The Associated British Ports (Immingham Green Energy Terminal) Order 2025
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 12 LAND IN WHICH ONLY NEW RIGHTS AND RESTRICTIVE COVENANTS, ETC. MAY BE ACQUIRED
Article 24 (1) Land Plans - Sheet | (2) Plot reference number shown on land plans | (3) Purpose for which rights over land may be acquired or restrictive covenants imposed | (4) Relevant part of the authorised project 4 | 4/17 | The right to enter and remain upon the land for the purposes of the installation, operation, use, maintenance and decommissioning of the authorised project and to— pass re-pass with or without vehicles machinery plant and equipment to construct lay maintain retain and use apparatus; break up or open the surface construct, lay maintain retain and use apparatus together with ancillary equipment including cathodic protection to include installation by way of directional drilling; construct maintain retain and use matting, trackways and hard standings for the purposes of access to construct lay and maintain apparatus and associated works, plant and equipment, and to restore and re-instate the land to its prior condition following the use of the new rights; remove, store and stockpile topsoil and subsoil, employ water barriers and pumping equipment, remove materials and to restore and re-instate the land to its prior condition; erect, maintain and remove temporary fencing for site safety and to create, retain and remove temporary secure works compounds within that part of the land over which the new rights are acquired; erect permanent fencing as is reasonably necessary for the purposes of security and protection of the authorised project; benefit from continuous vertical and lateral support for the apparatus installed as part of the authorised project; erect temporary signage and provide measures for benefit of public and personnel safety. A restrictive covenant over the land for the benefit of the remainder of the Order land— not to undermine or damage the apparatus installed as part of the authorised project nor to do anything which may interfere with apparatus or support for the apparatus within that part of the land over which the new rights are acquired; not to alter or permit or allow to be altered the then existing level of the land nor to cover or permit or allow to be covered the surface of the land over which the new rights are acquired in such manner as to render the access to apparatus impracticable or more difficult or which may damage it within that part of the land over which the new rights are acquired; not to erect construct or place or suffer to be erected constructed or placed any building or structure or carry out or suffer to be carried out any excavation or plant or suffer to be planted any trees on or within that part of the land without the previous consent in writing of the undertaker such consent not to be unreasonably withheld or delayed. | Work No. 4 and the further associated development to which paragraph 11 of Part 1 (authorised development) of Schedule 1 (authorised project) refers and the ancillary works to which Part 2 (ancillary works) of Schedule 1 (authorised project) refers 5 | 5/23, 5/24, 5/25 | The right to enter and remain upon the land for the purposes of the installation, operation, use, maintenance and decommissioning of the authorised project and to— pass re-pass with or without vehicles machinery plant and equipment to construct lay maintain retain and use apparatus; break up or open the surface construct, lay maintain retain and use apparatus together with ancillary equipment including cathodic protection to include installation by way of directional drilling; construct maintain retain and use matting, trackways, hard standings for the purposes of access to construct lay and maintain apparatus and associated works, plant and equipment, and to restore and re-instate the land to its prior condition following the use of the new rights; remove, store and stockpile topsoil and subsoil, employ water barriers and pumping equipment, remove materials and to restore and re-instate the land to its prior condition; erect, maintain and remove temporary fencing for site safety and to create, retain and remove temporary secure works compounds within that part of the land over which the new rights are acquired; erect permanent fencing as is reasonably necessary for the purposes of security and protection of the authorised project; benefit from continuous vertical and lateral support for the apparatus installed as part of the authorised project; erect temporary signage and provide measures for benefit of public and personnel safety. A restrictive covenant over the land for the benefit of the remainder of the Order land— not to undermine or damage the apparatus installed as part of the authorised project nor to do anything which may interfere with apparatus or support for the apparatus within that part of the land over which the new rights are acquired; not to alter or permit or allow to be altered the then existing level of the land nor to cover or permit or allow to be covered the surface of the land over which the new rights are acquired in such manner as to render the access to apparatus impracticable or more difficult or which may damage it within that part of the land over which the new rights are acquired; not to erect construct or place or suffer to be erected constructed or placed any building or structure or carry out or suffer to be carried out any excavation or plant or suffer to be planted any trees on or within that part of the land without the previous consent in writing of the undertaker such consent not to be unreasonably withheld or delayed. | Work No. 6 and the further associated development to which paragraph 11 of Part 1 (authorised development) of Schedule 1 (authorised project) refers and the ancillary works to which Part 2 (ancillary works) of Schedule 1 (authorised project) refers 5, 6 | 5/7, 5/8, 5/10, 5/11, 5/12, 5/13, 5/14, 5/15, 5/20, 5/22, 5/23, 5/24, 5/25, 5/27, 5/28, 5/29, 5/30, 5/32, 5/33, 5/34, 5/38, 6/14, 6/15 | The right to enter and remain upon the land for the purposes of the installation, operation, use, maintenance and decommissioning of the authorised project and to— pass re-pass with or without machinery plant and equipment to construct at a depth no less than 3 metres maintain