Propose a change

The A38 Derby Junctions Development Consent Order 2023

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 5 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Article 26 (1) | (2) | (3) Plot reference number shown on land plans | Purpose for which rights over land may be acquired | Relevant part of the authorised development Land Plans – Sheet 1 1/3a | Required for the establishment and maintenance of environmental mitigation and enhancement areas | Work No. 8 1/3b | Required for the establishment and maintenance of environmental mitigation and enhancement areas and the diversion and maintenance of and access to utilities and the establishment and maintenance of flood storage areas | Work No. 1, 8 and 9 1/4b | Required for the establishment of environmental mitigation and enhancement and the diversion and maintenance of and access to utilities | Work No. 8 and 9 Land Plans – Sheet 2 2/1b | Required for the diversion and maintenance of and access to utilities and the establishment and maintenance of environmental mitigation and enhancement | Work No. 8 and 9 2/1c | Required for the construction of a diverge slip road and for the establishment of environmental mitigation and enhancement areas and the construction of highway drainage attenuation | Work No. 2 and 8 2/1f | Required for the construction of a cycle track and the diversion and maintenance of and access to utilities | Work No. 3 and 9 2/1o | Required for the construction and reconfiguration of the junction between Lyttelton Street and Kingsway Park Close and the diversion and maintenance and access to utilities | Work No. 7 and 9 2/1p | Required for the construction and reconfiguration of the junction between Lyttelton Street and Kingsway Park Close and the diversion and maintenance and access to utilities | Work No. 7 and 9 2/7a and 2/8 | Required for the diversion construction and maintenance of a cycle track | Work No. 3 2/9 | Required for the construction and maintenance of a cycle track and the diversion and maintenance of and access to utilities | Work No. 3 and 9 2/13a | Required to construct a link road and the diversion and maintenance and access to utilities | Work No. 7 and 9 2/19a | Required to construct a link road and the diversion and maintenance of and access to utilities and the construction of footways | Work No. 7 and 9 2/19b | Required to construct a link road and the diversion and maintenance of and access to utilities and the reconfiguration of Lyttelton junction | Work No. 7 and 9 Land Plans – Sheet 3 3/1p and 3/1q | Required for the construction of a northbound diverge slip road and the diversion and maintenance of and access to utilities and the stopping up of the Enfield Road entry and exit roads | Work No. 11 and 22 3/1w and 3/1x | Required for the diversion and maintenance of and access to a utility corridor and construction of a new emergency access | Work No. 16 and 21 3/5a | Required for the alteration, realignment and grading of highway; the construction, improvement and realignment of cycle track and the diversion and maintenance of and access to utilities | Work No. 10, 15 and 22 3/9b | Required for alterations to the access to and egress from the filling station and fast-food site and the diversion and maintenance of utilities | Work No. 16 and 22 3/16a, 3/17 and 3/19 | Required for the construction and alteration of a private means of access | Work No. 16 3/22b | Required for the construction of a southbound diverge slip and alteration realignment and grading of highway and the construction and maintenance of a noise barrier and alterations to the access to and egress from the A52 to the Royal School for the Deaf | Work No. 13 and 16 Land Plans – Sheet 4 4/1b | Required for the diversion and maintenance of and access to a utility corridor and for the demolition of a footbridge and replacement of a footbridge | Work No. 10 and 21 4/1d | Required for the alteration, realignment and grading of a highway | Work No. 10, 21 and 22 4/7b | Required for the construction and maintenance of a noise barrier | Work No. 13 Land Plans – Sheet 6 6/2 | Required for the construction and maintenance of a flood plain compensation area and the diversion and maintenance of and access to utilities | Work No. 31 Land Plans – Sheet 7 7/5 | Required for the construction and maintenance of a flood plain compensation area and the diversion and maintenance of and access to utilities | Work No. 31 Land Plans – Sheet 8 8/6 | Required for the access construction and maintenance of a railbridge | Work No. 23 8/23b, 8/25c and 8/21 | Required for the diversion and maintenance of and access to utilities | Work No. 35 Land Plans – Sheet 9 9/6b | Required for the alteration, realignment and grading of northbound and southbound carriageways, the construction of a southbound diverge slip road and the diversion and maintenance of and access to utilities | Work No. 23, 26 and 35

Your change, as a redline

SCHEDULE 5 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Article 26 (1) | (2) | (3) Plot reference number shown on land plans | Purpose for which rights over land may be acquired | Relevant part of the authorised development Land Plans – Sheet 1 1/3a | Required for the establishment and maintenance of environmental mitigation and enhancement areas | Work No. 8 1/3b | Required for the establishment and maintenance of environmental mitigation and enhancement areas and the diversion and maintenance of and access to utilities and the establishment and maintenance of flood storage areas | Work No. 1, 8 and 9 1/4b | Required for the establishment of environmental mitigation and enhancement and the diversion and maintenance of and access to utilities | Work No. 8 and 9 Land Plans – Sheet 2 2/1b | Required for the diversion and maintenance of and access to utilities and the establishment and maintenance of environmental mitigation and enhancement | Work No. 8 and 9 2/1c | Required for the construction of a diverge slip road and for the establishment of environmental mitigation and enhancement areas and the construction of highway drainage attenuation | Work No. 2 and 8 2/1f | Required for the construction of a cycle track and the diversion and maintenance of and access to utilities | Work No. 3 and 9 2/1o | Required for the construction and reconfiguration of the junction between Lyttelton Street and Kingsway Park Close and the diversion and maintenance and access to utilities | Work No. 7 and 9 2/1p | Required for the construction and reconfiguration of the junction between Lyttelton Street and Kingsway Park Close and the diversion and maintenance and access to utilities | Work No. 7 and 9 2/7a and 2/8 | Required for the diversion construction and maintenance of a cycle track | Work No. 3 2/9 | Required for the construction and maintenance of a cycle track and the diversion and maintenance of and access to utilities | Work No. 3 and 9 2/13a | Required to construct a link road and the diversion and maintenance and access to utilities | Work No. 7 and 9 2/19a | Required to construct a link road and the diversion and maintenance of and access to utilities and the construction of footways | Work No. 7 and 9 2/19b | Required to construct a link road and the diversion and maintenance of and access to utilities and the reconfiguration of Lyttelton junction | Work No. 7 and 9 Land Plans – Sheet 3 3/1p and 3/1q | Required for the construction of a northbound diverge slip road and the diversion and maintenance of and access to utilities and the stopping up of the Enfield Road entry and exit roads | Work No. 11 and 22 3/1w and 3/1x | Required for the diversion and maintenance of and access to a utility corridor and construction of a new emergency access | Work No. 16 and 21 3/5a | Required for the alteration, realignment and grading of highway; the construction, improvement and realignment of cycle track and the diversion and maintenance of and access to utilities | Work No. 10, 15 and 22 3/9b | Required for alterations to the access to and egress from the filling station and fast-food site and the diversion and maintenance of utilities | Work No. 16 and 22 3/16a, 3/17 and 3/19 | Required for the construction and alteration of a private means of access | Work No. 16 3/22b | Required for the construction of a southbound diverge slip and alteration realignment and grading of highway and the construction and maintenance of a noise barrier and alterations to the access to and egress from the A52 to the Royal School for the Deaf | Work No. 13 and 16 Land Plans – Sheet 4 4/1b | Required for the diversion and maintenance of and access to a utility corridor and for the demolition of a footbridge and replacement of a footbridge | Work No. 10 and 21 4/1d | Required for the alteration, realignment and grading of a highway | Work No. 10, 21 and 22 4/7b | Required for the construction and maintenance of a noise barrier | Work No. 13 Land Plans – Sheet 6 6/2 | Required for the construction and maintenance of a flood plain compensation area and the diversion and maintenance of and access to utilities | Work No. 31 Land Plans – Sheet 7 7/5 | Required for the construction and maintenance of a flood plain compensation area and the diversion and maintenance of and access to utilities | Work No. 31 Land Plans – Sheet 8 8/6 | Required for the access construction and maintenance of a railbridge | Work No. 23 8/23b, 8/25c and 8/21 | Required for the diversion and maintenance of and access to utilities | Work No. 35 Land Plans – Sheet 9 9/6b | Required for the alteration, realignment and grading of northbound and southbound carriageways, the construction of a southbound diverge slip road and the diversion and maintenance of and access to utilities | Work No. 23, 26 and 35

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds