The Cambridge Waste Water Treatment Plant Relocation Order 2025
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 14 PARAMETERS
Article 6 PART 1 TERMINAL PUMPING STATION (WORK No. 16) (1) Item | (2) Maximum design parameter Finished ground level (FGL) (+ or – 0.5m) | 9.5m Above Ordnance Datum (AOD) Invert level (lowest internal point) of incoming sewer | -13.0m AOD (22.5m below FGL) Depth of terminal pumping station | No deeper than 25.5m below AOD (35m below FGL) including lowest point of piles Height of terminal pumping station | Up to 11.5m AOD (2m above FGL) Configuration | Circular 24m external diameter Maximum flow capacity | 7,000 l/s Overall footprint of terminal pumping station area | 65m x 115m PART 2 STORM TANKS (WORK No. 14) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9.5m AOD Storm tank area | 71m long x 54m wide Depth | 4.5m AOD (5m below FGL) Foundations | -15.5m AOD (25m below FGL) Height | 14.5m AOD (5m above FGL) Stormwater storage capacity | No less than 20,400m3 PART 3 INLET WORKS (WORK No. 4) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9.5m AOD Elevated screen channel – configuration | 12m wide x 3m deep x 60m long Elevated grit removal chambers – configuration | 16m wide x 3m deep x 17m long Elevated flow measurement channel – configuration | 5m wide x 3m deep x 22m long Inlet works - Height | 17.5m AOD (8m above FGL) Inlet works - Depth | 7.5m AOD (2m below FGL) to underside of structure Inlet works - Foundations | -15.5m AOD (25m below FGL) Screenings handling plant | 12m x 9m Screenings handling plant height | 13.5m AOD (4m above FGL) Number of screenings handling plant | 2 No. Grit handling plant | 8m x 3m Grit handling plant height | 13.5m AOD (4m above FGL) Footprint of odour control unit | 20m x 10m Odour control unit diameter | 5m Odour control unit height | 14.5m AOD (5m above FGL) Number of odour control units | 2 No. Number of odour control unit exhaust stacks | 2 No. Carbon vessel height | 13.5m AOD (4m above FGL) Odour control unit exhaust stack height | 25.5m AOD (16m above FGL) Overall footprint of inlet works area | 90m x 75m PART 4 PRIMARY SETTLEMENT TANKS (WORK No. 6) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9.5m AOD Total surface area of circular or rectangular primary settlement tanks | 6,451m2 Number of primary settlement tanks | 6 No. Depth | 1.5m AOD (8m below FGL) Foundations | Piles to a depth of -15.5m AOD (25m below FGL) Height | 15.5m AOD (6m above FGL) Overall footprint of primary settlement tanks area | 175m x 115m Ferric dosing plant area including kiosk | 20m x 5m Ferric dosing plant: height | 14.5m AOD (5m above FGL) PART 5 ACTIVATED SLUDGE PROCESS TANKS (WORK No. 10) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9m AOD Area of individual activated sludge process tanks | Reactor – 20m wide x 90m long Number of reactor tanks | 4 No. Area of mixing and conditioning tank | 25m wide x 25m long Area of interstage pumping station | 25m x 15m Depth of activated sludge process tanks, mixing and conditioning tank and interstage pumping station | 3m AOD (6m below FGL) Height of activated sludge process tanks, mixing and conditioning tank and interstage pumping station | 17m AOD (8m above FGL) Foundation depth of overall activated sludge process area | -16m AOD (25m below FGL) Blower Building – height | 14m AOD (5m above FGL) Blower Building footprint | 25m x 15m Overall footprint of activated sludge process area | 115m x 135m PART 6 FINAL SETTLEMENT TANKS (WORK No. 11) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9m AOD Configuration of individual final settlement tanks | 8 No. circular tanks each with a 39m diameter Depth | 4m AOD (5m below FGL) Foundations | Piles to a depth of -16m AOD (25m below FGL) Height | 18m AOD (9m above