1 Citation, commencement and interpretation
(1) This Order may be cited as the West Burton Solar Project (Correction) Order 2025 and comes into force on 4th June 2025.
(2) In this Order, “the 2025 Order” means the West Burton Solar Project Order 2025.
Propose a change2 Corrections
(1) The 2025 Order is corrected in accordance with paragraphs (2) and (3).
(2) The Table in Schedule 1 (corrections) to this Order sets out the corrections, in which—
(a) column 1 sets out where the correction is to be made;
(b) column 2 sets out how the correction is to be made; and
(c) column 3 sets out the text which is to be substituted, inserted or omitted.
(3) For the table in Part 3 of Schedule 6 to the 2025 Order (temporary prohibition or restriction of the use of streets) substitute the table set out in Schedule 2 (table to be substituted for the table in Part 3 of Schedule 6 to the 2025 Order) to this Order.
Propose a changeSCHEDULE 1 CORRECTIONS
Article 2(2)
Column (1) Where the correction is made | Column (2) How correction is made | Column (3) Text substituted, inserted or omitted
Article 2(1) (interpretation), definition of “date of decommissioning” | For “phase” substitute | “part”
Omit | “as approved under requirement 2 of Schedule 2 (requirements)”
Article 2(1), definition of “date of final commissioning” | For “approved” substitute | “submitted”
Article 2 (interpretation) | In paragraph (3) for “includes” substitute | “include”
Article 23 (private rights) | In Paragraph (1)(a), after “agreement”, insert | “or through the grant of a lease of the land by agreement”
In paragraph (1)(a), before the final “or”, insert | “;”
Article 31 (statutory undertakers) | In sub-paragraph (b), after “remove” insert | “, relocate the rights of”
Article 38 (felling or lopping of trees and removal of hedgerows) | In paragraph (1), before sub-paragraph (a), insert | “(a) obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development;”
In paragraph (2), for “paragraph (2)” substitute | “paragraph (3)”
In paragraph (4), for “paragraph (2)” substitute | “paragraph (3)”
Schedule 2 (requirements), paragraph 1 (interpretation), (definition) of “relevant planning authority” | In sub-paragraph (a), omit | paragraph (vi)
In sub-paragraph (b)(viii), for “Requirement 1”, substitute | “Requirement 14”
Schedule 2, paragraph 4 (community liaison group) | In sub-paragraph (3), for “approved” substitute | “submitted”
Schedule 2, paragraph 7 (landscape and ecological management plan) | In sub-paragraph (4), for “2(1)(h)” substitute | “(h)”
In sub-paragraph (4), after “permitted preliminary works”, insert | “as defined in article 2(1)”
Schedule 2, paragraph 12 (archaeology) | In sub-paragraph (1)(c), for “improved” substitute | “approved”
In sub-paragraph (2), for “sub-paragraph 1(c)”, substitute | “sub-paragraph (1)(c)”
Schedule 2, paragraph 17 (permissive path) | In sub-paragraph (2), for “365” substitute | “364”
Schedule 2, paragraph 21 (decommissioning and restoration) | In sub-paragraph (1), omit | “as approved under requirement 2 of schedule 2 (requirements)”
Schedule 2, paragraph 22 (long term flood risk mitigation) | In sub-paragraph (1), for “following consultation”, substitute | “in consultation”
Schedule 13 (documents and plans to be certified), Part 1 (documents and plans), row 2 (“book of reference”) | In column (2) (document reference), for “DEC/WB4.3”, substitute | “EN010132/DEC/WB4.3”
Schedule 13, Part 1, row 6 (“environmental statement appendix 9.12 biodiversity net gain report”) | Omit | the entire row
Schedule 13, Part 1, row 7 (“figure 8.18.3 landscape and ecological mitigation and enhancement measures West Burton 3 (Revision B)”) | Omit | the entire row
Schedule 13, Part 1, row 11 (“outline construction traffic management plan”) | In column (2) (document reference) for “EN010132/EX4/WB6.14.2”, substitute | “EN010132/EX7/WB6.3.14.2”
Schedule 13, Part 1, row 13 (“outline decommissioning statement”) | In column (2) (document reference), for “EN10132/EX6/WB7.14” , substitute | “EN010132/DEC/WB7.2”
In column (3) (revision number), for “B”, substitute | “C”
In column (4) (date), for “April 2024”, substitute | “October 2024”
Schedule 13, Part 1, row 17 (“outline operational environmental management plan”) | In column (2) (document reference), for “EN01032/EX5/WB7.14“, substitute | “EN010132/DEC/WB7.14”
In column (3) (revision number), for “D”, substitute | “E”
In column (4), for “April 2024”, substitute | “October 2024”
Schedule 13, Part 2 (substitute and supplementary documents), row 8 (technical note on cumulative effects of additional schemes) | In column (5) (examination library reference), for “[TBC]”, substitute | “[REP7-016]”
Schedule 13, Part 2 | At the end of the table, insert a new row, and in column (1) (originating document), insert | “Environmental Statement”
in column (2) (replacement or supplementary part), insert | “Environmental statement appendix 9.12 biodiversity net gain report”
in column (3) (document reference), insert | “EN010132/DEC/WB6.3.9.12_A”
in column 4 (date), insert | “November 2024”
in column (5) (examination library reference), insert | “N/A”
Schedule 13, Part 2 | At the end of the table, insert a new row, and in column (1) (originating document), insert | “Environmental Statement”
in column (2) (replacement or supplementary part), insert | “Figure 8.18.3: Landscape and Ecology Mitigation and Enhancement Measures West Burton 3”
in column (3) (document reference), insert | “EN10132/DEC/6.4.8.18.3_B”
in column (4) (date), insert | “October 2024”
in column (5) (examination library reference), insert | “N/A”
Schedule 15 (protective provisions), Part 3 (for the protection of National Grid Electricity Transmission Plc as electricity undertaker), paragraph 33 (notices) | For “article”, substitute | “article 44”
Schedule 15, Part 14 (for the protection of Uniper UK Limited), paragraph 192 (retained apparatus) | For “paragraph, 200”, substitute | “paragraph 200”
Schedule 15, Part 17 (for the protection of Tillbridge Solar Project Limited), paragraph 220 | For ““Tillbridge Work No. [ ] Area” means the area for Work No. [ ] authorised in the Tillbridge Solar Order;”, substitute | “Tillbridge Work No. 4E” means the area for Work No. 4E authorised in the Tillbridge Solar Order;”
Schedule 15, Part 17 (for the protection of Tillbridge Solar Project Limited) | For “Tillbridge Work No. [] Area”, in each place it occurs, substitute | “Tillbridge Work No. 4E”
Schedule 15, Part 18 – For the Protection of EDF Energy (Thermal Generation) Limited, paragraph 240 (acquisition of land) | In sub-paragraph (1), in both places it appears, for “order”, substitute | “Order”
In sub-paragraph (1), for “or the interest”, substitute | “other interest”
In sub-paragraph (1), for “done”, substitute | “than”
In sub-paragraph (1), at the end, insert | “such agreement not to be unreasonably withheld”
Schedule 15, Part 18 – For the Protection of EDF Energy (Thermal Generation) Limited, paragraph 250 (notices) | For “article”, substitute | “article 44”