Channel Tunnel Rail Link Act 1996
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
1 Construction and maintenance of scheduled works.
(1) The nominated undertaker may construct and maintain the works specified in Schedule 1 to this Act (“the scheduled works”), being— (a) works for the construction of a railway between St. Pancras in London and the Channel Tunnel portal at Castle Hill, Folkestone, Kent, (b) works consequent on, or incidental to, the construction of the works mentioned in paragraph (a) above, and (c) works which can conveniently be carried out at the same time as works included in paragraph (a) or (b) above. (2) Subject to subsection (3) below, the scheduled works shall be constructed in the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited sections. (3) In constructing or maintaining any of the scheduled works, the nominated undertaker may— (a) deviate laterally from the lines or situations shown on the deposited plans to any extent within the limits of deviation for that work so shown, and (b) deviate vertically from the level shown for that work on the deposited sections— (i) to any extent not exceeding 3 metres upwards, and (ii) to any extent downwards.
1 Construction and maintenance of scheduled works.
(1) The nominated undertaker may construct and maintain the works specified in Schedule 1 to this Act (“the scheduled works”), being— (a) works for the construction of a railway between St. Pancras in London and the Channel Tunnel portal at Castle Hill, Folkestone, Kent, (b) works consequent on, or incidental to, the construction of the works mentioned in paragraph (a) above, and (c) works which can conveniently be carried out at the same time as works included in paragraph (a) or (b) above. (2) Subject to subsection (3) below, the scheduled works shall be constructed in the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited sections. (3) In constructing or maintaining any of the scheduled works, the nominated undertaker may— (a) deviate laterally from the lines or situations shown on the deposited plans to any extent within the limits of deviation for that work so shown, and (b) deviate vertically from the level shown for that work on the deposited sections— (i) to any extent not exceeding 3 metres upwards, and (ii) to any extent downwards.
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.