The M60/M62/M66 Simister Island Interchange Development Consent Order 2025
Write the words of this act the way you think they should read. Solon shows your change as a redline against the published text and pins it to that exact text, so it can never be applied to wording you did not see.
Change 1
SCHEDULE 4 PERMANENT STOPPING UP OF STREETS AND PUBLIC RIGHTS OF WAY
Article 15 PART 1 STREETS TO BE STOPPED UP AND FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED (1) Street to be stopped up | (2) Extent of stopping up M60 (eastbound) to M60 Junction 18 signalised junction | Existing section of 339 metres of public road, to be stopped up between points 2/1 to 2/B shown on Sheet 2 of the streets, rights of way and access plans M62 (westbound) to M60 (southbound) (via Junction 18) | Existing section of 252 metres of public road, to be stopped up between points 2/5 to 2/G shown on Sheet 2 of the streets, rights of way and access plans M66 (southbound) to M62 (eastbound) (via Junction 18) | Existing section of 661 metres of public road, to be stopped up between points 4/3 on Sheet 4 to point 2/C shown on Sheet 2 of the streets, rights of way and access plans PART 2 PUBLIC RIGHTS OF WAY TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDED (1) Public right of way to be stopped up | (2) Extent of stopping up | (3) New public right of way to be substituted or provided Footpath 28aPRE and 29aPRE, Simister/Heaton Park (Work No. 46) | 198 metres of Footpath PR2 to be stopped up shown on Sheet 3 of the streets, rights of way and access plans | 91 metres of footpath (174 metres including retained) between points 3/1 and 3/A on Sheet 3 of the streets, rights of way and access plans Footpath 9WHI, Simister (Work No. 40) | 757 metres of Footpath PR1 to be stopped up shown on Sheet 2 of the streets, rights of way and access plans | 673 metres of footpath (757 metres including retained) around the Northern Loop between point 4/4 on Sheet 4 and point 2/E shown on Sheet 2 of the streets, rights of way and access plans Footpath 7WHI, Unsworth (Work No. 47) | 60 metres of Footpath PR3 to be stopped up shown on Sheet 4 of the streets, rights of way and access plans | 91 metres of footpath (110 metres including retained) between points 4/2 and 4/B shown on sheet 4 of the streets, rights of way and access plans
SCHEDULE 4 PERMANENT STOPPING UP OF STREETS AND PUBLIC RIGHTS OF WAY
Article 15 PART 1 STREETS TO BE STOPPED UP AND FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED (1) Street to be stopped up | (2) Extent of stopping up M60 (eastbound) to M60 Junction 18 signalised junction | Existing section of 339 metres of public road, to be stopped up between points 2/1 to 2/B shown on Sheet 2 of the streets, rights of way and access plans M62 (westbound) to M60 (southbound) (via Junction 18) | Existing section of 252 metres of public road, to be stopped up between points 2/5 to 2/G shown on Sheet 2 of the streets, rights of way and access plans M66 (southbound) to M62 (eastbound) (via Junction 18) | Existing section of 661 metres of public road, to be stopped up between points 4/3 on Sheet 4 to point 2/C shown on Sheet 2 of the streets, rights of way and access plans PART 2 PUBLIC RIGHTS OF WAY TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDED (1) Public right of way to be stopped up | (2) Extent of stopping up | (3) New public right of way to be substituted or provided Footpath 28aPRE and 29aPRE, Simister/Heaton Park (Work No. 46) | 198 metres of Footpath PR2 to be stopped up shown on Sheet 3 of the streets, rights of way and access plans | 91 metres of footpath (174 metres including retained) between points 3/1 and 3/A on Sheet 3 of the streets, rights of way and access plans Footpath 9WHI, Simister (Work No. 40) | 757 metres of Footpath PR1 to be stopped up shown on Sheet 2 of the streets, rights of way and access plans | 673 metres of footpath (757 metres including retained) around the Northern Loop between point 4/4 on Sheet 4 and point 2/E shown on Sheet 2 of the streets, rights of way and access plans Footpath 7WHI, Unsworth (Work No. 47) | 60 metres of Footpath PR3 to be stopped up shown on Sheet 4 of the streets, rights of way and access plans | 91 metres of footpath (110 metres including retained) between points 4/2 and 4/B shown on sheet 4 of the streets, rights of way and access plans
One line that says what changes, such as "Halve the dog tax".
Who it helps, what it costs, what it fixes. It is what persuades people to support it.
How this law is officially changed
Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.
A proposal here is not law. Support on Solon is evidence that people want the change; the official route says what it takes to make it law.
Sign in to file your proposal. What you have written stays on this page.
Sign in to file itThink it through
Ask what your change would do, who would gain and who would bear a cost, and where something like it is already law. The assistant reads your draft as it stands, cites the law and the studies it finds, and takes no side. What you file stays yours.