The M4 Motorway (Prince of Wales Bridge) (Temporary Restriction and Prohibition of Traffic) Order 2024

United Kingdom · regulation

Ask the law about thisMore laws of United KingdomFor machines: Markdown

Open at the publisher →

In force since 2024-06-29, as the publisher states.

Copy read on 2026-11-10. The page it was read from

Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

sha256 fe7d2c043611317b53281edec88e7b176590d0806724abc48e7fedd507927829

Contents: 10 provisions
  1. Title and introductory text
  2. 1 Citation and commencement
  3. 2 Interpretation
  4. 3 Motorway restrictions
  5. 4 Motorway restrictions
  6. 5 Motorway restrictions
  7. 6 Motorway restrictions
  8. 7 Use of traffic signs to implement the motorway restrictions
  9. 8 Exemptions
  10. 9 Partial suspension of the Motorway Regulations

Proposed changes to this act

No one has proposed a change to this act yet.

How this law is officially changed

Solon does not know this law's official route yet. The proposal is recorded all the same, and the route appears here once its source is added.

10 provisions

Title and introductory text

2024 No. 759 Road Traffic, England The M4 Motorway (Prince of Wales Bridge) (Temporary Restriction and Prohibition of Traffic) Order 2024 Made 18th June 2024 Coming into force 29th June 2024 The Secretary of State for Transport, being the traffic authority for the Prince of Wales Bridge on the M4 motorway and in exercise of the powers conferred by sections 2(1) and (2)(a) and (b), 4 and 14(1)(a), (4) and (7) of the Road Traffic Regulation Act 1984, makes the following Order. In accordance with section 14(1)(a) of that Act, the Secretary of State is satisfied that traffic on the lengths of road specified in this Order should be restricted because works are proposed to be executed on the M4 motorway. The Secretary of State has also had regard to the existence of alternative routes suitable for the traffic which will be affected by this Order in accordance with section 14(3) of that Act.

Propose a change

1 Citation and commencement

This Order may be cited as the M4 Motorway (Prince of Wales Bridge) (Temporary Restriction and Prohibition of Traffic) Order 2024 and comes into force on 29th June 2024.

Propose a change

2 Interpretation

In this Order— “contraflow” means a part of a carriageway of a road where traffic is authorised to proceed in the opposite direction to the usual direction of traffic on that part; “fifth length of carriageway” means— the eastbound carriageway of the M4 motorway from a point 3340 metres east of the eastern edge of Station Road overbridge to a point 192 metres west of the centre line of junction 22 of the M4 motorway; and the westbound carriageway of the M4 motorway from a point 192 metres west of the centre line of junction 22 of the M4 motorway to a point 740 metres east of the centre line of the bridge over the rail line to Severn Tunnel Junction; “first length of carriageway” means the eastbound carriageway of the M4 motorway from a point 1000 metres east of the eastern edge of Station Road overbridge to a point 2000 metres east of Station Road overbridge; “first works period” means each period of 9 hours starting at 21:00 hours on each day during the works period; “fourth length of carriageway” means the westbound carriageway of the M4 motorway from a point 192 metres west of the centre line of junction 22 of the M4 motorway to a point 740 metres east of the centre line of the bridge over the rail line to Severn Tunnel Junction; “hard shoulder” means the hard shoulder within the meaning of regulation 3(1)(e) of the Motorway Regulations, which is adjacent to the fifth length of carriageway; “Motorway Regulations” means the Motorways Traffic (England and Wales) Regulations 1982; “outside lane” means the right hand or off side lane of a carriageway with 2 or more lanes; “overall width” has the meaning given in regulation 3(2) of the Road Vehicles (Construction and Use) Regulations 1986; “second length of carriageway” means— the eastbound carriageway of the M4 motorway from a point 2000 metres east of the eastern edge of Station Road overbridge to a point 192 metres west of the centre line of junction 22 of the M4 motorway; and the westbound carriageway of the M4 motorway from a point 192 metres west of the centre line of junction 22 of the M4 motorway to a point 740 metres east of the centre line of the bridge over the rail line to Severn Tunnel Junction; “second works period” means each period of 10 hours starting at 20:00 hours on each day during the works period; “third length of carriageway” means the eastbound carriageway of the M4 motorway from a point 740 metres east of the centre line of the bridge over the rail line to Severn Tunnel Junction to a point 192 metres west of the centre line of junction 22 of the M4 motorway; “works” means bridge deck repairs and associated maintenance; “works period” means the period starting at 01:00 hours on Monday 1st July 2024 and ending when the works have been completed or after 18 months, whichever is sooner.

Propose a change

3 Motorway restrictions

Subject to Article 7 and Article 8 no person may, during the works period— (a) cause or permit any vehicle to be driven at a speed exceeding 50 miles per hour on the first length of carriageway; (b) cause or permit any vehicle to be driven at a speed exceeding 40 miles per hour on the second length of carriageway; (c) cause or permit any vehicle with an overall width exceeding 2.75 metres to enter or proceed in the outside lane of the second length of carriageway; (d) cause or permit any vehicle with an overall width exceeding 3.25 metres to enter or proceed in the second length of carriageway.

Propose a change

4 Motorway restrictions

Subject to Article 7 and Article 8 during the works period a contraflow will be in operation on the second length of carriageway and no person may cause or permit any vehicle to enter or proceed in— (a) the outside lane of the eastbound carriageway in any direction other than westbound; (b) the outside lane of the westbound carriageway in any direction other than eastbound.

Propose a change

5 Motorway restrictions

Subject to Article 7 and Article 8, no person may, during any first works period, cause or permit any vehicle to enter or proceed in the third length of carriageway.

Propose a change

6 Motorway restrictions

Subject to Article 7 and Article 8, no person may, during any second works period, cause or permit any vehicle to enter or proceed in the fourth length of carriageway.

Propose a change

7 Use of traffic signs to implement the motorway restrictions

Articles 3, 4, 5, 6 and 9 apply only at such times and to such extent as indicated from time to time by traffic signs.

Propose a change

8 Exemptions

The provisions of— (a) Articles 3, 4, 5 and 6 do not apply to a vehicle— (i) being used for police, ambulance, fire and rescue authority emergency response purposes; or (ii) proceeding at the direction of, or with the permission of, a police constable; (b) Article 3 does not apply to vehicles falling within regulation 3(4) of the Road Traffic Exemptions (Special Forces) (Variation and Amendment) Regulations 2011 where a vehicle is used in accordance with regulation 3(5) of those Regulations; (c) Articles 5 and 6 do not apply to any vehicle— (i) being used in connection with the works; (ii) being driven by, or at the direction of, a traffic officer in uniform; or (iii) being used for winter maintenance purposes.

Propose a change

9 Partial suspension of the Motorway Regulations

Subject to Article 7, regulation 5 of the Motorway Regulations and, in so far as it relates to a vehicle being driven, regulation 9 of the Motorway Regulations are suspended during the works period in relation to the hard shoulder.