The Steeple Renewables Project Order 2026
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 7 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
Article 20 1 In this Schedule— “access rights” means any rights over land to— alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation to such access); remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; “cable rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; “habitat mitigation and enhancement rights” over land to— install, execute, implement, retain, maintain, inspect, repair, improve, renew, remove, relocate, plant and replant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures; remain, pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works; “substation connection rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures and to connect such cables and services to the National Grid West Burton Power Station substation; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain soft landscaping measures. (1) Plot number(s) | (2) Work No. | (3) Purpose for which rights may be acquired and restrictive covenants imposed 05/03, 05/10, 05/11, 05/12, 05/14, 05/16, 05/17, 05/19 | 4 | Cable rights 02/02, 02/08, 02/11, 02/15, 02/16, 02/19, 02/24, 02/26, 04/03, 04/04, 04/06, 05/01, 05/03, 05/04, 05/05, 05/06, 05/07, 05/13, 05/14, 05/29, 05/30, 05/33, 06/03, 06/05, 06/10, 06/16, 06/19, 06/20, 06/21 | 6 | Cable rights 02/22, 03/09 | 6a | Cable rights 05/03, 05/14, 05/27, 05/28, 05/32 | 6 | Access rights 01/01, 01/02, 01/03, 03/01, 03/02, 03/04, 06/24, 07/01, 07/02, 07/03, 07/04, 07/05, 07/06, 07/07, 07/08, 07/09, 07/10, 07/11 | 8 | Habitat mitigation and enhancement rights 05/03, 05/10, 05/11, 05/12, 05/14, 05/16, 05/17, 05/19 | 4, 5 | Substation connection rights 03/11 | 7 | Cable rights, access rights 05/22 | 7 | Cable rights
SCHEDULE 7 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
Article 20 1 In this Schedule— “access rights” means any rights over land to— alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and road widening and to remove impediments (including vegetation to such access); remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; “cable rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; “habitat mitigation and enhancement rights” over land to— install, execute, implement, retain, maintain, inspect, repair, improve, renew, remove, relocate, plant and replant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures; remain, pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works; “substation connection rights” means rights over land to— install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures and to connect such cables and services to the National Grid West Burton Power Station substation; remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; and install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain soft landscaping measures. (1) Plot number(s) | (2) Work No. | (3) Purpose for which rights may be acquired and restrictive covenants imposed 05/03, 05/10, 05/11, 05/12, 05/14, 05/16, 05/17, 05/19 | 4 | Cable rights 02/02, 02/08, 02/11, 02/15, 02/16, 02/19, 02/24, 02/26, 04/03, 04/04, 04/06, 05/01, 05/03, 05/04, 05/05, 05/06, 05/07, 05/13, 05/14, 05/29, 05/30, 05/33, 06/03, 06/05, 06/10, 06/16, 06/19, 06/20, 06/21 | 6 | Cable rights 02/22, 03/09 | 6a | Cable rights 05/03, 05/14, 05/27, 05/28, 05/32 | 6 | Access rights 01/01, 01/02, 01/03, 03/01, 03/02, 03/04, 06/24, 07/01, 07/02, 07/03, 07/04, 07/05, 07/06, 07/07, 07/08, 07/09, 07/10, 07/11 | 8 | Habitat mitigation and enhancement rights 05/03, 05/10, 05/11, 05/12, 05/14, 05/16, 05/17, 05/19 | 4, 5 | Substation connection rights 03/11 | 7 | Cable rights, access rights 05/22 | 7 | Cable rights
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.