The Steeple Renewables Project Order 2026

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

SCHEDULE 12 DOCUMENTS TO BE CERTIFIED

Article 36 (1) Document name | (2) Document reference | (3) Version | (4) Date Site location plan | 1.1 | 2 | November 2025 Land plans | 2.1 | 4 | January 2026 Works plans | 2.2 | 3 | December 2025 Access and public rights of way plan | 2.3 | 2 | July 2025 Book of reference | 4.3 | 3 | April 2026 Environmental Statement: Non Technical Summary | 6.1 | 2 | March 2026 Environmental Statement: Chapter 0 Contents | 6.2.0 | 1 | April 2025 Environmental Statement: Chapter 1 Introduction | 6.2.1 | 1 | April 2025 Environmental Statement: Chapter 2 EIA Methodology & Public Consultation | 6.2.2 | 1 | April 2025 Environmental Statement: Chapter 3 Site Description, Site Selection and Iterative Design Process | 6.2.3 | 1 | April 2025 Environmental Statement: Chapter 4 Proposed Development | 6.2.4 | 1 | April 2025 Environmental Statement: Chapter 5 Planning Policy | 6.2.5 | 1 | April 2025 Environmental Statement: Chapter 6 Landscape and Visual Impact and Residential Amenity | 6.2.6 | 1 | April 2025 Environmental Statement: Chapter 7 Ecology and Biodiversity | 6.2.7 | 3 | April 2026 Environmental Statement: Chapter 8 Hydrology, Hydrogeology, Flood Risk and Drainage | 6.2.8 | 2 | January 2026 Environmental Statement: Chapter 9 Cultural Heritage | 6.2.9 | 1 | April 2025 Environmental Statement: Chapter 10 Socio Economics | 6.2.10 | 1 | April 2025 Environmental Statement: Chapter 11 Noise and Vibration | 6.2.11 | 1 | April 2025 Environmental Statement: Chapter 12 Climate Change | 6.2.12 | 1 | April 2025 Environmental Statement: Chapter 13 Transport and Access | 6.2.13 | 1 | April 2025 Environmental Statement: Chapter 14 Air Quality | 6.2.14 | 2 | January 2026 Environmental Statement: Chapter 16 Land Use and Agriculture | 6.2.15 | 2 | March 2026 Environmental Statement: Chapter 16 Glint and Glare | 6.2.16 | 1 | April 2025 Environmental Statement: Chapter 17 Miscellaneous Issues | 6.2.17 | 1 | April 2025 Environmental Statement: Chapter 18 Summary | 6.2.18 | 2 | March 2026 Environmental Statement: Chapter 19 Glossary | 6.2.19 | 1 | April 2025 Environmental Statement: Appendix 1.1 Steeple Project Environment Impact Assessment Scoping Report | 6.3.1, Appendix 1.1 | 1 | April 2025 Environmental Statement: Appendix 1.2 EIA Scoping Opinion | 6.3.1, Appendix 1.2 | 1 | April 2025 Environmental Statement: Appendix 1.3 Environment Agency EIA Scoping Response | 6.3.1, Appendix 1.3 | 1 | April 2025 Environmental Statement: Appendix 1.4 EIA Statement of Competence | 6.3.1, Appendix 1.4 | 1 | April 2025 Environmental Statement: Appendix 2.1 Schedule 4 Requirements of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 as amended | 6.3.2 Appendix 2.1 | 1 | April 2025 Environmental Statement: ES Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report | 6.3.2 Appendix 2.2 | 2 | December 2025 Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 1 | 6.3.2, Appendix 2.2 Part 1 | 2 | December 2025 Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 2 | 6.3.2, Appendix 2.2 Part 2 | 2 | December 2025 Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 3 | 6.3.2, Appendix 2.2 Part 3 | 2 | December 2025 Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 4 | 6.3.2, Appendix 2.2 Part 4 | 2 | January 2026 Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 5 | 6.3.2, Appendix 2.2 Part 5 | 2 | January 2026 Environmental Statement: Appendix 2.3 Cumulative Sites Long List and Short List | 6.3.2, Appendix 2.3 | 1 | April 2025 Environmental Statement: Appendix 4.1 Outline construction environmental management plan | 6.3.4, Appendix 4.1 | 3 | March 2026 Environmental Statement: Appendix 4.2 Outline decommissioning plan | 6.3.4, Appendix 4.2 | 3 | March 2026 Environmental Statement: Appendix 4.3 Outline fire risk management plan | 6.3.4, Appendix 4.3 | 3 | March 2026 Environmental Statement: Appendix 4.4 Outline operational environmental management plan | 6.3.4, Appendix 4.4 | 3 | March 2026 Environmental Statement: Appendix 4.5 Outline design principles | 6.3.4, Appendix 4.5 | 2 | January 2026 Environmental Statement: Appendix 4.6 Crossings Schedule | 6.3.4, Appendix 4.6 | 1 | April 2025 Environmental Statement: Appendix 6.1 Viewpoint Photograph Record – Cumulative Annotations Part A and Part B | 6.3.6, Appendix 6.1 | 1 | January 2026 Environmental Statement: Appendix 6.2 Photomontages Part 1 – Summer | 6.3.6, Appendix 6.2 | 1 | April 2025 Environmental Statement: Appendix 6.2 Photomontages Part 1 – Summer with Cumulative Annotations | 6.3.6, Appendix 6.2 | 1 | January 2026 Environmental Statement: Appendix 6.2 Photomontages Part 2 – Winter | 6.3.6, Appendix 6.2 | 1 | April 2025 Environmental Statement: Appendix 6.2 Photomontages Part 2 – Winter With Cumulative Annotations | 6.3.6, Appendix 6.2 | 1 | January 2026 Environmental Statement: Appendix 6.3 Viewpoint Assessment | 6.3.6, Appendix 6.3 | 2 | March 2026 Environmental Statement: Appendix 6.4 – Residential Visual Amenity Assessment | 6.3.6, Appendix 6.4 | 1 | April 2025 Environmental Statement: Appendix 6.5 Arboricultural impact assessment | 6.3.6, Appendix 6.5 | 1 | April 2025 Environmental Statement: Appendix 6.6 Assessment of Public Rights of Way | 6.3.6 Appendix 6.6 | 2 | March 2026 Environmental Statement: Appendix 7.1 Legislation and Policy | 6.3.7 Appendix 7.1 | 1 | April 2025 Environmental Statement: Appendix 7.2 Designated Sites | 6.3.7 Appendix 7.2 | 1 | April 2025 Environmental Statement: Appendix 7.3 Habitat Report | 6.3.7 Appendix 7.3 | 1 | April 2025 Environmental Statement: Appendix 7.4 Breeding Bird Report | 6.3.7 Appendix 7.4 | 1 | April 2025 Environmental Statement: Appendix 7.5 Barn Owl Report (Confidential) | 6.3.7 Appendix 7.5 | 1 | April 2025 Environmental Statement: Appendix 7.6 Wintering Bird Report | 6.3.7 Appendix 7.6 | 1 | April 2025 Environmental Statement: Appendix 7.7 Bat Report | 6.3.7 Appendix 7.7 | 1 | April 2025 Environmental Statement: Appendix 7.8 Badger Report (Confidential) | 6.3.7 Appendix 7.8 | 1 | April 2025 Environmental Statement: Appendix 7.9 Otter and Water Vole Report | 6.3.7 Appendix 7.9 | 1 | April 2025 Environmental Statement: Appendix 7.10 Great Crested Newt Report | 6.3.7 Appendix 7.10 | 1 | April 2025 Environmental Statement: Appendix 7.11 Aquatic Invertebrates Report | 6.3.7 Appendix 7.11 | 1 | April 2025 Environmental Statement: Appendix 7.12 Biodiversity Net Gain | 6.3.7 Appendix 7.12 | 1 | April 2025 Environmental Statement: Appendix 7.13 Skylark Mitigation Strategy | 6.3.7 Appendix 7.13 | 1 | April 2025 Environmental Statement: Appendix 7.14 Outline landscape ecology management plan | 6.3.7 Appendix 7.14 | 2 | April 2026 Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 1 | 6.3.8 Appendix 8.1 Part 1 | 4 | March 2026 Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 1 Rev 2 Appendix E update | 6.3.8 Appendix 8.1 Part 1 | 1 | January 2026 Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 2 | 6.3.8 Appendix 8.1 Part 2 | 1 | April 2025 Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 3 | 6.3.8 Appendix 8.1 Part 3 | 2 | January 2026 Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 3 Appendix G update only | 6.3.8 Appendix 8.1 Part 3 | 1 | January 2026 Environmental Statement: Appendix 8.2 Surface water drainage strategy | 6.3.8 Appendix 8.2 | 4 | March 2026 Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 2 Appendix B update only | 6.3.8 Appendix 8.2 | 2 | January 2026 Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix G update only | 6.3.8 Appendix 8.2 | 1 | January 2026 Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix H update only | 6.3.8 Appendix 8.2 | 1 | January 2026 Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix H update only | 6.3.8 Appendix 8.2 | 1 | January 2026 Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix L (New) | 6.3.8 Appendix 8.2 | 1 | January 2026 Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix M (New) | 6.3.8 Appendix 8.2 | 1 | January 2026 Environmental Statement: Appendix 8.3 Water Framework Directive Assessment | 6.3.8, Appendix 8.3 | 2 | January 2026 Environmental Statement: Appendix 9.1 Cultural Heritage Technical Baseline | 6.3.9 Appendix 9.1 | 1 | April 2025 Environmental Statement: Appendix 9.2 Magnitude Surveys Geophysical Survey Report | 6.3.9 Appendix 9.2 | 2 | March 2026 Environmental Statement: Appendix 9.3 Archaeological Mitigation Statement | 6.3.9 Appendix 9.3 | 1 | April 2025 Environmental Statement: Appendix 9.4 Outline written scheme of investigation for pre-determination trial trenching | 6.3.9 Appendix 9.4 | 1 | April 2025 Environmental Statement: Appendix 9.5 Outline written scheme of investigation for post consent archaeological works | 6.3.9 Appendix 9.5 | 2 | April 2026 Environmental Statement: Appendix 10.1 Outline supply chain, employment and skills plan | 6.3.10 Appendix 10.1 | 2 | January 2026 Environmental Statement: Appendix 13.1 Transport Assessment | 6.3.13 Appendix 13.1 | 1 | April 2025 Environmental Statement: Appendix 13.2 Outline construction traffic management plan | 6.3.13 Appendix 13.2 | 2 | March 2026 Environmental Statement: Appendix 14.1 Air Quality Appendices | 6.3.14 Appendix 14.1 | 1 | April 2025 Environmental Statement: Appendix 15.1 Agricultural Land Classification Report | 6.3.15 Appendix 15.1 | 1 | April 2025 Environmental Statement: Appendix 15.2 Outline soil management plan | 6.3.15 Appendix 15.2 | 2 | January 2026 Environmental Statement: Appendix 16.1 Solar | 6.3.16 Appendix 16.1 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 1 | 6.3.17 Appendix 17.1 Part 1 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 2 | 6.3.17 Appendix 17.1 Part 2 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 3 | 6.3.17 Appendix 17.1 Part 3 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 4 | 6.3.17 Appendix 17.1 Part 4 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 5 | 6.3.17 Appendix 17.1 Part 5 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 6 | 6.3.17 Appendix 17.1 Part 6 | 1 | April 2025 Figure 1.1 Site Location Plan | 6.4.1, Figure 1.1 | 2 | July 2025 Figure 2.1 Indicative Site Layout | 6.4.2, Figure 2.1 | 2 | July 2025 Figure 2.2 Cumulative Schemes Plan | 6.4.2, Figure 2.2 | 1 | April 2025 Figure 3.1 Site Constraints Plan | 6.4.3, Figure 3.1 | 1 | April 2025 Figure 3.2 Topographical Survey | 6.4.3. Figure 3.2 | 2 | July 2025 Figure 3.3 Public Rights of Way Plan | 6.4.3, Figure 3.3 | 1 | April 2025 Figure 3.4 Alternative Sites | 6.4.3, Figure 3.4 | 1 | April 2025 Figure 6.1 Site Location Plan | 6.4.6, Figure 6.1 | 1 | April 2025 Figure 6.2 Landscape Designations | 6.4.6, Figure 6.2 | 1 | April 2025 Figure 6.3 Topography | 6.4.6, Figure 6.3 | 1 | April 2025 Figure 6.4 Landscape Character Areas | 6.4.6, Figure 6.4 | 1 | April 2025 Figure 6.5a Visual Receptors (Settlements, A Roads, B Roads and Long-Distance Routes) Revision D | 6.4.6, Figure 6.5a | 1 | June 2025 Figure 6.5b Visual Receptors (Settlements, A Roads, B Roads and PROW) | 6.4.6, Figure 6.5b | 1 | April 2025 Figure 6.5c Visual Receptors (Settlements, A Roads, B Roads and Minor Roads) | 6.4.6, Figure 6.5c | 1 | April 2025 Figure 6.6a Screened Zone of Theoretical Visibility (SZTV) and viewpoint (VP) Locations (10km radius) | 6.4.6, Figure 6.6a | 1 | April 2025 Figure 6.6b SZTV and VP Locations (5km radius) | 6.4.6, Figure 6.6b | 1 | April 2025 Figure 6.6c SZTV and VP Locations (2km radius) | 6.4.6, Figure 6.6c | 1 | April 2025 Figure 6.7 SZTV and Landscape Character | 6.4.6, Figure 6.7 | 1 | April 2025 Figure 6.8a SZTV and Visual Receptors (Settlements, A Roads, B Roads and Long Distance Routes) | 6.4.6, Figure 6.8a | 1 | April 2025 Figure 6.8b SZTV and Visual Receptors (Settlements, A Roads, B Roads and PROW) | 6.4.6, Figure 6.8b | 1 | April 2025 Figure 6.8c SZTV and Visual Receptors (Settlements, A Roads, B Roads and Minor Roads) | 6.4.6, Figure 6.8c | 1 | April 2025 Figure 6.9 Outline Landscape and Ecology Mitigation Strategy | 6.4.6, Figure 6.9 | 1 | April 2025 6.4.8 Figure 8.1 Watercourses | 6.4.8, Figure 8.1 | 1 | April 2025 6.4.8 Figure 8.2 Environment Agency Flood Zones | 6.4.8, Figure 8.2 | 1 | April 2025 6.4.8 Figure 8.3 Environment Agency Surface Water Flood Extents | 6.4.8, Figure 8.3 | 1 | April 2025 6.4.8 Figure 8.4 Groundwater and Surface Water Abstractions | 6.4.8, Figure 8.4 | 1 | April 2025 6.4.9 Figure 9.1 Heritage Assets Considered Within The Environmental Statement | 6.4.9, Figure 9.1 | 1 | April 2025 6.4.9 Figure 9.2 Designated Heritage Assets Within Relevant Study Area | 6.4.9, Figure 9.2 | 1 | April 2025 6.4.9 Figure 9.3 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area | 6.4.9, Figure 9.3 | 1 | April 2025 6.4.9 Figure 9.4 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area | 6.4.9, Figure 9.4 | 1 | April 2025 6.4.9 Figure 9.5 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area | 6.4.9, Figure 9.5 | 1 | April 2025 6.4.9 Figure 9.6 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area | 6.4.9, Figure 9.6 | 1 | April 2025 6.4.9 Figure 9.7 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area | 6.4.9, Figure 9.7 | 1 | April 2025 6.4.9 Figure 9.8 Important Hedgerows (Heritage) | 6.4.9, Figure 9.8 | 1 | April 2025 6.4.10 Figure 10.1 Primary Impact Zone | 6.4.10, Figure 10.1 | 1 | April 2025 6.4.10 Figure 10.2 Secondary Impact Zone | 6.4.10, Figure 10.2 | 1 | April 2025 6.4.11 Figure 11.1 Assessment Locations and Daytime Specific Sound Levels | 6.4.11, Figure 11.1 | 1 | April 2025 6.4.11 Figure 11.2 Assessment Locations and Night-time Specific Sound Levels | 6.4.11, Figure 11.2 | 1 | April 2025 6.4.17 Figure 17.2 Utilities Plan | 6.4.17, Figure 17.2 | 1 | April 2025 West Burton Power Station plan | 8.61 | 1 | April 2026

Your change, as a redline

SCHEDULE 12 DOCUMENTS TO BE CERTIFIED

Article 36 (1) Document name | (2) Document reference | (3) Version | (4) Date Site location plan | 1.1 | 2 | November 2025 Land plans | 2.1 | 4 | January 2026 Works plans | 2.2 | 3 | December 2025 Access and public rights of way plan | 2.3 | 2 | July 2025 Book of reference | 4.3 | 3 | April 2026 Environmental Statement: Non Technical Summary | 6.1 | 2 | March 2026 Environmental Statement: Chapter 0 Contents | 6.2.0 | 1 | April 2025 Environmental Statement: Chapter 1 Introduction | 6.2.1 | 1 | April 2025 Environmental Statement: Chapter 2 EIA Methodology & Public Consultation | 6.2.2 | 1 | April 2025 Environmental Statement: Chapter 3 Site Description, Site Selection and Iterative Design Process | 6.2.3 | 1 | April 2025 Environmental Statement: Chapter 4 Proposed Development | 6.2.4 | 1 | April 2025 Environmental Statement: Chapter 5 Planning Policy | 6.2.5 | 1 | April 2025 Environmental Statement: Chapter 6 Landscape and Visual Impact and Residential Amenity | 6.2.6 | 1 | April 2025 Environmental Statement: Chapter 7 Ecology and Biodiversity | 6.2.7 | 3 | April 2026 Environmental Statement: Chapter 8 Hydrology, Hydrogeology, Flood Risk and Drainage | 6.2.8 | 2 | January 2026 Environmental Statement: Chapter 9 Cultural Heritage | 6.2.9 | 1 | April 2025 Environmental Statement: Chapter 10 Socio Economics | 6.2.10 | 1 | April 2025 Environmental Statement: Chapter 11 Noise and Vibration | 6.2.11 | 1 | April 2025 Environmental Statement: Chapter 12 Climate Change | 6.2.12 | 1 | April 2025 Environmental Statement: Chapter 13 Transport and Access | 6.2.13 | 1 | April 2025 Environmental Statement: Chapter 14 Air Quality | 6.2.14 | 2 | January 2026 Environmental Statement: Chapter 16 Land Use and Agriculture | 6.2.15 | 2 | March 2026 Environmental Statement: Chapter 16 Glint and Glare | 6.2.16 | 1 | April 2025 Environmental Statement: Chapter 17 Miscellaneous Issues | 6.2.17 | 1 | April 2025 Environmental Statement: Chapter 18 Summary | 6.2.18 | 2 | March 2026 Environmental Statement: Chapter 19 Glossary | 6.2.19 | 1 | April 2025 Environmental Statement: Appendix 1.1 Steeple Project Environment Impact Assessment Scoping Report | 6.3.1, Appendix 1.1 | 1 | April 2025 Environmental Statement: Appendix 1.2 EIA Scoping Opinion | 6.3.1, Appendix 1.2 | 1 | April 2025 Environmental Statement: Appendix 1.3 Environment Agency EIA Scoping Response | 6.3.1, Appendix 1.3 | 1 | April 2025 Environmental Statement: Appendix 1.4 EIA Statement of Competence | 6.3.1, Appendix 1.4 | 1 | April 2025 Environmental Statement: Appendix 2.1 Schedule 4 Requirements of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 as amended | 6.3.2 Appendix 2.1 | 1 | April 2025 Environmental Statement: ES Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report | 6.3.2 Appendix 2.2 | 2 | December 2025 Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 1 | 6.3.2, Appendix 2.2 Part 1 | 2 | December 2025 Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 2 | 6.3.2, Appendix 2.2 Part 2 | 2 | December 2025 Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 3 | 6.3.2, Appendix 2.2 Part 3 | 2 | December 2025 Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 4 | 6.3.2, Appendix 2.2 Part 4 | 2 | January 2026 Environmental Statement: Appendix 2.2 Phase 1 Geoenvironmental Desk Study Report – Appendix Historical Maps Part 5 | 6.3.2, Appendix 2.2 Part 5 | 2 | January 2026 Environmental Statement: Appendix 2.3 Cumulative Sites Long List and Short List | 6.3.2, Appendix 2.3 | 1 | April 2025 Environmental Statement: Appendix 4.1 Outline construction environmental management plan | 6.3.4, Appendix 4.1 | 3 | March 2026 Environmental Statement: Appendix 4.2 Outline decommissioning plan | 6.3.4, Appendix 4.2 | 3 | March 2026 Environmental Statement: Appendix 4.3 Outline fire risk management plan | 6.3.4, Appendix 4.3 | 3 | March 2026 Environmental Statement: Appendix 4.4 Outline operational environmental management plan | 6.3.4, Appendix 4.4 | 3 | March 2026 Environmental Statement: Appendix 4.5 Outline design principles | 6.3.4, Appendix 4.5 | 2 | January 2026 Environmental Statement: Appendix 4.6 Crossings Schedule | 6.3.4, Appendix 4.6 | 1 | April 2025 Environmental Statement: Appendix 6.1 Viewpoint Photograph Record – Cumulative Annotations Part A and Part B | 6.3.6, Appendix 6.1 | 1 | January 2026 Environmental Statement: Appendix 6.2 Photomontages Part 1 – Summer | 6.3.6, Appendix 6.2 | 1 | April 2025 Environmental Statement: Appendix 6.2 Photomontages Part 1 – Summer with Cumulative Annotations | 6.3.6, Appendix 6.2 | 1 | January 2026 Environmental Statement: Appendix 6.2 Photomontages Part 2 – Winter | 6.3.6, Appendix 6.2 | 1 | April 2025 Environmental Statement: Appendix 6.2 Photomontages Part 2 – Winter With Cumulative Annotations | 6.3.6, Appendix 6.2 | 1 | January 2026 Environmental Statement: Appendix 6.3 Viewpoint Assessment | 6.3.6, Appendix 6.3 | 2 | March 2026 Environmental Statement: Appendix 6.4 – Residential Visual Amenity Assessment | 6.3.6, Appendix 6.4 | 1 | April 2025 Environmental Statement: Appendix 6.5 Arboricultural impact assessment | 6.3.6, Appendix 6.5 | 1 | April 2025 Environmental Statement: Appendix 6.6 Assessment of Public Rights of Way | 6.3.6 Appendix 6.6 | 2 | March 2026 Environmental Statement: Appendix 7.1 Legislation and Policy | 6.3.7 Appendix 7.1 | 1 | April 2025 Environmental Statement: Appendix 7.2 Designated Sites | 6.3.7 Appendix 7.2 | 1 | April 2025 Environmental Statement: Appendix 7.3 Habitat Report | 6.3.7 Appendix 7.3 | 1 | April 2025 Environmental Statement: Appendix 7.4 Breeding Bird Report | 6.3.7 Appendix 7.4 | 1 | April 2025 Environmental Statement: Appendix 7.5 Barn Owl Report (Confidential) | 6.3.7 Appendix 7.5 | 1 | April 2025 Environmental Statement: Appendix 7.6 Wintering Bird Report | 6.3.7 Appendix 7.6 | 1 | April 2025 Environmental Statement: Appendix 7.7 Bat Report | 6.3.7 Appendix 7.7 | 1 | April 2025 Environmental Statement: Appendix 7.8 Badger Report (Confidential) | 6.3.7 Appendix 7.8 | 1 | April 2025 Environmental Statement: Appendix 7.9 Otter and Water Vole Report | 6.3.7 Appendix 7.9 | 1 | April 2025 Environmental Statement: Appendix 7.10 Great Crested Newt Report | 6.3.7 Appendix 7.10 | 1 | April 2025 Environmental Statement: Appendix 7.11 Aquatic Invertebrates Report | 6.3.7 Appendix 7.11 | 1 | April 2025 Environmental Statement: Appendix 7.12 Biodiversity Net Gain | 6.3.7 Appendix 7.12 | 1 | April 2025 Environmental Statement: Appendix 7.13 Skylark Mitigation Strategy | 6.3.7 Appendix 7.13 | 1 | April 2025 Environmental Statement: Appendix 7.14 Outline landscape ecology management plan | 6.3.7 Appendix 7.14 | 2 | April 2026 Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 1 | 6.3.8 Appendix 8.1 Part 1 | 4 | March 2026 Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 1 Rev 2 Appendix E update | 6.3.8 Appendix 8.1 Part 1 | 1 | January 2026 Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 2 | 6.3.8 Appendix 8.1 Part 2 | 1 | April 2025 Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 3 | 6.3.8 Appendix 8.1 Part 3 | 2 | January 2026 Environmental Statement: Appendix 8.1 Flood Risk Assessment Part 3 Appendix G update only | 6.3.8 Appendix 8.1 Part 3 | 1 | January 2026 Environmental Statement: Appendix 8.2 Surface water drainage strategy | 6.3.8 Appendix 8.2 | 4 | March 2026 Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 2 Appendix B update only | 6.3.8 Appendix 8.2 | 2 | January 2026 Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix G update only | 6.3.8 Appendix 8.2 | 1 | January 2026 Environmental Statement: Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix H update only | 6.3.8 Appendix 8.2 | 1 | January 2026 Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix H update only | 6.3.8 Appendix 8.2 | 1 | January 2026 Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix L (New) | 6.3.8 Appendix 8.2 | 1 | January 2026 Environmental Statement: 6.3.8 Appendix 8.2 Surface Water Drainage Strategy Rev 3 Appendix M (New) | 6.3.8 Appendix 8.2 | 1 | January 2026 Environmental Statement: Appendix 8.3 Water Framework Directive Assessment | 6.3.8, Appendix 8.3 | 2 | January 2026 Environmental Statement: Appendix 9.1 Cultural Heritage Technical Baseline | 6.3.9 Appendix 9.1 | 1 | April 2025 Environmental Statement: Appendix 9.2 Magnitude Surveys Geophysical Survey Report | 6.3.9 Appendix 9.2 | 2 | March 2026 Environmental Statement: Appendix 9.3 Archaeological Mitigation Statement | 6.3.9 Appendix 9.3 | 1 | April 2025 Environmental Statement: Appendix 9.4 Outline written scheme of investigation for pre-determination trial trenching | 6.3.9 Appendix 9.4 | 1 | April 2025 Environmental Statement: Appendix 9.5 Outline written scheme of investigation for post consent archaeological works | 6.3.9 Appendix 9.5 | 2 | April 2026 Environmental Statement: Appendix 10.1 Outline supply chain, employment and skills plan | 6.3.10 Appendix 10.1 | 2 | January 2026 Environmental Statement: Appendix 13.1 Transport Assessment | 6.3.13 Appendix 13.1 | 1 | April 2025 Environmental Statement: Appendix 13.2 Outline construction traffic management plan | 6.3.13 Appendix 13.2 | 2 | March 2026 Environmental Statement: Appendix 14.1 Air Quality Appendices | 6.3.14 Appendix 14.1 | 1 | April 2025 Environmental Statement: Appendix 15.1 Agricultural Land Classification Report | 6.3.15 Appendix 15.1 | 1 | April 2025 Environmental Statement: Appendix 15.2 Outline soil management plan | 6.3.15 Appendix 15.2 | 2 | January 2026 Environmental Statement: Appendix 16.1 Solar | 6.3.16 Appendix 16.1 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 1 | 6.3.17 Appendix 17.1 Part 1 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 2 | 6.3.17 Appendix 17.1 Part 2 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 3 | 6.3.17 Appendix 17.1 Part 3 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 4 | 6.3.17 Appendix 17.1 Part 4 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 5 | 6.3.17 Appendix 17.1 Part 5 | 1 | April 2025 Environmental Statement: Appendix 17.1 Utilities Report Part 6 | 6.3.17 Appendix 17.1 Part 6 | 1 | April 2025 Figure 1.1 Site Location Plan | 6.4.1, Figure 1.1 | 2 | July 2025 Figure 2.1 Indicative Site Layout | 6.4.2, Figure 2.1 | 2 | July 2025 Figure 2.2 Cumulative Schemes Plan | 6.4.2, Figure 2.2 | 1 | April 2025 Figure 3.1 Site Constraints Plan | 6.4.3, Figure 3.1 | 1 | April 2025 Figure 3.2 Topographical Survey | 6.4.3. Figure 3.2 | 2 | July 2025 Figure 3.3 Public Rights of Way Plan | 6.4.3, Figure 3.3 | 1 | April 2025 Figure 3.4 Alternative Sites | 6.4.3, Figure 3.4 | 1 | April 2025 Figure 6.1 Site Location Plan | 6.4.6, Figure 6.1 | 1 | April 2025 Figure 6.2 Landscape Designations | 6.4.6, Figure 6.2 | 1 | April 2025 Figure 6.3 Topography | 6.4.6, Figure 6.3 | 1 | April 2025 Figure 6.4 Landscape Character Areas | 6.4.6, Figure 6.4 | 1 | April 2025 Figure 6.5a Visual Receptors (Settlements, A Roads, B Roads and Long-Distance Routes) Revision D | 6.4.6, Figure 6.5a | 1 | June 2025 Figure 6.5b Visual Receptors (Settlements, A Roads, B Roads and PROW) | 6.4.6, Figure 6.5b | 1 | April 2025 Figure 6.5c Visual Receptors (Settlements, A Roads, B Roads and Minor Roads) | 6.4.6, Figure 6.5c | 1 | April 2025 Figure 6.6a Screened Zone of Theoretical Visibility (SZTV) and viewpoint (VP) Locations (10km radius) | 6.4.6, Figure 6.6a | 1 | April 2025 Figure 6.6b SZTV and VP Locations (5km radius) | 6.4.6, Figure 6.6b | 1 | April 2025 Figure 6.6c SZTV and VP Locations (2km radius) | 6.4.6, Figure 6.6c | 1 | April 2025 Figure 6.7 SZTV and Landscape Character | 6.4.6, Figure 6.7 | 1 | April 2025 Figure 6.8a SZTV and Visual Receptors (Settlements, A Roads, B Roads and Long Distance Routes) | 6.4.6, Figure 6.8a | 1 | April 2025 Figure 6.8b SZTV and Visual Receptors (Settlements, A Roads, B Roads and PROW) | 6.4.6, Figure 6.8b | 1 | April 2025 Figure 6.8c SZTV and Visual Receptors (Settlements, A Roads, B Roads and Minor Roads) | 6.4.6, Figure 6.8c | 1 | April 2025 Figure 6.9 Outline Landscape and Ecology Mitigation Strategy | 6.4.6, Figure 6.9 | 1 | April 2025 6.4.8 Figure 8.1 Watercourses | 6.4.8, Figure 8.1 | 1 | April 2025 6.4.8 Figure 8.2 Environment Agency Flood Zones | 6.4.8, Figure 8.2 | 1 | April 2025 6.4.8 Figure 8.3 Environment Agency Surface Water Flood Extents | 6.4.8, Figure 8.3 | 1 | April 2025 6.4.8 Figure 8.4 Groundwater and Surface Water Abstractions | 6.4.8, Figure 8.4 | 1 | April 2025 6.4.9 Figure 9.1 Heritage Assets Considered Within The Environmental Statement | 6.4.9, Figure 9.1 | 1 | April 2025 6.4.9 Figure 9.2 Designated Heritage Assets Within Relevant Study Area | 6.4.9, Figure 9.2 | 1 | April 2025 6.4.9 Figure 9.3 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area | 6.4.9, Figure 9.3 | 1 | April 2025 6.4.9 Figure 9.4 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area | 6.4.9, Figure 9.4 | 1 | April 2025 6.4.9 Figure 9.5 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area | 6.4.9, Figure 9.5 | 1 | April 2025 6.4.9 Figure 9.6 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area | 6.4.9, Figure 9.6 | 1 | April 2025 6.4.9 Figure 9.7 Nottinghamshire Historic Environmental Record Monuments Within Relevant Study Area | 6.4.9, Figure 9.7 | 1 | April 2025 6.4.9 Figure 9.8 Important Hedgerows (Heritage) | 6.4.9, Figure 9.8 | 1 | April 2025 6.4.10 Figure 10.1 Primary Impact Zone | 6.4.10, Figure 10.1 | 1 | April 2025 6.4.10 Figure 10.2 Secondary Impact Zone | 6.4.10, Figure 10.2 | 1 | April 2025 6.4.11 Figure 11.1 Assessment Locations and Daytime Specific Sound Levels | 6.4.11, Figure 11.1 | 1 | April 2025 6.4.11 Figure 11.2 Assessment Locations and Night-time Specific Sound Levels | 6.4.11, Figure 11.2 | 1 | April 2025 6.4.17 Figure 17.2 Utilities Plan | 6.4.17, Figure 17.2 | 1 | April 2025 West Burton Power Station plan | 8.61 | 1 | April 2026

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds