High Speed Rail (London - West Midlands) Act 2017
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 5 Acquisition of land for particular purposes
Section 4(2) The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table. Area | Number of land shown on deposited plans | Purpose for which land may be acquired or used London Borough of Camden | 4, 13, 79a, 99 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 68, 69, 93, 162, 163, 236, 369, 401 to 411, 508, 522, 665, 704, 721, 724, 727, 750, 791, 792, 794 to 796, 801 to 805, 807 to 811, 901, 912, 978, 1017, 1051 | Diversion or installation of, or works to, utilities apparatus 78, 110, 816, 817, 819, 820, 822, 829, 834, 847, 848, 849, 852, 854, 855, 856, AP3-22 | Provision of worksite and access for construction 140a, 142 | Provision of worksite and access for construction Diversion or installation of, or works to utilities apparatus Installation of ground anchors 90, 151 to 154, 157, 159, 177, 180, 181 | Installation of ground anchors 363 | Provision of electricity supply system and access 434 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance AP3-5 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus London Borough of Brent | 28, 29, 48, 50, 55, 58, 78, 87, 185, 374, AP4-13 to AP4-15 | Diversion or installation of, or works to, utilities apparatus 53a, 54a, AP4-6, AP4-10 | Provision of worksite and access for construction Royal Borough of Kensington & Chelsea | 1 to 3 | Provision of worksite and access for construction Provision and renewal of railway systems for operational purposes and drainage 16, 19 | Diversion or installation of, or works to, utilities apparatus London Borough of Hammersmith & Fulham | 5, 6, 50c, 67, AP4-3, AP4-7, AP4-9 to AP4-11 | Provision of worksite and access for construction 12, 13, 21a, 22c, 22e, 28, 29, 37, 48, 50a, 50b, 63, 66, 71, 73, 75, 76 | Diversion or installation of, or works to, utilities apparatus 77 | Provision of environmental mitigation AP4-1 | Provision of worksite and access for construction and maintenance London Borough of Ealing | 5, 7, 8, 9, 12, 13, 29, 30, 118a, 120a, 124a, 124b, 132, 156, 223, 229, 233, 265, 562, 787a, 788 to 790, 946 to 949 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 20, 21, 35, 36, 40, 41, 44, 45, 48, 49, 52, 53, 56, 57, 60, 61, 64, 65, 68, 69, 72, 73, 76, 77, 80, 81, 84, 125a, 125b, 126, 127a, 127b, 142 to 144, 145a, 152 to 154, 155a, 155b, 190, 193, 194, 196, 200, 202, 204 to 206, 209, 214, 216 to 219, 221, 222, 228, 231, 232, 235, 237, 240, 242, 251, 254 to 257, 259, 267, 269, 271, 272, 274, 277, 282 to 289, 438, 439, AP2-13, AP2-15, AP2-17, AP2-21, AP4-8, AP4-10, AP4-16, AP4-17 | Provision of worksite and access for construction 103, 106 | Provision of worksite and access for construction Provision and renewal of railway systems for operational purposes and drainage Diversion or installation of, or works to, utilities apparatus 119, 121, 150, 151, 157, 158, 165 | Provision of worksite and access for construction Reinstatement of businesses or facilities Diversion or installation of, or works to, utilities apparatus 133 to 139, 295, 297, 298, 314, 315, 322 to 324, 396, 406, 408, 445, 456 to 461, 471, 579, 580, 716, 770, 771, 798, 799, 805 to 807, 842 to 844, 849, 867, 898, 922, 925, 926, 942, 944, 945, 957 to 964, 973 to 975, 977, 985, 987, AP2-25, AP2-26 | Diversion or installation of, or works to, utilities apparatus 213 | Provision and renewal of railway systems for operational purposes and drainage 454 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus AP4-1 | Reinstatement of businesses or facilities London Borough of Hillingdon | 1 to 16, 26 to 28, 39, 40, 68, 84, 85, 106, 107, 128 to 139, 175, 176, 190, 202, 203, 219, 224, 229 to 239, 371, 384, 387, 390, 447, 449, 452, 454, 463a, 464a, 476, 477, 478a, 492a, 522, 523, 523a, AP5-1b, AP5-2 to AP5-14 | Diversion or installation of, or works to, utilities apparatus 25, 441, 442, 458, 459, 469, 471, 483a, 484, 485, 494 to 496, 537, AP4-20, AP4-25, AP4-27 to AP4-29, AP4-33 to AP4-39 | Provision of environmental mitigation 25a, 470, 494b | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 50, 51 | Provision of access for construction and maintenance of utility diversions 101 to 103, 420, 422, 423, 426, 427 to 429, 466a, 467, 482, 487, 488, 502, 504, 506, AP4-12, AP4-13, AP4-15, AP4-16 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 377, 379, 411, 414, 415, 535 | Provision of worksite and access for construction 412, 413, 416 to 419, AP4-26 | Provision of worksite and access for construction and maintenance 424, 425, 460, 536, 540, AP4-17 to AP4-19 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 465a, 511 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 474 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation 496a, 498, 499, 526 to 534 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation Diversion and installation of overhead electric lines 501, 507 | Diversion and installation of overhead electric lines Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 510, AP4-21 | Provision of worksite and access for construction Provision of environmental mitigation 545 | Diversion and installation of overhead electric lines Provision of worksite and access for construction and maintenance 548, 550, 556 to 558, 563, AP2-1 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 562 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 564, 590b, AP2-3, AP2-4 | Diversion and installation of overhead electric lines 606, 614, 615, 618 | Provision of worksite and access for construction and maintenance Provision and renewal of railway systems for operational purposes and drainage Provision of new public right of way Diversion and installation of overhead electric lines Diversion or installation of, or works to, utilities apparatus 611, 613 | Provision of worksite and access for construction and maintenance Provision and renewal of railway systems for operational purposes and drainage Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 612 | Provision of worksite and access for construction and maintenance Provision and renewal of railway systems for operational purposes and drainage Diversion or installation of, or works to, utilities apparatus 616 | Provision of worksite and access for construction and maintenance Provision and renewal of railway systems for operational purposes and drainage Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 496, 654, 655 | Provision of environmental mitigation Provision of flood mitigation measures 496a, 498 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines 557, 560, 561, 570 to 580, 583, 584, 588, 590, 591, 593, 594, 707, 714, 719, 720c | Diversion and installation of overhead electric lines 558 | Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines 565 | Diversion and installation of overhead electric lines Provision of electricity supply system and access 566 to 568 | Provision of access for construction and maintenance of utility diversions Provision of electricity supply system and access 603, 604, 643 to 645, 657 to 659, 665, 683, 693, 694, 698a, 720d, 723, 724, 728, 729, 736, 737, 739, 741, 742, 748, 749, 753, 767, 768, 770, 784, 786, 787, 789 | Provision of environmental mitigation 621 | Provision of balancing pond and associated works and access for maintenance Provision of electricity supply system and access Provision of new public right of way 622, 624, 625, 627, 628, 630 to 632, 636, 666, 669, 671, 738 | Diversion or installation of, or works to, utilities apparatus 633, 676, 677, 679, 697, 741a, 747, 747a, 747b, 747d, 756, 756a, 761, 762a, 763 to 765, 771, 772, 774 to 778, 780 to 783 | Provision of worksite and access for construction and maintenance 642, 758 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 663, 672 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 692 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Provision of electricity supply system and access Provision of flood mitigation measures Provision of new public right of way Diversion and installation of overhead electric lines 726, 731, 734, 740, 745, 746 | Provision of worksite and access for construction 751, 755 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation 759 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus AP2-5, AP2-6 | Provision of access for construction and maintenance AP4-40 to AP4-42 | Reinstatement of businesses or facilities County of Buckinghamshire, District of South Bucks,Parish of Iver | AP2-1, AP2-3 | Provision and renewal of railway systems for operational purposes and drainage AP2-9 to AP2-11, AP2-14, AP2-15 | Provision of worksite and access for construction Borough of Slough | AP2-3, AP2-5, AP2-6, AP2-14, AP2-21, AP2-25, AP2-30, AP2-33, AP2-34 | Provision of worksite and access for construction AP2-12, AP2-26 | Provision and renewal of railway systems for operational purposes and drainage AP2-13, AP2-20 | Provision of worksite and access for construction Provision and renewal of railway systems for operational purposes and drainage AP2-17, AP2-22, AP2-23, AP2-28 | Provision of worksite and access for construction Provision of flood mitigation measures AP2-35 | Provision of access for construction and maintenance of utility diversions AP2-37 | Diversion or installation of, or works to, utilities apparatus County of Buckinghamshire District of South Bucks Parish of Denham | 1, 2 | Provision of flood mitigation measures 1d, 1f | Diversion and installation of overhead electric lines 11, 17, 19, 32 | Provision of environmental mitigation 25, 26, 28 to 31, 33, 46, 52 | Provision of worksite and access for construction 14, 15, 23, 27 | Provision of balancing pond and associated works and access for maintenance 26 | Provision of worksite and access for construction 34 | Provision of environmental mitigation Provision of worksite and access for construction 42, 43 | Diversion or installation of, or works to, utilities apparatus 37 to 39, 47 to 49, AP2-3 | Provision of access for construction and maintenance AP4-1, AP4-2, AP4-4 to AP4-9 | Provision of worksite and access for construction Provision of drainage and associated works Parish of Wexham | AP4-1 | Provision of environmental mitigation County of Hertfordshire District of Three Rivers | 5 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works 7, 13, 15, 17, 19, 21, 22, 24, 25, 27, 31, 38, 41, 44, 48, 54, 58, 65, 69, 104 | Provision of worksite and access for construction 12 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 23, 53, 80 | Provision of balancing pond and associated works and access for maintenance 32, 36, 37 | Provision of worksite and access for construction Provision of drainage and associated works 40, 46, 61, 63, 64 | Provision of drainage and associated works 49, 55, 80a, 84, 94, 97, 120, AP4-1 to AP4-17 | Provision of environmental mitigation 75 | Provision of environmental mitigation Provision of worksite and access for construction 107, 109 | Provision of environmental mitigation Provision of worksite and access for construction Provision of electricity supply system and access Diversion and installation of overhead electric lines 116 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 10 | Diversion or installation of, or works to, utilities apparatus AP4-18 | Reinstatement of businesses or facilities County of Buckinghamshire District of Chiltern Parish of Chalfont St Peter | 1, 7, 21, 30, 31, 35 | Provision of worksite and access for construction 16 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 19 | Diversion and installation of overhead electric lines 70, 75, 76, 83, 85 | Provision of environmental mitigation Parish of Chalfont St Giles | 4 to 6 | Provision of environmental mitigation 131 | Provision of worksite and access for construction 134, 135, 139, 141, 142, 147 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Parish of Amersham | 7, 22, 24, 28, 34, 37 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance 10 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 27 | Diversion or installation of, or works to, utilities apparatus 31 | Provision of environmental mitigation Provision of worksite and access for construction 59, 66, 67, 74, 76, 77 | Provision of protective works to watercourse Parish of Coleshill | 4 | Provision of environmental mitigation 8 | Diversion or installation of, or works to, utilities apparatus Parish of Little Missenden | 2 to 4 | Provision of protective works to watercourse 11, 16 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 14 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance 15, 17, 19, 20 | Diversion or installation of, or works to, utilities apparatus AP2-2, AP2-3 | Provision of new public right of way Parish of Great Missenden | 142, 158, 174, 178, AP4-55, AP4-56 | Provision of environmental mitigation 135 to 137 | Provision of drainage and associated works 155, 184 | Provision of environmental mitigation Provision of drainage and associated works AP4-80, AP4-81 | Provision of environmental mitigation Provision of new public right of way 170, 171 | Provision of environmental mitigation Provision of worksite and access for construction AP4-31, AP4-38, AP4-41, AP4-41a, AP4-42 to AP4-44, AP4-47a, AP4-48, AP4-49, AP4-59, AP4-73, AP4-74 | Diversion and installation of overhead electric lines 173, 179, 188, 189 | Diversion or installation of, or works to, utilities apparatus 112, 117 | Provision of environmental mitigation Diversion and installation of overhead electric lines Diversion or installation of, or works to, utilities apparatus 157, 159 to 161, 163, 167, AP4-15 | Provision of worksite and access for construction 128, 139 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 138, 147 | Diversion and installation of overhead electric lines 166 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines 162a, 162b | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 180, AP4-51, AP4-52, AP4-75 | Provision of environmental mitigation Diversion and installation of overhead electric lines AP2-2 | Provision of balancing pond and associated works and access for maintenance AP4-54, AP4-78 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance AP4-57 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines Provision of new public right of way AP4-58, AP4-69, AP4-70 | Provision of worksite and access for construction and maintenance Provision of drainage and associated works AP4-65 | Provision of balancing pond and associated works and access for maintenance AP4-67 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works AP4-68 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines Parish of The Lee | 2, 42 to 45 | Provision of environmental mitigation 5, 22, 24, 28, 34 | Reprofiling of ground 8, 9, 26 | Provision of worksite and access for construction Reprofiling of ground 11, 12, 18, 19, 31 | Provision of environmental mitigation Diversion and installation of overhead electric lines 16 | Diversion and installation of overhead electric lines 27 | Provision of environmental mitigation Reprofiling of ground Diversion or installation of, or works to, utilities apparatus 32 | Provision of environmental mitigation Reprofiling of ground 36 | Reprofiling of ground Provision of worksite and access for construction and maintenance 39, 40 | Provision of environmental mitigation Provision of worksite and access for construction AP2-1 | Provision of access for construction District of Aylesbury Vale Parish of Wendover | 1, 3, 14, 48, 150, 153, 233 | Provision of environmental mitigation Diversion and installation of overhead electric lines 5, 8, 15, 19, 59, 66 to 71, 74, 76 to 78, 80, 81, 123, 143, 147, 220 | Provision of drainage and associated works 7, 251a | Provision of environmental mitigation Provision of drainage and associated works 9, 11, 23, 25, 50, 57, 65, 97, 98, 127, 129, 132, 146, 222, 232, 236, 238, 239, 243, 248, 250a, 257 | Provision of environmental mitigation 18, 42, 45, 46, 60, 120, 126, 149, 151, 182, 187, 190, 192, 224 | Provision of worksite and access for construction 24 | Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 29 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 31 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Provision of drainage and associated works 32, 58, 108, 109, 142, 212, 214, 223, 241 | Diversion and installation of overhead electric lines 34, 55, 94, 124, 204 | Provision of environmental mitigation Diversion and installation of overhead electric lines Provision of worksite and access for construction 35, 169, 172, 185, 205, 206 | Diversion or installation of, or works to, utilities apparatus 38 to 41, 52, 96, 103, 110, 111 | Provision of environmental mitigation Provision of worksite and access for construction 47, 56, 62, 63, 165, 211, 235 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 54 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 61, 221 | Provision of worksite and access for construction Provision of drainage and associated works 64 | Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of drainage and associated works 91, 213, 215 | Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 95 | Provision of worksite and access for construction and maintenance 100 | Provision of environmental mitigation Provision of drainage and associated works Diversion and installation of overhead electric lines 135, 136 | Provision of balancing pond and associated works and access for maintenance Diversion and installation of overhead electric lines 156, 159, 217 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 171 | Provision of worksite and access for construction Provision of new public right of way 173 | Installation of ground anchors 203 | Provision of worksite and access for construction Provision of new public right of way Diversion and installation of overhead electric lines 219 | Provision of worksite and access for construction Provision of environmental mitigation Provision of drainage and associated works Diversion and installation of overhead electric lines 230 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines AP1-11 | Provision of environmental mitigation Provision of worksite and access for construction and provision of balancing pond and associated works Access for maintenance AP2-1 | Provision of balancing pond and associated works and access for maintenance AP2-3a | Minor highway alterations AP2-4 | Reinstatement of businesses or facilities District of Wycombe Parish of Ellesborough | 2 | Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 4, 15, 74 | Provision of worksite and access for construction 5 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 10 | Provision of environmental mitigation Provision of drainage and associated works 13, 17, 32, 33 | Diversion or installation of, or works to, utilities apparatus 34, 44, 66, 70 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 22, 23, 30, 35, 36, 38, 41, 47, 48, AP2-1, AP2-2 | Provision of environmental mitigation 50, 51, 54 to 57 | Provision of flood mitigation measures 52 | Provision of worksite and access for construction and maintenance 53, 61 to 64, 71, 72 | Provision of drainage and associated works 69, 80 | Diversion and installation of overhead electric lines 11, 12 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus AP4-1 | Provision of environmental mitigation Provision of worksite and access for construction District of Aylesbury Vale Parish of Stoke Mandeville | 4, 21, 23, 26, 33, 34, 38, 81, 90, 100 to 102, 108, 112, 155, 157, 158, 161 | Provision of environmental mitigation 6, 69, 113 | Provision of worksite and access for construction and maintenance 8, 9, 94, 95, 120 | Provision of flood mitigation measures 10 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 18 | Provision of worksite and access for construction and maintenance Provision of new public right of way 22, 48, 56, 122, 132, 144 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 24, 59, 63, 116, 149, 151 | Provision of worksite and access for construction 25, 72, 75, 76, 78 to 80, 87, 88, 91, 98, 109, 117, 138, 141 | Diversion or installation of, or works to, utilities apparatus 28 | Provision of balancing pond and associated works and access for maintenance 43, 84, 103, 129 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 61 | Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 62 | Provision of drainage and associated works 74, 92, 93, 152 | Provision of drainage and associated works Provision of environmental mitigation 83, AP2-2 | Provision of new public right of way Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation 118 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 119 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works 123, 131, 134, AP1-3, AP1-4, 150 | Provision of environmental mitigation Provision of worksite and access for construction 126 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 146 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance District of Wycombe Parish of Great and Little Kimble cum Marsh | 1 | Provision of drainage and associated works 3, 7, 9 | Provision of worksite and access for construction District of Aylesbury Parish of Stone with Bishopstone and Hartwell | 6, 65, 86 | Diversion or installation of, or works to, utilities apparatus 17, 18, 23, 32 | Provision of environmental mitigation Diversion and installation of overhead electric lines 27, 29, 30, 37, 69, 79, 81 | Provision of environmental mitigation 28, 28b | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 33 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works Provision of worksite and access for construction 35 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 36 | Provision of environmental mitigation Provision of access for construction and maintenance 39 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works Provision of access for construction and maintenance 40 | Provision of worksite and access for construction and maintenance 44, 46, 53, 57, 59 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 45 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance 47 | Provision of worksite and access for construction Provision of a turning head 48, 85, 90 | Provision of worksite and access for construction 51, 55 | Provision of worksite and access for construction Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 60 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Provision of a turning head 61, 72 | Provision of environmental mitigation Provision of worksite and access for construction 66a, 66b, 71b, 73b | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation Provision of drainage and associated works Provision of flood mitigation measures 74a, 75, 89 | Provision of flood mitigation measures 76a | Provision of environmental mitigation Provision of drainage and associated works 87 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures 88 | Provision of flood mitigation measures Provision of drainage and associated works AP4-2 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works Parish of Aylesbury | 1 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 6, 18 | Provision of environmental mitigation Diversion and installation of overhead electric lines 20 to 22, 24 | Provision of environmental mitigation Parish of Coldharbour | 2 to 7, 10, 11 | Provision of environmental mitigation Parish of Fleet Marston | 4 | Provision of worksite and access for construction and maintenance 5, 11 | Provision of environmental mitigation Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 6, 7 | Diversion or installation of, or works to, utilities apparatus 8, 9 | Provision of flood mitigation measures 10 | Provision of worksite and access for construction Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 13, 26 | Provision of environmental mitigation 14, 18, 30 | Provision of drainage and associated works 15, 21 | Provision of worksite and access for construction 16, 19 | Provision of environmental mitigation Provision of new public right of way 20 | Provision of environmental mitigation Provision of worksite and access for construction 23 | Provision of worksite and access for construction Provision of drainage and associated works 25 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 12b | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Parish of Waddesdon | 1, 16 | Provision