Propose a change

Title 37 Public Utilities

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

37-16-104. Safety and performance requirements.

(a) A net metering system used by a customer-generator shall meet all applicable safety and performance standards established by the national electrical code, the institute of electrical and electronics engineers and underwriters laboratories. (b) The customer-generator shall at its expense provide lockable, switching equipment capable of isolating the net metering facility from the electric utility's system. Such equipment shall be approved by the electric utility and shall be accessible by the electric utility at all times. (c) The electric utility shall not be liable directly or indirectly for permitting or continuing to allow an attachment of a net metering facility, or for acts or omissions of the customer-generator that cause loss or injury, including death, to any third party. (d) The customer-generator is responsible for all costs associated with its facility and is also responsible for all costs related to any modifications to the facility that may be required by the electric utility for purposes of safety and reliability. (e) The commission, after appropriate notice and opportunity for comment, may adopt by regulation additional control and testing requirements for customer-generators that the commission determines are necessary to protect public safety and system reliability.

Your change, as a redline

37-16-104. Safety and performance requirements.

(a) A net metering system used by a customer-generator shall meet all applicable safety and performance standards established by the national electrical code, the institute of electrical and electronics engineers and underwriters laboratories. (b) The customer-generator shall at its expense provide lockable, switching equipment capable of isolating the net metering facility from the electric utility's system. Such equipment shall be approved by the electric utility and shall be accessible by the electric utility at all times. (c) The electric utility shall not be liable directly or indirectly for permitting or continuing to allow an attachment of a net metering facility, or for acts or omissions of the customer-generator that cause loss or injury, including death, to any third party. (d) The customer-generator is responsible for all costs associated with its facility and is also responsible for all costs related to any modifications to the facility that may be required by the electric utility for purposes of safety and reliability. (e) The commission, after appropriate notice and opportunity for comment, may adopt by regulation additional control and testing requirements for customer-generators that the commission determines are necessary to protect public safety and system reliability.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it