The Cory Decarbonisation Project Order 2025
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 16 DESIGN PARAMETERS
Schedule 2, Paragraph 4 (1) Component/Building/Area | (2) Works Area | (3) Maximum Number | (4) Maximum Height (m) of Component/ Building/ Area | (5) Maximum Height (m) | (6) Further Parameters Direct Contact Cooler | 1A | 2 | 30 | 33 Above Ordnance Datum | - Absorber Column(s) and Stack(s) | 1B | 2 combined Absorber Columns and Stacks or a maximum of 2 Absorber Columns and 2 Stacks | 110 | 113 Above Ordnance Datum | Minimum vertical distance between top of Absorber Column(s) and top of Stack(s) whether combined or separate – 30m Minimum height of the top of Stack(s) – 100m from development platform as built Where there are 2 Stacks: Maximum internal diameter of Stack associated with Riverside 1: 3.1m Maximum internal diameter of Stack associated with Riverside 2: 2.5m Where there is 1 Stack: Maximum internal diameter of Stack: 4.0m Regenerator | 1A | 2 | 60 | 63 Above Ordnance Datum | - Compression Plant | 1C | 2 | 45 | 48 Above Ordnance Datum | - CO2 Dehydration | 1C | 2 | 25 | 28 Above Ordnance Datum | - CO2 Liquefaction | 1C | 2 | 30 | 33 Above Ordnance Datum | - CO2 Vents | 1C | 2 | 45 | 48 Above Ordnance Datum | - LCO₂ Buffer Storage Area | 1D | 16 | 45 | 48 Above Ordnance Datum | - Hybrid or Dry Cooling Tower | 1E | 2 | 32 | 35 Above Ordnance Datum | - Water Treatment Plant and Wastewater Treatment Plant | 1E | 2 | 20 | 23 Above Ordnance Datum | - Back Pressure Turbine and Generator | 1A | 2 | 35 | 38 Above Ordnance Datum | - Insulated heat pipework and flue gas ducting | 2A(ii) and 2b(i) | - | 30 | 33 Above Ordnance Datum | - Loading platform (not including topside infrastructure and equipment) | 4C | 1 | - | 11.5 Above Chart Datum | Maximum length of 40 metres Maximum width of 50 metres Breasting Dolphins | 4B | 4 | - | 11.5 Above Chart Datum | - Mooring Dolphins | 4B | 6 | - | 11.5 Above Chart Datum | Maximum length of 7 metres Maximum width of 7 metres Access Trestle Start Point (not including topside infrastructure and equipment) | 4B | 1 | - | 20 Above Ordnance Datum | Maximum length of 335 metres Maximum width of 10 metres LCO2 pipelines, piperacks and pipe bridges | 5 | - | 30 | 33 Above Ordnance Datum | -
SCHEDULE 16 DESIGN PARAMETERS
Schedule 2, Paragraph 4 (1) Component/Building/Area | (2) Works Area | (3) Maximum Number | (4) Maximum Height (m) of Component/ Building/ Area | (5) Maximum Height (m) | (6) Further Parameters Direct Contact Cooler | 1A | 2 | 30 | 33 Above Ordnance Datum | - Absorber Column(s) and Stack(s) | 1B | 2 combined Absorber Columns and Stacks or a maximum of 2 Absorber Columns and 2 Stacks | 110 | 113 Above Ordnance Datum | Minimum vertical distance between top of Absorber Column(s) and top of Stack(s) whether combined or separate – 30m Minimum height of the top of Stack(s) – 100m from development platform as built Where there are 2 Stacks: Maximum internal diameter of Stack associated with Riverside 1: 3.1m Maximum internal diameter of Stack associated with Riverside 2: 2.5m Where there is 1 Stack: Maximum internal diameter of Stack: 4.0m Regenerator | 1A | 2 | 60 | 63 Above Ordnance Datum | - Compression Plant | 1C | 2 | 45 | 48 Above Ordnance Datum | - CO2 Dehydration | 1C | 2 | 25 | 28 Above Ordnance Datum | - CO2 Liquefaction | 1C | 2 | 30 | 33 Above Ordnance Datum | - CO2 Vents | 1C | 2 | 45 | 48 Above Ordnance Datum | - LCO₂ Buffer Storage Area | 1D | 16 | 45 | 48 Above Ordnance Datum | - Hybrid or Dry Cooling Tower | 1E | 2 | 32 | 35 Above Ordnance Datum | - Water Treatment Plant and Wastewater Treatment Plant | 1E | 2 | 20 | 23 Above Ordnance Datum | - Back Pressure Turbine and Generator | 1A | 2 | 35 | 38 Above Ordnance Datum | - Insulated heat pipework and flue gas ducting | 2A(ii) and 2b(i) | - | 30 | 33 Above Ordnance Datum | - Loading platform (not including topside infrastructure and equipment) | 4C | 1 | - | 11.5 Above Chart Datum | Maximum length of 40 metres Maximum width of 50 metres Breasting Dolphins | 4B | 4 | - | 11.5 Above Chart Datum | - Mooring Dolphins | 4B | 6 | - | 11.5 Above Chart Datum | Maximum length of 7 metres Maximum width of 7 metres Access Trestle Start Point (not including topside infrastructure and equipment) | 4B | 1 | - | 20 Above Ordnance Datum | Maximum length of 335 metres Maximum width of 10 metres LCO2 pipelines, piperacks and pipe bridges | 5 | - | 30 | 33 Above Ordnance Datum | -
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.