The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
31 Acquisition of land limited to subsoil lying more than 9 metres beneath surface
(1) This article applies to the land specified in Schedule 13 (land of which only subsoil more than 9 metres beneath surface may be acquired). (2) In the case of land to which this article applies, the undertaker may only acquire compulsorily under article 28 (compulsory acquisition of land) so much of, or such rights in, the subsoil of the land as may be required for the purposes of the authorised project. (3) Where the undertaker acquires any part of, or rights in, the subsoil of the land to which this article applies, the undertaker shall not be required to acquire a greater interest in the land or an interest in any other part of it. (4) References in this article to the subsoil of land are references to the subsoil lying more than 9 metres beneath the level of the surface of the land; and for this purpose “level of the surface of the land” means— (a) in the case of any land on which a building is erected, the level of the surface of the ground adjoining the building; (b) in the case of a watercourse or other water area, the level of the surface of the ground nearest to it which is at all times above water level; or (c) in any other case, ground surface level.
31 Acquisition of land limited to subsoil lying more than 9 metres beneath surface
(1) This article applies to the land specified in Schedule 13 (land of which only subsoil more than 9 metres beneath surface may be acquired). (2) In the case of land to which this article applies, the undertaker may only acquire compulsorily under article 28 (compulsory acquisition of land) so much of, or such rights in, the subsoil of the land as may be required for the purposes of the authorised project. (3) Where the undertaker acquires any part of, or rights in, the subsoil of the land to which this article applies, the undertaker shall not be required to acquire a greater interest in the land or an interest in any other part of it. (4) References in this article to the subsoil of land are references to the subsoil lying more than 9 metres beneath the level of the surface of the land; and for this purpose “level of the surface of the land” means— (a) in the case of any land on which a building is erected, the level of the surface of the ground adjoining the building; (b) in the case of a watercourse or other water area, the level of the surface of the ground nearest to it which is at all times above water level; or (c) in any other case, ground surface level.
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.