The Oil and Gas Authority (Carbon Storage and Offshore Petroleum) (Specified Periods for Disclosure of Protected Material) Regulations 2025

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

Schedule Further provision about summary information

Regulation 5 Summary survey information 1 (1) The summary survey information is any information specified in sub-paragraph (2) which is protected carbon storage information. (2) The information mentioned in sub-paragraph (1) is— (a) the name of a survey; (b) the person who is expected to carry out, or carried out, a survey; (c) the date on which survey acquisition started or is expected to start; (d) the date on which survey acquisition finished or is expected to finish; (e) whether a survey is a geophysical survey or a geological survey; (f) the type of a survey; (g) the method used by a survey to acquire data; (h) the geographic coordinates of the area surveyed. Summary well information 2 (1) The summary well information is any information specified in sub-paragraph (2) which is protected carbon storage information. (2) The information mentioned in sub-paragraph (1) is— (a) the date on which drilling of a well started; (b) whether a well is connected to any other well; (c) whether, in relation to a well, any other well has been drilled— (i) under the same carbon storage licence; (ii) in the area covered by the licence mentioned in sub-paragraph (i); (d) where a well is associated with a storage site, the name of the storage site; (e) the total depth of a well; (f) the datum from which the depth of the well was measured; (g) the height above sea level of the datum from which the depth of the well was measured; (h) the date on which the total depth of a well was reached; (i) the status of a well; (j) the following information about the strata which are or may be encountered whilst undertaking a well activity— (i) name, (ii) age, (iii) thickness, and (iv) type of rock; (k) whether any fluids have been encountered when undertaking a well activity and, if so, which fluids; (l) the results of— (i) a flow test; (ii) an injection test. Summary storage site and storage complex information 3 (1) The summary storage site and storage complex information is any information specified in sub-paragraph (2) which is protected carbon storage information. (2) The information mentioned in sub-paragraph (1) is— (a) the state of the CO2 when it is injected at a storage site; (b) the age of the targeted storage formation in a storage site and storage complex; (c) type of rock of the targeted storage formation in a storage site and storage complex; (d) the age of the primary top seal in a storage site and storage complex; (e) type of rock of the primary top seal in a storage site and storage complex; (f) store type in a storage site; (g) the bounding polygon of a storage site or storage complex; (h) whether the carbon storage licence for a storage site and storage complex is in— (i) the initial or appraisal term, (ii) the operational term, or (iii) the post-closure period; (i) the date or dates on which CO2 is injected at a storage site; (j) the date on which a storage site is closed. (3) In this paragraph— “appraisal term” has the meaning given for the purposes of regulation 3(2)(a) of the 2010 Licensing Regulations; “initial term” has the meaning given for the purposes of regulation 4 of the 2010 Licensing Regulations; “operational term”, in relation to a storage site and storage complex, means the period— beginning immediately after the appraisal or initial term (as the case may be), and ending immediately before the first day of the post-closure period; “post-closure period”, in relation to a storage site, means the period— beginning with the date on which the storage site is closed, and ending at the end of the day on which the carbon storage licence for the storage site terminates. Summary relevant installation information 4 (1) The summary relevant installation information is any information specified in sub-paragraph (2) which is protected carbon storage information. (2) The information mentioned in sub-paragraph (1) is— (a) the name of a relevant installation; (b) the identification number of a relevant installation; (c) the type of a relevant installation; (d) the name of the operator of a relevant installation; (e) the name of the owner of a relevant installation; (f) a description of a relevant installation; (g) information on a relevant installation’s connections to pipelines and cables; (h) the carbon storage licence under which a relevant installation is operated; (i) the storage site or sites to which a relevant installation is connected; (j) the location of a relevant installation; (k) the operational status of a relevant installation. (3) The information specified in sub-paragraph (2) includes information about a planned relevant installation.

Your change, as a redline

Schedule Further provision about summary information

Regulation 5 Summary survey information 1 (1) The summary survey information is any information specified in sub-paragraph (2) which is protected carbon storage information. (2) The information mentioned in sub-paragraph (1) is— (a) the name of a survey; (b) the person who is expected to carry out, or carried out, a survey; (c) the date on which survey acquisition started or is expected to start; (d) the date on which survey acquisition finished or is expected to finish; (e) whether a survey is a geophysical survey or a geological survey; (f) the type of a survey; (g) the method used by a survey to acquire data; (h) the geographic coordinates of the area surveyed. Summary well information 2 (1) The summary well information is any information specified in sub-paragraph (2) which is protected carbon storage information. (2) The information mentioned in sub-paragraph (1) is— (a) the date on which drilling of a well started; (b) whether a well is connected to any other well; (c) whether, in relation to a well, any other well has been drilled— (i) under the same carbon storage licence; (ii) in the area covered by the licence mentioned in sub-paragraph (i); (d) where a well is associated with a storage site, the name of the storage site; (e) the total depth of a well; (f) the datum from which the depth of the well was measured; (g) the height above sea level of the datum from which the depth of the well was measured; (h) the date on which the total depth of a well was reached; (i) the status of a well; (j) the following information about the strata which are or may be encountered whilst undertaking a well activity— (i) name, (ii) age, (iii) thickness, and (iv) type of rock; (k) whether any fluids have been encountered when undertaking a well activity and, if so, which fluids; (l) the results of— (i) a flow test; (ii) an injection test. Summary storage site and storage complex information 3 (1) The summary storage site and storage complex information is any information specified in sub-paragraph (2) which is protected carbon storage information. (2) The information mentioned in sub-paragraph (1) is— (a) the state of the CO2 when it is injected at a storage site; (b) the age of the targeted storage formation in a storage site and storage complex; (c) type of rock of the targeted storage formation in a storage site and storage complex; (d) the age of the primary top seal in a storage site and storage complex; (e) type of rock of the primary top seal in a storage site and storage complex; (f) store type in a storage site; (g) the bounding polygon of a storage site or storage complex; (h) whether the carbon storage licence for a storage site and storage complex is in— (i) the initial or appraisal term, (ii) the operational term, or (iii) the post-closure period; (i) the date or dates on which CO2 is injected at a storage site; (j) the date on which a storage site is closed. (3) In this paragraph— “appraisal term” has the meaning given for the purposes of regulation 3(2)(a) of the 2010 Licensing Regulations; “initial term” has the meaning given for the purposes of regulation 4 of the 2010 Licensing Regulations; “operational term”, in relation to a storage site and storage complex, means the period— beginning immediately after the appraisal or initial term (as the case may be), and ending immediately before the first day of the post-closure period; “post-closure period”, in relation to a storage site, means the period— beginning with the date on which the storage site is closed, and ending at the end of the day on which the carbon storage licence for the storage site terminates. Summary relevant installation information 4 (1) The summary relevant installation information is any information specified in sub-paragraph (2) which is protected carbon storage information. (2) The information mentioned in sub-paragraph (1) is— (a) the name of a relevant installation; (b) the identification number of a relevant installation; (c) the type of a relevant installation; (d) the name of the operator of a relevant installation; (e) the name of the owner of a relevant installation; (f) a description of a relevant installation; (g) information on a relevant installation’s connections to pipelines and cables; (h) the carbon storage licence under which a relevant installation is operated; (i) the storage site or sites to which a relevant installation is connected; (j) the location of a relevant installation; (k) the operational status of a relevant installation. (3) The information specified in sub-paragraph (2) includes information about a planned relevant installation.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds