Propose a change

The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 14 DESIGN PARAMETERS

Article 2 PART 1 DESIGN PARAMETERS ASSOCIATED WITH THE CARBON CAPTURE PLANT FOR UNIT 1 (1) Component / Building / Area | (2) Work No. | (3) Maximum number | (4) Maximum length (m) | (5) Maximum width (m) | (6) Maximum height (m AGL) | (7) Maximum height (m AOD) (1) Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL. (2) Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be doubled stacked. (3) The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack. Gas / Gas Heat Exchanger | 1D(v)(aa) | 2 | 25 | 25 | 45 | 51.1 Quench Column | 1D(i)(aa) | 1 | 50 | 30 | 40 | 46.1 Absorber Column | 1D(i)(bb) | 1 | 50 | 30 | 95 | 101.1 Regenerator | 1D(iii)(aa) | 2 | 15 | 15 | 70 | 76.1 Carbon Dioxide Gas Compressor Building | 1E(i) | 4 | 45 | 40 | 30 | 36.1 Carbon Dioxide Main Vent Stacks | 1E(iii) | 1 | 10 | 10 | 30 | 36.1 Main Process & Service Rack | 1D(iii) | 1 | 150 | 20 | 25 | 31.1 PART 2 DESIGN PARAMETERS ASSOCIATED WITH THE CARBON CAPTURE PLANT FOR UNIT 2 (1) Component / Building / Area | (2) Work No. | (3) Maximum number | (4) Maximum length (m) | (5) Maximum width (m) | (6) Maximum height (m AGL) | (7) Maximum height (m AOD) (1) Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL. (2) Building / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked. (3) The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack. Gas / Gas Heat Exchanger | 1D(vi)(aa) | 2 | 25 | 25 | 45 | 51.1 Quench Column | 1D(ii)(aa) | 1 | 50 | 30 | 40 | 46.1 Absorber Column | 1D(ii)(bb) | 1 | 50 | 30 | 95 | 101.1 Regenerator | 1D(iv)(aa) | 2 | 15 | 15 | 70 | 76.1 Carbon Dioxide Gas Compressor Building | 1E(ii) | 4 | 45 | 40 | 30 | 36.1 Carbon Dioxide Main Vent Stacks | 1E(iv) | 1 | 10 | 10 | 30 | 36.1 Main Process & Service Rack | 1D(iv) | 1 | 150 | 20 | 25 | 31.1 PART 3 DESIGN PARAMETERS ASSOCIATED WITH THE COMMON INFRASTRUCTURE REQUIRED FOR BOTH THE CARBON CAPTURE PLANT FOR UNIT 1 AND THE CARBON CAPTURE PLANT FOR UNIT 2 (1) Component / Building / Area | (2) Work No. | (3) Maximum number | (4) Maximum length (m) | (5) Maximum width (m) | (6) Maximum height (m AGL) | (7) Maximum height (m AOD) (1) Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked. Carbon Capture Wastewater Treatment Plant Area | 1D(viii)(a) | 1 | 80 | 70 | 40 | 46.1 Solvent Storage and Make-up System Compound | 1D(vii) | 4 | 55 | 45 | 25 | 31.1 Combined Power Turbine Building | 1C(iii)(bb) | 2 | 50 | 45 | 35 | 41.1 Pressure Reducing De-Superheating Station Building | 1C(iii)(dd) | 2 | 15 | 45 | 15 | 21.1 Steam Pipe Bridge Connection (Connection with existing Drax Power Station Infrastructure) | 1C(iii)(ee) | 1 | 30 | 10 | 65 | 71.1 Steam Pipe Bridge | 1C(iii)(ee) | 1 | 300 | 20 | 25 | 31.1 Fire Water Tanks | 1D(viii)(dd) | 4 | 15 | 15 | 15 | 21.1 Switchroom Building | 1F | 30 | 30 | 16 | 20 | 26.1 Carbon Dioxide Pipe Bridge | 2 | 1 | 500 | 20 | 20 | 26.1 Carbon Dioxide Delivery Terminal Compound (onshore carbon pipeline operator) | 2 | 1 | 100 | 100 | 12 | 18.1

Your change, as a redline

SCHEDULE 14 DESIGN PARAMETERS

Article 2 PART 1 DESIGN PARAMETERS ASSOCIATED WITH THE CARBON CAPTURE PLANT FOR UNIT 1 (1) Component / Building / Area | (2) Work No. | (3) Maximum number | (4) Maximum length (m) | (5) Maximum width (m) | (6) Maximum height (m AGL) | (7) Maximum height (m AOD) (1) Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL. (2) Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be doubled stacked. (3) The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack. Gas / Gas Heat Exchanger | 1D(v)(aa) | 2 | 25 | 25 | 45 | 51.1 Quench Column | 1D(i)(aa) | 1 | 50 | 30 | 40 | 46.1 Absorber Column | 1D(i)(bb) | 1 | 50 | 30 | 95 | 101.1 Regenerator | 1D(iii)(aa) | 2 | 15 | 15 | 70 | 76.1 Carbon Dioxide Gas Compressor Building | 1E(i) | 4 | 45 | 40 | 30 | 36.1 Carbon Dioxide Main Vent Stacks | 1E(iii) | 1 | 10 | 10 | 30 | 36.1 Main Process & Service Rack | 1D(iii) | 1 | 150 | 20 | 25 | 31.1 PART 2 DESIGN PARAMETERS ASSOCIATED WITH THE CARBON CAPTURE PLANT FOR UNIT 2 (1) Component / Building / Area | (2) Work No. | (3) Maximum number | (4) Maximum length (m) | (5) Maximum width (m) | (6) Maximum height (m AGL) | (7) Maximum height (m AOD) (1) Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL. (2) Building / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked. (3) The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack. Gas / Gas Heat Exchanger | 1D(vi)(aa) | 2 | 25 | 25 | 45 | 51.1 Quench Column | 1D(ii)(aa) | 1 | 50 | 30 | 40 | 46.1 Absorber Column | 1D(ii)(bb) | 1 | 50 | 30 | 95 | 101.1 Regenerator | 1D(iv)(aa) | 2 | 15 | 15 | 70 | 76.1 Carbon Dioxide Gas Compressor Building | 1E(ii) | 4 | 45 | 40 | 30 | 36.1 Carbon Dioxide Main Vent Stacks | 1E(iv) | 1 | 10 | 10 | 30 | 36.1 Main Process & Service Rack | 1D(iv) | 1 | 150 | 20 | 25 | 31.1 PART 3 DESIGN PARAMETERS ASSOCIATED WITH THE COMMON INFRASTRUCTURE REQUIRED FOR BOTH THE CARBON CAPTURE PLANT FOR UNIT 1 AND THE CARBON CAPTURE PLANT FOR UNIT 2 (1) Component / Building / Area | (2) Work No. | (3) Maximum number | (4) Maximum length (m) | (5) Maximum width (m) | (6) Maximum height (m AGL) | (7) Maximum height (m AOD) (1) Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked. Carbon Capture Wastewater Treatment Plant Area | 1D(viii)(a) | 1 | 80 | 70 | 40 | 46.1 Solvent Storage and Make-up System Compound | 1D(vii) | 4 | 55 | 45 | 25 | 31.1 Combined Power Turbine Building | 1C(iii)(bb) | 2 | 50 | 45 | 35 | 41.1 Pressure Reducing De-Superheating Station Building | 1C(iii)(dd) | 2 | 15 | 45 | 15 | 21.1 Steam Pipe Bridge Connection (Connection with existing Drax Power Station Infrastructure) | 1C(iii)(ee) | 1 | 30 | 10 | 65 | 71.1 Steam Pipe Bridge | 1C(iii)(ee) | 1 | 300 | 20 | 25 | 31.1 Fire Water Tanks | 1D(viii)(dd) | 4 | 15 | 15 | 15 | 21.1 Switchroom Building | 1F | 30 | 30 | 16 | 20 | 26.1 Carbon Dioxide Pipe Bridge | 2 | 1 | 500 | 20 | 20 | 26.1 Carbon Dioxide Delivery Terminal Compound (onshore carbon pipeline operator) | 2 | 1 | 100 | 100 | 12 | 18.1

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds