The Associated British Ports (Immingham Eastern Ro-Ro Terminal) Development Consent Order 2024
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 7 PLANS AND DOCUMENTS TO BE CERTIFIED
Articles 2 and 33 (1) Document | (2) Document Reference the book of reference | Document Reference 4.1 v2 the drainage plan | Document Reference 2.7 the engineering sections, drawings and plans | Document Reference 2.6 v4 the Enhanced Operational Controls | Document Reference 10.2.109 the environmental statement | The environmental statement chapters (Document Reference 8.2), figures (Document Reference 8.3), appendices (Document Reference 8.4) subject to the substitutions set out below: volume 1, chapter 2: proposed development document reference 8.2.2 v2; volume 1, chapter 3: details of project construction and operation 8.2.3 v2; volume 1, chapter 6: impact assessment approach document reference 8.2.6 v2; volume 1, chapter 20: cumulative and in-combination effects document reference 8.2.20 v2; volume 2, figure 1.2: Layout of Proposed Marine Works at Immingham Eastern Ro-Ro Terminal document reference 10.3.8, Figure 2.3; volume 2, figure 1.3: Layout of Proposed Landside Works at Immingham Eastern Ro-Ro Terminal document reference 10.3.8, Figure 2.2; volume 2, Figure 3.1: Demolition Works Associated with Immingham Eastern Ro-Ro Terminal document reference 10.3.8, Figure 3.1; volume 2, Figure 7.8: Peak Flood Baseline Flows (Top) and Impact of Scheme (Bottom) document reference 10.3.8, Figure 7.1; volume 2, Figure 7.9: Peak Ebb Baseline Flows (Top) and Impact of Scheme (Bottom) document reference 10.3.8, Figure 7.2; volume 2, Figure 7.19: Modelled Bed Level Change Over a Mean Spring Neap Cycle document reference 10.3.8, Figure 7.3; volume 2, Figure 7.20: Predicted Change to BSS on Flood (Top) and Ebb (Bottom) document reference 10.3.8, Figure 7.4; volume 2, Figure 7.22: Baseline Hs (Top) and Effect of Scheme (Bottom) for 0.5-yr Wave Event from NE (Left) and E (Right) document reference 10.3.8, Figure 7.5; volume 2, Figure 7.23: Baseline Hs (Top) and Effect of Scheme (Bottom) for 0.5-yr Wave Event from SE (Left) and NE (Right) document reference 10.3.8, Figure 7.6; volume 2, Figure 7.24: Baseline Hs (Top) and Effect of Scheme (Bottom) for 50-yr Wave Event from E (Left) and SE (Right) document reference 10.3.8, Figure 7.7; volume 2, figure 8.3.20: location of projects, developments and activities that are scoped into the inter-project effects assessment document reference 8.3.20 v2; volume 2, Figure 13.1b: Air Quality Study Area document reference 10.3.8, Figure 13.1; volume 2, Figure 13.3a: Operational Phase Assessment document reference 10.3.8, Figure 13.2; Volume 2, Figure 14.1: Sound Monitoring Locations document reference 10.3.8, Figure 14.1; Volume 3, Appendix 2.2: Concept Lighting Design Stage Summary Report reference 10.3.8, Annex A; Volume 3, Appendix 2.3: Building Schedule reference 10.3.8, Annex B; volume 3, appendix 10.1: navigational risk assessment document reference 8.4.10(a) v2; volume 3, appendix 10.2: navigation simulation study – part 1 document reference 8.4.10(b) v2; volume 3, appendix 10.2: navigation simulation study – part 2 document reference 8.4.10(b) v2; volume 3, appendix 10.3: navigational simulation – stakeholder demonstrations document reference 8.4.10(c) v2; Volume 3, Appendix 14.2: Construction Noise Levels and Assumptions reference 10.3.8, Annex C volume 3, appendix 17.1: transport assessment document reference 8.4.17(a) v2; and volume 3, transport assessment addendum document reference 8.4.17(a).1. the environmental statement addendum | Document Reference 10.3.8 the flood risk assessment | Document Reference 8.4.11 the general arrangement plans | Document Reference 2.5 v2 the land plans | Document Reference 2.2 v2 the lighting plan | Document Reference 2.8 v2 the operational freight management plan | Document Reference 10.2.76 v2 the outline offshore construction environmental management plan | Document Reference 9.2.2 v2 the outline onshore construction environmental management plan | Document Reference 9.2.1 v2 the supplementary navigation information report with appendices | Document Reference 10.2.72 the travel plan | Document Reference 8.4.17(b) the WEMP | Document Reference 9.4 the works plans | Document Reference 2.3 v2
SCHEDULE 7 PLANS AND DOCUMENTS TO BE CERTIFIED
Articles 2 and 33 (1) Document | (2) Document Reference the book of reference | Document Reference 4.1 v2 the drainage plan | Document Reference 2.7 the engineering sections, drawings and plans | Document Reference 2.6 v4 the Enhanced Operational Controls | Document Reference 10.2.109 the environmental statement | The environmental statement chapters (Document Reference 8.2), figures (Document Reference 8.3), appendices (Document Reference 8.4) subject to the substitutions set out below: volume 1, chapter 2: proposed development document reference 8.2.2 v2; volume 1, chapter 3: details of project construction and operation 8.2.3 v2; volume 1, chapter 6: impact assessment approach document reference 8.2.6 v2; volume 1, chapter 20: cumulative and in-combination effects document reference 8.2.20 v2; volume 2, figure 1.2: Layout of Proposed Marine Works at Immingham Eastern Ro-Ro Terminal document reference 10.3.8, Figure 2.3; volume 2, figure 1.3: Layout of Proposed Landside Works at Immingham Eastern Ro-Ro Terminal document reference 10.3.8, Figure 2.2; volume 2, Figure 3.1: Demolition Works Associated with Immingham Eastern Ro-Ro Terminal document reference 10.3.8, Figure 3.1; volume 2, Figure 7.8: Peak Flood Baseline Flows (Top) and Impact of Scheme (Bottom) document reference 10.3.8, Figure 7.1; volume 2, Figure 7.9: Peak Ebb Baseline Flows (Top) and Impact of Scheme (Bottom) document reference 10.3.8, Figure 7.2; volume 2, Figure 7.19: Modelled Bed Level Change Over a Mean Spring Neap Cycle document reference 10.3.8, Figure 7.3; volume 2, Figure 7.20: Predicted Change to BSS on Flood (Top) and Ebb (Bottom) document reference 10.3.8, Figure 7.4; volume 2, Figure 7.22: Baseline Hs (Top) and Effect of Scheme (Bottom) for 0.5-yr Wave Event from NE (Left) and E (Right) document reference 10.3.8, Figure 7.5; volume 2, Figure 7.23: Baseline Hs (Top) and Effect of Scheme (Bottom) for 0.5-yr Wave Event from SE (Left) and NE (Right) document reference 10.3.8, Figure 7.6; volume 2, Figure 7.24: Baseline Hs (Top) and Effect of Scheme (Bottom) for 50-yr Wave Event from E (Left) and SE (Right) document reference 10.3.8, Figure 7.7; volume 2, figure 8.3.20: location of projects, developments and activities that are scoped into the inter-project effects assessment document reference 8.3.20 v2; volume 2, Figure 13.1b: Air Quality Study Area document reference 10.3.8, Figure 13.1; volume 2, Figure 13.3a: Operational Phase Assessment document reference 10.3.8, Figure 13.2; Volume 2, Figure 14.1: Sound Monitoring Locations document reference 10.3.8, Figure 14.1; Volume 3, Appendix 2.2: Concept Lighting Design Stage Summary Report reference 10.3.8, Annex A; Volume 3, Appendix 2.3: Building Schedule reference 10.3.8, Annex B; volume 3, appendix 10.1: navigational risk assessment document reference 8.4.10(a) v2; volume 3, appendix 10.2: navigation simulation study – part 1 document reference 8.4.10(b) v2; volume 3, appendix 10.2: navigation simulation study – part 2 document reference 8.4.10(b) v2; volume 3, appendix 10.3: navigational simulation – stakeholder demonstrations document reference 8.4.10(c) v2; Volume 3, Appendix 14.2: Construction Noise Levels and Assumptions reference 10.3.8, Annex C volume 3, appendix 17.1: transport assessment document reference 8.4.17(a) v2; and volume 3, transport assessment addendum document reference 8.4.17(a).1. the environmental statement addendum | Document Reference 10.3.8 the flood risk assessment | Document Reference 8.4.11 the general arrangement plans | Document Reference 2.5 v2 the land plans | Document Reference 2.2 v2 the lighting plan | Document Reference 2.8 v2 the operational freight management plan | Document Reference 10.2.76 v2 the outline offshore construction environmental management plan | Document Reference 9.2.2 v2 the outline onshore construction environmental management plan | Document Reference 9.2.1 v2 the supplementary navigation information report with appendices | Document Reference 10.2.72 the travel plan | Document Reference 8.4.17(b) the WEMP | Document Reference 9.4 the works plans | Document Reference 2.3 v2
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.