 30D) | Work Nos. 30 and 31 Flintshire | 14-14 | Temporary use as a construction compound and working area (as part of Work Nos. 31A and 31B) | Work Nos. 30, 31, 32 and 33 Flintshire | 14-23, 14-24, 14-25, 14-26, 14-27 | Temporary use as a construction access and working area (as part of Work No. 31B) | Work Nos. 30, 31, 31A, 32 and 33 Flintshire | 14-30a, 15-01a | Temporary use as a construction access (as part of Work No.33) | Work No. 33 Flintshire | 15-02 | Temporary use as a construction access and working area (as part of Work No.33) | Work Nos.32, 33 and 33A Flintshire | 16-01, 16-06, 16-06a, 16-07, 16-08, 16-09, 16-11 | Temporary use as a construction access and working area, and for diversion of public right of way and watercourse (as part of Work No. 34) | Work Nos. 33 and 34 Flintshire | 16-17 | Temporary use as a working area (as part of Work No. 34) | Work Nos. 34 and 35 Flintshire | 16-28 | Temporary use as a construction working area and access (Work No.35) | Work Nos. 35, 36, 36A and 37 Flintshire | 17-05 | Temporary use as a construction access and working area (as part of Work Nos. 35 and 36A) | Work Nos. 35, 36, 36A and 37 Flintshire | 17-09, 17-10 | Temporary use as a construction access (Work No.38A) | Work Nos. 35, 36, 36A and 37 Flintshire | 17-11 | Temporary use as a working area (as part of Work No. 38) | Work Nos. 37 and 38 Flintshire | 17-16 | Temporary use as a construction working area and access (as part of Work No.39B) | Work Nos. 38, 39, 40 and 57H Flintshire | 17-31 | Temporary use as a construction access (Work No.39A) | Work Nos. 39, 40 and 57H Flintshire | 17-35, 17-37, 17-38 | Temporary use as a construction access and working area (Work No. 40A) | Work Nos. 39, 40 and 57H Flintshire | 18-01 | Temporary use as a working area, access and public right of way diversion (as part of Work No. 40B) | Work Nos.40, 41 and 57I Flintshire | 18-13 | Temporary use as a construction compound, working area and access (as part of Work Nos. 41A and 41B) | Work Nos. 40, 41, 42 and 57I Flintshire | 18-16, 18-17 | Temporary use as a construction access and visibility splay (as part of Work No.41B) | Work Nos. 40, 41, 42 and 57I Flintshire | 19-04c | Temporary use as a working area (as part of Work No. 43D) | Work Nos. 42, 43, 57J and 57K Flintshire | 20-07 | Temporary use as a working area (as part of Work No. 44) | Work Nos. 44 and 57L Flintshire | 20-10, 20-10a | Temporary use as a construction access (as part of Work No.44B) | Work Nos. 44, 44A, 45, 46, 57L and 57M Flintshire | 20-16, 20-17 | Temporary use as a construction access (as part of Work No.46) | Work Nos. 44, 44A, 45 and 46 Flintshire | 20-19b | Temporary use as a construction access (as part of Work No.45) | Work Nos. 44, 45 and 45B Flintshire | 20-20 | Temporary use as a construction compound and working area (as part of Work Nos. 44C and 45A) | Work Nos. 44, 44A, 45, 46, 57L and 57M Flintshire | 21-03 | Temporary use as a construction access (Work No.47A) | Work No. 47 Flintshire | 21-07 | Temporary use as a construction access (Work No.47B) | Work No. 47 and 48 Flintshire | 22-02 | Temporary use as a working area and access (as part of Work No. 47) | Work Nos. 47 and 48 Flintshire | 22-04 | Temporary use for and to construct an access (Work No.49) | Work No. 47, 48 and 49 Flintshire | 25-03, 25-07, 25-08, 25-09 | Temporary use as a working area (as part of Work Nos. 51a, 51B and 52) | Work Nos. 51, 51A and 52 Flintshire | 27-02, 28-01 | Temporary use as a working area (as part of Work Nos. 53A and 53B) | Work Nos. 53, 53A and 54 Flintshire | 28-02 | Temporary use for and to construct an access (Work No.54) | Work Nos. 53, 53A and 54 Flintshire | 29-01 | Temporary use for and to construct an access (Work No.56) | Work Nos. 55, 55A and 56 Flintshire | 29-02 | Temporary use as a working area (as part of Work No. 55B) | Work Nos. 55, 55A and 56 Flintshire | 29-06 | Temporary use as a working area (as part of Work Nos. 55A and 55B) | Work Nos. 55, 55A and 56 PART 2 Land of which only temporary possession for access may be taken (1) Area | (2) Number of plot shown on land plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of authorised development Cheshire and Chester West | 2-06 | Temporary use for access (as part of Work No.5A) | Work Nos 2, 3, 4, 5 and 6 Cheshire and Chester West | 9-24, 9-25 | Temporary use as a construction access (as part of Work No.24A) | Work Nos. 24 and 25 Flintshire | 13-13, 13-15, 13-17, 13-18, 14-02, 14-03 | Temporary use as a construction access (as part of Work No.30E) | Work Nos. 30, 30D 31, 31A, 32 and 33 Flintshire | 17-34 | Temporary use for access (as part of Work No.40) | Work Nos. 39, 39A, 40, 40A, 41, 57H and 57I Flintshire | 19-06 | Temporary use as a construction access (as Work No.43C) | Work Nos. 42, 43, 44, 57J and 57K

Your change, as a redline

SCHEDULE 7 Land of which only temporary possession may be taken

Article 34 PART 1 Land of which only temporary possession may be taken (1) Area | (2) Number of plot shown on land plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of authorised development Cheshire and Chester West | 1-05 | Temporary use as a construction working area and for access (as part of Work No.3) | Work Nos 1, 2, 3, 3A, 3B 4 and 5 Cheshire and Chester West | 1-06d | Temporary use as a construction access (Work No.3A) | Work Nos 1, 2, 3, 3A, 3B, 4 and 5 Cheshire and Chester West | 1-08 | Temporary use as a construction compound and working area (as part of Work No.1A) | Work Nos 1, 2, 3, 4 and 5 Cheshire and Chester West | 1-16, 1-17 | Temporary use as construction access (as part of Work No.3) | Work Nos 1, 2, 3, 4 and 5 Cheshire and Chester West | 2-02 | Temporary use as a construction working area and for access to facilitate construction (as part of Work No.5C) | Work Nos 2, 3, 4 and 5 Cheshire and Chester West | 2-04 | Temporary use as a construction access (as part of Work No.5C) | Work Nos 2, 3, 4, 5 and 6 Cheshire and Chester West | 2-07 | Temporary use as a construction access (as part of Work No.5A) | Work Nos 2, 3, 4, 5 and 6 Cheshire and Chester West | 2-11, 2-12 | Temporary use a construction access (as part of Work No.5B) | Work Nos 2, 3, 4, 5 and 6 Cheshire and Chester West | 3-01 | Temporary use as a construction access (Work No. 6C) | Work Nos 4, 5, 6, 7 and 11 Cheshire and Chester West | 3-02 | Temporary use as a construction compound and working area (as part of Work No. 6B) | Work Nos 4, 5, 6, 7, 11, 57A and 57B Cheshire and Chester West | 4-01, 4-02 | Temporary use as a construction compound and working area (as part of Work No. 6B) | Work Nos 4, 5, 6, 7, 11, 57A and 57B Cheshire and Chester West | 4-03, 4-04 | Temporary use for a construction access including visibility splay (as part of Work No. 6D) | Work Nos 4, 5, 6, 7, 11, 57A and 57B Cheshire and Chester West | 4-11 | Temporary use as a construction access (Work No. 6E) | Work Nos 4, 5, 6, 7, 11, 57A and 57B Cheshire and Chester West | 5-03, 5-04 | Temporary use as a construction access (as part of Work No 12) | Work Nos 11, 12, 13, 14, 57C and 57D Cheshire and Chester West | 5-19, 5-21, 5-24, 5-25, 5-26, 6-11, 6-13 | Temporary use for access and peat storage | Work Nos 13, 13A, 14, 57E and 57F Cheshire and Chester West | 6-20 | Temporary use as a construction compound and working area (as part of Work No. 15A) | Work Nos 14, 15 and 16 Cheshire and Chester West | 6-21 | Temporary use as a construction access (Work No.15B) | Work Nos 14, 15 and 16 Cheshire and Chester West | 7-02, 7-02a, 7-03b | Temporary use as a construction access (Work No.16B) | Work No. 16A Cheshire and Chester West | 7-10 | Temporary use as a working area (as part of Work No. 17) | Work No. 17 Cheshire and Chester West | 8-02 | Temporary use as a construction working are and access (Work No. 18A) | Work Nos. 17, 18, 19, 19A, 20 and 21 Cheshire and Chester West | 8-06, 8-08 | Temporary use as a construction working area (Work No. 18) | Work Nos. 18, 19, 19A, 20 and 21 Cheshire and Chester West | 8-09 | Temporary use as a construction access, compound and working area (Work Nos.19A and 19B) | Work Nos. 17, 18, 19, 19A, 20 and 21 Cheshire and Chester West | 8-14 | Temporary use as a construction access (Work No. 19C) | Work Nos. 20 and 21 Cheshire and Chester West | 9-02, 9-05, 9-06, 9-08, 9-11, 9-13 | Temporary use as a construction access and working area (as part of Work No. 22) | Work Nos. 19, 22, 23, 24 and 57G Cheshire and Chester West | 9-18 | Temporary use as a construction access (Work No. 23A) | Work Nos. 19, 22, 23 and 24 Cheshire and Chester West | 9-20 | Temporary use as a construction access and working area (as part of Work No. 23B) | Work Nos. 22, 23 and 24 Cheshire and Chester West | 9-23 | Temporary use as a construction access (as part of Work No.24A) | Work Nos. 24 and 25 Cheshire and Chester West | 10-04a | Temporary possession for traffic management | Work No. 25 Cheshire and Chester West | 10-14 10-15 | Temporary use as a construction access (as part of Work No.25) | Work Nos. 25, 26, 27, 28 Cheshire and Chester West | 10-17 | Temporary use as a construction access (Work No.28A) | Work Nos. 25, 26, 26A, 27, 28, 28A, 28B Cheshire and Chester West | 10-19 | Temporary use as a construction access and working area (as part of Work Nos.25, 26, 26A and 27 | Work Nos. 25, 26, 26A, 27 and 28 Cheshire and Chester West | 11-01, 11-02 | Temporary use as a construction access (Work No.28A) | Work Nos. 25, 26, 26A, 27, 28, 28A, 28B Flintshire | 12-12a, 12-13 | Temporary use as a construction compound and working area (as part of Work Nos. 29A and 30A) | Work Nos. 28, 29. 29A, 30 and 30A Flintshire | 12-15, 12-16, 12-17 | Temporary use as a construction access (Works No.30 and 30A) | Work Nos. 28, 29, 29A, 30 and 30A Flintshire | 13-14, 13-16 | Temporary use as a construction compound and working area (as part of Work No. 30D) | Work Nos. 30 and 31 Flintshire | 13-19 | Temporary use as a construction access (as part of Work No.30E) | Work Nos. 30 and 31 Flintshire | 14-01 | Temporary use as a construction compound and working area (as part of Work No. 30D) | Work Nos. 30 and 31 Flintshire | 14-14 | Temporary use as a construction compound and working area (as part of Work Nos. 31A and 31B) | Work Nos. 30, 31, 32 and 33 Flintshire | 14-23, 14-24, 14-25, 14-26, 14-27 | Temporary use as a construction access and working area (as part of Work No. 31B) | Work Nos. 30, 31, 31A, 32 and 33 Flintshire | 14-30a, 15-01a | Temporary use as a construction access (as part of Work No.33) | Work No. 33 Flintshire | 15-02 | Temporary use as a construction access and working area (as part of Work No.33) | Work Nos.32, 33 and 33A Flintshire | 16-01, 16-06, 16-06a, 16-07, 16-08, 16-09, 16-11 | Temporary use as a construction access and working area, and for diversion of public right of way and watercourse (as part of Work No. 34) | Work Nos. 33 and 34 Flintshire | 16-17 | Temporary use as a working area (as part of Work No. 34) | Work Nos. 34 and 35 Flintshire | 16-28 | Temporary use as a construction working area and access (Work No.35) | Work Nos. 35, 36, 36A and 37 Flintshire | 17-05 | Temporary use as a construction access and working area (as part of Work Nos. 35 and 36A) | Work