Propose a change

Title 41 Water

Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.

Change 1

What to do with it
As published

41-3-939. Groundwater study to assess corrective controls within groundwater control areas.

Subject to available funding, not less than once every ten (10) years the state engineer shall conduct a groundwater study in each county that has a control area designated by the board of control under W.S. 41-3-912 and where the state engineer has ordered one (1) or more corrective controls under W.S. 41-3-915. The study under this section shall assess the effect of the ordered corrective controls, assess recharge of the aquifer compared to water consumption from that aquifer and assess the impact of future development on the aquifer. The study under this section may include mapping, modeling and the drilling of monitoring wells. The state engineer may conduct a study under this section in counties without a control area if deemed necessary by the state engineer. The results of each study conducted under this section shall be made public by the state engineer and shall be reported to the joint agriculture, state and public lands and water resources interim committee not later than sixty (60) days after the study is completed.

Your change, as a redline

41-3-939. Groundwater study to assess corrective controls within groundwater control areas.

Subject to available funding, not less than once every ten (10) years the state engineer shall conduct a groundwater study in each county that has a control area designated by the board of control under W.S. 41-3-912 and where the state engineer has ordered one (1) or more corrective controls under W.S. 41-3-915. The study under this section shall assess the effect of the ordered corrective controls, assess recharge of the aquifer compared to water consumption from that aquifer and assess the impact of future development on the aquifer. The study under this section may include mapping, modeling and the drilling of monitoring wells. The state engineer may conduct a study under this section in counties without a control area if deemed necessary by the state engineer. The results of each study conducted under this section shall be made public by the state engineer and shall be reported to the joint agriculture, state and public lands and water resources interim committee not later than sixty (60) days after the study is completed.

One line that says what changes, such as "Halve the dog tax".

Who it helps, what it costs, what it fixes. It is what persuades people to support it.

A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.

Sign in to file your proposal. What you have written stays on this page.

Sign in to file it