of flood mitigation measures 2, 73, 79 | Provision of environmental mitigation Provision of new public right of way 3, 32, 45, 107, 128, 129 | Provision of drainage and associated works 6 | Provision of environmental mitigation Provision of drainage and associated works Provision of new public right of way 7, 9, 113, 120, 126, 127 | Provision of environmental mitigation Provision of worksite and access for construction 8, 10, 11, 13, 34, 36, 41, 42, 49, 51, 53, 59, 60, 67, 69, 74, 76, 81 to 83, 85, 100, 103 | Provision of environmental mitigation 17, 46, 52, 56, 66, 72, 78, 84, 106, 114 | Provision of worksite and access for construction 18 | Provision of environmental mitigation Provision of worksite and access for construction Provision of electricity supply system and access 31, 54, 109, 112 | Provision of worksite and access for construction and maintenance 33, 40, 58 | Provision of balancing pond and associated works and access for maintenance 68, 93, 110, 111 | Diversion or installation of, or works to, utilities apparatus 91 | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 94 | Provision of new public right of way 97 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 105 | Provision of drainage and associated works Provision of worksite and access for construction and maintenance 123 | Provision of environmental mitigation Provision of worksite and access for construction Provision of flood mitigation measures Parish of Quainton | 3, 35, 61, 66 | Provision of environmental mitigation Provision of flood mitigation measures 8, 23, 59, 74, 88, 115, AP2-5, AP2-14, AP2-15, AP4-1, AP4-2 | Provision of balancing pond and associated works and access for maintenance 9, 12, 14, 24, 92, 98 to 100, 133, 138, 142, 177, 182, 191, 194, 199, 203, 216, 218, 248 to 250 | Provision of worksite and access for construction 11, 20, 27, 53, 56, 58, 62, 64, 65, 122, 125, 128, 141, 195a, 206a, 222, 223, 225, 226, 232, 240, 253, 270, 271, 273a, AP1-23, AP1-24 | Provision of environmental mitigation 17, 75, 127, 210, 212 | Diversion or installation of, or works to, utilities apparatus 19 | Provision of worksite and access for construction Removal of utility apparatus 21 | Provision of environmental mitigation Provision of worksite and access for construction Removal of utility apparatus 31 | Provision of balancing pond and associated works and access for maintenance Removal of utility apparatus 32, 50, 68, 151, 219, 220, 224 | Provision of flood mitigation measures 33, 72 | Provision of worksite and access for construction and maintenance 87 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 54, 71, 89, 104, 110, 113, 118b, 118d, AP1-5, AP1-16 to AP1-20 | Provision of environmental mitigation Provision of worksite and access for construction 38 | Provision of environmental mitigation Provision of diversion or installation of, or works to, utilities apparatus 40 | Provision of environmental mitigation Provision of drainage and associated works 46, 107, 109, 131, 146, 149, 159, 197, 244, AP2-3, AP2-4, AP2-10 | Provision of drainage and associated works 47 | Provision of a turning head Provision of environmental mitigation 49 | Provision of a turning head Diversion or installation of, or works to, utilities apparatus 93 | Provision of balancing pond and associated works and access for maintenance Provision of flood mitigation measures 118c, 176 | Provision of environmental mitigation Diversion and installation of overhead electric lines 124 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 135, 150, 155, 157, 158, 161, 164, 168, 170, 184a, 233 | Diversion and installation of overhead electric lines 136a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of new public right of way Provision of electricity supply system and access 143 | Diversion and installation of overhead electric lines Provision of access for construction and maintenance 160 | Provision of access for construction and maintenance 166 | Provision of electricity supply system and access 173 | Provision of environmental mitigation Diversion and installation of overhead electric lines Provision of drainage and associated works 174, 175 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 204 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of flood mitigation measures 206b, 207a | Provision of environmental mitigation Provision of electricity supply system and access 243 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 251 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance AP2-6, AP2-7 to AP2-9 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines Parish of Grendon Underwood | 3, 5, 10, 28, 30 | Provision of environmental mitigation 20, 23, 26 | Provision of worksite and access for construction 4 | Provision of environmental mitigation Provision of drainage and associated works 21 and 24 | Provision of environmental mitigation Provision of worksite and access for construction 12a | Provision of environmental mitigation Provision of worksite and access for construction and maintenance AP2-6 | Provision of worksite and access for construction and maintenance Provision of new public right of way 16a | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Provision of new public right of way 29 | Provision of balancing pond and associated works and access for maintenance AP1-1, AP1-5, AP1-6, AP1-9 | Diversion and installation of overhead electric lines Parish of Middle Claydon | 1, 2 | Provision of environmental mitigation Parish of East Claydon | 4, 4a, 5, 7 | Diversion and installation of overhead electric lines Parish of Calvert Green | 1, 9, 11 | Provision of environmental mitigation 2 | Provision of environmental mitigation Provision of new public right of way AP2-1 | Provision of new public right of way 6 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of flood mitigation measures Provision of new public right of way 8 | Provision of flood mitigation measures 23 | Diversion or installation of, or works to, utilities apparatus 24 | Diversion or installation of, or works to, utilities apparatus Provision of access for construction and maintenance 25 | Provision of worksite and access for construction 18a | Provision of access for construction and maintenance Provision of new public right of way AP4-2 | Provision of access for construction AP4-6 | Provision of balancing pond and associated works and access for maintenance Parish of Steeple Claydon | 3, 4, 6, 78, 80, 110, 111, AP1-1, AP4-1, AP4-4 | Provision of environmental mitigation 24, 26a, 27, 31, 33, 97 | Provision of worksite and access for construction 72 | Provision of environmental mitigation Provision of access for construction and maintenance 9c, 9d | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of access for construction and maintenance 9a, 100, 117, 119, 120 | Diversion or installation of, or works to, utilities apparatus 21 | Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 52a, 76 | Provision of environmental mitigation Provision of worksite and access for construction 51a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 75 | Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 98, 99, 112 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 109 | Provision of flood mitigation measures 124, 125 | Provision of drainage and associated works 69, 71 | Provision of new public right of way 102, 103, AP1-8, AP2-1 to AP2-4 | Provision of worksite and access for construction and maintenance Parish of Charndon | 2, 3 | Diversion or installation of, or works to, utilities apparatus Parish of Twyford | 5, 6, 13, 62, 67, 92, 101 | Provision of worksite and access for construction 14 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of new public right of way 24, 26, 44, 49, 54 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 27, 48 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 38, 60, 81, 82, 89, 90 | Provision of flood mitigation measures 39 | Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction 47, 63, 64, 69 | Provision of environmental mitigation Provision of worksite and access for construction 52 | Provision of environmental mitigation Provision of worksite and access for construction Provision of access for construction and maintenance 53, 76 | Provision of worksite and access for construction and maintenance 58, 88 | Provision of environmental mitigation Provision of new public right of way 71, 75, 77, 83, 84, 95, 97, 99, 100 | Provision of environmental mitigation 72 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 78 | Provision of drainage and associated works 80 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 87 | Diversion or installation of, or works to, utilities apparatus 91 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 94 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of access for construction and maintenance Provision of new public right of way Parish of Preston Bissett | 1 to 4 | Provision of flood mitigation measures 6, 13, 22, 27, 30, 31, 44, 45, 54 to 56, 58, 62, AP2-1 | Provision of environmental mitigation 8, 15a, 16b, 28a, 29a, 52 | Provision of worksite and access for construction 12a, 12b, AP4-1 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 20, 21 | Provision of environmental mitigation Provision of drainage and associated works 23a | Provision of environmental mitigation Provision of new public right of way Provision of drainage and associated works Provision of worksite and access for construction and maintenance 37 | Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction and maintenance 16c, 16d, 18b, 41, 47 to 51 | Provision of environmental mitigation Provision of worksite and access for construction 40, 42, 43, 61 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance County of Oxfordshire District of Cherwell Parish of Godington | 5a, 5b, 12, AP2-1 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 6a | Provision of worksite and access for construction 8a, 8b, 14, 15 | Provision of flood mitigation measures County of Buckinghamshire District of Aylesbury Vale Parish of Chetwode | 1 to 3, 8, 9 | Provision of flood mitigation measures 5, 12 to 14, 22 to 24, 28, 31, 35, 42, 45, 52, 53, 55, 64, 84, 87 | Provision of environmental mitigation 17a, 17b, 17c, 17d | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of drainage and associated works 19 to 21, 95, 96 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 25, 27, 34, 91 | Provision of worksite and access for construction 30 | Provision of environmental mitigation Provision of drainage and associated works 41, 86, 88 | Diversion or installation of, or works to, utilities apparatus 51 | Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 54 | Provision of drainage and associated works Removal of utility apparatus 63 | Provision of drainage and associated works 65 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 71, 90 | Provision of environmental mitigation Provision of new public right of way 76 | Provision of worksite and access for construction Removal of utility apparatus Parish of Barton Hartshorn | 2a, AP2-5 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 6a | Provision of environmental mitigation 7a, 16 | Provision of worksite and access for construction 9, 10, 22 | Provision of flood mitigation measures 13 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 14 | Provision of worksite and access for construction Provision of drainage and associated works 19, 24 | Provision of drainage and associated works 25, 26 | Provision of environmental mitigation Provision of new public right of way County of Oxfordshire District of Cherwell Parish of Newton Purcell with Shelswell | 1, 8, 17, 39, 49, 66 | Provision of environmental mitigation Provision of worksite and access for construction 4, 6, 15, 16, 19, 23, 31, 34, 36, 46, 54, 86 | Provision of environmental mitigation 10, 22, 27, 55, 69, 75, 82, 83 | Provision of worksite and access for construction 21, 26, 63, 67, 74, 76 | Provision of drainage and associated works 32 | Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus Provision of worksite and access for construction 37, 59 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 30, 56, 58 | Provision of worksite and access for construction and maintenance 57, 62 | Provision of flood mitigation measures Provision of drainage and associated works 61 | Provision of worksite and access for construction and maintenance Provision of new public right of way 64 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 72 | Provision of worksite and access for construction Provision of flood mitigation measures 85, 88 | Diversion or installation of, or works to, utilities apparatus 92 | Provision of worksite and access for construction Provision of new public right of way Parish of Finmere | 5, 9, 54 | Provision of environmental mitigation 7, 15 | Provision of environmental mitigation Provision of new public right of way 8, 12 | Provision of environmental mitigation Provision of worksite and access for construction 24, 33, 36, 37 | Provision of worksite and access for construction 18 | Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 18a, 25, 40, 42 | Diversion or installation of, or works to, utilities apparatus 48 | Provision of access for utility works 52 | Provision of environmental mitigation Removal of utility apparatus Parish of Mixbury | 7, 24, 26, 40 | Diversion or installation of, or works to, utilities apparatus 8, 13a | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 12, 17a, 45, 46, 57, AP2-8 to AP2-11 | Provision of environmental mitigation 15a, 18, AP2-5a | Provision of environmental mitigation Diversion and installation of overhead electric lines 34, 43a, 43b, 51 | Provision of worksite and access for construction 28a, 37, 38 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 31 | Provision of balancing pond and associated works and access for maintenance Provision of electricity supply system and access 31a | Provision of environmental mitigation Removal of utility apparatus Diversion or installation of, or works to, utilities apparatus 39 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 40b, 40c, 49 | Provision of environmental mitigation Provision of worksite and access for construction 41a, 63 | Provision of drainage and associated works 48 | Provision of environmental mitigation Provision of new public right of way 53, 54 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way Provision of drainage and associated works 52 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way Provision of drainage and associated works Removal of utility apparatus 62 | Provision of flood mitigation measures Removal of utility apparatus 66 | Removal of utility apparatus County of Buckinghamshire District of Aylesbury Vale Parish of Westbury | 1 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus Provision of drainage and associated works 1a | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of new public right of way 5, 6 | Provision of drainage and associated works 7 | Provision of environmental mitigation Provision of drainage and associated works Provision of new public right of way Provision of worksite and access for construction and maintenance 14 | Provision of flood mitigation measures 19, 21 to 25, 27 | Provision of environmental mitigation 28 | Provision of environmental mitigation Provision of new public right of way 29 | Provision of worksite and access for construction Provision of new public right of way 30, 33 to 35, 38 | Provision of worksite and access for construction 18, 20 | Diversion or installation of, or works to, utilities apparatus Parish of Turweston | 3, 4, 45, 46 | Provision of new public right of way 11 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 8, 13a, 20, 27, 50, 68, 71, 72, 76 to 79, 83, 85, 99, 100 | Provision of worksite and access for construction 18, 21, 89, 91 | Provision of environmental mitigation 29 | Diversion or installation of, or works to, utilities apparatus 62, 73 | Provision of worksite and access for construction Diversion and installation of overhead electric lines Removal of utility apparatus 81 | Provision of worksite and access for construction and maintenance 37 | Diversion and installation of overhead electric lines 38, 104, 106 | Provision of environmental mitigation Provision of worksite and access for construction 40, 57 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 42, 61, 67 | Diversion and installation of overhead electric lines 43, 48 | Diversion and installation of overhead electric lines Provision of new public right of way 49 | Provision of worksite and access for construction Provision of new public right of way 65 | Provision of worksite and access for construction Removal of utility apparatus Provision of balancing pond and associated works and access for maintenance 84 | Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 88 | Provision of environmental mitigation Diversion and installation of overhead electric lines 90 | Provision of environmental mitigation Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 102, 110 | Provision of drainage and associated works 109 | Provision of environmental mitigation Provision of flood mitigation measures AP2-1 to AP2-4 | Reinstatement of businesses or facilities County of Northamptonshire District of South Northamptonshire Parish of Whitfield | 1 | Provision of balancing pond and associated works and access for maintenance Diversion and installation of overhead electric lines 4, 9, 13, 14 | Provision of drainage and associated works 6 | Provision of environmental mitigation Diversion and installation of overhead electric lines Provision of worksite and access for construction Provision of drainage and associated works Provision of electricity supply system, and access 10 | Provision of environmental mitigation Provision of flood mitigation measures Provision of new public rights of way Provision of drainage and associated works 16, AP2-3 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 20, 35 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 26 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 30 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 17 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 25 | Provision of flood mitigation measures Provision of new public right of way 27 | Provision of flood mitigation measures 28 | Provision of environmental mitigation 29, 37, 40, 42, 48 to 50 | Provision of worksite and access for construction 41 | Provision of balancing pond and associated works and access for maintenance 44 | Provision of environmental mitigation Provision of worksite and access for construction Parish of Brackley | 1 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 4, 6 | Provision of worksite and access for construction and maintenance 7 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 9 | Provision of worksite and access for construction 12 | Provision of environmental mitigation Provision of worksite and access for construction 13 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 14, 15 | Diversion or installation of, or works to, utilities apparatus Parish of Radstone | 1, 2, 22 | Provision of worksite and access for construction 5, 7a | Provision of worksite and access for construction Provision of new public right of way 6a, 6b, 20 | Provision of environmental mitigation Provision of worksite and access for construction 9 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 7 | Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus 8a, 16a, 16c, 18a, 18c, 40, 41, 47 | Provision of environmental mitigation 10, 17, 21, 23, 38, AP2-4, AP2-6 | Provision of environmental mitigation Provision of drainage and associated works 19, 26, 32, 33 | Provision of environmental mitigation Provision of drainage and associated works Provision of balancing pond and associated works and access for maintenance 27, 37a, 37b, 41a | Provision of balancing pond and associated works and access for maintenance 28, 29 | Provision of flood mitigation measures 30 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of environmental mitigation Provision of new public right of way Removal of utility apparatus 36 | Provision of environmental mitigation Removal of utility apparatus AP2-7 | Provision of new public right of way 46 | Provision of flood mitigation measures Parish of Greatworth | 1 | Provision of new public right of way 3 | Provision of drainage and associated works Provision of flood mitigation measures 4 | Provision of environmental mitigation Provision of drainage and associated works 5 | Provision of flood mitigation measures 8, 11, 15, 75, 76 | Provision of environmental mitigation 9 | Provision of worksite and access for construction Provision of new public right of way 12, AP2-1 | Provision of worksite and access for construction Provision of new public right of way Removal of utility apparatus 13 | Provision of environmental mitigation Provision of new public right of way Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus Provision of worksite and access for construction 19 | Provision of environmental mitigation Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 15a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 16, 17, 17a, 38 | Diversion or installation of, or works to, utilities apparatus 18, 48, 59, 60, 63, 64, 66, 67, 71, 72, 74, 77, 80, 82, 84 to 86, 90, 91, 98, AP4-5 | Provision of worksite and access for construction 10 | Provision of environmental mitigation Provision of new public right of way 20, 21 | Provision of drainage and associated works 23 | Provision of worksite and access for construction Provision of drainage and associated works Removal of utility apparatus 30, 70, 73 | Provision of worksite and access for construction Removal of utility apparatus 24 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus 25 | Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus 39a, 39b | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus 26 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 28, 31, 32, 34, 52, 56, 83, 99 | Provision of worksite and access for construction Provision of environmental mitigation 29a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus Provision of drainage and associated works Provision of balancing pond and associated works and access for maintenance 33 | Provision of balancing pond and associated works and access for maintenance 43 | Provision of flood mitigation measures Diversion or installation of, or works to, utilities apparatus 44 | Provision of worksite and access for construction and maintenance 57, 61a | Provision of worksite and access for construction and maintenance Provision of new public right of way Parish of Marston St Lawrence | 4, 23 | Provision of environmental mitigation 5, 8, 11, 14 | Provision of worksite and access for construction 7, 9 | Provision of environmental mitigation Provision of worksite and access for construction 15 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 17 | Provision of environmental mitigation Provision of drainage and associated works AP4-1 | Provision of drainage and associated works Parish of Sulgrave | 1 | Provision of environmental mitigation Provision of new public right of way Parish of Thorpe Mandeville | 3 | Provision of new public right of way Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 4, 16, 48, 54 | Provision of worksite and access for construction 18, 47 | Diversion or installation of, or works to, utilities apparatus 15, 31, 35 | Provision of environmental mitigation 25, 41, 42 | Provision of drainage and associated works 26 | Provision of environmental mitigation Provision of drainage and associated works Provision of balancing pond and associated works and access for maintenance Removal of utility apparatus 28, 33, 36, 40, 43 | Provision of flood mitigation measures 29, 51 | Provision of environmental mitigation Provision of worksite and access for construction 60, 62 | Provision of balancing pond and associated works and access for maintenance 69 | Provision of environmental mitigation Provision of drainage and associated works Removal of utility apparatus Diversion or installation of, or works to, utilities apparatus 71 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation AP2-3 | Provision of a turning head Provision of access for construction Parish of Culworth | 1 | Diversion or installation of, or works to, utilities apparatus 7, 8, 13, 16 | Provision of environmental mitigation Provision of worksite and access for construction 11 | Provision of environmental mitigation Provision of drainage and associated works 12, 20, 23 | Provision of environmental mitigation 17 | Provision of worksite and access for construction Provision of electricity supply system and access 18 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of new public right of way 19, AP4-1 | Provision of balancing pond and associated works and access for maintenance 21a | Provision of worksite and access for construction and maintenance 22, 25, 44 | Provision of worksite and access for construction 29 | Provision of drainage and associated works 34 | Provision of worksite and access for construction Provision of drainage and associated works 39 | Provision of flood mitigation measures Parish of Chipping Warden and Edgcote | 2, 4, 9, 28, 32, 33, 95, 96, 105, AP4-1, AP4-1a, AP4-1b, AP4-2 | Provision of environmental mitigation 35, 36, 39 | Diversion or installation of, or works to, utilities apparatus 11 | Provision of worksite and access for construction Provision of flood mitigation measures 3, 14, 41 | Provision of flood mitigation measures 15, 16, 24, 27, 38, 43, 48 to 50, 81b, 81d, 82b, 83b, 84, 86, 87a, 87b, 87c, 89a, 90, 91, 92b, 93, 104, 107, AP2-16, AP2-17, AP4-12, AP4-13 | Provision of worksite and access for construction 18a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 25 | Provision of worksite and access for construction and maintenance 47, AP2-1 | Provision of balancing pond and associated works and access for maintenance 58 | Provision of environmental mitigation Provision of new public right of way 65a | Provision of environmental mitigation Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 71, AP1-3, AP2-15 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 72a, AP2-21 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 94a, 99 | Provision of worksite and access for construction Provision of new public right of way AP2-3, AP2-5, AP2-13 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works AP2-14 | Provision of a turning head AP2-9 | Provision of drainage and associated works AP4-3 | Provision of drainage and associated works AP4-10, AP4-11 | Provision of access for construction Parish of Aston Le Walls | 3, 32, AP4-1 | Provision of worksite and access for construction 9 | Diversion or installation of, or works to, utilities apparatus 10 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 17 | Provision of worksite and access for construction Provision of new public right of way 20 | Provision of environmental mitigation 23, 25, AP2-1 | Provision of environmental mitigation Provision of worksite and access for construction 28a, 31, AP2-2, AP2-3 | Provision of balancing pond and associated works and access for maintenance 39, AP2-4 | Provision of drainage and associated works Parish of Boddington | 11, 29, 39, 52, 54, 66, AP2-1, AP4-3 | Provision of drainage and associated works 3, 23, 26, 27a, 27b, 50, 51, 89, 107b, 109b, AP4-1, AP4-2 | Provision of worksite and access for construction 2a, 40a, 87, 96, 98, 114, 123b, AP2-2 | Provision of environmental mitigation Provision of worksite and access for construction 18 | Provision of environmental mitigation Provision of new public right of way Provision of worksite and access for construction 97, 100a, 107a, 109a | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 85 | Diversion or installation of, or works to, utilities apparatus 16, 56, 86 | Provision of flood mitigation measures 91 | Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation 25, 30a, 30b, 57, 62, 63, 71, 72, 80, 93, 115, 121 | Provision of environmental mitigation 97a and 99 | Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus 101 | Provision of worksite and access for construction and maintenance 14a | Provision of balancing pond and associated works and access for maintenance Provision of flood mitigation measures 22 | Provision of environmental mitigation Provision of new public right of way Provision of worksite and access for construction 28 | Provision of environmental mitigation Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 61 | Provision of environmental mitigation Removal of utility apparatus 69 | Provision of balancing pond and associated works and access for maintenance 74 | Provision of environmental mitigation Provision of worksite and access for construction Removal of utility apparatus 81 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 103a | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction and maintenance County of Warwickshire District of Stratford-on-Avon Parish of Stoneton | 5, 7, 8, 13, 14, 16a, 28 | Provision of environmental mitigation 15 | Diversion or installation of, or works to, utilities apparatus 16, 18 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 19 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 6b, 9b, 22, 24 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Parish of Wormleighton | 21 | Provision of environmental mitigation 12, AP2-4 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 11, 15, 17, 18, 20 | Provision of worksite and access for construction and maintenance 13 | Diversion or installation of, or works to, utilities apparatus 23, 25 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 26 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction Provision of access for construction and maintenance of utility diversions 28 | Provision of environmental mitigation Provision of access for construction and maintenance of utility diversions 31b | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 34a, 47 | Provision of environmental mitigation Provision of worksite and access for construction 50 | Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation 52 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 55 | Provision of worksite and access for construction Parish of Radbourn | 2, 13b, 19, 28 | Provision of worksite and access for construction 3 | Provision of worksite and access for construction Reprofiling of ground Provision of drainage and associated works 6 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 7 | Provision of worksite and access for construction Reprofiling of ground Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 8, 8c | Provision of flood mitigation measures 8b | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Reprofiling of ground Provision of new public right of way 9 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction Provision of new public right of way Provision of environmental mitigation 11 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance Provision of new public right of way 13a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 15 | Provision of environmental mitigation 16 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 5 | Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures Provision of access for construction and maintenance of utility diversions 8d | Provision of environmental mitigation Provision of worksite and access for construction Parish of Ladbroke | 5, 19, 20, 25 to 27 | Diversion or installation of, or works to, utilities apparatus 7, 12, 15, 39, 41, 42, 52 | Provision of environmental mitigation 8, 18 | Reprofiling of ground Provision of drainage and associated works Provision of worksite and access for construction 24, 28, 32 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 29, 33, 71, 72 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 35, 56, 62, 63, 76 | Provision of environmental mitigation Provision of drainage and associated works 36, 61 | Provision of worksite and access for construction 37, AP4-2, AP4-3 | Provision of new public right of way 53, 59, 69 | Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction 66 | Provision of balancing pond and associated works and access for maintenance AP4-1 | Minor highway alterations Parish of Southam | 5, 31, 63, 65, 70, 72, 90, 93 | Provision of environmental mitigation 54, 56, 58, 60 to 62, 87, AP1-1, AP1-2 | Diversion or installation of, or works to, utilities apparatus 6, 9, 111 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 13, 94, 95 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 8, 14, 103 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 24, 32 | Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 34, 39, 55, 68, 80 | Provision of environmental mitigation Provision of worksite and access for construction 16, 41, 53, 91 | Provision of worksite and access for construction 28, 29 | Provision of drainage and associated works 45 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 47 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works 49, 51, 52, AP4-1 to AP4-3 | Provision of new public right of way 75 | Provision of environmental mitigation Provision of access for construction and maintenance of utility diversions 100 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures 107 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures 112, 118 | Provision of worksite and access for construction and maintenance Parish of Long Itchington | 1, 15, 19, 30a, 35a, 37, 47, AP4-4 | Provision of environmental mitigation 2 | Provision of worksite and access for construction and maintenance 6 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 7 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 7a | Provision of drainage and associated works 9 | Provision of environmental mitigation Provision of worksite and access for construction Provision of access for construction and maintenance of utility diversions 12, 49, 50, 52, 63, 64 | Diversion or installation of, or works to, utilities apparatus 20, 22, 31, 32 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 53 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance 48, 57 | Provision of worksite and access for construction 58 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 59, 61 | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 11a | Removal of utility apparatus Parish of Ufton | 2 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 8, 21, 23, 24 | Diversion or installation of, or works to, utilities apparatus 9 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works 15 | Provision of environmental mitigation Provision of worksite and access for construction Drainage and associated work 11, 18 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works Provision of flood mitigation measures AP4-4 to AP4-7 | Provision of access for construction District of Warwick Parish of Offchurch | 4, 6, 32, 49, 50, 51a, 54a | Provision of environmental mitigation 7, 10, 98a | Provision of worksite and access for construction and maintenance 11 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 12, AP2-1 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Provision of drainage and associated works 13, 19, 28, 36, 42 to 44, 53a | Provision of environmental mitigation Provision of worksite and access for construction 15 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 18 | Provision of environmental mitigation Minor highway alterations 21, 45, 58, 59b, 60, 62 | Provision of worksite and access for construction 23 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works 24 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works 27 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works 29, 66, 89 | Diversion or installation of, or works to, utilities apparatus 37, 73 | Provision of balancing pond and associated works and access for maintenance 57a | Provision of worksite and access for construction Provision of drainage and associated works 68, 70, 84 | Reprofiling of ground Provision of worksite and access for construction 69 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 71, 75 | Provision of new public right of way 78, 79, 87 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 80 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way Provision of access for construction and maintenance of utility diversions 91a | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures 92a | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 47a | Provision of a turning head 51b | Provision of a turning head Provision of environmental mitigation AP2-2, AP2-3 | Minor highway alterations Parish of Cubbington | 1a | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation Provision of worksite and access for construction and maintenance 19, 21, 41, 46, 49, 53, 57, 61, 65 | Provision of worksite and access for construction 23, 27, 28, 50, 52, 67 | Provision of environmental mitigation 4 | Diversion or installation of, or works to, utilities apparatus 5, 6 | Provision of access for construction and maintenance Provision of access for construction and maintenance of utility diversions 9 | Provision access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 11a, 14, 15 | Provision of environmental mitigation Drainage and associated works Provision of worksite and access for construction 32 | Provision of drainage and associated works Provision of worksite and access for construction 35 | Provision of environmental mitigation Provision of drainage and associated works Installation of ground anchors 39, 48 | Provision of environmental mitigation Provision of worksite and access for construction 44 | Provision of new public right of way 47 | Provision of access for construction and maintenance AP4-3 | Provision of environmental mitigation Parish of Weston Under Wetherley | 1, 2 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 4, 5a, AP4-1 to AP4-3 | Provision of environmental mitigation AP4-4 | Provision of worksite and access for construction and maintenance Parish of Stoneleigh | 1, 5, 7, 10, 13, 18, 44, 119, 123, 124, 126, 129, 130, 142a, 147, 148, 152, 152a, 155, AP2-1 to AP2-3, AP4-7, AP4-8 | Provision of worksite and access for construction 8, 27, 50, 52, 54a, 94, 117, 122, 164, 165, 167, 179, AP4-10, AP4-11 | Provision of environmental mitigation 21, 24, 28, 29, 31, 34, 43, 77a, 83 | Diversion or installation of, or works to, utilities apparatus 22, 42, 144, 158, 163 | Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction 33, 62 | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 48a, 66, 75, 96, 127, 128, 137, 138, 151, 173, 174, 177, AP4-10a, AP4-10b | Provision of environmental mitigation Provision of worksite and access for construction 55 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 63 | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works 73, AP4-1 | Provision of drainage and associated works 79a, 87, 112, 139 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 84 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 136, 141 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 97, 100, 143 | Provision of worksite and access for construction and maintenance 99 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 104 | Provision of balancing pond and associated works and access for maintenance 105 | Provision of environmental mitigation Provision of flood mitigation measures 132 | Provision of flood mitigation measures 133, AP4-12 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 140b, 146 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 166, 182 | Provision of environmental mitigation Provision of new public right of way 171a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 178 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 184 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way Parish of Kenilworth | 12, 30a, AP2-3 | Provision of environmental mitigation 13, 16, 21, AP2-1, AP2-2 | Provision of worksite and access for construction 5, 6, 23, 25a | Provision of environmental mitigation Provision of worksite and access for construction 9, 11, 15 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 20 | Provision of worksite and access for construction Provision of new public right of way Parish of Burton Green | 4, 6, 9, 13, 14, 23a, 37a, 43a, 48, 58b, 65a, 65b, 73a, 82a, 97, AP2-7, AP2-9, AP2-10, AP2-12 | Provision of environmental mitigation Provision of worksite and access for construction 7, 19, 59, 63, AP4-1 to AP4-4 | Provision of environmental mitigation 11, 21, AP1-1a | Provision of worksite and access for construction 28a, 28b, 28c | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 29, 31 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 32, AP2-3 | Provision of worksite and access for construction and maintenance 33a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works Provision of new public right of way 35 | Reinstatement of businesses or facilities 72 | Provision of environmental mitigation Provision of new public right of way 77 | Provision of new public right of way 98 | Provision of worksite and access for construction Provision of new public right of way AP2-1 | Provision of worksite and access for construction Provision of environmental mitigation Provision of new public right of way Diversion or installation of, or works to, utilities apparatus AP2-6 | Provision of passing places District of North Warwickshire Parish of Great Packington | 1, 6 | Provision of worksite and access for construction 7, 8 | Provision of balancing pond and associated works and access for maintenance Parish of Little Packington | 2 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 4 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 10, 12, 15, 16 | Diversion and installation of overhead electric lines 17, 19 | Provision of worksite and access for construction Diversion and installation of overhead electric lines AP1-1 | Reinstatement of businesses or facilities Parish of Coleshill | 1c | Provision of environmental mitigation Diversion and installation of overhead electric lines 1f, 1g, 1r | Provision of balancing pond and associated works and access for maintenance 1, 2 to 5, 7, 12, 13, 112, 127, 134, 136, 139, 145, 148, 150, 160, 204, 272, 304, 306, 397, 408, 410, 435, 445, 479, 514, AP4-1b, AP4-15, AP4-17, AP4-22 | Diversion and installation of overhead electric lines 33, 35 to 37, 40, 41, 85, 381, 433, 454, 455, 482a, 540, 556, 558a, 561a, 565a | Diversion or installation of, or works to, utilities apparatus 38 | Provision of balancing pond and associated works and access for maintenance 48, 52, 58, 59, 63, 68, 101, 102, 106, 278, 288a, 295, 296, 365, 371, 413, 420, 581a, 589a | Provision of worksite and access for construction 50 | Diversion and installation of overhead electric lines Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of balancing pond and associated works and access for maintenance 116, 124, 162a, 180b, 240, 241, 244, 246a, 248, 300, 302, 309, 320, 325, 326, 357, 367, 372, 428, 484, 509, 510, 519, AP2-21, AP2-24, AP2-26 to AP2-28 | Provision of environmental mitigation 51, 440, 495a | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 73 | Provision of environmental mitigation Removal of existing utilities 546a | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 74, 321, 452a, 452b, 546 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 75, 233a, 322, 377, 391, 396 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 77, 87a, 90a, 90b, 91a, 91b, 92a, 92b 103a, 103b, 108b, 108c, 152, 157, 548a | Provision of environmental mitigation Provision of worksite and access for construction Diversion and installation of overhead electric lines 112b | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 127a | Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 108a, 310, 315, 354, 506 to 508, 580a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 100, 427 | Provision of worksite and access for construction and maintenance 164 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion and installation of overhead electric lines 283, 289, 297, 312a, 335, 346, 366, 369 | Provision of environmental mitigation Provision of worksite and access for construction 188 | Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction 195, 196 | Provision of worksite and access for construction Diversion and installation of overhead line equipment 199 | Provision of balancing pond and associated works and access for maintenance Diversion and installation of overhead line equipment 247, 257a | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of new public right of way 253, 388, 416, 451, 459, 460, 502 | Provision of environmental mitigation Diversion and installation of overhead line equipment 308, 318, 467 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 358 | Diversion and installation of overhead line equipment Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of balancing pond and associated works and access for maintenance 404, 409 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 432 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 412 | Provision of environmental mitigation Diversion and installation of overhead line equipment 419, 517a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 481 | Provision of environmental mitigation Provision of new public right of way 491a, 491b | Provision of environmental mitigation Provision of new public right of way Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 511, 559a, 559b, AP2-20 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of balancing pond and associated works and access for maintenance 526a, 526b | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 593a, 593b | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead line equipment 439, 485, 486 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 492, 500 | Provision of worksite and access for construction Diversion and installation of overhead electric lines Parish of Water Orton | 6, 132 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 9a, 10, 27, 28, 37, 40, 43a, 82a | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 13a, 42, 50, 57, 64, 65, 67 to 69, 74 | Provision of environmental mitigation 23, 34, 35, 38, 39, 41, 77a | Provision of environmental mitigation Provision of worksite and access for construction 43, AP4-5 | Reinstatement of businesses or facilities 44, 89a, 126, 130, 142, AP4-25, AP4-26 | Provision of worksite and access for construction 48 | Provision of environmental mitigation Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 52 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 53, 54, 56 | Provision of balancing pond and associated works and access for maintenance 76 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 100a, 100b, 100c, 118 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 119a, 123 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 124a, 124b, 129, 139a | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 131a, 131b, 145, 146a, 146b, 149a, 149b, AP4-19, AP4-20 | Diversion and installation of overhead electric lines 138a | Diversion or installation of, or works to, utilities apparatus 133, 140, 143 | Provision of worksite and access for construction and maintenance 155a, 155b | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines Provision of balancing pond and associated works and access for maintenance AP4-14, AP4-16, AP4-17 | Provision of worksite and access for construction Minor highway alterations Parish of Shustoke | AP4-1 to AP4-3, AP4-5, AP4-6 | Provision of environmental mitigation Parish of Curdworth | 1a, 49, 70, 72, 77, 78, 80, 106, 215 | Diversion or installation of, or works to, utilities apparatus 2 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation 3a, 6, 7, 113a, 201, 202, 223, 241, 244 | Provision of worksite and access for construction 5a, 5b, 8a, 11a, 37, 39, 40, 43, 51b, 58, 59, 61, 82a, 96, 102, 153a, 168, 170, 174, 186, 187, AP1-1, AP1-2, AP4-1, AP4-17 to AP4-24, AP4-30, AP4-32 | Diversion and installation of overhead electric lines 13, AP2-6 | Provision of worksite and access for construction Provision of environmental mitigation 16, 21 to 23, 34, 38, 57, 81, 114, 117, 118, 121, 128, 137, 140, 141, 142, 149, 152, 155, 156, 160, 192, 200, AP1-5, AP1-6, AP2-7 to AP2-9, AP4-3 to AP4-9 | Provision of environmental mitigation 10a, 25a, 26 to 28, 31, 32, 45, 48, 69 | Provision of environmental mitigation Diversion and installation of overhead electric lines 35, 191, 194 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 210, 216, 219, 220 to 222, 225 to 227, 229, 231, 235, 236, 238, 240, 243, 245, 246 | Provision of worksite and access for construction and maintenance 51a, 68a | Provision of balancing pond and associated works and access for maintenance Diversion and installation of overhead electric lines 65a, 66a, 81a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 71 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 67a, 83, 83a, 90 to 92 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 88, 209, 233, 247 | Provision of new public right of way 98, 101, 103 | Installation of ground anchors 99, 103a | Installation of ground anchors Provision of access for utility works 108a | Provision of environmental mitigation Provision of access for utility works 153, 164, 251, 254, 256 | Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation 228 | Removal of utility apparatus 249 | Provision of new public right of way Provision of environmental mitigation 252 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation AP2-10 | Provision of access for maintenance Parish of Lea Marston | 1 to 4, 13, 16 | Diversion or installation of, or works to, utilities apparatus 12, 14 | Provision of environmental mitigation Provision of drainage and associated works 17, 24a, 26, 28 to 30, 32, 33, 35, 37, 41, 54, 55a, 59, 61, 65a, 71a, AP2-1, AP2-8 to AP2-12, AP2-17, AP2-18, AP2-25, AP4-1 to AP4-4 | Provision of environmental mitigation 18 | Provision of balancing pond and associated works and access for maintenance 44, 47, 49, AP2-23 | Provision of new public right of way 66 | Provision of new public right of way Provision of worksite and access for construction 67 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 72a, 72b, 73 | Provision of new vehicular right on existing public right of way 74a | Provision of environmental mitigation Provision of new public right of way 55b, 68b | Provision of environmental mitigation Minor highway alterations 78a, AP2-22 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way Provision of environmental mitigation AP2-24 | Provision of new public right of way Parish of Kingsbury | 2, AP2-1, AP2-2 | Provision of environmental mitigation Parish of Middleton | 4, 108 | Provision of environmental mitigation Provision of flood mitigation measures 27, 37, 39, 47, 72 to 74, 87, 93, 95, 99, 101 to 103, 114, 115, 121, 125, 131a, 134a, 148, 160, 167, 175, AP2-6 to AP2-8, AP2-10b, AP2-18, AP2-21 | Provision of environmental mitigation 100, AP2-10a | Provision of environmental mitigation Provision of flood mitigation measures Provision of balancing pond and associated works and access for maintenance 21, 30, 32 | Diversion and installation of overhead electric lines 110, 169a | Provision of worksite and access for construction and maintenance Provision of environmental mitigation 5a, 13a, 31a, 127a, 135a, AP2-10, AP2-10c, AP2-20 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction and maintenance Provision of flood mitigation measures 38, 66 | Diversion or installation of, or works to, utilities apparatus 41 | Provision of flood mitigation measures 52 | Provision and renewal of railway systems for operational purposes and drainage 11a, 57, 58, 135b, 135c, 135d, 138a, 142a, 147a, 153a, 154a, 156a, 157a, 164a, 171a, 174, AP2-3, AP2-4, AP2-4a, AP2-11b | Provision of environmental mitigation Provision of worksite and access for construction AP2-9 | Provision of new public right of way 107 | Provision of environmental mitigation Provision of flood mitigation measures Provision of worksite and access for construction and maintenance 112, AP2-5 | Provision of balancing pond and associated works and access for maintenance 113 | Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction and maintenance 124, 129, AP2-5a | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation 128 | Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction County of Staffordshire District of Lichfield Parish of Drayton Bassett | 2a, 3, 4a, 4b, 35, 38, 40, 43, 45, 46, 49, 52, 54, 55, 65, 75, 100, AP2-1, AP2-3, AP2-4 | Provision of environmental mitigation 28 | Diversion or installation of, or works to, utilities apparatus 7, 23, 29, 50, 86 | Diversion and installation of overhead electric lines 13a, AP4-1 | Provision of worksite and access for construction and maintenance 16 | Provision of worksite and access for construction 19a, AP2-6 | Provision of balancing pond and associated works and access for maintenance 22, 24 | Provision of environmental mitigation Provision of flood mitigation measures Provision of worksite and access for construction 30 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation 33 | Provision of environmental mitigation Provision of drainage and associated works 53, 92, 94, 102, AP2-7 | Provision of environmental mitigation Provision of worksite and access for construction 58, 59, 63, 68, 71, 80 | Provision of environmental mitigation Diversion and installation of overhead electric lines 93 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 99 | Provision of environmental mitigation Provision of new public right of way 106 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 109, 117, AP2-8 to AP2-10 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 114, AP2-2 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of worksite and access for construction Parish of Fazeley | 3, 6, 8 | Diversion and installation of overhead electric lines Parish of Hints with Canwell | 15, 17, 18, 87, 88, AP2-20 | Provision of worksite and access for construction and maintenance 20 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 21, 53, 59, 63, 68, 71a, 72, 74, 81, 122, 128, 141, 145, 147a, AP2-12, AP2-17 | Provision of environmental mitigation 23, 125, 129 | Diversion or installation of, or works to, utilities apparatus 24, 50, 62b, 73a, 76a, 77b, 77c, 77d, 84a, 84b, 110, 154 | Provision of environmental mitigation Provision of worksite and access for construction 25, 28 | Provision of worksite and access for construction Provision of environmental mitigation Diversion and installation of overhead electric lines 30, 33, 38, 45, 47, 48 | Diversion and installation of overhead electric lines 35 | Diversion and installation of overhead electric lines Provision of new public right of way Provision of worksite and access for construction Provision of environmental mitigation 37, 39 | Diversion and installation of overhead electric lines Provision of new public right of way 55a, 62a, 62c, 73b, 77a, AP2-9a, AP2-18, AP2-19 | Provision of environmental mitigation Provision of new public right of way Provision of worksite and access for construction 58, AP2-22, AP2-23, AP2-24a | Provision of drainage and associated works 61 | Implementation of woodland management measures 65, 143 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 70 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation 75a, 75b | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of new public right of way 78a, 78b, 96a | Provision of environmental mitigation Provision of flood mitigation measures 80 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 82a | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way Implementation of woodland management measures 86 | Provision of balancing pond and associated works and access for maintenance 94 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 101 | Provision of environmental mitigation Provision of new public right of way Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 116 to 118, 123 | Provision of worksite and access for construction 131a | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction Provision of new public right of way 153, 155 | Provision of environmental mitigation Provision of drainage and associated works 157a, 159 | Provision of worksite and access for construction Provision of drainage and associated works Provision of environmental mitigation Parish of Weeford | 7, 24, 27 | Provision of environmental mitigation 12, 16, 21 | Provision of worksite and access for construction 14 | Provision of access for construction and maintenance 20 | Provision of environmental mitigation Provision of worksite and access for construction 22 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus AP1-5, AP1-8, AP1-10, AP1-11 | Diversion and installation of overhead electric lines AP2-1 | Provision of drainage and associated works Parish of Swinfen and Packington | 11, 16, 23 | Provision of environmental mitigation 11a, AP2-1, AP2-2 | Provision of drainage and associated works 12, 15, 29 | Provision of environmental mitigation Provision of worksite and access for construction 20 | Provision of environmental mitigation Provision of new public right of way 17a, 18a, 19, 22 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 33, 34, 42 | Provision of worksite and access for construction 36, 39 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 37 | Diversion or installation of, or works to, utilities apparatus Parish of Whittington | 5, 17, 63, 67, AP2-25, AP2-26 | Diversion or installation of, or works to, utilities apparatus 19a, 20a, 23, 101a, AP2-2 to AP2-4 | Provision of environmental mitigation 92a, 92b, AP2-5, AP2-6 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 28, 29, 31, 100a, 104a, 105a, 107, 112, 114a | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 32, 47, 48 | Implementation of woodland management measures 37, 41 | Implementation of woodland management measures Provision of new public right of way 42, 46 | Provision of environmental mitigation Provision of worksite and access for construction Implementation of woodland management measures 52, 54, 116a | Provision of worksite and access for construction and maintenance 58, 64, 66, 98a | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 79, 91, AP2-28, AP2-29 | Provision of worksite and access for construction 81a | Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 25a | Provision of environmental mitigation Provision of access for maintenance AP2-10, AP2-11, AP2-38 | Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures AP2-20 | Provision of drainage and associated works 94a | Provision of environmental mitigation Provision of drainage and associated works 103a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Parish of Fradley and Streethay | AP2-1, AP2-21 | Provision of environmental mitigation AP2-24, AP2-30, AP2-36a, AP2-37, AP2-38, AP2-44, AP2-45, AP2-66, AP2-67, AP2-70, AP2-72, AP2-72a, AP2-76, AP2-80, AP2-82, AP2-106, AP2-134, AP2-135, AP2-135a, AP2-136, AP2-138 | Provision of worksite and access for construction AP2-22, AP2-46, AP2-47, AP2-50, AP2-51, AP2-52, AP2-53, AP2-55, AP2-59, AP2-60, AP2-65, AP2-83, AP2-85, AP2-87, AP2-88, AP2-90, AP2-92, AP2-93, AP2-98, AP2-100, AP2-104, AP2-105, AP2-107, AP2-109, AP2-110, AP2-111, AP2-114, AP2-116, AP2-128, AP2-129, AP2-130, AP2-131a, AP2-132, AP2-133, AP2-141, AP2-143, AP2-145, AP2-146, AP2-147, AP2-150, AP2-151, AP2-155, AP2-157 | Provision of environmental mitigation Provision of worksite and access for construction AP2-119, AP2-120, AP2-122 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works AP2-61, AP2-62, AP2-64 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way AP2-40, AP2-43, AP2-68, AP2-71, AP2-163 | Provision and renewal of railway systems for operational purposes and drainage AP2-19, AP2-20, AP2-23 | Diversion or installation of, or works to, utilities apparatus AP2-16 | Provision of environmental mitigation Provision and renewal of railway systems for operational purposes and drainage Provision of drainage and associated works AP2-117 | Provision of new public right of way Parish of Curborough and Elmhurst | AP4-3 to AP4-7 | Diversion or installation of, or works to, utility apparatus Parish of Lichfield | AP4-3 | Diversion or installation of, or works to, utility apparatus Parish of Longdon | 4 to 6, 8 to 10, 13, 14 | Diversion and installation of overhead electric lines Parish of Kings Bromley | 1, 4 | Provision and renewal of railway systems for operational purposes and drainage 119, 160, 185, 186, 193a, 194, AP2-3, AP2-5, AP2-8, AP2-9, AP2-11 to AP2-13, AP2-27, AP2-28 | Provision of environmental mitigation Provision of worksite and access for construction 98, 100, 114a, 118a, 124a, 130a, AP2-17, AP2-41, AP2-46a | Provision of worksite and access for construction and maintenance AP2-54 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of worksite and access for construction AP2-33, AP2-35a, AP2-35b, AP2-35c | Provision of worksite and access for construction Provision of environmental mitigation Provision of drainage and associated works 52a, 52b, 121 | Provision of worksite and access for construction 165, AP2-52, AP2-52a, AP2-53 | Provision of environmental mitigation AP2-46b, AP2-46c | Provision of environmental mitigation Provision of drainage and associated works 61a, 78, 81, 146, AP2-7, AP2-40, AP4-2, AP4-3, AP4-5, AP4-6, AP4-8, AP4-9 | Diversion or installation of, or works to, utilities apparatus 62, 65, 140A, 192, 192b, AP1-1 to AP1-5, AP1-7, AP1-9 to AP1-12, AP2-39, AP2-43, AP2-44, AP4-1 | Diversion and installation of overhead electric lines 83, 90 | Diversion and installation of overhead electric lines Provision of environmental mitigation 85a, 86 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 88 | Provision of access for construction 91, 195, 196 | Provision of drainage and associated works 95, 168, 187 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation 102, AP2-35a | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 128a | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus AP2-31a | Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 138, 139, 142 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 148 | Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation Provision of worksite and access for construction 161, 171 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way AP2-15, AP2-19, AP2-20a, AP2-21a, AP2-25 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 130b | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works 140c | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Parish of Armitage with Handsacre | 1, 4 | Provision of worksite and access for construction 11, 14, 15 | Provision of worksite and access for construction Provision of drainage and associated works 18, 20, 24, AP2-1 to AP2-3 | Provision of worksite and access for construction and maintenance Parish of Colton | 10, 16, 17 | Provision and renewal of railway systems for operational purposes and drainage Borough of Stafford Parish of Colwich | 24, AP2-1 | Provision and renewal of railway systems for operational purposes and drainage Metropolitan Borough of Solihull Parish of Berkswell | 2a, 4, 28a, AP2-4 | Provision of environmental mitigation Provision of worksite and access for construction 6a, 6b, 8, 9, 10, 12, 17, 32c, 67, AP2-8, AP2-9 | Provision of worksite and access for construction 24, 26b, 47, 54, 71, 72 | Diversion and installation of overhead electric lines 31 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 35 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Provision of electricity supply system and access 36a, 36b | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 37 | Provision of electricity supply system and access 42, AP2-10, AP2-11 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 43 | Provision of environmental mitigation Provision of worksite and access for construction Installation of ground anchors 53 | Provision of new public right of way 55 | Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction Provision of new public right of way 59 | Provision of worksite and access for construction Provision of new public right of way 60, 64 and 69 | Provision of drainage and associated works Provision of worksite and access for construction 63 | Provision of environmental mitigation Provision of drainage and associated works 32b, 127, 128, 134, 145, 164a, 165c, 209, AP2-14 | Provision of environmental mitigation 129, 136, 167, 168a, 168c, 169, 170, 172a, 174, 185, 186, 188, 191, 193, 205, 207, 216, 218, 219, 231, 236 | Provision of worksite and access for construction 130a, 142 | Provision and renewal of railway systems for operational purposes and drainage 143 | Provision of a worksite and access for construction and maintenance Provision of balancing pond and associated works and access for maintenance 140, 141, 162, 175, 206, 211, 220, 230 | Provision of worksite and access for construction and maintenance 147, 151, 152, 153, 155 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utility apparatus Provision of environmental mitigation 158 | Provision of flood mitigation measures Provision of worksite and access for construction and maintenance 172, 221, 222 | Provision of flood mitigation measures Provision of worksite and access for construction 195, 204, 208, 238 | Provision of environmental mitigation Provision of worksite and access for construction 223, 233 | Provision of balancing pond and associated works and access for maintenance Parish of Meriden | 3 | Provision of environmental mitigation Provision of worksite and access for construction Parish of Hampton-in-Arden | 1 | Provision of worksite and access for construction and maintenance Provision of new public right of way 2 | Provision of environmental mitigation 4, 6, AP2-6 | Provision of environmental mitigation Provision of worksite and access for construction 7, 15, 16, 16b, 17, 17b, 18, 27 to 29, 30a, 31a, 37b, 50a, 52, 54, 62, AP2-24 | Provision of worksite and access for construction 8, 26, 34, 45, 55 | Provision of balancing pond and associated works and access for maintenance 9 | Provision of drainage and associated works 16a, 17a, 18a, AP2-8, AP2-10, AP2-11 | Provision of worksite and access for construction Provision of flood mitigation measures 22 | Provision of worksite and access for construction and maintenance 24, 43 | Provision of a turning head 36, 41 | Provision of worksite and access for construction and maintenance Provision of balancing pond and associated works and access for maintenance 35, 42 | Provision of worksite and access for construction and maintenance Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 46a | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 47a | Provision of worksite and access for construction Diversion or installation of, or works to, utility apparatus 49 | Provision of flood mitigation measures 25b, 25c | Minor highway alterations 37a | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of environmental mitigation 47b | Provision of worksite and access for construction Diversion of installation of or works to, utilities apparatus Provision of new public rights of way Provision of worksite and access for construction AP2-26 | Provision of drainage and associated works Parish of Bickenhill | 2, 3 | Provision of balancing pond and associated works and access for maintenance 6, 7, 10, 18, 22, 23, 29, 31, 32, 35, 46, 48, 57, 60, 61, 69, 71a, 74 to 76 | Provision of worksite and access for construction 37, 40, 41b, 62, 69a | Provision of worksite and access for construction Diversion and installation of overhead electric lines 41 | Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines 12 | Provision of balancing pond and associated works and access for maintenance 11 | Provision of balancing pond and associated works and access for maintenance Minor highway alterations 42a, 42b, 42c, 57a, 57b, 57c | Provision and renewal of railway systems for operational purposes and drainage 58 | Diversion or installation of, or works to, utilities apparatus 71 | Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of balancing pond and associated works and access for maintenance 71b | Provision of environmental mitigation Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of balancing pond and associated works and access for maintenance 85 | Provision of environmental mitigation Diversion and installation of overhead electric lines Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 87 | Provision of environmental mitigation 90 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 88 | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 91 | Diversion or installation of, or works to, utilities apparatus Reinstatement of businesses or facilities 91a | Reinstatement of businesses or facilities Parish of Dickens Heath | AP4-1 | Reinstatement of businesses or facilities Parish of Chelmsley Wood | 6 | Provision of worksite and access for construction and maintenance City of Birmingham | 1a | Diversion and installation of overhead electric lines 3a, 4b, 4c, AP2-11, AP2-12 | Provision of worksite and access for construction 5a | Provision of environmental mitigation 12 | Provision of environmental mitigation Provision of worksite and access for construction 8 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 9 | Provision of environmental mitigation Provision of flood mitigation measures 9a and 9b | Provision of environmental mitigation Provision of flood mitigation measures Diversion and installation of overhead electric lines 13a, 15, 29, 32, 33 | Provision of environmental mitigation Provision of worksite and access for construction Provision of flood mitigation measures 14, 28 | Provision of environmental mitigation Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of flood mitigation measures 16, 31, 54 to 56, 69, 78, 157m, 157n, 157p, 157q, 157s, 159, 163, 194, 195, 196, 214 to 216, 218, 281, 282, 300h, 308, 315, 316, 320, 327, 328, 330, 353, 364, 385, 386, 401 | Provision of worksite and access for construction 23, 24, 27 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 26 | Provision of environmental mitigation 41 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation 46, 151, 157r, 245, 264, 267, 300a, 300b, 300c, 478, 479 | Provision of worksite and access for construction Diversion or installation of, or works to, utility apparatus 63a, 63b, 63c, 63d, 63f, 63g, 63h, 63i, 63j, 63k, 85a, 85b, 85c, 85d, 85e, 85f, 85g, 85h, 85i, 85j, 85k, 87c, 87e, 87f, 87g, 87h, 87i, AP2-5, AP2-7, AP2-9, AP4-25 to AP4-28 | Reinstatement of businesses or facilities 67 | Provision of worksite and access for construction Provision and renewal of railway systems for operational purposes and drainage 102a, 102b, 102c, 102d, 157d, 157f, 157h, 157i, 157k, 246, 248, 251a, 251b, 251c, 251d, 251e, 251f, 251g, 251h, 251j, 251k, 251n, 261, 263, AP4-20 to AP4-22, AP4-24 | Diversion or installation of, or works to, utility apparatus 157c, 157e, 157g, 274a, 322, 355, 363, 376 | Provision and renewal of railway systems for operational purposes and drainage 223 | Provision of worksite and access for construction Provision of access for construction and maintenance 268 | Provision and renewal of railway systems for operational purposes and drainage Diversion or installation of, or works to, utility apparatus 269, 271 to 273, 324, 419 | Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 300d, 300e | Removal of utility apparatus 19, 304, 305, 306, 326, 326a | Provision of balancing pond and associated works and access for maintenance 332, 334, 339, 340, 345, 346, 360, 366, 379, 384, 387, 388, 395, AP4-30, AP4-31 | Provision of worksite and access for construction and maintenance 367, 368 | Provision and renewal of railway systems for operational purposes and drainage Provision of worksite and access for construction and maintenance 437 | Provision of worksite and access for construction Provision of a turning head 317 | Minor highway alterations City of Manchester | 1 to 6 | Modification to depot
SCHEDULE 5 Acquisition of land for particular purposes
Section 4(2) The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table. Area | Number of land shown on deposited plans | Purpose for which land may be acquired or used London Borough of Camden | 4, 13, 79a, 99 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 68, 69, 93, 162, 163, 236, 369, 401 to 411, 508, 522, 665, 704, 721, 724, 727, 750, 791, 792, 794 to 796, 801 to 805, 807 to 811, 901, 912, 978, 1017, 1051 | Diversion or installation of, or works to, utilities apparatus 78, 110, 816, 817, 819, 820, 822, 829, 834, 847, 848, 849, 852, 854, 855, 856, AP3-22 | Provision of worksite and access for construction 140a, 142 | Provision of worksite and access for construction Diversion or installation of, or works to utilities apparatus Installation of ground anchors 90, 151 to 154, 157, 159, 177, 180, 181 | Installation of ground anchors 363 | Provision of electricity supply system and access 434 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance AP3-5 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus London Borough of Brent | 28, 29, 48, 50, 55, 58, 78, 87, 185, 374, AP4-13 to AP4-15 | Diversion or installation of, or works to, utilities apparatus 53a, 54a, AP4-6, AP4-10 | Provision of worksite and access for construction Royal Borough of Kensington & Chelsea | 1 to 3 | Provision of worksite and access for construction Provision and renewal of railway systems for operational purposes and drainage 16, 19 | Diversion or installation of, or works to, utilities apparatus London Borough of Hammersmith & Fulham | 5, 6, 50c, 67, AP4-3, AP4-7, AP4-9 to AP4-11 | Provision of worksite and access for construction 12, 13, 21a, 22c, 22e, 28, 29, 37, 48, 50a, 50b, 63, 66, 71, 73, 75, 76 | Diversion or installation of, or works to, utilities apparatus 77 | Provision of environmental mitigation AP4-1 | Provision of worksite and access for construction and maintenance London Borough of Ealing | 5, 7, 8, 9, 12, 13, 29, 30, 118a, 120a, 124a, 124b, 132, 156, 223, 229, 233, 265, 562, 787a, 788 to 790, 946 to 949 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 20, 21, 35, 36, 40, 41, 44, 45, 48, 49, 52, 53, 56, 57, 60, 61, 64, 65, 68, 69, 72, 73, 76, 77, 80, 81, 84, 125a, 125b, 126, 127a, 127b, 142 to 144, 145a, 152 to 154, 155a, 155b, 190, 193, 194, 196, 200, 202, 204 to 206, 209, 214, 216 to 219, 221, 222, 228, 231, 232, 235, 237, 240, 242, 251, 254 to 257, 259, 267, 269, 271, 272, 274, 277, 282 to 289, 438, 439, AP2-13, AP2-15, AP2-17, AP2-21, AP4-8, AP4-10, AP4-16, AP4-17 | Provision of worksite and access for construction 103, 106 | Provision of worksite and access for construction Provision and renewal of railway systems for operational purposes and drainage Diversion or installation of, or works to, utilities apparatus 119, 121, 150, 151, 157, 158, 165 | Provision of worksite and access for construction Reinstatement of businesses or facilities Diversion or installation of, or works to, utilities apparatus 133 to 139, 295, 297, 298, 314, 315, 322 to 324, 396, 406, 408, 445, 456 to 461, 471, 579, 580, 716, 770, 771, 798, 799, 805 to 807, 842 to 844, 849, 867, 898, 922, 925, 926, 942, 944, 945, 957 to 964, 973 to 975, 977, 985, 987, AP2-25, AP2-26 | Diversion or installation of, or works to, utilities apparatus 213 | Provision and renewal of railway systems for operational purposes and drainage 454 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus AP4-1 | Reinstatement of businesses or facilities London Borough of Hillingdon | 1 to 16, 26 to 28, 39, 40, 68, 84, 85, 106, 107, 128 to 139, 175, 176, 190, 202, 203, 219, 224, 229 to 239, 371, 384, 387, 390, 447, 449, 452, 454, 463a, 464a, 476, 477, 478a, 492a, 522, 523, 523a, AP5-1b, AP5-2 to AP5-14 | Diversion or installation of, or works to, utilities apparatus 25, 441, 442, 458, 459, 469, 471, 483a, 484, 485, 494 to 496, 537, AP4-20, AP4-25, AP4-27 to AP4-29, AP4-33 to AP4-39 | Provision of environmental mitigation 25a, 470, 494b | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 50, 51 | Provision of access for construction and maintenance of utility diversions 101 to 103, 420, 422, 423, 426, 427 to 429, 466a, 467, 482, 487, 488, 502, 504, 506, AP4-12, AP4-13, AP4-15, AP4-16 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 377, 379, 411, 414, 415, 535 | Provision of worksite and access for construction 412, 413, 416 to 419, AP4-26 | Provision of worksite and access for construction and maintenance 424, 425, 460, 536, 540, AP4-17 to AP4-19 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 465a, 511 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 474 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation 496a, 498, 499, 526 to 534 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation Diversion and installation of overhead electric lines 501, 507 | Diversion and installation of overhead electric lines Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 510, AP4-21 | Provision of worksite and access for construction Provision of environmental mitigation 545 | Diversion and installation of overhead electric lines Provision of worksite and access for construction and maintenance 548, 550, 556 to 558, 563, AP2-1 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 562 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 564, 590b, AP2-3, AP2-4 | Diversion and installation of overhead electric lines 606, 614, 615, 618 | Provision of worksite and access for construction and maintenance Provision and renewal of railway systems for operational purposes and drainage Provision of new public right of way Diversion and installation of overhead electric lines Diversion or installation of, or works to, utilities apparatus 611, 613 | Provision of worksite and access for construction and maintenance Provision and renewal of railway systems for operational purposes and drainage Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 612 | Provision of worksite and access for construction and maintenance Provision and renewal of railway systems for operational purposes and drainage Diversion or installation of, or works to, utilities apparatus 616 | Provision of worksite and access for construction and maintenance Provision and renewal of railway systems for operational purposes and drainage Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 496, 654, 655 | Provision of environmental mitigation Provision of flood mitigation measures 496a, 498 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines 557, 560, 561, 570 to 580, 583, 584, 588, 590, 591, 593, 594, 707, 714, 719, 720c | Diversion and installation of overhead electric lines 558 | Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines 565 | Diversion and installation of overhead electric lines Provision of electricity supply system and access 566 to 568 | Provision of access for construction and maintenance of utility diversions Provision of electricity supply system and access 603, 604, 643 to 645, 657 to 659, 665, 683, 693, 694, 698a, 720d, 723, 724, 728, 729, 736, 737, 739, 741, 742, 748, 749, 753, 767, 768, 770, 784, 786, 787, 789 | Provision of environmental mitigation 621 | Provision of balancing pond and associated works and access for maintenance Provision of electricity supply system and access Provision of new public right of way 622, 624, 625, 627, 628, 630 to 632, 636, 666, 669, 671, 738 | Diversion or installation of, or works to, utilities apparatus 633, 676, 677, 679, 697, 741a, 747, 747a, 747b, 747d, 756, 756a, 761, 762a, 763 to 765, 771, 772, 774 to 778, 780 to 783 | Provision of worksite and access for construction and maintenance 642, 758 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 663, 672 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 692 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Provision of electricity supply system and access Provision of flood mitigation measures Provision of new public right of way Diversion and installation of overhead electric lines 726, 731, 734, 740, 745, 746 | Provision of worksite and access for construction 751, 755 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation 759 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus AP2-5, AP2-6 | Provision of access for construction and maintenance AP4-40 to AP4-42 | Reinstatement of businesses or facilities County of Buckinghamshire, District of South Bucks,Parish of Iver | AP2-1, AP2-3 | Provision and renewal of railway systems for operational purposes and drainage AP2-9 to AP2-11, AP2-14, AP2-15 | Provision of worksite and access for construction Borough of Slough | AP2-3, AP2-5, AP2-6, AP2-14, AP2-21, AP2-25, AP2-30, AP2-33, AP2-34 | Provision of worksite and access for construction AP2-12, AP2-26 | Provision and renewal of railway systems for operational purposes and drainage AP2-13, AP2-20 | Provision of worksite and access for construction Provision and renewal of railway systems for operational purposes and drainage AP2-17, AP2-22, AP2-23, AP2-28 | Provision of worksite and access for construction Provision of flood mitigation measures AP2-35 | Provision of access for construction and maintenance of utility diversions AP2-37 | Diversion or installation of, or works to, utilities apparatus County of Buckinghamshire District of South Bucks Parish of Denham | 1, 2 | Provision of flood mitigation measures 1d, 1f | Diversion and installation of overhead electric lines 11, 17, 19, 32 | Provision of environmental mitigation 25, 26, 28 to 31, 33, 46, 52 | Provision of worksite and access for construction 14, 15, 23, 27 | Provision of balancing pond and associated works and access for maintenance 26 | Provision of worksite and access for construction 34 | Provision of environmental mitigation Provision of worksite and access for construction 42, 43 | Diversion or installation of, or works to, utilities apparatus 37 to 39, 47 to 49, AP2-3 | Provision of access for construction and maintenance AP4-1, AP4-2, AP4-4 to AP4-9 | Provision of worksite and access for construction Provision of drainage and associated works Parish of Wexham | AP4-1 | Provision of environmental mitigation County of Hertfordshire District of Three Rivers | 5 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works 7, 13, 15, 17, 19, 21, 22, 24, 25, 27, 31, 38, 41, 44, 48, 54, 58, 65, 69, 104 | Provision of worksite and access for construction 12 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 23, 53, 80 | Provision of balancing pond and associated works and access for maintenance 32, 36, 37 | Provision of worksite and access for construction Provision of drainage and associated works 40, 46, 61, 63, 64 | Provision of drainage and associated works 49, 55, 80a, 84, 94, 97, 120, AP4-1 to AP4-17 | Provision of environmental mitigation 75 | Provision of environmental mitigation Provision of worksite and access for construction 107, 109 | Provision of environmental mitigation Provision of worksite and access for construction Provision of electricity supply system and access Diversion and installation of overhead electric lines 116 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 10 | Diversion or installation of, or works to, utilities apparatus AP4-18 | Reinstatement of businesses or facilities County of Buckinghamshire District of Chiltern Parish of Chalfont St Peter | 1, 7, 21, 30, 31, 35 | Provision of worksite and access for construction 16 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 19 | Diversion and installation of overhead electric lines 70, 75, 76, 83, 85 | Provision of environmental mitigation Parish of Chalfont St Giles | 4 to 6 | Provision of environmental mitigation 131 | Provision of worksite and access for construction 134, 135, 139, 141, 142, 147 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Parish of Amersham | 7, 22, 24, 28, 34, 37 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance 10 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 27 | Diversion or installation of, or works to, utilities apparatus 31 | Provision of environmental mitigation Provision of worksite and access for construction 59, 66, 67, 74, 76, 77 | Provision of protective works to watercourse Parish of Coleshill | 4 | Provision of environmental mitigation 8 | Diversion or installation of, or works to, utilities apparatus Parish of Little Missenden | 2 to 4 | Provision of protective works to watercourse 11, 16 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 14 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance 15, 17, 19, 20 | Diversion or installation of, or works to, utilities apparatus AP2-2, AP2-3 | Provision of new public right of way Parish of Great Missenden | 142, 158, 174, 178, AP4-55, AP4-56 | Provision of environmental mitigation 135 to 137 | Provision of drainage and associated works 155, 184 | Provision of environmental mitigation Provision of drainage and associated works AP4-80, AP4-81 | Provision of environmental mitigation Provision of new public right of way 170, 171 | Provision of environmental mitigation Provision of worksite and access for construction AP4-31, AP4-38, AP4-41, AP4-41a, AP4-42 to AP4-44, AP4-47a, AP4-48, AP4-49, AP4-59, AP4-73, AP4-74 | Diversion and installation of overhead electric lines 173, 179, 188, 189 | Diversion or installation of, or works to, utilities apparatus 112, 117 | Provision of environmental mitigation Diversion and installation of overhead electric lines Diversion or installation of, or works to, utilities apparatus 157, 159 to 161, 163, 167, AP4-15 | Provision of worksite and access for construction 128, 139 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 138, 147 | Diversion and installation of overhead electric lines 166 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines 162a, 162b | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 180, AP4-51, AP4-52, AP4-75 | Provision of environmental mitigation Diversion and installation of overhead electric lines AP2-2 | Provision of balancing pond and associated works and access for maintenance AP4-54, AP4-78 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance AP4-57 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines Provision of new public right of way AP4-58, AP4-69, AP4-70 | Provision of worksite and access for construction and maintenance Provision of drainage and associated works AP4-65 | Provision of balancing pond and associated works and access for maintenance AP4-67 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works AP4-68 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines Parish of The Lee | 2, 42 to 45 | Provision of environmental mitigation 5, 22, 24, 28, 34 | Reprofiling of ground 8, 9, 26 | Provision of worksite and access for construction Reprofiling of ground 11, 12, 18, 19, 31 | Provision of environmental mitigation Diversion and installation of overhead electric lines 16 | Diversion and installation of overhead electric lines 27 | Provision of environmental mitigation Reprofiling of ground Diversion or installation of, or works to, utilities apparatus 32 | Provision of environmental mitigation Reprofiling of ground 36 | Reprofiling of ground Provision of worksite and access for construction and maintenance 39, 40 | Provision of environmental mitigation Provision of worksite and access for construction AP2-1 | Provision of access for construction District of Aylesbury Vale Parish of Wendover | 1, 3, 14, 48, 150, 153, 233 | Provision of environmental mitigation Diversion and installation of overhead electric lines 5, 8, 15, 19, 59, 66 to 71, 74, 76 to 78, 80, 81, 123, 143, 147, 220 | Provision of drainage and associated works 7, 251a | Provision of environmental mitigation Provision of drainage and associated works 9, 11, 23, 25, 50, 57, 65, 97, 98, 127, 129, 132, 146, 222, 232, 236, 238, 239, 243, 248, 250a, 257 | Provision of environmental mitigation 18, 42, 45, 46, 60, 120, 126, 149, 151, 182, 187, 190, 192, 224 | Provision of worksite and access for construction 24 | Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 29 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 31 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Provision of drainage and associated works 32, 58, 108, 109, 142, 212, 214, 223, 241 | Diversion and installation of overhead electric lines 34, 55, 94, 124, 204 | Provision of environmental mitigation Diversion and installation of overhead electric lines Provision of worksite and access for construction 35, 169, 172, 185, 205, 206 | Diversion or installation of, or works to, utilities apparatus 38 to 41, 52, 96, 103, 110, 111 | Provision of environmental mitigation Provision of worksite and access for construction 47, 56, 62, 63, 165, 211, 235 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 54 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 61, 221 | Provision of worksite and access for construction Provision of drainage and associated works 64 | Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of drainage and associated works 91, 213, 215 | Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 95 | Provision of worksite and access for construction and maintenance 100 | Provision of environmental mitigation Provision of drainage and associated works Diversion and installation of overhead electric lines 135, 136 | Provision of balancing pond and associated works and access for maintenance Diversion and installation of overhead electric lines 156, 159, 217 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 171 | Provision of worksite and access for construction Provision of new public right of way 173 | Installation of ground anchors 203 | Provision of worksite and access for construction Provision of new public right of way Diversion and installation of overhead electric lines 219 | Provision of worksite and access for construction Provision of environmental mitigation Provision of drainage and associated works Diversion and installation of overhead electric lines 230 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines AP1-11 | Provision of environmental mitigation Provision of worksite and access for construction and provision of balancing pond and associated works Access for maintenance AP2-1 | Provision of balancing pond and associated works and access for maintenance AP2-3a | Minor highway alterations AP2-4 | Reinstatement of businesses or facilities District of Wycombe Parish of Ellesborough | 2 | Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 4, 15, 74 | Provision of worksite and access for construction 5 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 10 | Provision of environmental mitigation Provision of drainage and associated works 13, 17, 32, 33 | Diversion or installation of, or works to, utilities apparatus 34, 44, 66, 70 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 22, 23, 30, 35, 36, 38, 41, 47, 48, AP2-1, AP2-2 | Provision of environmental mitigation 50, 51, 54 to 57 | Provision of flood mitigation measures 52 | Provision of worksite and access for construction and maintenance 53, 61 to 64, 71, 72 | Provision of drainage and associated works 69, 80 | Diversion and installation of overhead electric lines 11, 12 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus AP4-1 | Provision of environmental mitigation Provision of worksite and access for construction District of Aylesbury Vale Parish of Stoke Mandeville | 4, 21, 23, 26, 33, 34, 38, 81, 90, 100 to 102, 108, 112, 155, 157, 158, 161 | Provision of environmental mitigation 6, 69, 113 | Provision of worksite and access for construction and maintenance 8, 9, 94, 95, 120 | Provision of flood mitigation measures 10 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 18 | Provision of worksite and access for construction and maintenance Provision of new public right of way 22, 48, 56, 122, 132, 144 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 24, 59, 63, 116, 149, 151 | Provision of worksite and access for construction 25, 72, 75, 76, 78 to 80, 87, 88, 91, 98, 109, 117, 138, 141 | Diversion or installation of, or works to, utilities apparatus 28 | Provision of balancing pond and associated works and access for maintenance 43, 84, 103, 129 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 61 | Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 62 | Provision of drainage and associated works 74, 92, 93, 152 | Provision of drainage and associated works Provision of environmental mitigation 83, AP2-2 | Provision of new public right of way Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation 118 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 119 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works 123, 131, 134, AP1-3, AP1-4, 150 | Provision of environmental mitigation Provision of worksite and access for construction 126 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 146 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance District of Wycombe Parish of Great and Little Kimble cum Marsh | 1 | Provision of drainage and associated works 3, 7, 9 | Provision of worksite and access for construction District of Aylesbury Parish of Stone with Bishopstone and Hartwell | 6, 65, 86 | Diversion or installation of, or works to, utilities apparatus 17, 18, 23, 32 | Provision of environmental mitigation Diversion and installation of overhead electric lines 27, 29, 30, 37, 69, 79, 81 | Provision of environmental mitigation 28, 28b | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 33 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works Provision of worksite and access for construction 35 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 36 | Provision of environmental mitigation Provision of access for construction and maintenance 39 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works Provision of access for construction and maintenance 40 | Provision of worksite and access for construction and maintenance 44, 46, 53, 57, 59 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 45 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance 47 | Provision of worksite and access for construction Provision of a turning head 48, 85, 90 | Provision of worksite and access for construction 51, 55 | Provision of worksite and access for construction Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 60 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Provision of a turning head 61, 72 | Provision of environmental mitigation Provision of worksite and access for construction 66a, 66b, 71b, 73b | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation Provision of drainage and associated works Provision of flood mitigation measures 74a, 75, 89 | Provision of flood mitigation measures 76a | Provision of environmental mitigation Provision of drainage and associated works 87 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures 88 | Provision of flood mitigation measures Provision of drainage and associated works AP4-2 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works Parish of Aylesbury | 1 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 6, 18 | Provision of environmental mitigation Diversion and installation of overhead electric lines 20 to 22, 24 | Provision of environmental mitigation Parish of Coldharbour | 2 to 7, 10, 11 | Provision of environmental mitigation Parish of Fleet Marston | 4 | Provision of worksite and access for construction and maintenance 5, 11 | Provision of environmental mitigation Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 6, 7 | Diversion or installation of, or works to, utilities apparatus 8, 9 | Provision of flood mitigation measures 10 | Provision of worksite and access for construction Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 13, 26 | Provision of environmental mitigation 14, 18, 30 | Provision of drainage and associated works 15, 21 | Provision of worksite and access for construction 16, 19 | Provision of environmental mitigation Provision of new public right of way 20 | Provision of environmental mitigation Provision of worksite and access for construction 23 | Provision of worksite and access for construction Provision of drainage and associated works 25 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 12b | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Parish of Waddesdon | 1, 16 | Provision of flood mitigation measures 2, 73, 79 | Provision of environmental mitigation Provision of new public right of way 3, 32, 45, 107, 128, 129 | Provision of drainage and associated works 6 | Provision of environmental mitigation Provision of drainage and associated works Provision of new public right of way 7, 9, 113, 120, 126, 127 | Provision of environmental mitigation Provision of worksite and access for construction 8, 10, 11, 13, 34, 36, 41, 42, 49, 51, 53, 59, 60, 67, 69, 74, 76, 81 to 83, 85, 100, 103 | Provision of environmental mitigation 17, 46, 52, 56, 66, 72, 78, 84, 106, 114 | Provision of worksite and access for construction 18 | Provision of environmental mitigation Provision of worksite and access for construction Provision of electricity supply system and access 31, 54, 109, 112 | Provision of worksite and access for construction and maintenance 33, 40, 58 | Provision of balancing pond and associated works and access for maintenance 68, 93, 110, 111 | Diversion or installation of, or works to, utilities apparatus 91 | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 94 | Provision of new public right of way 97 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 105 | Provision of drainage and associated works Provision of worksite and access for construction and maintenance 123 | Provision of environmental mitigation Provision of worksite and access for construction Provision of flood mitigation measures Parish of Quainton | 3, 35, 61, 66 | Provision of environmental mitigation Provision of flood mitigation measures 8, 23, 59, 74, 88, 115, AP2-5, AP2-14, AP2-15, AP4-1, AP4-2 | Provision of balancing pond and associated works and access for maintenance 9, 12, 14, 24, 92, 98 to 100, 133, 138, 142, 177, 182, 191, 194, 199, 203, 216, 218, 248 to 250 | Provision of worksite and access for construction 11, 20, 27, 53, 56, 58, 62, 64, 65, 122, 125, 128, 141, 195a, 206a, 222, 223, 225, 226, 232, 240, 253, 270, 271, 273a, AP1-23, AP1-24 | Provision of environmental mitigation 17, 75, 127, 210, 212 | Diversion or installation of, or works to, utilities apparatus 19 | Provision of worksite and access for construction Removal of utility apparatus 21 | Provision of environmental mitigation Provision of worksite and access for construction Removal of utility apparatus 31 | Provision of balancing pond and associated works and access for maintenance Removal of utility apparatus 32, 50, 68, 151, 219, 220, 224 | Provision of flood mitigation measures 33, 72 | Provision of worksite and access for construction and maintenance 87 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 54, 71, 89, 104, 110, 113, 118b, 118d, AP1-5, AP1-16 to AP1-20 | Provision of environmental mitigation Provision of worksite and access for construction 38 | Provision of environmental mitigation Provision of diversion or installation of, or works to, utilities apparatus 40 | Provision of environmental mitigation Provision of drainage and associated works 46, 107, 109, 131, 146, 149, 159, 197, 244, AP2-3, AP2-4, AP2-10 | Provision of drainage and associated works 47 | Provision of a turning head Provision of environmental mitigation 49 | Provision of a turning head Diversion or installation of, or works to, utilities apparatus 93 | Provision of balancing pond and associated works and access for maintenance Provision of flood mitigation measures 118c, 176 | Provision of environmental mitigation Diversion and installation of overhead electric lines 124 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 135, 150, 155, 157, 158, 161, 164, 168, 170, 184a, 233 | Diversion and installation of overhead electric lines 136a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of new public right of way Provision of electricity supply system and access 143 | Diversion and installation of overhead electric lines Provision of access for construction and maintenance 160 | Provision of access for construction and maintenance 166 | Provision of electricity supply system and access 173 | Provision of environmental mitigation Diversion and installation of overhead electric lines Provision of drainage and associated works 174, 175 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 204 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of flood mitigation measures 206b, 207a | Provision of environmental mitigation Provision of electricity supply system and access 243 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 251 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance AP2-6, AP2-7 to AP2-9 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines Parish of Grendon Underwood | 3, 5, 10, 28, 30 | Provision of environmental mitigation 20, 23, 26 | Provision of worksite and access for construction 4 | Provision of environmental mitigation Provision of drainage and associated works 21 and 24 | Provision of environmental mitigation Provision of worksite and access for construction 12a | Provision of environmental mitigation Provision of worksite and access for construction and maintenance AP2-6 | Provision of worksite and access for construction and maintenance Provision of new public right of way 16a | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Provision of new public right of way 29 | Provision of balancing pond and associated works and access for maintenance AP1-1, AP1-5, AP1-6, AP1-9 | Diversion and installation of overhead electric lines Parish of Middle Claydon | 1, 2 | Provision of environmental mitigation Parish of East Claydon | 4, 4a, 5, 7 | Diversion and installation of overhead electric lines Parish of Calvert Green | 1, 9, 11 | Provision of environmental mitigation 2 | Provision of environmental mitigation Provision of new public right of way AP2-1 | Provision of new public right of way 6 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of flood mitigation measures Provision of new public right of way 8 | Provision of flood mitigation measures 23 | Diversion or installation of, or works to, utilities apparatus 24 | Diversion or installation of, or works to, utilities apparatus Provision of access for construction and maintenance 25 | Provision of worksite and access for construction 18a | Provision of access for construction and maintenance Provision of new public right of way AP4-2 | Provision of access for construction AP4-6 | Provision of balancing pond and associated works and access for maintenance Parish of Steeple Claydon | 3, 4, 6, 78, 80, 110, 111, AP1-1, AP4-1, AP4-4 | Provision of environmental mitigation 24, 26a, 27, 31, 33, 97 | Provision of worksite and access for construction 72 | Provision of environmental mitigation Provision of access for construction and maintenance 9c, 9d | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of access for construction and maintenance 9a, 100, 117, 119, 120 | Diversion or installation of, or works to, utilities apparatus 21 | Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 52a, 76 | Provision of environmental mitigation Provision of worksite and access for construction 51a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 75 | Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 98, 99, 112 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 109 | Provision of flood mitigation measures 124, 125 | Provision of drainage and associated works 69, 71 | Provision of new public right of way 102, 103, AP1-8, AP2-1 to AP2-4 | Provision of worksite and access for construction and maintenance Parish of Charndon | 2, 3 | Diversion or installation of, or works to, utilities apparatus Parish of Twyford | 5, 6, 13, 62, 67, 92, 101 | Provision of worksite and access for construction 14 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of new public right of way 24, 26, 44, 49, 54 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 27, 48 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 38, 60, 81, 82, 89, 90 | Provision of flood mitigation measures 39 | Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction 47, 63, 64, 69 | Provision of environmental mitigation Provision of worksite and access for construction 52 | Provision of environmental mitigation Provision of worksite and access for construction Provision of access for construction and maintenance 53, 76 | Provision of worksite and access for construction and maintenance 58, 88 | Provision of environmental mitigation Provision of new public right of way 71, 75, 77, 83, 84, 95, 97, 99, 100 | Provision of environmental mitigation 72 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 78 | Provision of drainage and associated works 80 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 87 | Diversion or installation of, or works to, utilities apparatus 91 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 94 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of access for construction and maintenance Provision of new public right of way Parish of Preston Bissett | 1 to 4 | Provision of flood mitigation measures 6, 13, 22, 27, 30, 31, 44, 45, 54 to 56, 58, 62, AP2-1 | Provision of environmental mitigation 8, 15a, 16b, 28a, 29a, 52 | Provision of worksite and access for construction 12a, 12b, AP4-1 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 20, 21 | Provision of environmental mitigation Provision of drainage and associated works 23a | Provision of environmental mitigation Provision of new public right of way Provision of drainage and associated works Provision of worksite and access for construction and maintenance 37 | Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction and maintenance 16c, 16d, 18b, 41, 47 to 51 | Provision of environmental mitigation Provision of worksite and access for construction 40, 42, 43, 61 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance County of Oxfordshire District of Cherwell Parish of Godington | 5a, 5b, 12, AP2-1 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 6a | Provision of worksite and access for construction 8a, 8b, 14, 15 | Provision of flood mitigation measures County of Buckinghamshire District of Aylesbury Vale Parish of Chetwode | 1 to 3, 8, 9 | Provision of flood mitigation measures 5, 12 to 14, 22 to 24, 28, 31, 35, 42, 45, 52, 53, 55, 64, 84, 87 | Provision of environmental mitigation 17a, 17b, 17c, 17d | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of drainage and associated works 19 to 21, 95, 96 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 25, 27, 34, 91 | Provision of worksite and access for construction 30 | Provision of environmental mitigation Provision of drainage and associated works 41, 86, 88 | Diversion or installation of, or works to, utilities apparatus 51 | Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 54 | Provision of drainage and associated works Removal of utility apparatus 63 | Provision of drainage and associated works 65 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 71, 90 | Provision of environmental mitigation Provision of new public right of way 76 | Provision of worksite and access for construction Removal of utility apparatus Parish of Barton Hartshorn | 2a, AP2-5 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 6a | Provision of environmental mitigation 7a, 16 | Provision of worksite and access for construction 9, 10, 22 | Provision of flood mitigation measures 13 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 14 | Provision of worksite and access for construction Provision of drainage and associated works 19, 24 | Provision of drainage and associated works 25, 26 | Provision of environmental mitigation Provision of new public right of way County of Oxfordshire District of Cherwell Parish of Newton Purcell with Shelswell | 1, 8, 17, 39, 49, 66 | Provision of environmental mitigation Provision of worksite and access for construction 4, 6, 15, 16, 19, 23, 31, 34, 36, 46, 54, 86 | Provision of environmental mitigation 10, 22, 27, 55, 69, 75, 82, 83 | Provision of worksite and access for construction 21, 26, 63, 67, 74, 76 | Provision of drainage and associated works 32 | Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus Provision of worksite and access for construction 37, 59 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 30, 56, 58 | Provision of worksite and access for construction and maintenance 57, 62 | Provision of flood mitigation measures Provision of drainage and associated works 61 | Provision of worksite and access for construction and maintenance Provision of new public right of way 64 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 72 | Provision of worksite and access for construction Provision of flood mitigation measures 85, 88 | Diversion or installation of, or works to, utilities apparatus 92 | Provision of worksite and access for construction Provision of new public right of way Parish of Finmere | 5, 9, 54 | Provision of environmental mitigation 7, 15 | Provision of environmental mitigation Provision of new public right of way 8, 12 | Provision of environmental mitigation Provision of worksite and access for construction 24, 33, 36, 37 | Provision of worksite and access for construction 18 | Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 18a, 25, 40, 42 | Diversion or installation of, or works to, utilities apparatus 48 | Provision of access for utility works 52 | Provision of environmental mitigation Removal of utility apparatus Parish of Mixbury | 7, 24, 26, 40 | Diversion or installation of, or works to, utilities apparatus 8, 13a | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 12, 17a, 45, 46, 57, AP2-8 to AP2-11 | Provision of environmental mitigation 15a, 18, AP2-5a | Provision of environmental mitigation Diversion and installation of overhead electric lines 34, 43a, 43b, 51 | Provision of worksite and access for construction 28a, 37, 38 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 31 | Provision of balancing pond and associated works and access for maintenance Provision of electricity supply system and access 31a | Provision of environmental mitigation Removal of utility apparatus Diversion or installation of, or works to, utilities apparatus 39 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 40b, 40c, 49 | Provision of environmental mitigation Provision of worksite and access for construction 41a, 63 | Provision of drainage and associated works 48 | Provision of environmental mitigation Provision of new public right of way 53, 54 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way Provision of drainage and associated works 52 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way Provision of drainage and associated works Removal of utility apparatus 62 | Provision of flood mitigation measures Removal of utility apparatus 66 | Removal of utility apparatus County of Buckinghamshire District of Aylesbury Vale Parish of Westbury | 1 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus Provision of drainage and associated works 1a | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of new public right of way 5, 6 | Provision of drainage and associated works 7 | Provision of environmental mitigation Provision of drainage and associated works Provision of new public right of way Provision of worksite and access for construction and maintenance 14 | Provision of flood mitigation measures 19, 21 to 25, 27 | Provision of environmental mitigation 28 | Provision of environmental mitigation Provision of new public right of way 29 | Provision of worksite and access for construction Provision of new public right of way 30, 33 to 35, 38 | Provision of worksite and access for construction 18, 20 | Diversion or installation of, or works to, utilities apparatus Parish of Turweston | 3, 4, 45, 46 | Provision of new public right of way 11 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 8, 13a, 20, 27, 50, 68, 71, 72, 76 to 79, 83, 85, 99, 100 | Provision of worksite and access for construction 18, 21, 89, 91 | Provision of environmental mitigation 29 | Diversion or installation of, or works to, utilities apparatus 62, 73 | Provision of worksite and access for construction Diversion and installation of overhead electric lines Removal of utility apparatus 81 | Provision of worksite and access for construction and maintenance 37 | Diversion and installation of overhead electric lines 38, 104, 106 | Provision of environmental mitigation Provision of worksite and access for construction 40, 57 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 42, 61, 67 | Diversion and installation of overhead electric lines 43, 48 | Diversion and installation of overhead electric lines Provision of new public right of way 49 | Provision of worksite and access for construction Provision of new public right of way 65 | Provision of worksite and access for construction Removal of utility apparatus Provision of balancing pond and associated works and access for maintenance 84 | Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 88 | Provision of environmental mitigation Diversion and installation of overhead electric lines 90 | Provision of environmental mitigation Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 102, 110 | Provision of drainage and associated works 109 | Provision of environmental mitigation Provision of flood mitigation measures AP2-1 to AP2-4 | Reinstatement of businesses or facilities County of Northamptonshire District of South Northamptonshire Parish of Whitfield | 1 | Provision of balancing pond and associated works and access for maintenance Diversion and installation of overhead electric lines 4, 9, 13, 14 | Provision of drainage and associated works 6 | Provision of environmental mitigation Diversion and installation of overhead electric lines Provision of worksite and access for construction Provision of drainage and associated works Provision of electricity supply system, and access 10 | Provision of environmental mitigation Provision of flood mitigation measures Provision of new public rights of way Provision of drainage and associated works 16, AP2-3 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 20, 35 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 26 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 30 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 17 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 25 | Provision of flood mitigation measures Provision of new public right of way 27 | Provision of flood mitigation measures 28 | Provision of environmental mitigation 29, 37, 40, 42, 48 to 50 | Provision of worksite and access for construction 41 | Provision of balancing pond and associated works and access for maintenance 44 | Provision of environmental mitigation Provision of worksite and access for construction Parish of Brackley | 1 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 4, 6 | Provision of worksite and access for construction and maintenance 7 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 9 | Provision of worksite and access for construction 12 | Provision of environmental mitigation Provision of worksite and access for construction 13 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 14, 15 | Diversion or installation of, or works to, utilities apparatus Parish of Radstone | 1, 2, 22 | Provision of worksite and access for construction 5, 7a | Provision of worksite and access for construction Provision of new public right of way 6a, 6b, 20 | Provision of environmental mitigation Provision of worksite and access for construction 9 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 7 | Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus 8a, 16a, 16c, 18a, 18c, 40, 41, 47 | Provision of environmental mitigation 10, 17, 21, 23, 38, AP2-4, AP2-6 | Provision of environmental mitigation Provision of drainage and associated works 19, 26, 32, 33 | Provision of environmental mitigation Provision of drainage and associated works Provision of balancing pond and associated works and access for maintenance 27, 37a, 37b, 41a | Provision of balancing pond and associated works and access for maintenance 28, 29 | Provision of flood mitigation measures 30 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of environmental mitigation Provision of new public right of way Removal of utility apparatus 36 | Provision of environmental mitigation Removal of utility apparatus AP2-7 | Provision of new public right of way 46 | Provision of flood mitigation measures Parish of Greatworth | 1 | Provision of new public right of way 3 | Provision of drainage and associated works Provision of flood mitigation measures 4 | Provision of environmental mitigation Provision of drainage and associated works 5 | Provision of flood mitigation measures 8, 11, 15, 75, 76 | Provision of environmental mitigation 9 | Provision of worksite and access for construction Provision of new public right of way 12, AP2-1 | Provision of worksite and access for construction Provision of new public right of way Removal of utility apparatus 13 | Provision of environmental mitigation Provision of new public right of way Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus Provision of worksite and access for construction 19 | Provision of environmental mitigation Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 15a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 16, 17, 17a, 38 | Diversion or installation of, or works to, utilities apparatus 18, 48, 59, 60, 63, 64, 66, 67, 71, 72, 74, 77, 80, 82, 84 to 86, 90, 91, 98, AP4-5 | Provision of worksite and access for construction 10 | Provision of environmental mitigation Provision of new public right of way 20, 21 | Provision of drainage and associated works 23 | Provision of worksite and access for construction Provision of drainage and associated works Removal of utility apparatus 30, 70, 73 | Provision of worksite and access for construction Removal of utility apparatus 24 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus 25 | Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus 39a, 39b | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus 26 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 28, 31, 32, 34, 52, 56, 83, 99 | Provision of worksite and access for construction Provision of environmental mitigation 29a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus Provision of drainage and associated works Provision of balancing pond and associated works and access for maintenance 33 | Provision of balancing pond and associated works and access for maintenance 43 | Provision of flood mitigation measures Diversion or installation of, or works to, utilities apparatus 44 | Provision of worksite and access for construction and maintenance 57, 61a | Provision of worksite and access for construction and maintenance Provision of new public right of way Parish of Marston St Lawrence | 4, 23 | Provision of environmental mitigation 5, 8, 11, 14 | Provision of worksite and access for construction 7, 9 | Provision of environmental mitigation Provision of worksite and access for construction 15 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 17 | Provision of environmental mitigation Provision of drainage and associated works AP4-1 | Provision of drainage and associated works Parish of Sulgrave | 1 | Provision of environmental mitigation Provision of new public right of way Parish of Thorpe Mandeville | 3 | Provision of new public right of way Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 4, 16, 48, 54 | Provision of worksite and access for construction 18, 47 | Diversion or installation of, or works to, utilities apparatus 15, 31, 35 | Provision of environmental mitigation 25, 41, 42 | Provision of drainage and associated works 26 | Provision of environmental mitigation Provision of drainage and associated works Provision of balancing pond and associated works and access for maintenance Removal of utility apparatus 28, 33, 36, 40, 43 | Provision of flood mitigation measures 29, 51 | Provision of environmental mitigation Provision of worksite and access for construction 60, 62 | Provision of balancing pond and associated works and access for maintenance 69 | Provision of environmental mitigation Provision of drainage and associated works Removal of utility apparatus Diversion or installation of, or works to, utilities apparatus 71 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation AP2-3 | Provision of a turning head Provision of access for construction Parish of Culworth | 1 | Diversion or installation of, or works to, utilities apparatus 7, 8, 13, 16 | Provision of environmental mitigation Provision of worksite and access for construction 11 | Provision of environmental mitigation Provision of drainage and associated works 12, 20, 23 | Provision of environmental mitigation 17 | Provision of worksite and access for construction Provision of electricity supply system and access 18 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of new public right of way 19, AP4-1 | Provision of balancing pond and associated works and access for maintenance 21a | Provision of worksite and access for construction and maintenance 22, 25, 44 | Provision of worksite and access for construction 29 | Provision of drainage and associated works 34 | Provision of worksite and access for construction Provision of drainage and associated works 39 | Provision of flood mitigation measures Parish of Chipping Warden and Edgcote | 2, 4, 9, 28, 32, 33, 95, 96, 105, AP4-1, AP4-1a, AP4-1b, AP4-2 | Provision of environmental mitigation 35, 36, 39 | Diversion or installation of, or works to, utilities apparatus 11 | Provision of worksite and access for construction Provision of flood mitigation measures 3, 14, 41 | Provision of flood mitigation measures 15, 16, 24, 27, 38, 43, 48 to 50, 81b, 81d, 82b, 83b, 84, 86, 87a, 87b, 87c, 89a, 90, 91, 92b, 93, 104, 107, AP2-16, AP2-17, AP4-12, AP4-13 | Provision of worksite and access for construction 18a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 25 | Provision of worksite and access for construction and maintenance 47, AP2-1 | Provision of balancing pond and associated works and access for maintenance 58 | Provision of environmental mitigation Provision of new public right of way 65a | Provision of environmental mitigation Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 71, AP1-3, AP2-15 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 72a, AP2-21 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 94a, 99 | Provision of worksite and access for construction Provision of new public right of way AP2-3, AP2-5, AP2-13 | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works AP2-14 | Provision of a turning head AP2-9 | Provision of drainage and associated works AP4-3 | Provision of drainage and associated works AP4-10, AP4-11 | Provision of access for construction Parish of Aston Le Walls | 3, 32, AP4-1 | Provision of worksite and access for construction 9 | Diversion or installation of, or works to, utilities apparatus 10 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 17 | Provision of worksite and access for construction Provision of new public right of way 20 | Provision of environmental mitigation 23, 25, AP2-1 | Provision of environmental mitigation Provision of worksite and access for construction 28a, 31, AP2-2, AP2-3 | Provision of balancing pond and associated works and access for maintenance 39, AP2-4 | Provision of drainage and associated works Parish of Boddington | 11, 29, 39, 52, 54, 66, AP2-1, AP4-3 | Provision of drainage and associated works 3, 23, 26, 27a, 27b, 50, 51, 89, 107b, 109b, AP4-1, AP4-2 | Provision of worksite and access for construction 2a, 40a, 87, 96, 98, 114, 123b, AP2-2 | Provision of environmental mitigation Provision of worksite and access for construction 18 | Provision of environmental mitigation Provision of new public right of way Provision of worksite and access for construction 97, 100a, 107a, 109a | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 85 | Diversion or installation of, or works to, utilities apparatus 16, 56, 86 | Provision of flood mitigation measures 91 | Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation 25, 30a, 30b, 57, 62, 63, 71, 72, 80, 93, 115, 121 | Provision of environmental mitigation 97a and 99 | Diversion or installation of, or works to, utilities apparatus Removal of utility apparatus 101 | Provision of worksite and access for construction and maintenance 14a | Provision of balancing pond and associated works and access for maintenance Provision of flood mitigation measures 22 | Provision of environmental mitigation Provision of new public right of way Provision of worksite and access for construction 28 | Provision of environmental mitigation Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 61 | Provision of environmental mitigation Removal of utility apparatus 69 | Provision of balancing pond and associated works and access for maintenance 74 | Provision of environmental mitigation Provision of worksite and access for construction Removal of utility apparatus 81 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 103a | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction and maintenance County of Warwickshire District of Stratford-on-Avon Parish of Stoneton | 5, 7, 8, 13, 14, 16a, 28 | Provision of environmental mitigation 15 | Diversion or installation of, or works to, utilities apparatus 16, 18 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 19 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 6b, 9b, 22, 24 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Parish of Wormleighton | 21 | Provision of environmental mitigation 12, AP2-4 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 11, 15, 17, 18, 20 | Provision of worksite and access for construction and maintenance 13 | Diversion or installation of, or works to, utilities apparatus 23, 25 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 26 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction Provision of access for construction and maintenance of utility diversions 28 | Provision of environmental mitigation Provision of access for construction and maintenance of utility diversions 31b | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 34a, 47 | Provision of environmental mitigation Provision of worksite and access for construction 50 | Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation 52 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 55 | Provision of worksite and access for construction Parish of Radbourn | 2, 13b, 19, 28 | Provision of worksite and access for construction 3 | Provision of worksite and access for construction Reprofiling of ground Provision of drainage and associated works 6 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 7 | Provision of worksite and access for construction Reprofiling of ground Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 8, 8c | Provision of flood mitigation measures 8b | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Reprofiling of ground Provision of new public right of way 9 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction Provision of new public right of way Provision of environmental mitigation 11 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance Provision of new public right of way 13a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 15 | Provision of environmental mitigation 16 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 5 | Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures Provision of access for construction and maintenance of utility diversions 8d | Provision of environmental mitigation Provision of worksite and access for construction Parish of Ladbroke | 5, 19, 20, 25 to 27 | Diversion or installation of, or works to, utilities apparatus 7, 12, 15, 39, 41, 42, 52 | Provision of environmental mitigation 8, 18 | Reprofiling of ground Provision of drainage and associated works Provision of worksite and access for construction 24, 28, 32 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 29, 33, 71, 72 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 35, 56, 62, 63, 76 | Provision of environmental mitigation Provision of drainage and associated works 36, 61 | Provision of worksite and access for construction 37, AP4-2, AP4-3 | Provision of new public right of way 53, 59, 69 | Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction 66 | Provision of balancing pond and associated works and access for maintenance AP4-1 | Minor highway alterations Parish of Southam | 5, 31, 63, 65, 70, 72, 90, 93 | Provision of environmental mitigation 54, 56, 58, 60 to 62, 87, AP1-1, AP1-2 | Diversion or installation of, or works to, utilities apparatus 6, 9, 111 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 13, 94, 95 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 8, 14, 103 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 24, 32 | Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 34, 39, 55, 68, 80 | Provision of environmental mitigation Provision of worksite and access for construction 16, 41, 53, 91 | Provision of worksite and access for construction 28, 29 | Provision of drainage and associated works 45 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 47 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works 49, 51, 52, AP4-1 to AP4-3 | Provision of new public right of way 75 | Provision of environmental mitigation Provision of access for construction and maintenance of utility diversions 100 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures 107 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures 112, 118 | Provision of worksite and access for construction and maintenance Parish of Long Itchington | 1, 15, 19, 30a, 35a, 37, 47, AP4-4 | Provision of environmental mitigation 2 | Provision of worksite and access for construction and maintenance 6 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 7 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 7a | Provision of drainage and associated works 9 | Provision of environmental mitigation Provision of worksite and access for construction Provision of access for construction and maintenance of utility diversions 12, 49, 50, 52, 63, 64 | Diversion or installation of, or works to, utilities apparatus 20, 22, 31, 32 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 53 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction and maintenance 48, 57 | Provision of worksite and access for construction 58 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 59, 61 | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 11a | Removal of utility apparatus Parish of Ufton | 2 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 8, 21, 23, 24 | Diversion or installation of, or works to, utilities apparatus 9 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works 15 | Provision of environmental mitigation Provision of worksite and access for construction Drainage and associated work 11, 18 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works Provision of flood mitigation measures AP4-4 to AP4-7 | Provision of access for construction District of Warwick Parish of Offchurch | 4, 6, 32, 49, 50, 51a, 54a | Provision of environmental mitigation 7, 10, 98a | Provision of worksite and access for construction and maintenance 11 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 12, AP2-1 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Provision of drainage and associated works 13, 19, 28, 36, 42 to 44, 53a | Provision of environmental mitigation Provision of worksite and access for construction 15 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 18 | Provision of environmental mitigation Minor highway alterations 21, 45, 58, 59b, 60, 62 | Provision of worksite and access for construction 23 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works 24 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works 27 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works 29, 66, 89 | Diversion or installation of, or works to, utilities apparatus 37, 73 | Provision of balancing pond and associated works and access for maintenance 57a | Provision of worksite and access for construction Provision of drainage and associated works 68, 70, 84 | Reprofiling of ground Provision of worksite and access for construction 69 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 71, 75 | Provision of new public right of way 78, 79, 87 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works Diversion or installation of, or works to, utilities apparatus 80 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way Provision of access for construction and maintenance of utility diversions 91a | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures 92a | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 47a | Provision of a turning head 51b | Provision of a turning head Provision of environmental mitigation AP2-2, AP2-3 | Minor highway alterations Parish of Cubbington | 1a | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation Provision of worksite and access for construction and maintenance 19, 21, 41, 46, 49, 53, 57, 61, 65 | Provision of worksite and access for construction 23, 27, 28, 50, 52, 67 | Provision of environmental mitigation 4 | Diversion or installation of, or works to, utilities apparatus 5, 6 | Provision of access for construction and maintenance Provision of access for construction and maintenance of utility diversions 9 | Provision access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 11a, 14, 15 | Provision of environmental mitigation Drainage and associated works Provision of worksite and access for construction 32 | Provision of drainage and associated works Provision of worksite and access for construction 35 | Provision of environmental mitigation Provision of drainage and associated works Installation of ground anchors 39, 48 | Provision of environmental mitigation Provision of worksite and access for construction 44 | Provision of new public right of way 47 | Provision of access for construction and maintenance AP4-3 | Provision of environmental mitigation Parish of Weston Under Wetherley | 1, 2 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 4, 5a, AP4-1 to AP4-3 | Provision of environmental mitigation AP4-4 | Provision of worksite and access for construction and maintenance Parish of Stoneleigh | 1, 5, 7, 10, 13, 18, 44, 119, 123, 124, 126, 129, 130, 142a, 147, 148, 152, 152a, 155, AP2-1 to AP2-3, AP4-7, AP4-8 | Provision of worksite and access for construction 8, 27, 50, 52, 54a, 94, 117, 122, 164, 165, 167, 179, AP4-10, AP4-11 | Provision of environmental mitigation 21, 24, 28, 29, 31, 34, 43, 77a, 83 | Diversion or installation of, or works to, utilities apparatus 22, 42, 144, 158, 163 | Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction 33, 62 | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 48a, 66, 75, 96, 127, 128, 137, 138, 151, 173, 174, 177, AP4-10a, AP4-10b | Provision of environmental mitigation Provision of worksite and access for construction 55 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 63 | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works 73, AP4-1 | Provision of drainage and associated works 79a, 87, 112, 139 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 84 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 136, 141 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 97, 100, 143 | Provision of worksite and access for construction and maintenance 99 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 104 | Provision of balancing pond and associated works and access for maintenance 105 | Provision of environmental mitigation Provision of flood mitigation measures 132 | Provision of flood mitigation measures 133, AP4-12 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 140b, 146 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 166, 182 | Provision of environmental mitigation Provision of new public right of way 171a | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works 178 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 184 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way Parish of Kenilworth | 12, 30a, AP2-3 | Provision of environmental mitigation 13, 16, 21, AP2-1, AP2-2 | Provision of worksite and access for construction 5, 6, 23, 25a | Provision of environmental mitigation Provision of worksite and access for construction 9, 11, 15 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 20 | Provision of worksite and access for construction Provision of new public right of way Parish of Burton Green | 4, 6, 9, 13, 14, 23a, 37a, 43a, 48, 58b, 65a, 65b, 73a, 82a, 97, AP2-7, AP2-9, AP2-10, AP2-12 | Provision of environmental mitigation Provision of worksite and access for construction 7, 19, 59, 63, AP4-1 to AP4-4 | Provision of environmental mitigation 11, 21, AP1-1a | Provision of worksite and access for construction 28a, 28b, 28c | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 29, 31 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 32, AP2-3 | Provision of worksite and access for construction and maintenance 33a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works Provision of new public right of way 35 | Reinstatement of businesses or facilities 72 | Provision of environmental mitigation Provision of new public right of way 77 | Provision of new public right of way 98 | Provision of worksite and access for construction Provision of new public right of way AP2-1 | Provision of worksite and access for construction Provision of environmental mitigation Provision of new public right of way Diversion or installation of, or works to, utilities apparatus AP2-6 | Provision of passing places District of North Warwickshire Parish of Great Packington | 1, 6 | Provision of worksite and access for construction 7, 8 | Provision of balancing pond and associated works and access for maintenance Parish of Little Packington | 2 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 4 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 10, 12, 15, 16 | Diversion and installation of overhead electric lines 17, 19 | Provision of worksite and access for construction Diversion and installation of overhead electric lines AP1-1 | Reinstatement of businesses or facilities Parish of Coleshill | 1c | Provision of environmental mitigation Diversion and installation of overhead electric lines 1f, 1g, 1r | Provision of balancing pond and associated works and access for maintenance 1, 2 to 5, 7, 12, 13, 112, 127, 134, 136, 139, 145, 148, 150, 160, 204, 272, 304, 306, 397, 408, 410, 435, 445, 479, 514, AP4-1b, AP4-15, AP4-17, AP4-22 | Diversion and installation of overhead electric lines 33, 35 to 37, 40, 41, 85, 381, 433, 454, 455, 482a, 540, 556, 558a, 561a, 565a | Diversion or installation of, or works to, utilities apparatus 38 | Provision of balancing pond and associated works and access for maintenance 48, 52, 58, 59, 63, 68, 101, 102, 106, 278, 288a, 295, 296, 365, 371, 413, 420, 581a, 589a | Provision of worksite and access for construction 50 | Diversion and installation of overhead electric lines Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of balancing pond and associated works and access for maintenance 116, 124, 162a, 180b, 240, 241, 244, 246a, 248, 300, 302, 309, 320, 325, 326, 357, 367, 372, 428, 484, 509, 510, 519, AP2-21, AP2-24, AP2-26 to AP2-28 | Provision of environmental mitigation 51, 440, 495a | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 73 | Provision of environmental mitigation Removal of existing utilities 546a | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 74, 321, 452a, 452b, 546 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 75, 233a, 322, 377, 391, 396 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 77, 87a, 90a, 90b, 91a, 91b, 92a, 92b 103a, 103b, 108b, 108c, 152, 157, 548a | Provision of environmental mitigation Provision of worksite and access for construction Diversion and installation of overhead electric lines 112b | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 127a | Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of new public right of way Diversion or installation of, or works to, utilities apparatus 108a, 310, 315, 354, 506 to 508, 580a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 100, 427 | Provision of worksite and access for construction and maintenance 164 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Diversion and installation of overhead electric lines 283, 289, 297, 312a, 335, 346, 366, 369 | Provision of environmental mitigation Provision of worksite and access for construction 188 | Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction 195, 196 | Provision of worksite and access for construction Diversion and installation of overhead line equipment 199 | Provision of balancing pond and associated works and access for maintenance Diversion and installation of overhead line equipment 247, 257a | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of new public right of way 253, 388, 416, 451, 459, 460, 502 | Provision of environmental mitigation Diversion and installation of overhead line equipment 308, 318, 467 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance 358 | Diversion and installation of overhead line equipment Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of balancing pond and associated works and access for maintenance 404, 409 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 432 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 412 | Provision of environmental mitigation Diversion and installation of overhead line equipment 419, 517a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of new public right of way 481 | Provision of environmental mitigation Provision of new public right of way 491a, 491b | Provision of environmental mitigation Provision of new public right of way Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 511, 559a, 559b, AP2-20 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of balancing pond and associated works and access for maintenance 526a, 526b | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 593a, 593b | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead line equipment 439, 485, 486 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 492, 500 | Provision of worksite and access for construction Diversion and installation of overhead electric lines Parish of Water Orton | 6, 132 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 9a, 10, 27, 28, 37, 40, 43a, 82a | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 13a, 42, 50, 57, 64, 65, 67 to 69, 74 | Provision of environmental mitigation 23, 34, 35, 38, 39, 41, 77a | Provision of environmental mitigation Provision of worksite and access for construction 43, AP4-5 | Reinstatement of businesses or facilities 44, 89a, 126, 130, 142, AP4-25, AP4-26 | Provision of worksite and access for construction 48 | Provision of environmental mitigation Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 52 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 53, 54, 56 | Provision of balancing pond and associated works and access for maintenance 76 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 100a, 100b, 100c, 118 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 119a, 123 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 124a, 124b, 129, 139a | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 131a, 131b, 145, 146a, 146b, 149a, 149b, AP4-19, AP4-20 | Diversion and installation of overhead electric lines 138a | Diversion or installation of, or works to, utilities apparatus 133, 140, 143 | Provision of worksite and access for construction and maintenance 155a, 155b | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines Provision of balancing pond and associated works and access for maintenance AP4-14, AP4-16, AP4-17 | Provision of worksite and access for construction Minor highway alterations Parish of Shustoke | AP4-1 to AP4-3, AP4-5, AP4-6 | Provision of environmental mitigation Parish of Curdworth | 1a, 49, 70, 72, 77, 78, 80, 106, 215 | Diversion or installation of, or works to, utilities apparatus 2 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation 3a, 6, 7, 113a, 201, 202, 223, 241, 244 | Provision of worksite and access for construction 5a, 5b, 8a, 11a, 37, 39, 40, 43, 51b, 58, 59, 61, 82a, 96, 102, 153a, 168, 170, 174, 186, 187, AP1-1, AP1-2, AP4-1, AP4-17 to AP4-24, AP4-30, AP4-32 | Diversion and installation of overhead electric lines 13, AP2-6 | Provision of worksite and access for construction Provision of environmental mitigation 16, 21 to 23, 34, 38, 57, 81, 114, 117, 118, 121, 128, 137, 140, 141, 142, 149, 152, 155, 156, 160, 192, 200, AP1-5, AP1-6, AP2-7 to AP2-9, AP4-3 to AP4-9 | Provision of environmental mitigation 10a, 25a, 26 to 28, 31, 32, 45, 48, 69 | Provision of environmental mitigation Diversion and installation of overhead electric lines 35, 191, 194 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 210, 216, 219, 220 to 222, 225 to 227, 229, 231, 235, 236, 238, 240, 243, 245, 246 | Provision of worksite and access for construction and maintenance 51a, 68a | Provision of balancing pond and associated works and access for maintenance Diversion and installation of overhead electric lines 65a, 66a, 81a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 71 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 67a, 83, 83a, 90 to 92 | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines 88, 209, 233, 247 | Provision of new public right of way 98, 101, 103 | Installation of ground anchors 99, 103a | Installation of ground anchors Provision of access for utility works 108a | Provision of environmental mitigation Provision of access for utility works 153, 164, 251, 254, 256 | Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation 228 | Removal of utility apparatus 249 | Provision of new public right of way Provision of environmental mitigation 252 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation AP2-10 | Provision of access for maintenance Parish of Lea Marston | 1 to 4, 13, 16 | Diversion or installation of, or works to, utilities apparatus 12, 14 | Provision of environmental mitigation Provision of drainage and associated works 17, 24a, 26, 28 to 30, 32, 33, 35, 37, 41, 54, 55a, 59, 61, 65a, 71a, AP2-1, AP2-8 to AP2-12, AP2-17, AP2-18, AP2-25, AP4-1 to AP4-4 | Provision of environmental mitigation 18 | Provision of balancing pond and associated works and access for maintenance 44, 47, 49, AP2-23 | Provision of new public right of way 66 | Provision of new public right of way Provision of worksite and access for construction 67 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 72a, 72b, 73 | Provision of new vehicular right on existing public right of way 74a | Provision of environmental mitigation Provision of new public right of way 55b, 68b | Provision of environmental mitigation Minor highway alterations 78a, AP2-22 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of new public right of way Provision of environmental mitigation AP2-24 | Provision of new public right of way Parish of Kingsbury | 2, AP2-1, AP2-2 | Provision of environmental mitigation Parish of Middleton | 4, 108 | Provision of environmental mitigation Provision of flood mitigation measures 27, 37, 39, 47, 72 to 74, 87, 93, 95, 99, 101 to 103, 114, 115, 121, 125, 131a, 134a, 148, 160, 167, 175, AP2-6 to AP2-8, AP2-10b, AP2-18, AP2-21 | Provision of environmental mitigation 100, AP2-10a | Provision of environmental mitigation Provision of flood mitigation measures Provision of balancing pond and associated works and access for maintenance 21, 30, 32 | Diversion and installation of overhead electric lines 110, 169a | Provision of worksite and access for construction and maintenance Provision of environmental mitigation 5a, 13a, 31a, 127a, 135a, AP2-10, AP2-10c, AP2-20 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction and maintenance Provision of flood mitigation measures 38, 66 | Diversion or installation of, or works to, utilities apparatus 41 | Provision of flood mitigation measures 52 | Provision and renewal of railway systems for operational purposes and drainage 11a, 57, 58, 135b, 135c, 135d, 138a, 142a, 147a, 153a, 154a, 156a, 157a, 164a, 171a, 174, AP2-3, AP2-4, AP2-4a, AP2-11b | Provision of environmental mitigation Provision of worksite and access for construction AP2-9 | Provision of new public right of way 107 | Provision of environmental mitigation Provision of flood mitigation measures Provision of worksite and access for construction and maintenance 112, AP2-5 | Provision of balancing pond and associated works and access for maintenance 113 | Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction and maintenance 124, 129, AP2-5a | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation 128 | Provision of balancing pond and associated works and access for maintenance Provision of worksite and access for construction County of Staffordshire District of Lichfield Parish of Drayton Bassett | 2a, 3, 4a, 4b, 35, 38, 40, 43, 45, 46, 49, 52, 54, 55, 65, 75, 100, AP2-1, AP2-3, AP2-4 | Provision of environmental mitigation 28 | Diversion or installation of, or works to, utilities apparatus 7, 23, 29, 50, 86 | Diversion and installation of overhead electric lines 13a, AP4-1 | Provision of worksite and access for construction and maintenance 16 | Provision of worksite and access for construction 19a, AP2-6 | Provision of balancing pond and associated works and access for maintenance 22, 24 | Provision of environmental mitigation Provision of flood mitigation measures Provision of worksite and access for construction 30 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation 33 | Provision of environmental mitigation Provision of drainage and associated works 53, 92, 94, 102, AP2-7 | Provision of environmental mitigation Provision of worksite and access for construction 58, 59, 63, 68, 71, 80 | Provision of environmental mitigation Diversion and installation of overhead electric lines 93 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 99 | Provision of environmental mitigation Provision of new public right of way 106 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 109, 117, AP2-8 to AP2-10 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 114, AP2-2 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of worksite and access for construction Parish of Fazeley | 3, 6, 8 | Diversion and installation of overhead electric lines Parish of Hints with Canwell | 15, 17, 18, 87, 88, AP2-20 | Provision of worksite and access for construction and maintenance 20 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 21, 53, 59, 63, 68, 71a, 72, 74, 81, 122, 128, 141, 145, 147a, AP2-12, AP2-17 | Provision of environmental mitigation 23, 125, 129 | Diversion or installation of, or works to, utilities apparatus 24, 50, 62b, 73a, 76a, 77b, 77c, 77d, 84a, 84b, 110, 154 | Provision of environmental mitigation Provision of worksite and access for construction 25, 28 | Provision of worksite and access for construction Provision of environmental mitigation Diversion and installation of overhead electric lines 30, 33, 38, 45, 47, 48 | Diversion and installation of overhead electric lines 35 | Diversion and installation of overhead electric lines Provision of new public right of way Provision of worksite and access for construction Provision of environmental mitigation 37, 39 | Diversion and installation of overhead electric lines Provision of new public right of way 55a, 62a, 62c, 73b, 77a, AP2-9a, AP2-18, AP2-19 | Provision of environmental mitigation Provision of new public right of way Provision of worksite and access for construction 58, AP2-22, AP2-23, AP2-24a | Provision of drainage and associated works 61 | Implementation of woodland management measures 65, 143 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 70 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation 75a, 75b | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of new public right of way 78a, 78b, 96a | Provision of environmental mitigation Provision of flood mitigation measures 80 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 82a | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way Implementation of woodland management measures 86 | Provision of balancing pond and associated works and access for maintenance 94 | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 101 | Provision of environmental mitigation Provision of new public right of way Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 116 to 118, 123 | Provision of worksite and access for construction 131a | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction Provision of new public right of way 153, 155 | Provision of environmental mitigation Provision of drainage and associated works 157a, 159 | Provision of worksite and access for construction Provision of drainage and associated works Provision of environmental mitigation Parish of Weeford | 7, 24, 27 | Provision of environmental mitigation 12, 16, 21 | Provision of worksite and access for construction 14 | Provision of access for construction and maintenance 20 | Provision of environmental mitigation Provision of worksite and access for construction 22 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus AP1-5, AP1-8, AP1-10, AP1-11 | Diversion and installation of overhead electric lines AP2-1 | Provision of drainage and associated works Parish of Swinfen and Packington | 11, 16, 23 | Provision of environmental mitigation 11a, AP2-1, AP2-2 | Provision of drainage and associated works 12, 15, 29 | Provision of environmental mitigation Provision of worksite and access for construction 20 | Provision of environmental mitigation Provision of new public right of way 17a, 18a, 19, 22 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 33, 34, 42 | Provision of worksite and access for construction 36, 39 | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 37 | Diversion or installation of, or works to, utilities apparatus Parish of Whittington | 5, 17, 63, 67, AP2-25, AP2-26 | Diversion or installation of, or works to, utilities apparatus 19a, 20a, 23, 101a, AP2-2 to AP2-4 | Provision of environmental mitigation 92a, 92b, AP2-5, AP2-6 | Provision of environmental mitigation Provision of balancing pond and associated works and access for maintenance 28, 29, 31, 100a, 104a, 105a, 107, 112, 114a | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 32, 47, 48 | Implementation of woodland management measures 37, 41 | Implementation of woodland management measures Provision of new public right of way 42, 46 | Provision of environmental mitigation Provision of worksite and access for construction Implementation of woodland management measures 52, 54, 116a | Provision of worksite and access for construction and maintenance 58, 64, 66, 98a | Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 79, 91, AP2-28, AP2-29 | Provision of worksite and access for construction 81a | Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 25a | Provision of environmental mitigation Provision of access for maintenance AP2-10, AP2-11, AP2-38 | Diversion or installation of, or works to, utilities apparatus Provision of flood mitigation measures AP2-20 | Provision of drainage and associated works 94a | Provision of environmental mitigation Provision of drainage and associated works 103a | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Parish of Fradley and Streethay | AP2-1, AP2-21 | Provision of environmental mitigation AP2-24, AP2-30, AP2-36a, AP2-37, AP2-38, AP2-44, AP2-45, AP2-66, AP2-67, AP2-70, AP2-72, AP2-72a, AP2-76, AP2-80, AP2-82, AP2-106, AP2-134, AP2-135, AP2-135a, AP2-136, AP2-138 | Provision of worksite and access for construction AP2-22, AP2-46, AP2-47, AP2-50, AP2-51, AP2-52, AP2-53, AP2-55, AP2-59, AP2-60, AP2-65, AP2-83, AP2-85, AP2-87, AP2-88, AP2-90, AP2-92, AP2-93, AP2-98, AP2-100, AP2-104, AP2-105, AP2-107, AP2-109, AP2-110, AP2-111, AP2-114, AP2-116, AP2-128, AP2-129, AP2-130, AP2-131a, AP2-132, AP2-133, AP2-141, AP2-143, AP2-145, AP2-146, AP2-147, AP2-150, AP2-151, AP2-155, AP2-157 | Provision of environmental mitigation Provision of worksite and access for construction AP2-119, AP2-120, AP2-122 | Provision of environmental mitigation Provision of worksite and access for construction Provision of drainage and associated works AP2-61, AP2-62, AP2-64 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way AP2-40, AP2-43, AP2-68, AP2-71, AP2-163 | Provision and renewal of railway systems for operational purposes and drainage AP2-19, AP2-20, AP2-23 | Diversion or installation of, or works to, utilities apparatus AP2-16 | Provision of environmental mitigation Provision and renewal of railway systems for operational purposes and drainage Provision of drainage and associated works AP2-117 | Provision of new public right of way Parish of Curborough and Elmhurst | AP4-3 to AP4-7 | Diversion or installation of, or works to, utility apparatus Parish of Lichfield | AP4-3 | Diversion or installation of, or works to, utility apparatus Parish of Longdon | 4 to 6, 8 to 10, 13, 14 | Diversion and installation of overhead electric lines Parish of Kings Bromley | 1, 4 | Provision and renewal of railway systems for operational purposes and drainage 119, 160, 185, 186, 193a, 194, AP2-3, AP2-5, AP2-8, AP2-9, AP2-11 to AP2-13, AP2-27, AP2-28 | Provision of environmental mitigation Provision of worksite and access for construction 98, 100, 114a, 118a, 124a, 130a, AP2-17, AP2-41, AP2-46a | Provision of worksite and access for construction and maintenance AP2-54 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation Provision of worksite and access for construction AP2-33, AP2-35a, AP2-35b, AP2-35c | Provision of worksite and access for construction Provision of environmental mitigation Provision of drainage and associated works 52a, 52b, 121 | Provision of worksite and access for construction 165, AP2-52, AP2-52a, AP2-53 | Provision of environmental mitigation AP2-46b, AP2-46c | Provision of environmental mitigation Provision of drainage and associated works 61a, 78, 81, 146, AP2-7, AP2-40, AP4-2, AP4-3, AP4-5, AP4-6, AP4-8, AP4-9 | Diversion or installation of, or works to, utilities apparatus 62, 65, 140A, 192, 192b, AP1-1 to AP1-5, AP1-7, AP1-9 to AP1-12, AP2-39, AP2-43, AP2-44, AP4-1 | Diversion and installation of overhead electric lines 83, 90 | Diversion and installation of overhead electric lines Provision of environmental mitigation 85a, 86 | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 88 | Provision of access for construction 91, 195, 196 | Provision of drainage and associated works 95, 168, 187 | Provision of worksite and access for construction and maintenance Provision of environmental mitigation 102, AP2-35a | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus 128a | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus AP2-31a | Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 138, 139, 142 | Diversion or installation of, or works to, utilities apparatus Provision of worksite and access for construction 148 | Diversion or installation of, or works to, utilities apparatus Provision of environmental mitigation Provision of worksite and access for construction 161, 171 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way AP2-15, AP2-19, AP2-20a, AP2-21a, AP2-25 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 130b | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus Provision of drainage and associated works 140c | Diversion or installation of, or works to, utilities apparatus Diversion and installation of overhead electric lines Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Parish of Armitage with Handsacre | 1, 4 | Provision of worksite and access for construction 11, 14, 15 | Provision of worksite and access for construction Provision of drainage and associated works 18, 20, 24, AP2-1 to AP2-3 | Provision of worksite and access for construction and maintenance Parish of Colton | 10, 16, 17 | Provision and renewal of railway systems for operational purposes and drainage Borough of Stafford Parish of Colwich | 24, AP2-1 | Provision and renewal of railway systems for operational purposes and drainage Metropolitan Borough of Solihull Parish of Berkswell | 2a, 4, 28a, AP2-4 | Provision of environmental mitigation Provision of worksite and access for construction 6a, 6b, 8, 9, 10, 12, 17, 32c, 67, AP2-8, AP2-9 | Provision of worksite and access for construction 24, 26b, 47, 54, 71, 72 | Diversion and installation of overhead electric lines 31 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 35 | Provision of environmental mitigation Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utilities apparatus Provision of electricity supply system and access 36a, 36b | Provision of environmental mitigation Diversion or installation of, or works to, utilities apparatus 37 | Provision of electricity supply system and access 42, AP2-10, AP2-11 | Provision of environmental mitigation Provision of worksite and access for construction Provision of new public right of way 43 | Provision of environmental mitigation Provision of worksite and access for construction Installation of ground anchors 53 | Provision of new public right of way 55 | Provision of environmental mitigation Provision of drainage and associated works Provision of worksite and access for construction Provision of new public right of way 59 | Provision of worksite and access for construction Provision of new public right of way 60, 64 and 69 | Provision of drainage and associated works Provision of worksite and access for construction 63 | Provision of environmental mitigation Provision of drainage and associated works 32b, 127, 128, 134, 145, 164a, 165c, 209, AP2-14 | Provision of environmental mitigation 129, 136, 167, 168a, 168c, 169, 170, 172a, 174, 185, 186, 188, 191, 193, 205, 207, 216, 218, 219, 231, 236 | Provision of worksite and access for construction 130a, 142 | Provision and renewal of railway systems for operational purposes and drainage 143 | Provision of a worksite and access for construction and maintenance Provision of balancing pond and associated works and access for maintenance 140, 141, 162, 175, 206, 211, 220, 230 | Provision of worksite and access for construction and maintenance 147, 151, 152, 153, 155 | Provision of worksite and access for construction and maintenance Diversion or installation of, or works to, utility apparatus Provision of environmental mitigation 158 | Provision of flood mitigation measures Provision of worksite and access for construction and maintenance 172, 221, 222 | Provision of flood mitigation measures Provision of worksite and access for construction 195, 204, 208, 238 | Provision of environmental mitigation Provision of worksite and access for construction 223, 233 | Provision of balancing pond and associated works and access for maintenance Parish of Meriden | 3 | Provision of environmental mitigation Provision of worksite and access for construction Parish of Hampton-in-Arden | 1 | Provision of worksite and access for construction and maintenance Provision of new public right of way 2 | Provision of environmental mitigation 4, 6, AP2-6 | Provision of environmental mitigation Provision of worksite and access for construction 7, 15, 16, 16b, 17, 17b, 18, 27 to 29, 30a, 31a, 37b, 50a, 52, 54, 62, AP2-24 | Provision of worksite and access for construction 8, 26, 34, 45, 55 | Provision of balancing pond and associated works and access for maintenance 9 | Provision of drainage and associated works 16a, 17a, 18a, AP2-8, AP2-10, AP2-11 | Provision of worksite and access for construction Provision of flood mitigation measures 22 | Provision of worksite and access for construction and maintenance 24, 43 | Provision of a turning head 36, 41 | Provision of worksite and access for construction and maintenance Provision of balancing pond and associated works and access for maintenance 35, 42 | Provision of worksite and access for construction and maintenance Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 46a | Provision of balancing pond and associated works and access for maintenance Provision of new public right of way 47a | Provision of worksite and access for construction Diversion or installation of, or works to, utility apparatus 49 | Provision of flood mitigation measures 25b, 25c | Minor highway alterations 37a | Provision of balancing pond and associated works and access for maintenance Provision of drainage and associated works Provision of environmental mitigation 47b | Provision of worksite and access for construction Diversion of installation of or works to, utilities apparatus Provision of new public rights of way Provision of worksite and access for construction AP2-26 | Provision of drainage and associated works Parish of Bickenhill | 2, 3 | Provision of balancing pond and associated works and access for maintenance 6, 7, 10, 18, 22, 23, 29, 31, 32, 35, 46, 48, 57, 60, 61, 69, 71a, 74 to 76 | Provision of worksite and access for construction 37, 40, 41b, 62, 69a | Provision of worksite and access for construction Diversion and installation of overhead electric lines 41 | Provision of worksite and access for construction and maintenance Diversion and installation of overhead electric lines 12 | Provision of balancing pond and associated works and access for maintenance 11 | Provision of balancing pond and associated works and access for maintenance Minor highway alterations 42a, 42b, 42c, 57a, 57b, 57c | Provision and renewal of railway systems for operational purposes and drainage 58 | Diversion or installation of, or works to, utilities apparatus 71 | Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of balancing pond and associated works and access for maintenance 71b | Provision of environmental mitigation Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of balancing pond and associated works and access for maintenance 85 | Provision of environmental mitigation Diversion and installation of overhead electric lines Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 87 | Provision of environmental mitigation 90 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 88 | Provision of balancing pond and associated works and access for maintenance Diversion or installation of, or works to, utilities apparatus 91 | Diversion or installation of, or works to, utilities apparatus Reinstatement of businesses or facilities 91a | Reinstatement of businesses or facilities Parish of Dickens Heath | AP4-1 | Reinstatement of businesses or facilities Parish of Chelmsley Wood | 6 | Provision of worksite and access for construction and maintenance City of Birmingham | 1a | Diversion and installation of overhead electric lines 3a, 4b, 4c, AP2-11, AP2-12 | Provision of worksite and access for construction 5a | Provision of environmental mitigation 12 | Provision of environmental mitigation Provision of worksite and access for construction 8 | Provision of environmental mitigation Provision of worksite and access for construction Diversion or installation of, or works to, utilities apparatus 9 | Provision of environmental mitigation Provision of flood mitigation measures 9a and 9b | Provision of environmental mitigation Provision of flood mitigation measures Diversion and installation of overhead electric lines 13a, 15, 29, 32, 33 | Provision of environmental mitigation Provision of worksite and access for construction Provision of flood mitigation measures 14, 28 | Provision of environmental mitigation Provision of worksite and access for construction Diversion and installation of overhead electric lines Provision of flood mitigation measures 16, 31, 54 to 56, 69, 78, 157m, 157n, 157p, 157q, 157s, 159, 163, 194, 195, 196, 214 to 216, 218, 281, 282, 300h, 308, 315, 316, 320, 327, 328, 330, 353, 364, 385, 386, 401 | Provision of worksite and access for construction 23, 24, 27 | Provision of worksite and access for construction Diversion and installation of overhead electric lines 26 | Provision of environmental mitigation 41 | Provision of balancing pond and associated works and access for maintenance Provision of environmental mitigation 46, 151, 157r, 245, 264, 267, 300a, 300b, 300c, 478, 479 | Provision of worksite and access for construction Diversion or installation of, or works to, utility apparatus 63a, 63b, 63c, 63d, 63f, 63g, 63h, 63i, 63j, 63k, 85a, 85b, 85c, 85d, 85e, 85f, 85g, 85h, 85i, 85j, 85k, 87c, 87e, 87f, 87g, 87h, 87i, AP2-5, AP2-7, AP2-9, AP4-25 to AP4-28 | Reinstatement of businesses or facilities 67 | Provision of worksite and access for construction Provision and renewal of railway systems for operational purposes and drainage 102a, 102b, 102c, 102d, 157d, 157f, 157h, 157i, 157k, 246, 248, 251a, 251b, 251c, 251d, 251e, 251f, 251g, 251h, 251j, 251k, 251n, 261, 263, AP4-20 to AP4-22, AP4-24 | Diversion or installation of, or works to, utility apparatus 157c, 157e, 157g, 274a, 322, 355, 363, 376 | Provision and renewal of railway systems for operational purposes and drainage 223 | Provision of worksite and access for construction Provision of access for construction and maintenance 268 | Provision and renewal of railway systems for operational purposes and drainage Diversion or installation of, or works to, utility apparatus 269, 271 to 273, 324, 419 | Provision of worksite and access for construction Provision of balancing pond and associated works and access for maintenance 300d, 300e | Removal of utility apparatus 19, 304, 305, 306, 326, 326a | Provision of balancing pond and associated works and access for maintenance 332, 334, 339, 340, 345, 346, 360, 366, 379, 384, 387, 388, 395, AP4-30, AP4-31 | Provision of worksite and access for construction and maintenance 367, 368 | Provision and renewal of railway systems for operational purposes and drainage Provision of worksite and access for construction and maintenance 437 | Provision of worksite and access for construction Provision of a turning head 317 | Minor highway alterations City of Manchester | 1 to 6 | Modification to depot
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.