FGL) Return activated sludge/surplus activated sludge pumps | 18 No. Overall footprint of final settlement tanks including combined return activated sludge/surplus activated sludge pumping station | 130m x 225m PART 7 TERTIARY TREATMENT PLANT (WORK No. 13) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9.5m AOD Depth of filtration plant | 4.5m AOD (5m below FGL) Foundation depth | -15.5m AOD (25m below FGL) Height of filtration plant | 19.5m AOD (10m above FGL) Ferric dosing plant area | 20m x 12m Ferric dosing plant: height | 17m AOD (7.5m above FGL) Overall footprint of tertiary treatment plant | 60m x 40m PART 8 SLUDGE STORAGE CAPACITY (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD Imported and indigenous primary sludge tanks | 2 | Maximum sludge capacity of 1,295m3 each Subject to maximum sludge capacity, maximum 16.5m diameter | Subject to maximum sludge capacity, 17.5m AOD (8.5m above FGL) Foundation depth | Piles to a depth of -16m AOD (25m below FGL) Un-thickened sludge tanks | 3 | Maximum sludge capacity of 1,327m3 each Subject to maximum sludge capacity, maximum 16.5m diameter | Subject to maximum sludge capacity, 17.5m AOD (8.5m above FGL) Foundation depth | Piles to a depth of -16m AOD (25m below FGL) Imports and screening area | 80m x 50m | 17.5m AOD (8.5m above FGL) (excluding vent stack, see Part 10 below) PART 9 THICKENING EQUIPMENT (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD Building to house thickening equipment | 1 | 28m x 18m | 19m AOD (10m above FGL) Foundations | Piles to a depth of -16m AOD (25m below FGL) Thickened sludge blending tank | 1 | Maximum sludge capacity of 800m3 Subject to maximum sludge capacity, maximum 11.5m diameter | Subject to maximum sludge capacity, 19m AOD (10m above FGL) Overall footprint of thickening area | 70m x 25m | 19m AOD (10m above FGL) Foundations | Piles to a depth of -16m AOD (25m below FGL) PART 10 ODOUR CONTROL PLANT (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD Sludge treatment centre odour control unit 1 | 1 | 20m x 10m | Vent stack 25m AOD (16m above FGL) Sludge treatment centre odour control unit 2 | 1 | 20m x 10m | Vent stack 25m AOD (16m above FGL) PART 11 DIGESTERS (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum diameter | (5) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD Digesters capacity | 2 | 4,900m3 | 22m | 30.4m AOD (21.4m above FGL) Post digestion storage capacity | 2 | 400m3 | 8.5m | 18.5m AOD (9.5m above FGL) Heating, pasteurisation and hydrolysis (HpH) heating tank capacity | 1 | 400m3 | 7m | 24m AOD (15m above FGL) Heating, pasteurisation and hydrolysis (HpH) pasteurisation tank capacity | 2 | 400m3 | 7m | 24m AOD (15m above FGL) Heating, pasteurisation and hydrolysis (HpH) hydrolysis tank capacity | 1 | 1,500m3 | 14m | 24m AOD (15m above FGL) Overall footprint of digestion plant area | 100m x 60m | 30.4m AOD (21.4m above FGL) Depth of piled foundations | -16 AOD (25m below FGL) | – PART 12 CAKE DEWATERING AND STORAGE (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum height Finished ground level (+ or – 0.5m) | – | – | 9m AOD Cake storage barn or silo | 1 | 30m x 40m | 18m AOD (9m above FGL) Dewatering centrifuges/volutes | 2 | 20m x 20m | Gantry height 17m AOD (8m above FGL) Foundation depth | Piles to a depth of -16m AOD (25m below FGL) Overall footprint of dewatering and cake storage area | – | 60m x 50m (9m above FGL) PART 13 LIQUOR TREATMENT PLANT (WORK No. 8) (1) Item | (2) Maximum design parameter | (3) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD | – Reactor | 25m diameter | 18m AOD (9m above FGL) Stilling tank | 5m diameter | 18m AOD (9m above FGL) Settlement tank | 15m diameter | 18m AOD (9m above FGL) Foundation depth | Piles to a depth of -16m AOD (25m below