The Electricity and Gas (Energy Company Obligation) Order 2014
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
29 Determining the cost score for a surplus action
(1) Subject to paragraph (2), the cost score for a surplus action is— A × B where— “A” is— the cost saving attributed to that action under article 19 of the 2012 Order; or if no cost saving was attributed to the action under article 19 of the 2012 Order, the cost saving for that action calculated in accordance with article 16(7) of the 2012 Order; “B” is the relevant conversion factor. (2) Where a surplus action is the repair or replacement of a qualifying boiler, the cost score for that action is the cost saving for that action calculated in accordance with article 17 of the 2012 Order multiplied by the relevant conversion factor. (3) In this article, “relevant conversion factor” means— (a) where a measure is described in the first column of the table in Schedule 5, the number specified for that measure in the second column of that table; or (b) where a measure is not so described, 1.
29 Determining the cost score for a surplus action
(1) Subject to paragraph (2), the cost score for a surplus action is— A × B where— “A” is— the cost saving attributed to that action under article 19 of the 2012 Order; or if no cost saving was attributed to the action under article 19 of the 2012 Order, the cost saving for that action calculated in accordance with article 16(7) of the 2012 Order; “B” is the relevant conversion factor. (2) Where a surplus action is the repair or replacement of a qualifying boiler, the cost score for that action is the cost saving for that action calculated in accordance with article 17 of the 2012 Order multiplied by the relevant conversion factor. (3) In this article, “relevant conversion factor” means— (a) where a measure is described in the first column of the table in Schedule 5, the number specified for that measure in the second column of that table; or (b) where a measure is not so described, 1.
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.