retain and use apparatus; construct and lay at a depth no less than 3 metres maintain retain and use apparatus together with ancillary equipment including cathodic protection to include installation by way of directional drilling; benefit from continuous vertical and lateral support for the apparatus installed as part of the authorised project; erect temporary signage and provide measures for benefit of public and personnel safety. A restrictive covenant over the land for the benefit of the remainder of the Order land— not to undermine or damage apparatus nor to do anything which may interfere with the apparatus or support for the apparatus within that part of the land over which the new rights are acquired; not to alter or permit or allow to be altered the then existing level of the land nor to cover or permit or allow to be covered the surface of the land over which the new rights are acquired in such manner as to render the access to the apparatus impracticable or more difficult or which may damage it within that part of the land over which the new rights are acquired; not to erect construct or place or suffer to be erected constructed or placed any building or structure or carry out or suffer to be carried out any excavation or plant or suffer to be planted any trees on or within that part of the land without the previous consent in writing of the undertaker such consent not to be unreasonably withheld or delayed. | Work No. 6 and the further associated development to which paragraph 11 of Part 1 (authorised development) of Schedule 1 (authorised project) refers and the ancillary works to which Part 2 (ancillary works) of Schedule 1 (authorised project) refers 5, 6 | 5/18, 6/6, 6/16, 6/18 | The right to— pass re-pass with or without vehicles machinery plant and equipment for the purpose of connection inspection repair and maintenance of the watercourse; connect into, use, drain into, inspect, repair, clear and maintain the watercourse; fell or lop any trees and remove any vegetation (including hedgerows) within or overhanging the watercourse. | The further associated development to which paragraph 11 of Part 1 (authorised development) of Schedule 1 (authorised project) refers and the ancillary works to which Part 2 (ancillary works) of Schedule 1 (authorised project) refers 4, 6, 7 | 4/8, 4/17, 4/22, 4/23, 5/37, 7/12 | The right to enter and remain within the land for the purposes of the installation, operation, use, maintenance and decommissioning of the authorised project and to— pass re-pass with or without machinery plant and equipment to construct lay maintain retain and use apparatus; construct, lay maintain, retain and use apparatus together with ancillary equipment including cathodic protection to include installation by way of directional drilling; benefit from continuous vertical and lateral support for the apparatus installed as part of the authorised project; provide measures for benefit of public and personnel safety. | The further associated development to which paragraph 11 of Part 1 (authorised development) of Schedule 1 (authorised project) refers and the ancillary works to which Part 2 (ancillary works) of Schedule 1 (authorised project) refers
SCHEDULE 12 LAND IN WHICH ONLY NEW RIGHTS AND RESTRICTIVE COVENANTS, ETC. MAY BE ACQUIRED
Article 24 (1) Land Plans - Sheet | (2) Plot reference number shown on land plans | (3) Purpose for which rights over land may be acquired or restrictive covenants imposed | (4) Relevant part of the authorised project 4 | 4/17 | The right to enter and remain upon the land for the purposes of the installation, operation, use, maintenance and decommissioning of the authorised project and to— pass re-pass with or without vehicles machinery plant and equipment to construct lay maintain retain and use apparatus; break up or open the surface construct, lay maintain retain and use apparatus together with ancillary equipment including cathodic protection to include installation by way of directional drilling; construct maintain retain and use matting, trackways and hard standings for the purposes of access to construct lay and maintain apparatus and associated works, plant and equipment, and to restore and re-instate the land to its prior condition following the use of the new rights; remove, store and stockpile topsoil and subsoil, employ water barriers and pumping equipment, remove materials and to restore and re-instate the land to its prior condition; erect, maintain and remove temporary fencing for site safety and to create, retain and remove temporary secure works compounds within that part of the land over which the new rights are acquired; erect permanent fencing as is reasonably necessary for the purposes of security and protection of the authorised project; benefit from continuous vertical and lateral support for the apparatus installed as part of the authorised project; erect temporary signage and provide measures for benefit of public and personnel safety. A restrictive covenant over the land for the benefit of the remainder of the Order land— not to undermine or damage the apparatus installed as part of the authorised project nor to do anything which may interfere with apparatus or support for the apparatus within that part of the land over which the new rights are acquired; not to alter or permit or allow to be altered the then existing level of the land nor to cover or permit or allow to be covered the surface of the land over which the new rights are acquired in such manner as to render the access to apparatus impracticable or more difficult or which may damage it within that part of the land over which the new rights are acquired; not to erect construct or place or suffer to be erected constructed or placed any building or structure or carry out or suffer to be carried out any excavation or plant or suffer to be planted any trees on or within that part of the land without the previous consent in writing of the undertaker such consent not to be unreasonably withheld or delayed. | Work No. 4 and the further associated development to which paragraph 11 of Part 1 (authorised development) of Schedule 1 (authorised project) refers and the ancillary works to which Part 2 (ancillary works) of Schedule 1 (authorised project) refers 5 | 5/23, 5/24, 5/25 | The right to enter and remain upon the land for the purposes of the installation, operation, use, maintenance and decommissioning of the authorised project and to— pass re-pass with or without vehicles machinery plant and equipment to construct lay maintain retain and use apparatus; break up or open the surface construct, lay maintain retain and use apparatus together with ancillary equipment including cathodic protection to include installation by way of directional drilling; construct maintain retain and use matting, trackways, hard standings for the purposes of access to construct lay and maintain apparatus and associated works, plant and equipment, and to restore and re-instate the land to its prior condition following the use of the new rights; remove, store and stockpile topsoil and subsoil, employ water barriers and pumping equipment, remove materials and to restore and re-instate the land to its prior condition; erect, maintain and remove temporary fencing for site safety and to create, retain and remove temporary secure works compounds within that part of the land over which the new rights are acquired; erect permanent fencing as is reasonably necessary for the purposes of security and protection of the authorised project; benefit from continuous vertical and lateral support for the apparatus installed as part of the authorised project; erect temporary signage and provide measures for benefit of public and personnel safety. A restrictive covenant over the land for the benefit of the remainder of the Order land— not to undermine or damage the apparatus installed as part of the authorised project nor to do anything which may interfere with apparatus or support for the apparatus within that part of the land over which the new rights are acquired; not to alter or permit or allow to be altered the then existing level of the land nor to cover or permit or allow to be covered the surface of the land over which the new rights are acquired in such manner as to render the access to apparatus impracticable or more difficult or which may damage it within that part of the land over which the new rights are acquired; not to erect construct or place or suffer to be erected constructed or placed any building or structure or carry out or suffer to be carried out any excavation or plant or suffer to be planted any trees on or within that part of the land without the previous consent in writing of the undertaker such consent not to be unreasonably withheld or delayed. | Work No. 6 and the further associated development to which paragraph 11 of Part 1 (authorised development) of Schedule 1 (authorised project) refers and the ancillary works to which Part 2 (ancillary works) of Schedule 1 (authorised project) refers 5, 6 | 5/7, 5/8, 5/10, 5/11, 5/12, 5/13, 5/14, 5/15, 5/20, 5/22, 5/23, 5/24, 5/25, 5/27, 5/28, 5/29, 5/30, 5/32, 5/33, 5/34, 5/38, 6/14, 6/15 | The right to enter and remain upon the land for the purposes of the installation, operation, use, maintenance and decommissioning of the authorised project and to— pass re-pass with or without machinery plant and equipment to construct at a depth no less than 3 metres maintain retain and use apparatus; construct and lay at a depth no less than 3 metres maintain retain and use apparatus together with ancillary equipment including cathodic protection to include installation by way of directional drilling; benefit from continuous vertical and lateral support for the apparatus installed as part of the authorised project; erect temporary signage and provide measures for benefit of public and personnel safety. A restrictive covenant over the land for the benefit of the remainder of the Order land— not to undermine or damage apparatus nor to do anything which may interfere with the apparatus or support for the apparatus within that part of the land over which the new rights are acquired; not to alter or permit or allow to be altered the then existing level of the land nor to cover or permit or allow to be covered the surface of the land over which the new rights are acquired in such manner as to render the access to the apparatus impracticable or more difficult or which may damage it within that part of the land over which the new rights are acquired; not to erect construct or place or suffer to be erected constructed or placed any building or structure or carry out or suffer to be carried out any excavation or plant or suffer to be planted any trees on or within that part of the land without the previous consent in writing of the undertaker such consent not to be unreasonably withheld or delayed. | Work No. 6 and the further associated development to which paragraph 11 of Part 1 (authorised development) of Schedule 1 (authorised project) refers and the ancillary works to which Part 2 (ancillary works) of Schedule 1 (authorised project) refers 5, 6 | 5/18, 6/6, 6/16, 6/18 | The right to— pass re-pass with or without vehicles machinery plant and equipment for the purpose of connection inspection repair and maintenance of the watercourse; connect into, use, drain into, inspect, repair, clear and maintain the watercourse; fell or lop any trees and remove any vegetation (including hedgerows) within or overhanging the watercourse. | The further associated development to which paragraph 11 of Part 1 (authorised development) of Schedule 1 (authorised project) refers and the ancillary works to which Part 2 (ancillary works) of Schedule 1 (authorised project) refers 4, 6, 7 | 4/8, 4/17, 4/22, 4/23, 5/37, 7/12 | The right to enter and remain within the land for the purposes of the installation, operation, use, maintenance and decommissioning of the authorised project and to— pass re-pass with or without machinery plant and equipment to construct lay maintain retain and use apparatus; construct, lay maintain, retain and use apparatus together with ancillary equipment including cathodic protection to include installation by way of directional drilling; benefit from continuous vertical and lateral support for the apparatus installed as part of the authorised project; provide measures for benefit of public and personnel safety. | The further associated development to which paragraph 11 of Part 1 (authorised development) of Schedule 1 (authorised project) refers and the ancillary works to which Part 2 (ancillary works) of Schedule 1 (authorised project) refers
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.