FGL) Total area of liquor treatment plant | 75m x 40m | 18m AOD (9m above FGL) PART 14 NUTRIENT RECOVERY OPTION (WORK No. 8) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9m AOD Number of stripping/scrubbing columns | 3 No. Stripping/scrubbing column heights | 27m AOD (18m above FGL) Stripping/scrubbing column diameters | 3m Feed pumping station – depth | 4m AOD (5m below FGL) Foundation depth | Piles to a depth of -16m AOD (25m below FGL) Total Area | 50m x 50m Total height | 27m AOD (18m above FGL) PART 15 GAS HANDLING EQUIPMENT OPTIONS (WORK Nos. 8 and 9) (1) Item | (2) Number | (3) Maximum design parameters | (4) Maximum height | (5) Maximum Capacity Finished ground level (+ or – 0.5m) | – | – | 9m AOD | – Gas holder/gas bag (Work No. 8) | 1 | 17m diameter | 29m AOD (20m above FGL) including lightning protection | 2,000m3 Flare stack (Work No. 8) | 1 | 24m AOD (15m above FGL) | 2,000m3/hr Footprint of biogas storage and operational area (Work No. 8) | 170m x 50m Foundation depth | Piles to a depth of -16m AOD (25m below FGL) EITHER Biogas upgrading plant (Work No. 9) | 1 | 50m x 50m | 21m AOD (12m above FGL) | 1,000m3/hr OR Combined heat and power (CHP) plant (Work No. 9) | 2 CHP engines | 50m x 50m | 33m AOD (24m above FGL) stack combined with boiler flue (see Part 16 below) | 1.5 MW thermal input per CHP engine (total maximum 3MWth) PART 16 STEAM RAISING BOILER (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD Boiler building | 1 | 20m x 20m | 17.5m AOD (8.5m above FGL) Boiler stack | 1 | 2m diameter plus access platform | Stack 33m AOD (24m above FGL) Overall footprint of boiler plant | 35m x 25m Boiler capacity | 2 | 3.5MWth each, one operational, one standby, total maximum 7MWth Foundation depth | Piles to a depth of -16m AOD (25m below FGL) PART 17 INTERNAL ROADS (FURTHER WORKS WITHIN THE INNER BOUNDARY OF WORK No. 15) (1) Item | (2) Maximum design parameter Width of two way roads | 8m wide Width of one way roads | 4m wide Total area of internal roads | 35,500m2 PART 18 BUILDINGS AND OTHER FACILITIES (WORK Nos. 3, 7, 19 and FURTHER WORKS) (1) Item | (2) Main parameters | (3) Maximum height Gateway building (Work No. 19) | 58.2m x 17.1m | 18.5m AOD (9m above FGL) Piled foundations to a depth of -15.5m AOD (25m below FGL) Workshop building (Work No. 7) | 55m x 16m | 19.5m AOD (10m above FGL) Piled foundations to a depth of -15.5m AOD (25m below FGL) District Network Operator (DNO) enclosure (Work No. 19) | 5m x 10m | 12.5m AOD (3m above FGL) Vehicle parking (Work Nos. 3, 7 and Further Works) | 4,000m2 | N/A 56 staff (including LGVs); 7 HGVs; 3 trailers; 12 visitor vehicle parking spaces (including two disabled spaces); 1 visitor coach parking space Provision for 50 bicycles PART 19 CONSTRUCTION COMPOUNDS (WORK Nos. 18, 25, 28, 32 and 34) (1) Item | (2) Maximum design parameter Existing Cambridge waste water treatment plant tunnel interception shaft (shaft 1)/pipe jack reception shaft (shaft 2) (Work Nos. 18 and 25) | 60m x 130m Pipe jack intermediate shaft 3 (Work No. 28) | 64m x 60m Pipe jack intermediate shaft 4 (Work No. 28) | 64m x 60m Pipe jack intermediate shaft 5 (Work No. 28) | 64m x 60m Riverside compound for treated effluent discharge point (Work No. 32) | 40m x 25m Waterbeach Primary Compound located at the North end of the pipeline (Work No. 34) | 100m x 100m Additional transient compounds along the Waterbeach pipeline at 1km spacing between the Main Construction Compound and the Primary Compound (Work No. 34) | 80m x 20m PART 20 TRANSFER TUNNEL (WORK Nos. 18 and 27) (1) Item | (2) Diameter | (3) Height | (4) Depth to Invert (+ or – 0.5m) | (5) Existing and finished ground level (+ or – 0.5m) Shaft 1 (interception shaft) (Work No. 18) | Maximum 9m | - | -11.0m AOD (18m below FGL) | 7m AOD (0m above FGL) Shaft 1 vent stack and odour control height (Work No. 18) | 17m AOD (10m above FGL) | 6m AOD (1m below FGL) | 7m AOD (0m above FGL) Shaft 2 (Work No. 18) | 12m | - | -11.0m AOD (18m below FGL) | 7m AOD (0m above FGL) Shaft 1 and 2 combined option (Work No. 18) | Remaining shaft 9m – temporary excavation 20m x 10m | - | -11.0m AOD (18m below FGL) | 7m AOD (0m above FGL) Shaft 3 (Work No. 27) | 12.5m | - | -11.5m AOD (21m below FGL) | 9.5m AOD (0m above FGL) Shaft 4 (Work No. 27) | 9.0m | - | -12.0m AOD (21m below FGL) | 9.0m AOD (0m above FGL) Shaft 5 (Work No. 27) | 12.5m | - | -12.5m AOD (23.5m below FGL) | 11.0m AOD (0m above FGL) PART 21 OUTFALL STRUCTURE (WORK No. 32) (1) Item | (2) Length/dimensions (+ or – 0.5m) | (3) Depth to invert (+ or – 0.5m) | (4) Existing and finished ground level (+ or – 0.5m) Finished ground level (+ or – 0.5m) | 4.5m AOD (0m above FGL) Outfall structure | 12m long x 7m wide x 5m deep | 0.5m AOD (4m below FGL) | 4.5m AOD (0m above FGL) North Sheet piled protection | 20m | -5.0m AOD (9.5m below FGL) | 4.5m AOD (0m above FGL) South Sheet piled protection | 35m | -5.0m AOD (10.5m below FGL) | 5.5m AOD (0m above FGL) PART 22 SOLAR INSTALLATION (WORK Nos. 7, 15 and 19) (1) Item | (2) Maximum area | (3) Minimum area Total solar installation | 7.0 Hectares | 0.0 Hectares PART 23 HEIGHTS OF SLIM STRUCTURES NOT INCLUDED IN OTHER PARTS (1) Item | (2) Height | (3) Existing and finished Ground level (+ or – 0.5m) Heights of crane jibs during construction (all Work Nos.) | 50m above existing ground level equating to 60.0m AOD | No greater than 10.0m AOD Lighting columns (Work Nos. 2, 3 and further works) | 15m AOD (5m above FGL) | No greater than 10.0m AOD PART 24 PARAPET OVER THE A14 (WORK No. 1) (1) Item | (2) Height Equestrian parapet over the A14 forming part of the highway works within Work No. 1 | 1.8m
SCHEDULE 14 PARAMETERS
Article 6 PART 1 TERMINAL PUMPING STATION (WORK No. 16) (1) Item | (2) Maximum design parameter Finished ground level (FGL) (+ or – 0.5m) | 9.5m Above Ordnance Datum (AOD) Invert level (lowest internal point) of incoming sewer | -13.0m AOD (22.5m below FGL) Depth of terminal pumping station | No deeper than 25.5m below AOD (35m below FGL) including lowest point of piles Height of terminal pumping station | Up to 11.5m AOD (2m above FGL) Configuration | Circular 24m external diameter Maximum flow capacity | 7,000 l/s Overall footprint of terminal pumping station area | 65m x 115m PART 2 STORM TANKS (WORK No. 14) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9.5m AOD Storm tank area | 71m long x 54m wide Depth | 4.5m AOD (5m below FGL) Foundations | -15.5m AOD (25m below FGL) Height | 14.5m AOD (5m above FGL) Stormwater storage capacity | No less than 20,400m3 PART 3 INLET WORKS (WORK No. 4) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9.5m AOD Elevated screen channel – configuration | 12m wide x 3m deep x 60m long Elevated grit removal chambers – configuration | 16m wide x 3m deep x 17m long Elevated flow measurement channel – configuration | 5m wide x 3m deep x 22m long Inlet works - Height | 17.5m AOD (8m above FGL) Inlet works - Depth | 7.5m AOD (2m below FGL) to underside of structure Inlet works - Foundations | -15.5m AOD (25m below FGL) Screenings handling plant | 12m x 9m Screenings handling plant height | 13.5m AOD (4m above FGL) Number of screenings handling plant | 2 No. Grit handling plant | 8m x 3m Grit handling plant height | 13.5m AOD (4m above FGL) Footprint of odour control unit | 20m x 10m Odour control unit diameter | 5m Odour control unit height | 14.5m AOD (5m above FGL) Number of odour control units | 2 No. Number of odour control unit exhaust stacks | 2 No. Carbon vessel height | 13.5m AOD (4m above FGL) Odour control unit exhaust stack height | 25.5m AOD (16m above FGL) Overall footprint of inlet works area | 90m x 75m PART 4 PRIMARY SETTLEMENT TANKS (WORK No. 6) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9.5m AOD Total surface area of circular or rectangular primary settlement tanks | 6,451m2 Number of primary settlement tanks | 6 No. Depth | 1.5m AOD (8m below FGL) Foundations | Piles to a depth of -15.5m AOD (25m below FGL) Height | 15.5m AOD (6m above FGL) Overall footprint of primary settlement tanks area | 175m x 115m Ferric dosing plant area including kiosk | 20m x 5m Ferric dosing plant: height | 14.5m AOD (5m above FGL) PART 5 ACTIVATED SLUDGE PROCESS TANKS (WORK No. 10) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9m AOD Area of individual activated sludge process tanks | Reactor – 20m wide x 90m long Number of reactor tanks | 4 No. Area of mixing and conditioning tank | 25m wide x 25m long Area of interstage pumping station | 25m x 15m Depth of activated sludge process tanks, mixing and conditioning tank and interstage pumping station | 3m AOD (6m below FGL) Height of activated sludge process tanks, mixing and conditioning tank and interstage pumping station | 17m AOD (8m above FGL) Foundation depth of overall activated sludge process area | -16m AOD (25m below FGL) Blower Building – height | 14m AOD (5m above FGL) Blower Building footprint | 25m x 15m Overall footprint of activated sludge process area | 115m x 135m PART 6 FINAL SETTLEMENT TANKS (WORK No. 11) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9m AOD Configuration of individual final settlement tanks | 8 No. circular tanks each with a 39m diameter Depth | 4m AOD (5m below FGL) Foundations | Piles to a depth of -16m AOD (25m below FGL) Height | 18m AOD (9m above FGL) Return activated sludge/surplus activated sludge pumps | 18 No. Overall footprint of final settlement tanks including combined return activated sludge/surplus activated sludge pumping station | 130m x 225m PART 7 TERTIARY TREATMENT PLANT (WORK No. 13) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9.5m AOD Depth of filtration plant | 4.5m AOD (5m below FGL) Foundation depth | -15.5m AOD (25m below FGL) Height of filtration plant | 19.5m AOD (10m above FGL) Ferric dosing plant area | 20m x 12m Ferric dosing plant: height | 17m AOD (7.5m above FGL) Overall footprint of tertiary treatment plant | 60m x 40m PART 8 SLUDGE STORAGE CAPACITY (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD Imported and indigenous primary sludge tanks | 2 | Maximum sludge capacity of 1,295m3 each Subject to maximum sludge capacity, maximum 16.5m diameter | Subject to maximum sludge capacity, 17.5m AOD (8.5m above FGL) Foundation depth | Piles to a depth of -16m AOD (25m below FGL) Un-thickened sludge tanks | 3 | Maximum sludge capacity of 1,327m3 each Subject to maximum sludge capacity, maximum 16.5m diameter | Subject to maximum sludge capacity, 17.5m AOD (8.5m above FGL) Foundation depth | Piles to a depth of -16m AOD (25m below FGL) Imports and screening area | 80m x 50m | 17.5m AOD (8.5m above FGL) (excluding vent stack, see Part 10 below) PART 9 THICKENING EQUIPMENT (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD Building to house thickening equipment | 1 | 28m x 18m | 19m AOD (10m above FGL) Foundations | Piles to a depth of -16m AOD (25m below FGL) Thickened sludge blending tank | 1 | Maximum sludge capacity of 800m3 Subject to maximum sludge capacity, maximum 11.5m diameter | Subject to maximum sludge capacity, 19m AOD (10m above FGL) Overall footprint of thickening area | 70m x 25m | 19m AOD (10m above FGL) Foundations | Piles to a depth of -16m AOD (25m below FGL) PART 10 ODOUR CONTROL PLANT (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD Sludge treatment centre odour control unit 1 | 1 | 20m x 10m | Vent stack 25m AOD (16m above FGL) Sludge treatment centre odour control unit 2 | 1 | 20m x 10m | Vent stack 25m AOD (16m above FGL) PART 11 DIGESTERS (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum diameter | (5) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD Digesters capacity | 2 | 4,900m3 | 22m | 30.4m AOD (21.4m above FGL) Post digestion storage capacity | 2 | 400m3 | 8.5m | 18.5m AOD (9.5m above FGL) Heating, pasteurisation and hydrolysis (HpH) heating tank capacity | 1 | 400m3 | 7m | 24m AOD (15m above FGL) Heating, pasteurisation and hydrolysis (HpH) pasteurisation tank capacity | 2 | 400m3 | 7m | 24m AOD (15m above FGL) Heating, pasteurisation and hydrolysis (HpH) hydrolysis tank capacity | 1 | 1,500m3 | 14m | 24m AOD (15m above FGL) Overall footprint of digestion plant area | 100m x 60m | 30.4m AOD (21.4m above FGL) Depth of piled foundations | -16 AOD (25m below FGL) | – PART 12 CAKE DEWATERING AND STORAGE (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum height Finished ground level (+ or – 0.5m) | – | – | 9m AOD Cake storage barn or silo | 1 | 30m x 40m | 18m AOD (9m above FGL) Dewatering centrifuges/volutes | 2 | 20m x 20m | Gantry height 17m AOD (8m above FGL) Foundation depth | Piles to a depth of -16m AOD (25m below FGL) Overall footprint of dewatering and cake storage area | – | 60m x 50m (9m above FGL) PART 13 LIQUOR TREATMENT PLANT (WORK No. 8) (1) Item | (2) Maximum design parameter | (3) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD | – Reactor | 25m diameter | 18m AOD (9m above FGL) Stilling tank | 5m diameter | 18m AOD (9m above FGL) Settlement tank | 15m diameter | 18m AOD (9m above FGL) Foundation depth | Piles to a depth of -16m AOD (25m below FGL) Total area of liquor treatment plant | 75m x 40m | 18m AOD (9m above FGL) PART 14 NUTRIENT RECOVERY OPTION (WORK No. 8) (1) Item | (2) Maximum design parameter Finished ground level (+ or – 0.5m) | 9m AOD Number of stripping/scrubbing columns | 3 No. Stripping/scrubbing column heights | 27m AOD (18m above FGL) Stripping/scrubbing column diameters | 3m Feed pumping station – depth | 4m AOD (5m below FGL) Foundation depth | Piles to a depth of -16m AOD (25m below FGL) Total Area | 50m x 50m Total height | 27m AOD (18m above FGL) PART 15 GAS HANDLING EQUIPMENT OPTIONS (WORK Nos. 8 and 9) (1) Item | (2) Number | (3) Maximum design parameters | (4) Maximum height | (5) Maximum Capacity Finished ground level (+ or – 0.5m) | – | – | 9m AOD | – Gas holder/gas bag (Work No. 8) | 1 | 17m diameter | 29m AOD (20m above FGL) including lightning protection | 2,000m3 Flare stack (Work No. 8) | 1 | 24m AOD (15m above FGL) | 2,000m3/hr Footprint of biogas storage and operational area (Work No. 8) | 170m x 50m Foundation depth | Piles to a depth of -16m AOD (25m below FGL) EITHER Biogas upgrading plant (Work No. 9) | 1 | 50m x 50m | 21m AOD (12m above FGL) | 1,000m3/hr OR Combined heat and power (CHP) plant (Work No. 9) | 2 CHP engines | 50m x 50m | 33m AOD (24m above FGL) stack combined with boiler flue (see Part 16 below) | 1.5 MW thermal input per CHP engine (total maximum 3MWth) PART 16 STEAM RAISING BOILER (WORK No. 8) (1) Item | (2) Number | (3) Maximum design parameter | (4) Maximum height Finished ground level (+ or – 0.5m) | 9m AOD Boiler building | 1 | 20m x 20m | 17.5m AOD (8.5m above FGL) Boiler stack | 1 | 2m diameter plus access platform | Stack 33m AOD (24m above FGL) Overall footprint of boiler plant | 35m x 25m Boiler capacity | 2 | 3.5MWth each, one operational, one standby, total maximum 7MWth Foundation depth | Piles to a depth of -16m AOD (25m below FGL) PART 17 INTERNAL ROADS (FURTHER WORKS WITHIN THE INNER BOUNDARY OF WORK No. 15) (1) Item | (2) Maximum design parameter Width of two way roads | 8m wide Width of one way roads | 4m wide Total area of internal roads | 35,500m2 PART 18 BUILDINGS AND OTHER FACILITIES (WORK Nos. 3, 7, 19 and FURTHER WORKS) (1) Item | (2) Main parameters | (3) Maximum height Gateway building (Work No. 19) | 58.2m x 17.1m | 18.5m AOD (9m above FGL) Piled foundations to a depth of -15.5m AOD (25m below FGL) Workshop building (Work No. 7) | 55m x 16m | 19.5m AOD (10m above FGL) Piled foundations to a depth of -15.5m AOD (25m below FGL) District Network Operator (DNO) enclosure (Work No. 19) | 5m x 10m | 12.5m AOD (3m above FGL) Vehicle parking (Work Nos. 3, 7 and Further Works) | 4,000m2 | N/A 56 staff (including LGVs); 7 HGVs; 3 trailers; 12 visitor vehicle parking spaces (including two disabled spaces); 1 visitor coach parking space Provision for 50 bicycles PART 19 CONSTRUCTION COMPOUNDS (WORK Nos. 18, 25, 28, 32 and 34) (1) Item | (2) Maximum design parameter Existing Cambridge waste water treatment plant tunnel interception shaft (shaft 1)/pipe jack reception shaft (shaft 2) (Work Nos. 18 and 25) | 60m x 130m Pipe jack intermediate shaft 3 (Work No. 28) | 64m x 60m Pipe jack intermediate shaft 4 (Work No. 28) | 64m x 60m Pipe jack intermediate shaft 5 (Work No. 28) | 64m x 60m Riverside compound for treated effluent discharge point (Work No. 32) | 40m x 25m Waterbeach Primary Compound located at the North end of the pipeline (Work No. 34) | 100m x 100m Additional transient compounds along the Waterbeach pipeline at 1km spacing between the Main Construction Compound and the Primary Compound (Work No. 34) | 80m x 20m PART 20 TRANSFER TUNNEL (WORK Nos. 18 and 27) (1) Item | (2) Diameter | (3) Height | (4) Depth to Invert (+ or – 0.5m) | (5) Existing and finished ground level (+ or – 0.5m) Shaft 1 (interception shaft) (Work No. 18) | Maximum 9m | - | -11.0m AOD (18m below FGL) | 7m AOD (0m above FGL) Shaft 1 vent stack and odour control height (Work No. 18) | 17m AOD (10m above FGL) | 6m AOD (1m below FGL) | 7m AOD (0m above FGL) Shaft 2 (Work No. 18) | 12m | - | -11.0m AOD (18m below FGL) | 7m AOD (0m above FGL) Shaft 1 and 2 combined option (Work No. 18) | Remaining shaft 9m – temporary excavation 20m x 10m | - | -11.0m AOD (18m below FGL) | 7m AOD (0m above FGL) Shaft 3 (Work No. 27) | 12.5m | - | -11.5m AOD (21m below FGL) | 9.5m AOD (0m above FGL) Shaft 4 (Work No. 27) | 9.0m | - | -12.0m AOD (21m below FGL) | 9.0m AOD (0m above FGL) Shaft 5 (Work No. 27) | 12.5m | - | -12.5m AOD (23.5m below FGL) | 11.0m AOD (0m above FGL) PART 21 OUTFALL STRUCTURE (WORK No. 32) (1) Item | (2) Length/dimensions (+ or – 0.5m) | (3) Depth to invert (+ or – 0.5m) | (4) Existing and finished ground level (+ or – 0.5m) Finished ground level (+ or – 0.5m) | 4.5m AOD (0m above FGL) Outfall structure | 12m long x 7m wide x 5m deep | 0.5m AOD (4m below FGL) | 4.5m AOD (0m above FGL) North Sheet piled protection | 20m | -5.0m AOD (9.5m below FGL) | 4.5m AOD (0m above FGL) South Sheet piled protection | 35m | -5.0m AOD (10.5m below FGL) | 5.5m AOD (0m above FGL) PART 22 SOLAR INSTALLATION (WORK Nos. 7, 15 and 19) (1) Item | (2) Maximum area | (3) Minimum area Total solar installation | 7.0 Hectares | 0.0 Hectares PART 23 HEIGHTS OF SLIM STRUCTURES NOT INCLUDED IN OTHER PARTS (1) Item | (2) Height | (3) Existing and finished Ground level (+ or – 0.5m) Heights of crane jibs during construction (all Work Nos.) | 50m above existing ground level equating to 60.0m AOD | No greater than 10.0m AOD Lighting columns (Work Nos. 2, 3 and further works) | 15m AOD (5m above FGL) | No greater than 10.0m AOD PART 24 PARAPET OVER THE A14 (WORK No. 1) (1) Item | (2) Height Equestrian parapet over the A14 forming part of the highway works within Work No. 1 | 1.8m
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.