Nos. 35, 36, 36A and 37 Flintshire | 17-09, 17-10 | Temporary use as a construction access (Work No.38A) | Work Nos. 35, 36, 36A and 37 Flintshire | 17-11 | Temporary use as a working area (as part of Work No. 38) | Work Nos. 37 and 38 Flintshire | 17-16 | Temporary use as a construction working area and access (as part of Work No.39B) | Work Nos. 38, 39, 40 and 57H Flintshire | 17-31 | Temporary use as a construction access (Work No.39A) | Work Nos. 39, 40 and 57H Flintshire | 17-35, 17-37, 17-38 | Temporary use as a construction access and working area (Work No. 40A) | Work Nos. 39, 40 and 57H Flintshire | 18-01 | Temporary use as a working area, access and public right of way diversion (as part of Work No. 40B) | Work Nos.40, 41 and 57I Flintshire | 18-13 | Temporary use as a construction compound, working area and access (as part of Work Nos. 41A and 41B) | Work Nos. 40, 41, 42 and 57I Flintshire | 18-16, 18-17 | Temporary use as a construction access and visibility splay (as part of Work No.41B) | Work Nos. 40, 41, 42 and 57I Flintshire | 19-04c | Temporary use as a working area (as part of Work No. 43D) | Work Nos. 42, 43, 57J and 57K Flintshire | 20-07 | Temporary use as a working area (as part of Work No. 44) | Work Nos. 44 and 57L Flintshire | 20-10, 20-10a | Temporary use as a construction access (as part of Work No.44B) | Work Nos. 44, 44A, 45, 46, 57L and 57M Flintshire | 20-16, 20-17 | Temporary use as a construction access (as part of Work No.46) | Work Nos. 44, 44A, 45 and 46 Flintshire | 20-19b | Temporary use as a construction access (as part of Work No.45) | Work Nos. 44, 45 and 45B Flintshire | 20-20 | Temporary use as a construction compound and working area (as part of Work Nos. 44C and 45A) | Work Nos. 44, 44A, 45, 46, 57L and 57M Flintshire | 21-03 | Temporary use as a construction access (Work No.47A) | Work No. 47 Flintshire | 21-07 | Temporary use as a construction access (Work No.47B) | Work No. 47 and 48 Flintshire | 22-02 | Temporary use as a working area and access (as part of Work No. 47) | Work Nos. 47 and 48 Flintshire | 22-04 | Temporary use for and to construct an access (Work No.49) | Work No. 47, 48 and 49 Flintshire | 25-03, 25-07, 25-08, 25-09 | Temporary use as a working area (as part of Work Nos. 51a, 51B and 52) | Work Nos. 51, 51A and 52 Flintshire | 27-02, 28-01 | Temporary use as a working area (as part of Work Nos. 53A and 53B) | Work Nos. 53, 53A and 54 Flintshire | 28-02 | Temporary use for and to construct an access (Work No.54) | Work Nos. 53, 53A and 54 Flintshire | 29-01 | Temporary use for and to construct an access (Work No.56) | Work Nos. 55, 55A and 56 Flintshire | 29-02 | Temporary use as a working area (as part of Work No. 55B) | Work Nos. 55, 55A and 56 Flintshire | 29-06 | Temporary use as a working area (as part of Work Nos. 55A and 55B) | Work Nos. 55, 55A and 56 PART 2 Land of which only temporary possession for access may be taken (1) Area | (2) Number of plot shown on land plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of authorised development Cheshire and Chester West | 2-06 | Temporary use for access (as part of Work No.5A) | Work Nos 2, 3, 4, 5 and 6 Cheshire and Chester West | 9-24, 9-25 | Temporary use as a construction access (as part of Work No.24A) | Work Nos. 24 and 25 Flintshire | 13-13, 13-15, 13-17, 13-18, 14-02, 14-03 | Temporary use as a construction access (as part of Work No.30E) | Work Nos. 30, 30D 31, 31A, 32 and 33 Flintshire | 17-34 | Temporary use for access (as part of Work No.40) | Work Nos. 39, 39A, 40, 40A, 41, 57H and 57I Flintshire | 19-06 | Temporary use as a construction access (as Work No.43C) | Work Nos. 42, 43, 44, 57J and 57K

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds