Propose a change

The Rother Valley Railway (Bodiam to Robertsbridge Junction) Order 2023

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

6 Power to construct new railway

(1) The Company may construct and maintain the new railway. (2) Subject to article 8 (power to deviate) the new railway may only be constructed in the lines or situations shown on the Order plans and in accordance with the levels shown on the Order sections. (3) Subject to paragraph (5), the Company may carry out and maintain such of the following works as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the new railway, namely— (a) electrical equipment and signalling works; (b) ramps, means of access, a passing loop, and a halt at Salehurst; (c) embankments, viaducts, aprons, abutments, retaining walls, wing walls, bridges, drainage and culverts; (d) works to install or alter the position of apparatus, including mains, sewers, drains and cables; (e) temporary works in the river Rother in connection with the construction of the new railway; (f) works to alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses; (g) extension and strengthening of the wall to the north of the river Rother at Robertsbridge between points X and Y on the Order plans. (4) Subject to paragraph (5), the Company may carry out and maintain such other works (of whatever nature) as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the new railway, other than works that would interfere with a navigable watercourse. (5) Paragraphs (3) and (4) only authorise the carrying out or maintenance of works outside the limits of deviation if such works are carried out on— (a) land specified in columns (1) and (2) of Schedule 2 (acquisition of land for ancillary works) for the purpose specified in column (3) of that Schedule; or (b) land specified in columns (1) and (2) of Schedule 7 (land of which temporary possession may be taken) for the purposes specified in column (3) of that Schedule. (6) The Company may, within the Order limits— (a) carry out and maintain landscaping, ecological and other works to mitigate any adverse effects of the construction, maintenance and operation of the authorised works (other than works authorised by this paragraph); and (b) carry out and maintain works for the benefit or protection of land affected by the authorised works (other than works authorised by this paragraph).

Your change, as a redline

6 Power to construct new railway

(1) The Company may construct and maintain the new railway. (2) Subject to article 8 (power to deviate) the new railway may only be constructed in the lines or situations shown on the Order plans and in accordance with the levels shown on the Order sections. (3) Subject to paragraph (5), the Company may carry out and maintain such of the following works as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the new railway, namely— (a) electrical equipment and signalling works; (b) ramps, means of access, a passing loop, and a halt at Salehurst; (c) embankments, viaducts, aprons, abutments, retaining walls, wing walls, bridges, drainage and culverts; (d) works to install or alter the position of apparatus, including mains, sewers, drains and cables; (e) temporary works in the river Rother in connection with the construction of the new railway; (f) works to alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses; (g) extension and strengthening of the wall to the north of the river Rother at Robertsbridge between points X and Y on the Order plans. (4) Subject to paragraph (5), the Company may carry out and maintain such other works (of whatever nature) as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the new railway, other than works that would interfere with a navigable watercourse. (5) Paragraphs (3) and (4) only authorise the carrying out or maintenance of works outside the limits of deviation if such works are carried out on— (a) land specified in columns (1) and (2) of Schedule 2 (acquisition of land for ancillary works) for the purpose specified in column (3) of that Schedule; or (b) land specified in columns (1) and (2) of Schedule 7 (land of which temporary possession may be taken) for the purposes specified in column (3) of that Schedule. (6) The Company may, within the Order limits— (a) carry out and maintain landscaping, ecological and other works to mitigate any adverse effects of the construction, maintenance and operation of the authorised works (other than works authorised by this paragraph); and (b) carry out and maintain works for the benefit or protection of land affected by the authorised works (other than works authorised by this paragraph).

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it

Think it through

Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.

Questions to start with
Think it through
Legal information from the published text, not advice for your case. Check the sources. Find a law · What the register holds