The Cory Decarbonisation Project Order 2025
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 8 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
Article 30 Interpretation 1 In this Schedule— “access rights” means, rights over land to, for the purposes of the authorised development, and in connection with the authorised development— alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery) and remove means of access to the authorised development including visibility splays and to remove and traverse impediments to such access; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development. “connection rights” means, right over land to, for the purposes of the authorised development, and in connection with the authorised development— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cable, optical fibre cable, data cable, telecommunications cable, flue gas pipework, condensate pipework, water supply pipework, foul water pipework, drains, sewers, heat pipes, LCO₂ pipework, and other apparatus and services, and associated works including bays, ducts, protection and safety measures and equipment, and other apparatus and structures; connect the services, apparatus, equipment, buildings and structures set out in sub-paragraph (a) to existing services, apparatus, equipment, buildings and structures; modify existing buildings structures; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and “LCO₂ pipework rights” means, right over land to, for the purposes of the authorised development, and in connection with the authorised development— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain LCO₂ pipework and associated works including supports, protection and safety measures and other apparatus and structures; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development. “maintenance access rights” means, rights over land to, for the purposes of the authorised development, and in connection with the authorised development, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights; “maintenance rights” means, rights over land to, for the purposes of the authorised development, and in connection with the authorised development, undertake construction, maintenance and decommissioning activities for Work No. 4, including laydown areas, compounds and welfare facilities and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights; “utilities rights” means - rights over land to, for the purposes of the authorised development, and in connection with the authorised development— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain underground electrical cables, earthing cable, optical fibre cable, data cable, telecommunications cable, flue gas pipework, condensate pipework, water supply pipework, foul water pipework, drains, sewers, heat pipes, LCO₂ pipework, and other apparatus and services, and associated works including bays, ducts, protection and safety measures and equipment, and other apparatus and structures; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development. (1) Number of plot shown on the Land Plans | (2) Purposes for which rights over land may be acquired and restrictive covenants imposed 1-002, 1-005, 1-007, 1-008, 1-023, 1-024, 1-030, 1-034, 1-040, 1-043, 1-048 | Utilities rights and access rights 1-028 | Maintenance access rights 1-028a | Utilities rights and maintenance access rights 1-051, 1-052, 1-055, 1-056, 1-058, 1-062, 1-074, 1-086, 1-087 | Connection rights and LCO₂ pipework rights 1-053 | Maintenance access rights 1-054 | Connection rights 1-054b | Access rights 1-059,1-060, 01-061, 1-063, 1-064, 1-065, 1-066, 1-067, 1-068, 1-069, 1-070, 1-071, 1-073, 1-075, 1-076, 1-077, 1-078, 1-079, 1-080, 1-081, 1-082, 1-084, 1-085, 1-088, 1-091 | Connection rights 1-083 | Maintenance access rights and maintenance rights 1-089 | LCO₂ pipework rights
SCHEDULE 8 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
Article 30 Interpretation 1 In this Schedule— “access rights” means, rights over land to, for the purposes of the authorised development, and in connection with the authorised development— alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery) and remove means of access to the authorised development including visibility splays and to remove and traverse impediments to such access; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development. “connection rights” means, right over land to, for the purposes of the authorised development, and in connection with the authorised development— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cable, optical fibre cable, data cable, telecommunications cable, flue gas pipework, condensate pipework, water supply pipework, foul water pipework, drains, sewers, heat pipes, LCO₂ pipework, and other apparatus and services, and associated works including bays, ducts, protection and safety measures and equipment, and other apparatus and structures; connect the services, apparatus, equipment, buildings and structures set out in sub-paragraph (a) to existing services, apparatus, equipment, buildings and structures; modify existing buildings structures; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and “LCO₂ pipework rights” means, right over land to, for the purposes of the authorised development, and in connection with the authorised development— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain LCO₂ pipework and associated works including supports, protection and safety measures and other apparatus and structures; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development. “maintenance access rights” means, rights over land to, for the purposes of the authorised development, and in connection with the authorised development, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights; “maintenance rights” means, rights over land to, for the purposes of the authorised development, and in connection with the authorised development, undertake construction, maintenance and decommissioning activities for Work No. 4, including laydown areas, compounds and welfare facilities and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights; “utilities rights” means - rights over land to, for the purposes of the authorised development, and in connection with the authorised development— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain underground electrical cables, earthing cable, optical fibre cable, data cable, telecommunications cable, flue gas pipework, condensate pipework, water supply pipework, foul water pipework, drains, sewers, heat pipes, LCO₂ pipework, and other apparatus and services, and associated works including bays, ducts, protection and safety measures and equipment, and other apparatus and structures; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development. (1) Number of plot shown on the Land Plans | (2) Purposes for which rights over land may be acquired and restrictive covenants imposed 1-002, 1-005, 1-007, 1-008, 1-023, 1-024, 1-030, 1-034, 1-040, 1-043, 1-048 | Utilities rights and access rights 1-028 | Maintenance access rights 1-028a | Utilities rights and maintenance access rights 1-051, 1-052, 1-055, 1-056, 1-058, 1-062, 1-074, 1-086, 1-087 | Connection rights and LCO₂ pipework rights 1-053 | Maintenance access rights 1-054 | Connection rights 1-054b | Access rights 1-059,1-060, 01-061, 1-063, 1-064, 1-065, 1-066, 1-067, 1-068, 1-069, 1-070, 1-071, 1-073, 1-075, 1-076, 1-077, 1-078, 1-079, 1-080, 1-081, 1-082, 1-084, 1-085, 1-088, 1-091 | Connection rights 1-083 | Maintenance access rights and maintenance rights 1-089 | LCO₂ pipework rights
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.